W912BV-16-R-0064-0001_-_PCMC_COPAN-HULAH.pdf

PDF 42 KB Posted

Attached to
PCMC COPAN-HULAH
Solicitation number
W912BV-16-R-0064
Issued by

About this file

This amendment is being issued to extend the proposal due date. The due date is changed from to 19 FEB 2016 to 27 FEB 2016. This amendment is also being issued to replace the bid schedule in its entirety. All other terms and conditions remain in effect.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is being issued to extend the proposal due date. The due date is changed from to 19 FEB 2016 to 29 FEB 2016. This amendment is also being issued to replace the bid schedule in its entirety. This amendment is also being issued to add w age rates for areas affected by the PCMC services required to fulf ill contract. All other terms and conditions remain in effect

1. CONTRACT ID CODE PAGE OF PAGES

1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Feb-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-16-R-0064

X 9B. DATED (SEE ITEM 11)

28-Jan-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Feb-2016

CODE

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BV-16-R-0064

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

BIDDERS SCHEDULE

BID SCHEDULE

Base Year - 1 Mar 2016 - 28 Feb 2017

COPAN & HULAH LAKES

CLIN SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

MOWING

IMPROVED AREAS

0001 ANGLERS POINT 7 MO $_________ $_________

0002 COPAN POINT 7 MO $_________ $_________

0003 POST OAK 7 MO $_________ $_________

0004 PRAIRIE POND 7 MO $_________ $_________

0005 WASHINGTON COVE NORTH 7 MO $_________ $_________

0006 WASHINGTON COVE SOUTH 7 MO $_________ $_________

TOTAL IMPROVED AREA $_________

SEMI IMPROVED AREAS

0007 COPAN LAKE OFFICE 7 MO $_________ $_________

0008 COPAN POINT 7 MO $_________ $_________

0009 PSAGE PLAINS 7 MO $_________ $_________

0010 POST OAD 7 MO $_________ $_________

WASHINGTON COVE SOUTH

7 MO $_________ $_________

LAWN AREAS

0012 COPAN LAKE OFFICE 7 MO $_________ $_________

DAM EMBANKMENT AREAS

0013 COPAN 7 MO $_________ $_________

LEVEE, DIKE & PONING

(LPD) AREAS

0014 CANEY ;EVEE 7 MO $_________ $_________

SHRUB/HEDGE AREAS 7 MO $_________ $_________

0015 COPAN LAKE OFFICE 7 MO $_________ $_________

APPENDIX B

JANITORIAL

PARK CLEANING

0016 COPAN LAKE OFFICE 12 MO $_________ $_________

APPENDIC C

SUMMER PERIOD

0017 ANGLERS POINT 7 MO $_________ $_________

0018 COPAN POINT 7 MO $_________ $_________

0019 POST OAK 7 MO $_________ $_________

0020 PRAIRIE POND 7 MO $_________ $_________

0021 WASHINGTON COVE 7 MO $_________ $_________

TOTAL SUMMER PERIOD $_________

WINTER PERIOD

0022 COPAN POINT 5 MO $_________ $_________

0023 WASHINGTON COVE SOUTH 5 MO $_________ $_________

TOTAL WINTER PERIOD $_________

VAULT & SEPTIC

PUMPING

0024 ANGLERS POINT 12 MO $_________ $_________

0025 COPAN POINT 12 MO $_________ $_________

0026 POST OAK 12 MO $_________ $_________

0027 WASHINGTON COVE 12 MO $_________ $_________

SUBTOTAL $_________

APPENDIX D PESTICIDE

