RS_Kerr_Fabricate_Stoplogs_and_Lifting_Beam_Specs_8-7-18.pdf

PDF 352 KB Posted

Attached to
R. S. Kerr Stop-Logs
Solicitation number
W912BV18R0030
Issued by

About this file

SECTION C Appendices/TABS attached as SECTION J Attachment 1

View the file

Other files

File Type Posted
W912BV18R0030_Amendment_0002.pdf PDF
Amendment_0001,_W912BV18R0030.pdf PDF
W912BV18R0030_Stop-Log.pdf PDF
RSK18SL_13July2018_RTA-Plans.pdf PDF
AMRDEC_Instructions.pdf PDF
SWT_Form_982.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C

August 7, 2018 rsl

Fabricate Stoplogs & Lifting Beam FY18 KERRSTOPLOGSFY18

TAB A

SECTION 01 25 00

ENGINEERING CONSIDERATIONS

PART 1 GENERAL

1.1 SCOPE

This section provides engineering considerations for the work to be performed to fabricate stoplogs and lifting beam(s), load test lifting beam(s), hang test stoplogs and lifting beam(s), and stack test stoplogs.

See the specifications and drawings for detailed requirements. The Contractor shall provide all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, management, and travel necessary to complete all work in accordance with the attached drawings, the specifications, and all other contract documents and requirements. The Government will provide no materials, equipment, or labor except for unloading of stoplogs at the RS Kerr Marine Terminal (see below).

1.2 EXPLANATION OF CONTRACT AUTHORITY AND RELATIONSHIPS

The U. S. Army Corps of Engineers (USACE), Tulsa District will award and administer this contract and shall be the sole authority to interact contractually with and provide oversight to the Contractor. References to any other organization, entity, or individual either authorizing, approving, or in any other way contractually interacting with the Contractor shall denote such action by the designated representative(s) of the Contracting Officer, USACE, Tulsa District.

1.3 REQUIREMENTS FOR ELECTRONIC SUBMISSIONS

Except where specifically noted, submittals shall be provided in electronic format. Adobe Portable Document Format (Adobe PDF) will serve as the primary file type. Adobe PDF files submitted shall be compatible with Adobe Acrobat Reader XI.

1.4 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.5 GENERAL WORK BREAKDOWN

This project will be a total turn-key contract with all work being performed by the Contractor. See other specifications sections, drawings, contract clauses, and other contract documents for detailed requirements of the work to be performed by the Contractor. The work is summarized as follows:

a. Fabrication of stoplogs and lifting beam(s);

SECTION 01 25 00 Page 1

b. Proof load testing and marking per ASME B30.20 of each lifting beam fabricated;

c. Hang testing and adjustment by counterweighting for plumb in the longitudinal and transverse directions of each stoplog and lifting beam fabricated to achieve required tolerances;

d. Stack testing of stoplogs;

e. Blasting and painting of stoplogs and lifting beam(s);

f. Delivery of stoplogs and lifting beam(s) to the RS Kerr Marine Terminal located at:

U.S. Army Corps of Engineers D1135 Rd, Gans, OK 74936 Coordinates: 35°22'06.8" N, 94°49'36.8" W

NOTE: Each stoplog shall be shipped immediately after successful completion of Government Witness Point Inspections and painting.

1.6 GOVERNMENT UNLOADING OF STOPLOGS

The Government will intermittently provide the labor, materials (4x4s, timbers), and equipment (crane and existing lifting beam or forklift) to unload the stoplogs as they arrive at the RS Kerr Marine Terminal. The Contractor shall provide the Contracting Officer (CO) or Contracting Officer's Representative (COR) at least one week advance notice of each delivery date. Deliveries will only be accepted Monday through Thursday, 8 a.m. to 3 p.m.

1.7 MANDATORY WORK SEQUENCE

The Contractor shall first schedule and fabricate, hang test, and proof load test at least one lifting beam. Stoplog fabrication may commence after or concurrently with the fabrication of the lifting beam, however, one lifting beam shall remain at the fabrication shop for the duration of stoplog fabrication to be utilized in the hang testing of all fabricated stoplogs.

1.8 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Work Plan; G, ECD

1.9 WORK PLAN MINIMUM REQUIREMENTS

Within 30 calendar days of contract award, a Work Plan shall be submitted for all work required by this contract. This work plan is separate from any and all documents submitted before contract award and shall provide greater detail than pre-award submitted work plans (if applicable).

