APPENDIX B

LEAD-BASED PAINT AND ASBESTOS REPORT

ADDED IN ITS ENTIRETY BY AMENDMENT 0004

A pp en di x

B L ea d-

B as ed P ai nt a nd

A sb es to s R ep or t

Spaces Detail Report-Asbestos

Building 518 Plant ALTU Site BASE

F3225Project

ABATSTAT: ABATDATE:

Space ID EX 0X EXT Quant.

Priority

Lab Results Comments

Material ID FIT Fitting (Type Not Specified.) 0 sqft Assumed Neg. / Under metal jacket.

PI Pipe (Type Not Specified.) 0 sqft Assumed Neg. / Under metal jacket.

WR Wrap - Miscellaneous 2 sqft Assumed Neg. /

WR Wrap - Miscellaneous 0 sqft Assumed Neg. /

WR Wrap - Miscellaneous 0 sqft Assumed Neg. /

WR Wrap - Miscellaneous 0 sqft Assumed Neg. /

WR Wrap - Miscellaneous 0 sqft Assumed Neg. /

Space ID MR 01 MECH Quant.

Priority

Lab Results Comments

Material ID CLSH Ceiling - Sheetrock 0 sqft Assumed Neg. / AB 3/22/2005

CLSH Ceiling - Sheetrock 0 sqft Assumed Neg. / AB 3/22/2005

CLSH Ceiling - Sheetrock 1500 sqft Assumed Neg. / AB 3/22/2005

CLSH Ceiling - Sheetrock 0 sqft Assumed Neg. / AB 3/22/2005

FICHW Chilled water system fittings 0 sqft Assumed Neg. / AB 3/22/2004

FICHW Chilled water system fittings 0 sqft Assumed Neg. / AB 3/22/2004

FICHW Chilled water system fittings 0 sqft Assumed Neg. / AB 3/22/2004

FICHW Chilled water system fittings 0 sqft Assumed Neg. / AB 3/22/2004

FIHW Fitting - Heating hot water 0 sqft Assumed Neg. / AB 3/22/2004

FIHW Fitting - Heating hot water 0 sqft Assumed Neg. / AB 3/22/2004

Tuesday, August 13, 2013 Page 1 of 4

HDUCT Duct 0 sqft Assumed Neg. /

HFLEX HVAC - Flexible duct/flex duct joint 16 sqft Assumed Neg. / AB 3/22/2004

HFLEX HVAC - Flexible duct/flex duct joint 0 sqft Assumed Neg. / AB 3/22/2004

HFLEX HVAC - Flexible duct/flex duct joint 0 sqft Assumed Neg. / AB 3/22/2004

HFLEX HVAC - Flexible duct/flex duct joint 0 sqft Assumed Neg. / AB 3/22/2004

HFLEX HVAC - Flexible duct/flex duct joint 0 sqft Assumed Neg. / AB 3/22/2004

MBLR Mech equip. - Boiler 0 sqft Assumed Neg. / Inside boiler.

MBRCH Mech Equip. - Boiler breeching 7 sqft Assumed Neg. / AB 3/22/2004

MBRCH Mech Equip. - Boiler breeching 0 sqft Assumed Neg. / AB 3/22/2004

MBRCH Mech Equip. - Boiler breeching 0 sqft Assumed Neg. / AB 3/22/2004

MBRCH Mech Equip. - Boiler breeching 0 sqft Assumed Neg. / AB 3/22/2004

MBRCH Mech Equip. - Boiler breeching 0 sqft Assumed Neg. / AB 3/22/2004

PI Pipe (Type Not Specified.) 0 sqft Assumed Neg. /

Space ID OF 02 OFF Quant.

Priority

Lab Results Comments

Material ID CLSH Ceiling - Sheetrock 480 sqft Positive /

FLVCT Vinyl Composite Tile Floor 480 sqft Assumed Pos. / 9"x 9" White.

WLSH Wall - sheetrock 160 sqft Positive /

Space ID PL 01 PLENU Quant.

Priority

Lab Results Comments

Material ID HMAS Duct System joint mastic 20 sqft Positive / On seams inside plenum.

Material ID HMAS Duct System joint mastic 0 sqft Positive / On seams inside plenum.

Tuesday, August 13, 2013 Page 2 of 4

HMAS Duct System joint mastic 20 sqft Positive / On seams inside plenum.

HMAS Duct System joint mastic 0 sqft Positive / On seams inside plenum.

