Attach_L-1_MPS_without_Cost_POD_MP,_W912BV18R0036.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- W912BV18R0036
About this file
Attachment L-1 Milestone Payment Schedule without Cost for Solicitation No. W912BV18R0036, Master Planning Services within the Pacific Ocean Division (POD).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd__0002_Solicitation__W912BV18R0036_MP_within_POD.pdf | ||
| Amd__0002_Attach_L-2_MPS_with_Cost_POD_MP_27_Aug_2018.xlsx | XLSX spreadsheet | |
| Amd__0001_Attach_L-1_MPS_without_Cost_POD_MP_21_Aug_2018.xlsx | XLSX spreadsheet | |
| Amd__0001_Attach_L-2_MPS_with_Cost_POD_MP_21_Aug_2018.xlsx | XLSX spreadsheet | |
| Amd__0001_Solicitation__W912BV18R0036_MP_within_POD.pdf | ||
| Attach_L-2_MPS_with_Cost_POD_MP,_W912BV18R0036.xlsx | XLSX spreadsheet | |
| Solicitation__W912BV18R0036_Master_Planning_Svcs_for_POD.pdf | ||
| AMRDEC_Users_Guide.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT L-1 |
| MILESTONE PAYMENT SCHEDULE WITHOUT COST |
| MILITARY MASTER PLANNING SERVICES WITHIN |
THE PACIFIC OCEAN DIVISION (POD)
Solicitation: W912BV-18-R-0036
Contract #TBD
7 August 2018
NOTES: 1) Offerors shall complete and return this Excel Attachment L-1 version or the Word version with their Volume II; 2) this document is formatted and protected, allowing the required information to be entered in the green cells ONLY; 3) Alternate milestones may not be proposed.
| CLIN | MILESTONE DESCRIPTION | Expiration Date to Exercise Option | Projected Schedule Start Date (MM/DD/YR) | Projected Completion Date (MM/DD/YR) |
| TASK 1 |
KICK-OFF MEETING, PLANS AND PROGRESS REPORTS
| 0001 | Task 1.1, PWS Section 7.1.1 | |
| Contract Kick-Off Meeting via teleconference within 21 calendar days of contract award | At Award | |
| 0002 | Task 1.2, PWS Section 7.1.2 | |
| Project Management Plan (PMP) | At Award | |
| 0003 | Monthly Progress Reports | |
| 0003AA | Task 1.4, PWS Section 7.1.3 | |
| Monthly Progress Reports, Base Period of Performance | At Award | |
| 0003AB | ||
| Option 1 | Task 1.5, PWS Section 7.1.3.1 | |
| Monthly Progress Reports, Option Period of Performance | 2 years after contract award | |
| 0004 | Task 1.6, PWS Section 7.1.4 | |
| Quality Assurance/Quality Control (QA/QC) Plan | At Award |
TASK 2
JOINT BASE ELMENDORF-RICHARDSON (JBER), ALASKA
FLIGHTLINE MASTER PLAN
| 0005 | Task 2.1, PWS Section 7.2.3 | |
| Installation Kick-off Meeting (On-site) | At Award | |
| 0006 | Task 2.2 |
Airfield Area Development Plan (ADP) 0006AA Task 2.2, PWS Sections 7.2.4.1 and 7.2.4.2 Data Collection and Analysis
AND
Task 2.2, PWS Section 7.2.4.2
| Planning Workshop | At Award | |
| 0006AB | Task 2.2, PWS Section 7.2.4.3 |
Draft JBER ADP
AND
Task 2.2, PWS Section 7.2.4.4
| Draft ADP On-site Review | At Award | |
| 0006AC | Task 2.2, PWS Section 7.2.4.5 |
Pre-final ADP
AND
Task 2.2, PWS Section 7.2.4.6
| Final JBER ADP | At Award |
| 0007 | |
| Option 2 | Task 2.3 |
Area Development Execution Plan (ADEP)
| 0007AA | |
| Option 2 | Task 2.3, PWS Section 7.2.5.1 |
| Data Collection and Workshop | 2 years after contract award |
| 0007AB | |
| Option 2 | Task 2.3, PWS Section 7.2.5.2 |
| Draft ADEP Report | 2 years after contract award |
| 0007AC | |
| Option 2 | Task 2.3, PWS Section 7.2.5.3 |
Pre-final ADEP Report
AND
Task 2.3, PWS Section 7.2.5.4 Final ADEP Report 2 years after contract award
TASK 3
ARMY BUNKERS AT KEDENA AIR FORCE BASE-OKINAWA, JAPAN
MASTER PLAN SUPPORT
| 0008 | Task 3.1, PWS Section 7.3.2 | |
| Installation Kick-off Meeting (Virtual) | At Award | |
| 0009 | Task 3.2 |
Facility Condition Assessments (FCA) for Category Code 422 of Munitions Storage Facilities (MSF)
| 0009AA | Data Collection and On-site Survey | At Award | |
| 0009AB | FCA BUILDER Draft Reports | At Award | |
| 0009AC | FCA BUILDER Final Reports | At Award | |
| 0010 | |||
| Option 3 | Task 3.3 |
Nodal Development Plan (NDP)
| 0010AA | |