SECTION 01 25 00 Page 2

The plan shall include, as a minimum, details for all work listed in paragraph GENERAL WORK BREAKDOWN above. The work plan shall include detailed fabrication methods and procedures and description of shop facilities.

The Work Plan shall address sequence of fabrication and methods to protect, transport, and label components during fabrication and shipping. The Work Plan shall include the measuring system and devices used in ensuring dimensional tolerances. Measuring devices and certificates of calibration described in the Work Plan shall be available for review and use during Government Witness Point Inspections.

Fabrication activities and purchasing of materials shall not begin until the Work Plan has been approved by the COR. The Contractor's work schedule (days of the week and hours per day) shall be stated.

1.10 SAFETY

All work performed on Government property shall be performed in accordance with EM 385-1-1.

1.11 GOVERNMENT WITNESS POINT INSPECTIONS

The Government will conduct witness point inspections throughout the fabrication process on every stoplog and lifting beam and upon delivery to the Government facility. The Contractor shall notify the Government 14 calendar days prior to the defined witness points to allow for scheduling of Government personnel and travel. If the fabricator elects to fabricate multiple structures concurrently, then to the greatest extent possible the fabricator shall schedule witness points such that the witness point inspections can be combined and performed for those structures at their respective levels of completeness during one shop visit. See Section 05 59 13 for detailed witness points requirements.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

Not Used.

-- End of Section --

SECTION 01 25 00 Page 3

TAB B

SECTION 01 33 00

SUBMITTAL PROCEDURES

05/11

PART 1 GENERAL

1.1 SUMMARY

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Include required reports.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor's Quality Control (CQC) System Manager shall check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:

Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including catalog cuts, diagrams, operating charts or curves;

test reports; samples; O&M manuals (including parts list); certifications;

warranties; and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby.

A draft submittal register showing submittals required by the specifications is provided at the end of this section.

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to the start of fabrication includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.

Certificates of insurance List of proposed Subcontractors List of proposed products Submittal Register Work Plan Quality Control (QC) Plan

SECTION 01 33 00 Page 1

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports.

Daily logs and checklists.

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and

SECTION 01 33 00 Page 2 clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.

Text of posted operating instructions.

SD-09 Manufacturer's Field Reports

Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.

Factory test reports.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

Submittals required for Third Party Certification (TPC).

Special requirements necessary to properly close out a fabrication contract. For example, Final Approved Shop Drawings, Weld Tracking Logs, NDT Reports, Documentation of Critical Dimensions, etc.

1.2.2 Approving Authority

Office or designated person authorized to approve submittal.

1.2.3 Work

As used in this section, required by contract documents, including labor necessary to produce submittals, materials, products, equipment, and systems incorporated or to be incorporated.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Submittal Register; G

1.4 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

SECTION 01 33 00 Page 3

1.4.1 Government Approved (G)

Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.

1.4.2 For Information Only

Submittals not requiring Government approval will be for information only.

They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.

1.5 PREPARATION

1.5.1 Transmittal Form

The Government intends to utilize Form 4025-R for submitting both Government approved and information only submittals in accordance with the contract requirements. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.5.2 Source Drawings for Shop Drawings

Source drawing files are available to the Contractor upon request. See Specification Section 01 78 00.

1.5.3 Electronic File Format

Provide submittals in electronic format with the exception of material samples required for SD-04 Samples items. Compile the submittal file as a single, complete document, to include the Transmittal Form described within. Name the electronic submittal file specifically according to its contents, submit the file naming convention to the COR and copy the Contracting Officer for approval before first electronic file is produced.

Electronic files must be of sufficient quality that all information is legible. Use PDF as the electronic format, unless otherwise specified or directed by the Contracting Officer. Generate PDF files from original documents with bookmarks so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic submittal documents fewer than 10MB to an email address as provided by the Contracting Officer. Provide electronic documents over 10MB on an optical disc, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:

https://safe.amrdec.army.mil/safe/.

Provide hard copies of submittals when requested by the Contracting Officer. Up to three additional hard copies of any submittal may be requested at the discretion of the COR, at no additional cost to the Government.