HERBICIDE

GUARDRAIL AREAS-

EMBANKMENT

7 MO $_________ $_________

0029 PAVED & UNPAVED AREAS 7 MO $_________ $_________

0030 RIPRAP AREAS %

CONCRETE LINED DITCHES

HULAH LAKE

APPENDIX A MOWING

0031 DAM EMBANKMENT ATEAS 7 MO $_________ $_________

LEVEL/DIKE/PONDING

AREA – HULAUH SADDLE

DIKE

APPENDIX C CLEANING

OF PARK

VAULT.SEPTIC PUMPING _

0033 HULAH OVERLOOK 12 MO $_________ $_________

0034 FISHERMAN’S OVERLOOK 12 MO $_________ $_________

TOTAL APPENDIX C $_________

APPENDIX D

APLLICATION HEBICIDE

HULAH DAM, SADDLE

DIKE & COMPOUND

1 MO $_________ $_________

PAVED & UNPAVED

AREAS- HULAH DAM,

SADDLE DIKE &

COMPOUND

1 MO $_________ $_________

RIPRAP AREAS &

CONCRETE LINED

DITCHES- HULAH DAM,

SADDLE DIKE &

COMPOUND

1 MO $_________ $_________

TOTAL APPENDIX D $_________

TOTAL BASE YEAR $_________

BID SCHEDULE

Option Year 1 - 1 Mar 2017 - 28 Feb 2018

1001 ANGLERS POINT 7 MO $_________ $_________

1002 COPAN POINT 7 MO $_________ $_________

1003 POST OAK 7 MO $_________ $_________

1004 PRAIRIE POND 7 MO $_________ $_________

1005 WASHINGTON COVE NORTH 7 MO $_________ $_________

1006 WASHINGTON COVE SOUTH 7 MO $_________ $_________

SEMI IMPROVED AREAS

1007 COPAN LAKE OFFICE 7 MO $_________ $_________

1008 COPAN POINT 7 MO $_________ $_________

1009 PSAGE PLAINS 7 MO $_________ $_________

1010 POST OAD 7 MO $_________ $_________

1012 COPAN LAKE OFFICE 7 MO $_________ $_________

1013 COPAN 7 MO $_________ $_________

1014 CANEY ;EVEE 7 MO $_________ $_________

1015 COPAN LAKE OFFICE 7 MO $_________ $_________

1016 COPAN LAKE OFFICE 12 MO $_________ $_________

PARK CLEANING

1017 ANGLERS POINT 7 MO $_________ $_________

1018 COPAN POINT 7 MO $_________ $_________

1019 POST OAK 7 MO $_________ $_________

1020 PRAIRIE POND 7 MO $_________ $_________

1021 WASHINGTON COVE 7 MO $_________ $_________

1022 COPAN POINT 5 MO $_________ $_________

1023 WASHINGTON COVE SOUTH 5 MO $_________ $_________

1024 ANGLERS POINT 12 MO $_________ $_________

1025 COPAN POINT 12 MO $_________ $_________

1026 POST OAK 12 MO $_________ $_________

1027 WASHINGTON COVE 12 MO $_________ $_________

1028 GUARDRAIL AREAS-

EMBANKMENT

7 MO $_________ $_________

1029 PAVED & UNPAVED AREAS 7 MO $_________ $_________

RIPRAP AREAS %

1031 DAM EMBANKMENT ATEAS 7 MO $_________ $_________

AREA – HULAUH SADDLE

1033 HULAH OVERLOOK 12 MO $_________ $_________

1034 FISHERMAN’S OVERLOOK 12 MO $_________ $_________

HULAH DAM, SADDLE

DIKE & COMPOUND

1 MO $_________ $_________

PAVED & UNPAVED

AREAS- HULAH DAM,

SADDLE DIKE &

COMPOUND

1 MO $_________ $_________

RIPRAP AREAS &

CONCRETE LINED

DITCHES- HULAH DAM,

SADDLE DIKE &

COMPOUND

1 MO $_________ $_________

TOTAL OPTION YEAR 1 $_________

Option Year 2 - 1 Mar 2018 - 28 Feb 2019

COPAN ^ HULAH LAKES

2001 ANGLERS POINT 7 MO $_________ $_________

2002 COPAN POINT 7 MO $_________ $_________

2003 POST OAK 7 MO $_________ $_________

2004 PRAIRIE POND 7 MO $_________ $_________

2005 WASHINGTON COVE NORTH 7 MO $_________ $_________