| Option 3 | Task 3.3, PWS Section 7.3.4.1 |
Data Collection and Analysis
AND
Task 3.3., PWS Section 7.3.4.2
| On-site NDP Workshop | 2 years after contract award |
| 0010AB | |
| Option 3 | Task 3.3, PWS Section 7.3.4.3 |
NDP Draft Report
AND
Task 3.3., PWS Section 7.3.4.4
| NDP Pre-final Report | 2 years after contract award |
| 0010AC | |
| Option 3 | Task 3.3., PWS Section 7.3.4.5 |
| NDP Final Report | 2 years after contract award |
| 0011 | |
| Option 4 | Task 3.4 |
Nodal Development Execution Plan (NDEP)
| 0011AA | |
| Option 4 | Task 3.4, PWS Section 7.3.5.1 |
Data Collection and Workshop Preparation
AND
Task 3.4, PWS Section 7.3.5.2
| NDEP Planning Workshop | 2 years after contract award |
| 0011AB | |
| Option 4 | Task 3.4, PWS Section 7.3.5.3 |
| NDEP Draft Report | 2 years after contract award |
| 0011AC | |
| Option 4 | Task 3.4., PWS Section 7.3.5.6 |
| NDEP Pre-final Report | 2 years after contract award |
| 0011AD | |
| Option 4 | Task 3.4., PWS Section 7.3.5.7 |
| NDEP Final Report | 2 years after contract award |
| 0012 | |
| Option 5 | Task 3.5 |
Storm Water Management Plan (SWMP)
| 0012AA | |
| Option 5 | Task 3.5, PWS Section 7.3.6.1 |
Data Collection
AND
Task 3.5, PWS Section 7.3.6.2
| Planning Workshop | 2 years after contract award |
| 0012AB | |
| Option 5 | Task 3.5, PWS Section 7.3.6.3 |
Draft SWMP
AND
Task 3.5., PWS Section 7.3.6.4
| Pre-final SWMP | 2 years after contract award |
| 0012AC | |
| Option 5 | Task 3.5., PWS Section 7.3.6.5 |
| Final SWMP | 2 years after contract award |
| 0013 | |
| Option 6 | Task 3.6, PWS Section 7.3.7 |
Planning Charrette (PC) for Project Number (PN) #1
| 0013AA | |
| Option 6 | Task 3.6, PWS Section 7.3.7.1 |
| PC Workshop Preparation | 2 years after contract award |
| 0013AB | |
| Option 6 | Task 3.6, PWS Section 7.3.7.2 |
Submit PC Workshop In-brief Presentation and Agenda
AND
Task 3.6, PWS Section 7.3.7.3
| Conduct PC Workshop | 2 years after contract award |
| 0013AC | |
| Option 6 | Task 3.6, PWS Section 7.3.7.5 |
| Draft DD Form 1391 | 2 years after contract award |
| 0013AD | |
| Option 6 | Task 3.6, PWS Section 7.3.7.6 |
| Final DD Form 1391 | 2 years after contract award |
| 0014 | |
| Option 7 | Task 3.7 |
Planning Charrette (PC) for Project Number (PN) #2
| 0014AA | |
| Option 7 | Task 3.7 |
PC Workshop Preparation
| (Reference PWS Section 7.3.7.1 requirements) | 2 years after contract award |
| 0014AB | |
| Option 7 | Task 3.7 |
Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.3.7.2 requirements)
AND
Task 3.7 Conduct PC Workshop
| (Reference PWS Section 7.3.7.3 requirements) | 2 years after contract award |
| 0014AC | |
| Option 7 | Task 3.7 |
Draft DD Form 1391
| (Reference PWS Section 7.3.7.5 requirements) | 2 years after contract award |
| 0014AD | |
| Option 7 | Task 3.7 |
Final DD Form 1391
| (Reference PWS Section 7.3.7.6 requirements) | 2 years after contract award |
| 0015 | |
| Option 8 | Task 3.8 |
Planning Charrette (PC) for Project Number (PN) #3
| 0015AA | |
| Option 8 | Task 3.8 |
PC Workshop Preparation
| (Reference PWS Section 7.3.7.1 requirements) | 2 years after contract award |
| 0015AB | |
| Option 8 | Task 3.8 |
Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.3.7.2 requirements)
AND
Task 3.8 Conduct PC Workshop
| (Reference PWS Section 7.3.7.3 requirements) | 2 years after contract award |
| 0015AC | |
| Option 8 | Task 3.8 |
Draft DD Form 1391
| (Reference PWS Section 7.3.7.5 requirements) | 2 years after contract award |
| 0015AD | |
| Option 8 | Task 3.8 |
Final DD Form 1391
| (Reference PWS Section 7.3.7.6 requirements) | 2 years after contract award |
| 0016 | |
| Option 9 | Task 3.9 |
Planning Charrette (PC) for Project Number (PN) #4
| 0016AA | |
| Option 9 | Task 3.9 |
PC Workshop Preparation
| (Reference PWS Section 7.3.7.1 requirements) | 2 years after contract award |
| 0016AB | |
| Option 9 | Task 3.9 |
Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.3.7.2 requirements)
AND
Task 3.9 Conduct PC Workshop
| (Reference PWS Section 7.3.7.3) | 2 years after contract award |
| 0016AC | |
| Option 9 | Task 3.9 |
Draft DD Form 1391
| (Reference PWS Section 7.3.7.5 requirements) | 2 years after contract award |
| 0016AD | |
| Option 9 | Task 3.9 |
Final DD Form 1391
| (Reference PWS Section 7.3.7.6 requirements) | 2 years after contract award |
| 0017 | |
| Option 10 | Task 3.10 |
Planning Charrette (PC) for Project Number (PN) #5
| 0017AA | |
| Option 10 | Task 3.10 |
PC Workshop Preparation
| (Reference PWS Section 7.3.7.1 requirements) | 2 years after contract award |
| 0017AB | |
| Option 10 | Task 3.10 |
Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.3.7.2 requirements)
AND
Task 3.10 Reference PWS Section 7.3.7.3
| Conduct PC Workshop | 2 years after contract award |
| 0017AC | |
| Option 10 | Task 3.10 |
Draft DD Form 1391
| (Reference PWS Section 7.3.7.5 requirements) | 2 years after contract award |
| 0017AD | |
| Option 10 | Task 3.10 |
Final DD Form 1391 (Reference PWS Section 7.3.7.6 requirements) 2 years after contract award
TASK 4
7th AIR FORCE COMMUNITY PLANNIG LIAISON OFFICE (CPLO) PROGRAM SUPPORT-South Korea
| 0018 | |
| Option 11 | Task 4.1, PWS Section 7.4.3 |
| Installation Kick-off Meeting (Virtual) | 2 years after contract award |
| 0019 | |
| Option 12 | Task 4.2, PWS Section 7.4.4 |
| Community Planning and Liaison Office (CPLO) Program Support, Option Year 1 | 2 years after contract award |
| 0020 | |
| Option 13 | Task 4.3, PWS Section 7.4.5 |
Community Planning and Liaison Office (CPLO) Program Support
| Option Year 2 | 1 year after award of Task 4.2 |
| 0021 | |
| Option 14 | Task 4.4, PWS Section 7.4.6 |
Community Planning and Liaison Office (CPLO) Program Support
| Option Year 3 | 1 year after award of Task 4.3 |
| 0022 | |
| Option 15 | Task 4.5, PWS Section 7.4.7 |
Community Planning and Liaison Office (CPLO) Program Support
| Option Year 4 | 1 year after award of Task 4.4 |
| 0023 | |
| Option 16 | Task 4.6, PWS Section 7.4.8 |
Community Planning and Liaison Office (CPLO) Program Support Option Year 5 1 year after award of Task 4.5, but no later than 4 years after contract award
TASK 5
CAMP ZAMA MILITARY FAMILY HOUSING (MFH) PLANNING AND PROGRAM SUPPORT-JAPAN
| 0024 | |
| Option 17 | Task 5.1, PWS Section 7.5.2 |
| Installation Kick-off Meeting (Virtual) | 2 years after contract award |
| 0025 | |
| Option 18 | Task 5.2 |
Future Year Development Program (FYDP) with DD Form 1391/Form 22 Preparation
| 0025AA | |
| Option 18 | Task 5.2, PWS Section 7.5.3.1 |
| Draft FYDP Program Development Plan | 2 years after contract award |
| 0025AB | |
| Option 18 | Task 5.2, PWS Section 7.5.3.2 |
| Final FYDP Program Development Plan | 2 years after contract award |
| 0026 | |
| Option 19 | Task 5.3 |
Programming Planning Charrette Workshops for Project Numbers 1 through 5
| 0026AA | |
| Option 19 | Task 5.3, PWS Section 7.5.4.1 |
| PC Workshops Preparation | 2 years after contract award |
| 0026AB | |
| Option 19 | Task 5.3, PWS Section 7.5.4.2 |
| Conduct PC Workshops | 2 years after contract award |
| 0026AC | |
| Option 19 | Task 5.3, PWS Section 7.5.4.3 |
| Draft DD Form 1391 or Form 22 | 2 years after contract award |
| 0026AD | |
| Option 19 | Task 5.3, PWS Section 7.5.4.4 |
| Final DD Form 1391 or Form 22 | 2 years after contract award |
| 0027 | |
| Option 20 | Task 5.4, PWS Section 7.5.5 |
1st Customer Concept Documents (CCD) for 1 MFH Unit/Facility
| 0027AA | |
| Option 20 | Task 5.4, PWS Section 7.5.5.1 |
Data Collection and Information Review
AND
Task 5.4, PWS Section 7.5.5.2
| CCD Workshop (On-site) | 2 years after contract award |
| 0027AB | |
| Option 20 | Task 5.4, PWS Section 7.5.5.3 |
| Draft CCD Report | 2 years after contract award |
| 0027AC | |
| Option 20 | Task 5.4, PWS Section 7.5.5.4 |