SECTION 01 33 00 Page 4

1.6 QUANTITY OF SUBMITTALS

1.6.1 Number of Samples SD-04 Samples

a. Submit two samples/sets of samples showing range of variation, of each required item. One approved sample/set of samples will be retained by approving authority and one will be returned to Contractor. Additional samples will be necessary for paint and paint components.

b. Submit one sample panel or provide one sample installation. Include components listed in technical section.

c. Submit one sample installation, where directed in this requirement.

d. Submit one sample of non-solid materials.

1.7 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the COR is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications;

will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.8 SUBMITTAL REGISTER

Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and

(i) as approved. A draft submittal register showing items of equipment and materials for which submittals are required by the specifications is provided at the end of this section. This list may not be all inclusive and additional submittals may be required. Maintain a submittal register for the project in accordance with Section 01 46 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)). The Government will provide the initial draft submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.

Column (c): Lists specification section in which submittal is required.

Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.

Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.

Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.

SECTION 01 33 00 Page 5

1.8.1 Use of Submittal Register

Submit submittal register. Submit with QC plan and project schedule.

Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:

Column (a) Activity Number: Activity number from the project schedule.

Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.

Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.

Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.

1.8.2 Contractor Use of Submittal Register

Update the following fields in the Government-furnished submittal register program with each submittal throughout contract.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.

Column (l) List date of submittal transmission.

Column (q) List date approval received.

1.8.3 Approving Authority Use of Submittal Register

Update the following fields in the Government-furnished submittal register program.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (l) List date of submittal receipt.

Column (m) through (p) List Date related to review actions.

Column (q) List date returned to Contractor.

1.8.4 Copies Delivered to the Government

Deliver one copy of submittal register updated by Contractor to Government with each invoice request.

1.9 VARIATIONS

Variations from contract requirements require Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.

SECTION 01 33 00 Page 6

1.9.1 Considering Variations

Discussion with COR prior to submission will help ensure functional and quality requirements are met and minimize rejections and re-submittals.

When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).

Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.

1.9.2 Proposing Variations

When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.

Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.

The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

1.9.3 Warranting that Variations are Compatible

When delivering a variation for approval, Contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.9.4 Review Schedule Extension

In addition to normal submittal review period of 30 days, a period of 15 working days will be allowed for consideration by the Government of submittals with variations.

1.10 SCHEDULING

Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No time extensions will be allowed for time lost in late submittals.

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.

b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer or COR does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."

c. Re-submit register and annotate monthly by the Contractor with actual

SECTION 01 33 00 Page 7 submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.

d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

1.11 GOVERNMENT APPROVING AUTHORITY

When approving authority is Contracting Officer or the COR, the Government will:

a. Note date on which submittal was received.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, stamp and date submittals.

1.11.1 Review Notations

Contracting Officer or COR review will be completed within 30 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

1.12 DISAPPROVED SUBMITTALS

Make corrections required by the Contracting Officer or COR. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer. Contractor is responsible for the dimensions and

SECTION 01 33 00 Page 8 design of connection details and construction of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.13 APPROVED SUBMITTALS

The Contracting Officer's or the COR's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of fabrication, materials, detailing and other information are satisfactory.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work.

After submittals have been approved or accepted by the Contracting Officer or the COR, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.14 APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the COR for testing. Samples failing to meet contract requirements will automatically void previous approvals. Contractor to replace such materials or equipment to meet contract requirements.

Approval of the Contractor's samples by the Contracting Officer or the COR does not relieve the Contractor of his responsibilities under the contract.

1.15 WITHHOLDING OF PAYMENT

Payment for deliveries will not be made if required approvals have not been

SECTION 01 33 00 Page 9 obtained.

1.16 STAMPS

Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:

SECTION 01 33 00 Page 10

| CONTRACTOR |

| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |

| SIGNATURE: __________________________________________________________ |

| TITLE: ______________________________________________________________ |

| DATE: _______________________________________________________________ |

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 33 00 Page 11

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES

Fabricate Stoplogs & Lifting Beam FY18

01 25 00 SD-01 Preconstruction Submittals

1.9 G ECDWork Plan

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 45 00 SD-01 Preconstruction Submittals