2006 WASHINGTON COVE SOUTH 7 MO $_________ $_________

SEMI IMPROVED AREAS

2007 COPAN LAKE OFFICE 7 MO $_________ $_________

0008 COPAN POINT 7 MO $_________ $_________

2009 PSAGE PLAINS 7 MO $_________ $_________

2010 POST OAD 7 MO $_________ $_________

2012 COPAN LAKE OFFICE 7 MO $_________ $_________

2013 COPAN 7 MO $_________ $_________

2014 CANEY ;EVEE 7 MO $_________ $_________

2015 COPAN LAKE OFFICE 7 MO $_________ $_________

2016 COPAN LAKE OFFICE 12 MO $_________ $_________

PARK CLEANING

2017 ANGLERS POINT 7 MO $_________ $_________

2018 COPAN POINT 7 MO $_________ $_________

2019 POST OAK 7 MO $_________ $_________

2020 PRAIRIE POND 7 MO $_________ $_________

2021 WASHINGTON COVE 7 MO $_________ $_________

2022 COPAN POINT 5 MO $_________ $_________

2023 WASHINGTON COVE SOUTH 5 MO $_________ $_________

2024 ANGLERS POINT 12 MO $_________ $_________

2025 COPAN POINT 12 MO $_________ $_________

2026 POST OAK 12 MO $_________ $_________

2027 WASHINGTON COVE 12 MO $_________ $_________

EMBANKMENT

7 MO $_________ $_________

2029 PAVED & UNPAVED AREAS 7 MO $_________ $_________

RIPRAP AREAS %

2031 DAM EMBANKMENT ATEAS 7 MO $_________ $_________

AREA – HULAUH SADDLE

2033 HULAH OVERLOOK 12 MO $_________ $_________

2034 FISHERMAN’S OVERLOOK 12 MO $_________ $_________

HULAH DAM, SADDLE

DIKE & COMPOUND

1 MO $_________ $_________

PAVED & UNPAVED

AREAS- HULAH DAM,

SADDLE DIKE &

COMPOUND

1 MO $_________ $_________

RIPRAP AREAS &

CONCRETE LINED

DITCHES- HULAH DAM,

SADDLE DIKE &

COMPOUND

1 MO $_________ $_________

TOTAL OPTION YEAR 2 $_________

Option Year 3 - 1 Mar 2019 - 28 Feb 2020

3001 ANGLERS POINT 7 MO $_________ $_________

3002 COPAN POINT 7 MO $_________ $_________

3003 POST OAK 7 MO $_________ $_________

3004 PRAIRIE POND 7 MO $_________ $_________

3005 WASHINGTON COVE NORTH 7 MO $_________ $_________

3006 WASHINGTON COVE SOUTH 7 MO $_________ $_________

SEMI IMPROVED AREAS

3007 COPAN LAKE OFFICE 7 MO $_________ $_________

3008 COPAN POINT 7 MO $_________ $_________

3009 PSAGE PLAINS 7 MO $_________ $_________

3010 POST OAD 7 MO $_________ $_________

3012 COPAN LAKE OFFICE 7 MO $_________ $_________

3013 COPAN 7 MO $_________ $_________

3014 CANEY ;EVEE 7 MO $_________ $_________

3015 COPAN LAKE OFFICE 7 MO $_________ $_________

3016 COPAN LAKE OFFICE 12 MO $_________ $_________

PARK CLEANING

3017 ANGLERS POINT 7 MO $_________ $_________

3018 COPAN POINT 7 MO $_________ $_________

3019 POST OAK 7 MO $_________ $_________

3020 PRAIRIE POND 7 MO $_________ $_________

3021 WASHINGTON COVE 7 MO $_________ $_________

3022 COPAN POINT 5 MO $_________ $_________

3023 WASHINGTON COVE SOUTH 5 MO $_________ $_________

3024 ANGLERS POINT 12 MO $_________ $_________

3025 COPAN POINT 12 MO $_________ $_________

3026 POST OAK 12 MO $_________ $_________

3027 WASHINGTON COVE 12 MO $_________ $_________

EMBANKMENT

7 MO $_________ $_________

3029 PAVED & UNPAVED AREAS 7 MO $_________ $_________

3030 RIPRAP AREAS %