| Pre-final CCD Report | 2 years after contract award |
| 0027AD | |
| Option 20 | Task 5.4, PWS Section 7.5.5.5 |
Pre-final CCD Review Meeting
AND
Task 5.4, PWS Section 7.5.5.6
| Final CCD Report | 2 years after contract award |
| 0028 | |
| Option 21 | Task 5.5 |
2nd Customer Concept Documents (CCD) for 1 MFH Unit/Facility
| 0028AA | |
| Option 21 | Task 5.5 |
Reference PWS Section 7.5.5.1 Data Collection and Information Review
AND
Task 5.5 Reference PWS Section 7.5.5.2
| CCD Workshop (On-site) | 2 years after contract award |
| 0028AB | |
| Option 21 | Task 5.5 |
Reference PWS Section 7.5.5.3
| Draft CCD Report | 2 years after contract award |
| 0028AC | |
| Option 21 | Task 5.5 |
Reference PWS Section 7.5.5.4
| Pre-final CCD Report | 2 years after contract award |
| 0028AD | |
| Option 21 | Task 5.5 |
Reference PWS Section 7.5.5.5 Pre-final CCD Review Meeting
AND
Task 5.5 Reference PWS Section 7.5.5.6 Final CCD Report 2 years after contract award
TASK 6
MARINE CORPS AIR STATION IWAKUNI (MCASI), JAPAN
REAL PROPERTY AND MASTER PLANNING SUPPORT
| 0029 | |
| Option 22 | Task 6.1, PWS Section 7.6.3 |
| Installation Kick-off Meeting (Virtual) | 2 years after contract award |
| 0030 | |
| Option 23 | Task 6.2, PWS Section 7.6.4 |
FIAR Bi-annual Records Maintenance, 150 Records Annually Option Year 1
| 0030AA | |
| Option 23 | Task 6.2, PWS Section 7.6.4.1 |
| Real Property Record Maintenance | 2 years after contract award |
| 0030AB | |
| Option 23 | Task 6.2, PWS Section 7.6.4.2 |
| Real Property Updates/Creation: Draft Submission | 2 years after contract award |
| 0030AC | |
| Option 23 | Task 6.2, PWS Section 7.6.4.3 |
| Property Record Card Creation Final Submission and iNFADS Upload | 2 years after contract award |
| 0031 | |
| Option 24 | Task 6.3, PWS Section 7.6.5 |
FIAR Bi-annual Records Maintenance, 150 Records Annually Option Year 2
| 0031AA | |
| Option 24 | Task 6.3 |
Reference PWS Section 7.6.4.1
| Real Property Record Maintenance | 2 years after contract award |
| 0031AB | |
| Option 24 | Task 6.3 |
Reference PWS Section 7.6.4.2
| Real Property Updates/Creation: Draft Submission | 2 years after contract award |
| 0031AC | |
| Option 24 | Task 6.3 |
Reference PWS Section 7.6.4.3
| Property Record Card Creation Final Submission and iNFADS Upload | 2 years after contract award |
| 0032 | |
| Option 25 | Task 6.4, PWS Section 7.6.6 |
FIAR Bi-annual Records Maintenance, 150 Records Annually Option Year 3
| 0032AA | |
| Option 25 | Task 6.4 |
Reference PWS Section 7.6.4.1
| Real Property Record Maintenance | 2 years after contract award |
| 0032AB | |
| Option 25 | Task 6.4 |
Reference PWS Section 7.6.4.2
| Real Property Updates/Creation: Draft Submission | 2 years after contract award |
| 0032AC | |
| Option 25 | Task 6.4 |
Reference PWS Section 7.6.4.3
| Property Record Card Creation Final Submission and iNFADS Upload | 2 years after contract award |
| 0033 | |
| Option 26 | Task 6.5, PWS Section 7.6.7 |
| GIS Map Viewer Technical Support Services | 2 years after contract award |
| 0034 | |
| Option 27 | Task 6.6 |
GIS Program Support Option Year 1
| 0034AA | |
| Option 27 | Task 6.6, PWS Section 7.6.8.1 |
| GIS Program Management and Planning Support | 2 years after contract award |
| 0034AB | |
| Option 27 | Task 6.6, PWS Section 7.6.8.2 |
| GIS Data Management Support | 2 years after contract award |
| 0034AC | |
| Option 27 | Task 6.6, PWS Section 7.6.8.3 |
| GIS Visualization Support | 2 years after contract award |
| 0034AD | |
| Option 27 | Task 6.6, PWS Section 7.6.8.4 |
| Geospatial Analysis Support | 2 years after contract award |
| 0035 | |
| Option 28 | Task 6.7, PWS Section 7.6.9 |
GIS Program Support Option Year 2
| 0035AA | |
| Option 28 | Task 6.7 |
Reference PWS Section 7.6.8.1
| GIS Program Management and Planning Support | 1 year after award of Task 6.6 |
| 0035AB | |
| Option 28 | Task 6.7 |
Reference PWS Section 7.6.8.2