3.1 GCQC Plan

SD-06 Test Reports 3.6Daily Reports

01 78 00 SD-11 Closeout Submittals

3.1 G ECDFinal Approved Shop Drawings

05 05 23 SD-03 Product Data

1.4.1 G ECDUltrasonic Inspection

SD-06 Test Reports

1.4.5 G ECDEquipment Qualifications

3.4.1 G ECDUT Inspection Test Reports

05 50 13 SD-03 Product Data

2.3.1 G ECDLifting Beam Bearings and

Bushings

2.3.2 G ECDLifting Beam Wheels

2.3.8 G ECDLifting Beam Shaft Couplings

2.3.7 G ECDLifting Beam Universal Joints

2.3.18 G ECDLifting Beam Shackles

SD-07 Certificates

2.1 G ECDStoplog Seal Hardware

2.3.9 G ECDStoplog Lifting Pin

2.3.4 G ECDLifting Beam Hook Pin

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES

05 50 13 2.3.5 G ECDLifting Beam Hook

2.3.2 G ECDLifting Beam Wheels

2.3.3 G ECDLifting Beam Wheel Pin

2.3.6 G ECDLifting Beam Actuator Shaft

2.3.10 G ECDLifting Beam Grating

2.3.12 G ECDLifting Beam Safety Railing

2.3.11 G ECDLifting Beam Fasteners

2.3.17 G ECDLifting Beam Sling

2.2 GRubber Seals

05 59 13 SD-01 Preconstruction Submittals

1.2.3 G ECDWelding Procedure Specifications

(WPS)

1.2.4.2 G ECDFracture Control Plan (FCP)

1.2.1 G ECDWeld Tracking Log Template

SD-02 Shop Drawings

1.4.5 G ECDShop Drawings

2.2.7 G ECDWelding Repairs - Non-Fracture

Critical Members

2.2.7 G ECDWelding Repairs - Fracture

Critical Members

1.5 G ECDDelivery/Shipping Plan

SD-03 Product Data

2.1.3 G ECDMaterials Disposition Record

SD-06 Test Reports

2.2 G ECDCertified Test Reports

1.2.2 G ECDWeld Tracking Log

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES

05 59 13 SD-07 Certificates

1.4.1 G ECDQualification of Welders and

Welding Operators

1.4.2 G ECDInspector Qualifications

1.4.3 G ECDQualification of Structural Steel

Fabricator SD-09 Manufacturer’s Field Reports

2.2.8 G ECDControl Dimensions

09 97 02 SD-03 Product Data

Part 2 GManufacturer's Product Data Sheet

SD-04 Samples Part 2 GProduct Samples

2.1 GSpecial Paint Formulas

2.3.3 GSolvent and Thinners

SD-06 Test Reports 3.4Inspection Reports

SD-07 Certificates 1.5.1SSPC QP 3 Certificate 1.5.3Coating Thickness Gage

Qualification 2.4.2Surface Profile Gage

Qualification

1.5.2 GQualified Paint Applicator

35 20 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES

35 20 00 1.4.1 G ECDProof Load Plan SD-06 Test Reports

1.4.2 G ECDProof Load Test Report

1.4.1.1 G ECDMechanical System Certified

Inspection Reports SD-07 Certificates

1.4.1.2 G ECDLoad Measuring Device(s)

Certificate(s) of Calibration

1.4.1.3 G ECDCertificate of Weight

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

TAB C

SECTION 01 45 00

CONTRACTOR QUALITY CONTROL

5/18

PART 1 GENERAL

1.1 GENERAL REQUIREMENTS

Establish and maintain an effective contractor quality control (CQC) system. CQC consist of plans, procedures, and organization necessary to produce end products which comply with the contract requirements. The CQC system covers all operations and is keyed to the proposed sequence of work. The CQC System Manager will be held responsible for the quality of work and is subject to removal, in writing, by the Contracting Officer for non-compliance with the quality requirements specified in the contract. In this context the highest level manager responsible for the overall fabrication activities, including quality and production, is the project superintendent. The CQC System Manager maintains a physical presence at the fabrication plant at all times and is responsible for all fabrication related activities except as otherwise acceptable to the Contracting Officer.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E329 (2014a) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

CQC Plan; G

SD-06 Test Reports

Daily Reports

PART 2 PRODUCTS

Not Used

SECTION 01 45 00 Page 1

PART 3 EXECUTION

3.1 CQC PLAN

Submit no later than 15 days after award the CQC Plan proposed to implement the CQC requirements. The Government will consider an interim plan for the first seven days of operation. Fabrication will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the accepted interim plan will not be permitted to begin until acceptance of the CQC Plan.