3031 DAM EMBANKMENT ATEAS 7 MO $_________ $_________

AREA – HULAUH SADDLE

3033 HULAH OVERLOOK 12 MO $_________ $_________

3034 FISHERMAN’S OVERLOOK 12 MO $_________ $_________

HULAH DAM, SADDLE

DIKE & COMPOUND

1 MO $_________ $_________

PAVED & UNPAVED

AREAS- HULAH DAM,

SADDLE DIKE &

COMPOUND

1 MO $_________ $_________

3037 RIPRAP AREAS & 1 MO $_________ $_________

CONCRETE LINED

DITCHES- HULAH DAM,

SADDLE DIKE &

COMPOUND

TOTAL OPTION YEAR 3 $_________

Option Year 4 - 1 Mar 2020 - 28 Feb 2021

4001 ANGLERS POINT 7 MO $_________ $_________

4002 COPAN POINT 7 MO $_________ $_________

4003 POST OAK 7 MO $_________ $_________

4004 PRAIRIE POND 7 MO $_________ $_________

4005 WASHINGTON COVE NORTH 7 MO $_________ $_________

4006 WASHINGTON COVE SOUTH 7 MO $_________ $_________

SEMI IMPROVED AREAS

4007 COPAN LAKE OFFICE 7 MO $_________ $_________

4008 COPAN POINT 7 MO $_________ $_________

4009 PSAGE PLAINS 7 MO $_________ $_________

4010 POST OAD 7 MO $_________ $_________

4012 COPAN LAKE OFFICE 7 MO $_________ $_________

4013 COPAN 7 MO $_________ $_________

4014 CANEY ;EVEE 7 MO $_________ $_________

4015 COPAN LAKE OFFICE 7 MO $_________ $_________

4016 COPAN LAKE OFFICE 12 MO $_________ $_________

APPENDIX C

PARK CLEANING

4017 ANGLERS POINT 7 MO $_________ $_________

4018 COPAN POINT 7 MO $_________ $_________

4019 POST OAK 7 MO $_________ $_________

4020 PRAIRIE POND 7 MO $_________ $_________

4021 WASHINGTON COVE 7 MO $_________ $_________

4022 COPAN POINT 5 MO $_________ $_________

4023 WASHINGTON COVE SOUTH 5 MO $_________ $_________

4024 ANGLERS POINT 12 MO $_________ $_________

4025 COPAN POINT 12 MO $_________ $_________

4026 POST OAK 12 MO $_________ $_________

4027 WASHINGTON COVE 12 MO $_________ $_________

4028 GUARDRAIL AREAS-

EMBANKMENT

7 MO $_________ $_________

4029 PAVED & UNPAVED AREAS 7 MO $_________ $_________

RIPRAP AREAS %

4031 DAM EMBANKMENT ATEAS 7 MO $_________ $_________

AREA – HULAUH SADDLE

4033 HULAH OVERLOOK 12 MO $_________ $_________

4034 FISHERMAN’S OVERLOOK 12 MO $_________ $_________

HULAH DAM, SADDLE

DIKE & COMPOUND

1 MO $_________ $_________

PAVED & UNPAVED

AREAS- HULAH DAM,

SADDLE DIKE &

COMPOUND

1 MO $_________ $_________

RIPRAP AREAS &

CONCRETE LINED

DITCHES- HULAH DAM,

SADDLE DIKE &

COMPOUND

1 MO $_________ $_________

TOTAL OPTION YEAR 4 $_________

TOTAL BASE YEAR (CLIN 0001 thru 0037) __________ TOTAL OPTION YEAR ONE (1) (CLIN 1001 thru 1037) $_________________ TOTAL OPTION YEAR TWO (2) (CLIN 2001 thru 2037) $_________________ TOTAL OPTION YEAR THREE (3) (CLIN 3001 thru 3037) $_________________ TOTAL OPTION YEAR FOUR (4) (CLIN 4001 thru 4037) $_________________

TOTAL BASE AND ALL OPTIONS $_________________

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 PWS_COPAN_HULAH 72 21-JAN-2016 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 PWS_COPAN_HULAH 72 21-JAN-2016 Attachment 2 WAGE RATES - SCA

WASHINGTON

COUNTY - OK

10 28-JAN-2016

(End of Summary of Changes)