| GIS Data Management Support | 1 year after award of Task 6.6 |
| 0035AC | |
| Option 28 | Task 6.7 |
Reference PWS Section 7.6.8.3
| GIS Visualization Support | 1 year after award of Task 6.6 |
| 0035AD | |
| Option 28 | Task 6.7 |
Reference PWS Section 7.6.8.4
| Geospatial Analysis Support | 1 year after award of Task 6.6 |
| 0036 | |
| Option 29 | Task 6.8, PWS Section 7.6.10 |
GIS Program Support Option Year 3
| 0036AA | |
| Option 29 | Task 6.8 |
Reference PWS Section 7.6.8.1
| GIS Program Management and Planning Support | 1 year after award of Task 6.7 |
| 0036AB | |
| Option 29 | Task 6.8 |
Reference PWS Section 7.6.8.2
| GIS Data Management Support | 1 year after award of Task 6.7 |
| 0036AC | |
| Option 29 | Task 6.8 |
Reference PWS Section 7.6.8.3
| GIS Visualization Support | 1 year after award of Task 6.7 |
| 0036AD | |
| Option 29 | Task 6.8 |
Reference PWS Section 7.6.8.4
| Geospatial Analysis Support | 1 year after award of Task 6.7 |
| 0037 | |
| Option 30 | Task 6.9 |
1st Set of BFRs for 20 Category Codes (PWS Table 5 – List of 1st Set of BRFs)
| 0037AA | |
| Option 30 | Task 6.9, PWS Section 7.6.11.1 |
| Data Collection and Coordination | 2 years after contract award |
| 0037AB | |
| Option 30 | Task 6.9, PWS Section 7.6.11.2 |
| BFR Draft Report | 2 years after contract award |
| 0037AC | |
| Option 30 | Task 6.9, PWS Section 7.6.11.3 |
| Pre-final BFR Report | 2 years after contract award |
| 0037AD | |
| Option 30 | Task 6.9, PWS Section 7.6.11.4 |
| Final BFR Report | 2 years after contract award |
| 0038 | |
| Option 31 | Task 6.10 |
2nd Set of BFRs for 20 Category Codes (PWS Table 6 – List of 2nd Set of BFRs)
| 0038AA | |
| Option 31 | Task 6.10, PWS Section 7.6.12.1 |
| Data Collection and Coordination | 2 years after contract award |
| 0038AB | |
| Option 31 | Task 6.10, PWS Section 7.6.12.2 |
| BFR Draft Report | 2 years after contract award |
| 0038AC | |
| Option 31 | Task 6.10, PWS Section 7.6.12.3 |
| Pre-final BFR Report | 2 years after contract award |
| 0038AD | |
| Option 31 | Task 6.10, PWS Section 7.6.12.4 |
| Final BFR Report | 2 years after contract award |
| 0039 | |
| Option 32 | Task 6.11 |
3rd Set of BFRs for 20 Category Codes (PWS Table 7 – List of 3rd Set of BFRs)
| 0039AA | |
| Option 32 | Task 6.11, PWS Section 7.6.13.1 |
| Data Collection and Coordination | 2 years after contract award |
| 0039AB | |
| Option 32 | Task 6.11, PWS Section 7.6.13.2 |
| BFR Draft Report | 2 years after contract award |
| 0039AC | |
| Option 32 | Task 6.11, PWS Section 7.6.13.3 |
| Pre-final BFR Report | 2 years after contract award |
| 0039AD | |
| Option 32 | Task 6.11, PWS Section 7.6.13.4 |
| Final BFR Report | 2 years after contract award |
| 0040 | |
| Option 33 | Task 6.12 |
4th Set of BFRs for 21 Category Codes (PWS Table 8 – List of 4th Set of BFRs)
| 0040AA | |
| Option 33 | Task 6.12, PWS Section 7.6.14.1 |
| Data Collection and Coordination | 2 years after contract award |
| 0040AB | |
| Option 33 | Task 6.12, PWS Section 7.6.14.2 |
| BFR Draft Report | 2 years after contract award |
| 0040AC | |
| Option 33 | Task 6.12, PWS Section 7.6.14.3 |
| Pre-final BFR Report | 2 years after contract award |
| 0040AD | |
| Option 33 | Task 6.12, PWS Section 7.6.14.4 |
| Final BFR Report | 2 years after contract award |
TASK 7
AIR FORCE CIVIL ENGINEERING CENTER (AFCEC)
CHIBANA DISTRICT MASTER PLAN
| 0041 | |
| Option 34 | Task 7.1, PWS Section 7.7.3 |
| Installation Kick-off Meeting (Virtual) | 2 years after contract award |
| 0042 | |
| Option 35 | Task 7.2 |
Chibana District Area Development Plan (ADP)
| 0042AA | |
| Option 35 | Task 7.2, PWS Section 7.7.4.1 |
| Data Collection, Site Analysis and Stakeholder Interviews | 2 years after contract award |
| 0042AB | |
| Option 35 | Task 7.2, PWS Section 7.7.4.2 |
| On-site Planning Workshop | 2 years after contract award |
| 0042AC | |
| Option 35 | Task 7.2, PWS Section 7.7.4.6 |