3.1.1 Content of the CQC Plan

Include, as a minimum, the following to cover all fabrication operations, including work by subcontractors, fabricators, suppliers, and purchasing agents:

a. A description of the CQC organization, including a chart showing lines of authority and acknowledgment that the CQC staff will implement the three phase control system for all aspects of the work specified.

Include a CQC System Manager that reports directly to the project superintendent.

b. The name, qualifications (in resume format), years of experience, duties, responsibilities, and authorities of each person assigned a CQC function.

c. A copy of the letter to the CQC System Manager signed by an authorized official of the fabricator which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the Contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities will be issued by the CQC System Manager. Furnish copies of these letters to the Contracting Officer and the COR.

d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures must be in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities approved by the Contracting Officer are required to be used.)

f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

g. Procedures for tracking fabrication deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.

h. Reporting procedures, including proposed reporting formats.

i. A list of the definable features of work. A definable feature of work

SECTION 01 45 00 Page 2 is a task which is separate and distinct from other tasks, has separate control requirements, and is identified by different trades or disciplines, or it is work by the same trade in a different environment. Although each section of the specifications can generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. This list will be agreed upon during the coordination meeting.

3.1.2 Acceptance of Plan

Acceptance of the CQC Plan is required prior to the start of fabrication.

Acceptance is conditional and will be predicated on satisfactory performance. The Government reserves the right to require in writing via the Contracting Officer the Contractor to make changes in the CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.

3.1.3 Notification of Changes

After acceptance of the CQC Plan, notify the Contracting Officer and the COR in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer or the COR.

3.2 QUALITY CONTROL ORGANIZATION

3.2.1 Personnel Requirements

The requirements for the CQC organization are a CQC System Manager and additional qualified personnel listed below to ensure contract compliance.

Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization. The Contractor's CQC staff maintains a presence during all phases of fabrication and have complete authority and responsibility to take any action necessary to ensure Contract compliance. The CQC staff will be subject to acceptance by the Contracting Officer. Provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC organization. Promptly complete and furnish all letters, material submittals, shop drawing submittals, schedules and all other project documentation to the CQC organization. The CQC organization is responsible to maintain these documents and records at fabrication plant at all times.

3.2.2 CQC System Manager

Identify a CQC System Manager that is responsible for overall management of CQC and has the authority to act in all CQC matters for the Contractor.

The CQC System Manager must be an individual with a minimum of 5 years documented experience on fabrication similar in scope and complexity to this contract. This CQC System Manager shall be employed by the prime Contractor. Identify in the plan an alternate to serve in the event of the CQC System Manager's absence. The requirements for the alternate shall be the same as the CQC System Manager.

3.2.3 CQC Personnel

In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: welding and coatings. These individuals shall be directly employed by the prime Contractor and can not

SECTION 01 45 00 Page 3 be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager; be physically present at the fabrication plant during work on the specialized personnel's areas of responsibility; have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals shall have no duties under this contract other than quality control.

Experience Matrix

Area Qualifications

Welding As specified in Section 05 59 13, paragraph 1.4.2

Coatings NACE Coating Inspector Program (CIP) Level 2 with 5 years minimum experience in similar size and scope projects

3.2.4 Organizational Changes

Maintain the CQC staff at full strength at all times. When it is necessary to make changes to the CQC staff, revise the CQC Plan to reflect the changes and submit the changes to the Contracting Officer for acceptance.

3.3 SUBMITTALS AND DELIVERABLES

Submittals shall comply with the requirements in Section 01 33 00 SUBMITTAL PROCEDURES. The CQC organization shall be responsible for fully reviewing and certifying that all submittals and deliverables are in compliance with the contract requirements.

3.4 CONTROL

CQC is the means by which the Contractor ensures that the fabrication, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control are required to be conducted by the CQC System Manager for each definable feature of work as follows:

3.4.1 Preparatory Phase

This phase is performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:

a. A review of each paragraph of applicable specifications, reference codes, and standards. Make available during the preparatory inspection a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished. Maintain and make available approved submittals, shop drawings, and specifications on the fabrication plant floor for use by Government and Contractor personnel until final acceptance of the work.

b. Review of the Contract drawings.

c. Check to assure that all materials and/or equipment have been tested, submitted, and approved.