Space ID RF 2R ROOF1 Quant.

Priority

Lab Results Comments

Material ID RFROLL Roof - Rolled sheet type 70 sqft Assumed Pos. /

Material ID RFROLL Roof - Rolled sheet type 70 sqft Assumed Pos. /

Material ID RFROLL Roof - Rolled sheet type 1500 sqft Assumed Pos. /

Material ID RFROLL Roof - Rolled sheet type 6100 sqft Assumed Pos. /

Material ID HFLEX HVAC - Flexible duct/flex duct joint 0 sqft Assumed Neg. /

RFROLL Roof - Rolled sheet type 33000 sqft Assumed Pos. /

Space ID SH 01 DOCK Quant.

33000

Priority

Lab Results Comments

Material ID FIDW Domestic Water Fitting Insulation 0 sqft Positive /

FIDW Domestic Water Fitting Insulation 0 sqft Positive /

FIDW Domestic Water Fitting Insulation 0 sqft Positive /

FIDW Domestic Water Fitting Insulation 0 sqft Positive /

FIHW Fitting - Heating hot water 0 sqft Positive /

FIT Fitting (Type Not Specified.) 0 sqft Assumed Neg. /

HDUCT Duct 0 sqft Assumed Neg. /

Tuesday, August 13, 2013 Page 3 of 4

HFLEX HVAC - Flexible duct/flex duct joint 30 sqft Positive /

HFLEX HVAC - Flexible duct/flex duct joint 0 sqft Positive /

HFLEX HVAC - Flexible duct/flex duct joint 0 sqft Positive /

HFLEX HVAC - Flexible duct/flex duct joint 0 sqft Positive /

PI Pipe (Type Not Specified.) 0 sqft Assumed Neg. /

WLTR Wall Transite 2000 sqft Assumed Pos. /

Material ID CLSH Ceiling - Sheetrock 0 sqft Positive /

CLSH Ceiling - Sheetrock 459 sqft Positive /

FIHW Fitting - Heating hot water 2 sqft Positive /

PI Pipe (Type Not Specified.) 0 sqft Assumed Neg. /

WLSH Wall - sheetrock 560 sqft Positive /

WLSH Wall - sheetrock 0 sqft Positive /

Space ID TO 01 TOIL Quant.

Priority

Lab Results Comments

Material ID BATT BATT INSULATION MATERIAL 0 sqft Assumed Neg. /

CLSH Ceiling - Sheetrock 768 sqft Positive /

CLSH Ceiling - Sheetrock 0 sqft Positive /

DHWT Domestic Hot Water Tank 0 sqft Assumed Neg. / Under metal jacket.

FIDW Domestic Water Fitting Insulation 0 sqft Positive /

FIHW Fitting - Heating hot water 0 sqft Positive /

HDUCT Duct 0 sqft Assumed Neg. /

PI Pipe (Type Not Specified.) 0 sqft Assumed Neg. /

WLSH Wall - sheetrock 163 sqft Positive /

WLSH Wall - sheetrock 0 sqft Positive /

Tuesday, August 13, 2013 Page 4 of 4

BUILDING 193 EXPANSION

Altus Air Force Base, Oklahoma

PREPARED FOR:

MERRICK & COMPANY

3575 KOGER BOULEVARD, SUITE 235

DULUTH, GEORGIA 30096

PREPARED BY:

Gw2 ENGINEERING, INC.

3939 NORTH WALNUT AVENUE

OKLAHOMA CITY, OKLAHOMA 73105

PHONE: 405-684-8920

FAX: 405-684-8923

www.gwsquared.com

PROJECT NO. M091-13

November 14, 2013

*AM3

http://www.gwsquared.com

Table of Contents

Project Information.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1 Client and Authorization.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1

Summary of Findings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2 Visual Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2 Asbestos-Containing Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2 Lead-Base Paint. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3 EPA Inspection Protocol. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3 Fluorescent Tubes Visual Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3

Reliance and Limitations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 4

Appendixes

Appendix "A" Site Plans Appendix “B” Laboratory Test Results Appendix “C” Pictures

Project Information

Gw2 Engineering, Inc. is pleased to present this HAZMAT limited sampling forAsbestos

& lead-based paint, at a two-story office building 193 and Hangar 518 located at Altus AFB

, Altus, Oklahoma. The survey included interior building materials, and is provided in support of future demolition or remodeling of the buildings.