Draft Chibana District ADP
AND
Task 7.2, PWS Section 7.7.4.7
| On-site Draft Review and Preferred Alternative Selection | 2 years after contract award |
| 0042AD | |
| Option 35 | Task 7.2, PWS Section 7.7.4.8 |
| Pre-final Chibana District ADP | 2 years after contract award |
| 0042AE | |
| Option 35 | Task 7.2, PWS Section 7.7.4.9 |
| Final Chibana District ADP | 2 years after contract award |
| 0043 | |
| Option 36 | Task 7.3 |
Transportation Component Plan (TCP)
| 0043AA | |
| Option 36 | Task 7.3 |
| Transportation Component Plan Data Collection and Analysis | 2 years after contract award |
| 0043AB | |
| Option 36 | Task 7.3, PWS Section 7.7.5.1 |
| Transportation Component Plan Draft Report | 2 years after contract award |
| 0043AC | |
| Option 36 | Task 7.3, PWS Section 7.7.5.2 |
| Transportation Component Plan Pre-final Report | 2 years after contract award |
| 0043AD | |
| Option 36 | Task 7.3, PWS Section 7.7.5.3 |
| Transportation Component Plan Final Report | 2 years after contract award |
| 0044 | |
| Option 37 | Task 7.4 |
Utilities Component Plan (UCP)
| 0044AA | |
| Option 37 | Task 7.4 |
| Utilities Component Plan Data Collection and Analysis | 2 years after contract award |
| 0044AB | |
| Option 37 | Task 7.4, PWS Section 7.7.6.1 |
| Utilities Component Plan Draft Report | 2 years after contract award |
| 0044AC | |
| Option 37 | Task 7.4, PWS Section 7.7.6.2 |
| Utilities Component Plan Pre-final Report | 2 years after contract award |
| 0044AD | |
| Option 37 | Task 7.4, PWS Section 7.7.6.3 |
| Utilities Component Plan Final Report | 2 years after contract award |
| 0045 | |
| Option 38 | Task 7.5 |
Sustainability Component Plan (SCP)
| 0045AA | |
| Option 38 | Task 7.5, PWS Section 7.7.7.1 |
Data Collection
AND
Task 7.5, PWS Section 7.7.7.2
| SCP Planning Workshop | 2 years after contract award |
| 0045AB | |
| Option 38 | Task 7.5, PWS Section 7.7.7.3 |
| Draft SCP Report | 2 years after contract award |
| 0045AC | |
| Option 38 | Task 7.5, PWS Section 7.7.7.4 |
| Pre-final SCP Report | 2 years after contract award |
| 0045AD | |
| Option 38 | Task 7.5, PWS Section7.7.7.5 |
| Final SCP Report | 2 years after contract award |
TASK 8
AIR FORCE CIVIL ENGINEERING CENTER (AFCEC)
LODGING DISTRICT MASTER PLAN
| 0046 | |
| Option 39 | Task 8.1, PWS Section 7.8.4 |
| Lodging District Area Development Plan (ADP) Installation Kick-off Meeting (Virtual) | 2 years after contract award |
| 0047 | |
| Option 40 | Task 8.2 |
Kadena AFB Lodging District Area Development Plan (ADP)
| 0047AA | |
| Option 40 | Task 8.2, PWS Section 7.8.5.1 |
| Lodging District ADP Data Collection | 2 years after contract award |
| 0047AB | |
| Option 40 | Task 8.2, PWS Section 7.8.5.2 |
| Lodging District ADP Planning Workshop | 2 years after contract award |
| 0047AC | |
| Option 40 | Task 8.2, PWS Section 7.8.5.3 |
| Lodging District Draft ADP | 2 years after contract award |
| 0047AD | |
| Option 40 | Task 8.2, PWS 7.8.5.4 |
| Lodging District Draft ADP Review (Web Conference) | 2 years after contract award |
| 0047AE | |
| Option 40 | Task 8.2, PWS Section 7.8.5.5 |
| Lodging District Pre-final ADP | 2 years after contract award |
| 0047AF | |
| Option 40 | Task 8.2, PWS Section 7.8.5.6 |
| Lodging District Final ADP | 2 years after contract award |
| 0048 | |
| Option 41 | Task 8.3 |
Area Development Execution Plan (ADEP)
| 0048AA | |
| Option 41 | Task 8.3, PWS Section 7.8.6.1 |
| Planning Workshop | 2 years after contract award |
| 0048AB | |
| Option 41 | Task 8.3, PWS Section 7.8.6.2 |
| Lodging District Draft ADEP Report | 2 years after contract award |
| 0048AC | |
| Option 41 | Task 8.3, PWS Section 7.8.6.3 |
| Lodging District Pre-final ADEP Report | 2 years after contract award |
| 0048AD | |
| Option 41 | Task 8.3, PWS Section 7.8.6.4 |
| Lodging District Final ADEP Report | 2 years after contract award |
TASK 9