SECTION 01 45 00 Page 4

d. Review of provisions that have been made to provide required control inspection and testing.

e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the Contract.

f. Examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.

g. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document fabrication tolerances and workmanship standards for that feature of work.

h. Check to ensure that the portion of the plan for the work to be performed has been accepted by the COR.

i. Discussion of the initial control phase.

j. A meeting conducted by the CQC System Manager and attended by the applicable CQC personnel and the shop foreman responsible for the definable feature (welding, blasting, painting, etc.). Document the results of the preparatory phase actions by separate minutes prepared by the CQC System Manager and attach to the daily CQC report. Instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.

3.4.2 Initial Phase

This phase is accomplished at the beginning of a definable feature of work. Accomplish the following:

a. Check work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.

b. Verify adequacy of controls to ensure full contract compliance. Verify required control inspection and testing are in compliance with the contract.

c. Level of workmanship shall meet minimum acceptable workmanship standards outlined in SECTION C.

d. Resolve all differences.

e. A meeting conducted by the CQC System Manager and attended by the applicable CQC personnel and the shop foreman responsible for the definable feature. Prepare separate minutes of this phase by the CQC System Manager and attach to the daily CQC report.

f. The initial phase for each definable feature of work is repeated for each new crew to work on any feature, or any time acceptable specified quality standards are not being met.

3.4.3 Follow-up Phase

Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. Record the checks in the CQC documentation. Conduct final follow-up checks and correct all

SECTION 01 45 00 Page 5 deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work.

3.4.4 Additional Preparatory and Initial Phases

Conduct additional preparatory and initial phases on the same definable features of work if: the quality of on-going work is unacceptable; there are changes in the applicable CQC staff, onsite production supervision or work crew; work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.

3.5 TESTS

3.5.1 Testing Procedure

Perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements.

Upon request, furnish to the Government duplicate samples of test specimens for possible testing by the Government. Testing includes operation and/or acceptance tests when specified. Procure the services of a Corps of Engineers approved testing laboratory or utilize an approved testing laboratory located in the continental United States. Perform the following activities and record and provide the following data:

a. Verify that testing procedures comply with contract requirements.

b. Verify that facilities and testing equipment are available and comply with testing standards.

c. Check test instrument calibration data against certified standards.

d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.

e. Record results of all tests taken, both passing and failing on the CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test. If approved by the COR, actual test reports are submitted later with a reference to the test number and date taken. Provide an information copy of tests performed by an offsite or commercial test facility directly to the COR. Failure to submit timely test reports as stated results in nonpayment for deliverables and disapproval of the test facility for this Contract.

3.5.2 Testing Laboratory

3.5.2.1 Capability Check

The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques. Laboratories utilized for testing steel are required to meet criteria detailed in ASTM E329.

3.5.3 Onsite Equipment

The Government reserves the right to utilize the onsite control testing

SECTION 01 45 00 Page 6 equipment to make assurance tests, and to check the Contractor's testing procedures, techniques, and test results at no additional cost to the Government.

3.6 DOCUMENTATION

Maintain up-to-date records providing factual evidence that required quality control activities and tests have been performed. Include in these records the work of subcontractors and suppliers on an acceptable form that includes, as a minimum, the following information:

a. The name and area of responsibility of the Contractor/Subcontractor.

b. Operating plant equipment.

c. Work performed each day, giving location, description, and by whom.

d. Test and/or control activities performed with results and references to specifications/drawings requirements. Identify the control phase (Preparatory, Initial, Follow-up). List of deficiencies noted, along with corrective action.

e. Quantity of materials received at the site with statement of acceptability, storage, and reference to specifications/drawings requirements.

f. Submittals and deliverables reviewed, with Contract reference, by whom, and action taken.

g. Instructions given/received and conflicts in plans and/or specifications.

k. Daily Reports

Cover both conforming and deficient features and include a statement that equipment and materials incorporated in the work and workmanship comply with the Contract. Complete the daily reports in RMS CM daily within 24 hours after the date covered by the report, except that reports need not be submitted for days which no work is performed. As a minimum, prepare and submit one report for every 7 days of no work and on the last day of a no work period.