NAHA MILITARY PORT RELOCATION PLAN (NMPRP)
OKINAWA, JAPAN
| 0049 | |
| Option 42 | Task 9.1, PWS Section 7.9.3 |
| Installation Kick-off Meeting (Virtual) | 2 years after contract award |
| 0050 | |
| Option 43 | Task 9.2 |
NMPRP Nodal Development Plan (NDP)
| 0050AA | |
| Option 43 | Task 9.2, PWS Section 7.9.4.1 |
| Data Collection and Analysis | 2 years after contract award |
| 0050AB | |
| Option 43 | Task 9.2, PWS Section 7.9.4.2 |
| NDP Planning Workshop | 2 years after contract award |
| 0050AC | |
| Option 43 | Task 9.2, PWS Section 7.9.4.3 |
| Draft NDP Report | 2 years after contract award |
| 0050AD | |
| Option 43 | Task 9.2, PWS Section 7.9.4.4 |
| Pre-final NDP Report | 2 years after contract award |
| 0050AE | |
| Option 43 | Task 9.2, PWS Section 7.9.4.5 |
| Final NDP Report | 2 years after contract award |
| 0051 | |
| Option 44 | Task 9.3 |
NMPRP Nodal Development Plan (NDP) Update, Exclusion of Ammunition Pier Requirements
| 0051AA | |
| Option 44 | Task 9.3, PWS Section 7.9.5.1 |
| Draft NDP Update | 2 years after contract award |
| 0051AB | |
| Option 44 | Task 9.3, PWS Section 7.9.5.2 |
| Pre-final NDP Update | 2 years after contract award |
| 0051AC | |
| Option 44 | Task 9.3, PWS Section 7.9.5.3 |
| Final NDP Update | 2 years after contract award |
TASK 10
USAG JAPAN MILITARY FAMILY HOUSING (MFH)
PLANNING AND PROGRAM SUPPORT
| 0052 | |
| Option 45 | Task 10.1, PWS Section 7.10.2 |
| Installation Kick-off Meeting (Virtual) | 2 years after contract award |
| 0053 | |
| Option 46 | Task 10.2 |
USAG Japan MFH (ADP)
| 0053AA | |
| Option 46 | Task 10.2, PWS Section 7.10.3.1 |
| Data Collection and Analysis | 2 years after contract award |
| 0053AB | |
| Option 46 | Task 10.2, PWS Section 7.10.3.2 |
| ADP Planning Workshop | 2 years after contract award |
| 0053AC | |
| Option 46 | Task 10.2, PWS Section 7.10.3.3 |
| Draft ADP | 2 years after contract award |
| 0053AD | |
| Option 46 | Task 10.2, PWS Section 7.10.3.4 |
| Draft ADP On-site Review Conference | 2 years after contract award |
| 0053AE | |
| Option 46 | Task 10.2, PWS Section 7.10.3.5 |
| Pre-final ADP | 2 years after contract award |
| 0053AF | |
| Option 46 | Task 10.2, PWS Section 7.10.3.6 |
| Final ADP | 2 years after contract award |
| 0054 | |
| Option 47 | Task 10.3, PWS Section 7.10.4 |
Inclusion of 32 Dwelling Units within the USAG Japan MFH ADP
| 0054AA | ||
| Option 47 | Inclusion of 32 Dwelling Units into the Data Collection and Analysis | Within 3 months of award of Task 10.2 |
| 0054AB | ||
| Option 47 | Inclusion of 32 Dwelling Units into the ADP Planning Charrette | Within 3 months of award of Task 10.2 |
| 0054AC | ||
| Option 47 | Inclusion of 32 Dwelling Units into the Draft ADP | Within 3 months of award of Task 10.2 |
| 0054AD | ||
| Option 47 | Inclusion of 32 Dwelling Units into the Draft ADP On-site Review Conference | Within 3 months of award of Task 10.2 |
| 0054AE | ||
| Option 47 | Inclusion of 32 Dwelling Units into the Pre-final ADP | Within 3 months of award of Task 10.2 |
| 0054AF | ||
| Option 47 | Inclusion of 32 Dwelling Units into the Final ADP | Within 3 months of award of Task 10.2 |
| 0055 | ||
| Option 48 | Task 10.4 |
USAG Japan MFH Facility Condition Assessment (FCA)
| 0055AA | |
| Option 48 | Task 10.4, PWS Section 7.10.5.1 |
| Data Collection and On-site Survey | 2 years after contract award |
| 0055AB | |
| Option 48 | Task 10.4, PWS Section 7.10.5.2 |
| FCA BUILDER Draft Reports | 2 years after contract award |
| 0055AC | |
| Option 48 | Task 10.4, PWS Section 7.10.5.3 |
| FCA BUILDER Final Reports | 2 years after contract award |
| 0056 | |
| Option 49 | Task 10.5, PWS Section 7.10.6 |
Inclusion of 32 Dwelling Units for the Camp Zama and Sagamihara FCA and BUILDER
| 0056AA | ||
| Option 49 | Inclusion of 32 Dwelling Units into the Data Collection and On-site Survey | 2 years after contract award |
| 0056AB | ||
| Option 49 | Inclusion of 32 Dwelling Units into the FCA BUILDER Draft Reports | 2 years after contract award |
| 0056AC | ||
| Option 49 | Inclusion of 32 Dwelling Units into the FCA BUILDER Final Reports | 2 years after contract award |
| 0057 | ||
| Option 50 | Task 10.6 |
Planning Charrette (PC) for Project Number (PN) #1
| 0057AA | |
| Option 50 | Task 10.6, PWS Section 7.10.7.1 |
| PC Workshop Preparation | 2 years after contract award |
| 0057AB | |
| Option 50 | Task 10.6, PWS Section 7.10.7.2 |
Submit PC Workshop In-brief Presentation and Agenda
AND
Task 10.6, PWS Section 7.10.7.3
| Conduct PC Workshop | 2 years after contract award |
| 0057AC | |
| Option 50 | Task 10.6, PWS Section 7.10.7.5 |
| Draft DD Form 1391 | 2 years after contract award |
| 0057AD | |
| Option 50 | Task 10.6, PWS Section 7.10.7.6 |
| Final DD Form 1391 | 2 years after contract award |
| 0058 | |
| Option 51 | Task 10.7, PWS Section 10.8 |
Planning Charrette (PC) for Project Number (PN) #2
| 0058AA | |
| Option 51 | Task 10.7 |
PC Workshop Preparation
| (Reference PWS Section 7.10.7.1 requirements) | 2 years after contract award |
| 0058AB | |
| Option 51 | Task 10.7, PWS Section 7.10.7.2 |
Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.10.7.2)
AND
Task 10.7 Conduct PC Workshop
| (Reference PWS Section 7.10.7.3 requirements) | 2 years after contract award |
| 0058AC | |
| Option 51 | Task 10.7 |
Draft DD Form 1391
| (Reference PWS Section 7.10.7.5 requirements) | 2 years after contract award |
| 0058AD | |
| Option 51 | Task 10.7 |
Final DD Form 1391
| (Reference PWS Section 7.10.7.6 requirements) | 2 years after contract award |
| 0059 | |
| Option 52 | Task 10.8, PWS Section 7.10.9 |
Planning Charrette (PC) for Project Number (PN) #3
| 0059AA | |
| Option 52 | Task 10.8 |
PC Workshop Preparation
| (Reference PWS Section 7.10.7.1 requirements) | 2 years after contract award |
| 0059AB | |
| Option 52 | Task 10.8 |
Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.10.7.2 requirements)
AND
Task 10.8 Conduct PC Workshop
| (Reference PWS Section 7.10.7.3 requirements) | 2 years after contract award |
| 0059AC | |
| Option 52 | Task 10.8 |
Draft DD Form 1391
| (Reference PWS Section 7.10.7.5 requirements) | 2 years after contract award |
| 0059AD | |
| Option 52 | Task 10.8 |
Final DD Form 1391
| (Reference PWS Section 7.10.7.6 requirements) | 2 years after contract award |
| 0060 | |
| Option 53 | Task 10.9, PWS Section 7.10.10 |
Planning Charrette (PC) for Project Number (PN) #4
| 0060AA | |
| Option 53 | Task 10.9 |
PC Workshop Preparation
| (Reference PWS Section 7.10.7.1 requirements) | 2 years after contract award |
| 0060AB | |
| Option 53 | Task 10.9 |
Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.10.7.2 requirements)
AND
Task 10.9 Conduct PC Workshop
| (Reference PWS Section 7.10.7.3 requirements) | 2 years after contract award |
| 0060AC | |
| Option 53 | Task 10.9 |
Draft DD Form 1391
| (Reference PWS Section 7.10.7.5 requirements) | 2 years after contract award |
| 0060AD | |
| Option 53 | Task 10.9 |
Final DD Form 1391
| (Reference PWS Section 7.10.7.6 requirements) | 2 years after contract award |
| 0061 | |
| Option 54 | Task 10.10, PWS Section 7.10.11 |
Planning Charrette (PC) for Project Number (PN) #5
| 0061AA | |
| Option 54 | Task 10.10 |
PC Workshop Preparation
| (Reference PWS Section 7.10.7.1 requirements) | 2 years after contract award |
| 0061AB | |
| Option 54 | Task 10.10 |
Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.10.7.2 requirements)
AND
Task 10.10 Conduct PC Workshop
| (Reference PWS Section 7.10.7.3 requirements) | 2 years after contract award |
| 0061AC | |
| Option 54 | Task 10.10 |
Draft DD Form 1391
| (Reference PWS Section 7.10.7.5 requirements) | 2 years after contract award |
| 0061AD | |
| Option 54 | Task 10.10 |
Final DD Form 1391 (Reference PWS Section 7.10.7.6 requirements) 2 years after contract award