• Client and Authorization

• Summary of Findings

• Reliance Information and Limitations of this Report

Client and Authorization

This project was authorized by Mr. Chandresh Gajera, PE of Merrick & Company on

October 25, 2013 via email and acceptance of our proposal number M091-13 dated

September 24, 2013. The scope of services for this subsurface exploration were performed in accordance with our proposal.

Gw2 Engineering, Inc.

Project No. G035-13

August 30, 2013

Summary of Findings

The scope of work included the identification of suspect asbestos-containing materials

(ACM) and interior building components painted with lead-based paint (LBP). Gw2’s scope of work was limited to asbestos and lead. However, we did a visual inspection of the fluorescent tubes, potential mercury-containing materials. The inspection was conducted on October 28, 2013.

Visual Inspection

Initially, we walkthrough the building to determine the presence and existing conditions of the potential suspected materials that were exposed or accessible. Both floors 1st and 2nd had very similar appearance and we were able to group into homogeneous (color texture and appearance) sampling areas. During the walkthrough, we asked information on the history of the building on maintenance and installation of the light system. Outside pictures were not taken due to the restricted areas at Altus AFB. A few pictures were taken inside the building 193 (lights and ceiling covering).

Asbestos-Containing Materials

A total of five (5) samples of suspect ACM representing ceiling and walls of homogeneous materials were collected from the building. Materials sampled included wall paint and ceiling panels, acoustic ceiling panels, wall plaster, and drywall system.

Laboratory results indicated no detectable levels of asbestos in ceiling tile, acoustic panels and walls.

All samples were taken as randomly as possible, without creating any damaged to the sampled areas, since the building is still occupied. Three samples were collected for each test.

Gw2 Engineering, Inc.

Lead-Base Paint

A total of nine (3) samples were collected from the building 193 for lead analysis during the survey.

The survey for the existing Hangar 518 included the sampling of the exterior and interior lead-base paint on the structural steel components. Once we determined the random samples, paint-chips sampling was performed. The paint-chip was approximately 2"x1" and 2"x2" chips that represented all potential contaminated layers of paint. Three (3) of the paint chip samples had detectable levels of lead at the Hangar steel structures.

EPA guidelines were used to determine the sampling protocol. Sampling locations were chosen to be representative of homogeneous material. All samples were taken as randomly as possible, and minimizing disturbance of the materials.

EPA Inspection Protocol

a. Surfacing Materials (Spray or trowel to member of the building)

b. Thermal Insulation (Steel Structures)

c. Miscellaneous Material (Any other out of the above classification)

d. Friable Materials: Any material containing more than 1% Asbestos that when dry can be crumble, pulverized or crushed by hand pressure.

e. Category I Non-Friable: materials as packing, gaskets, resilian floor coverings, and asfalt roofing.

f. Category II Non-Friable: Any material that contains more than 1% asbestos and cannot be reduced to powder by hand.

Fluorescent Tubes Visual Inspection

Several fluorescent tubes were inspected for potential mercury-containing material. The inspection was limited to a visual inspection and verifying the brand name and the

Gw2 Engineering, Inc.

description of content from the manufacturer. The fluorescent tubes manufactory description indicates that there is no mercury containing material inside the light tubes.

Reliance and Limitations

This report was prepared expressly for the use of Merrick & Company for the building 193 and Hangar 518, ocated inside the AFB in Altus, Oklahoma. The information and recommendations contained in this report may not be adequate and should not be used by other parties or for other projects.

Information contained in this report is intended for design or information purposes. We recommend that contractors perform their own investigation to determine construction means and methods if there is unforseen conditions on suspected materials.

Please note that mold or any other environmental issues were not considered for this project and are beyond the scope of this report. Since we are not involved in all the phases of the construction process, Gw2 is not and cannot be responsible for mold or any other environmental issues.

This project, engineering evaluation, and report were conducted in accordance with the standard of care for visual inspection, laboratory test results and geotechnical engineering in the state of Oklahoma at the time of the investigation.

Gw2 Engineering, Inc.

Appendix “A”

Site Plans

Victor Oval

Victor Oval

Victor Oval

Victor Oval

Victor Text Box Test sample

Victor Oval

Victor Oval

Victor Oval

Victor Oval

Victor Text Box Sample Test

Victor Callout 3 Paint Sample Tests

Appendix “B”

Laboratory Test Results

Appendix “C”

Pictures

ASBESTOS-LEAD Final Report.pdf
of
Project Information
Client and Authorization
Summary of Findings
Visual Inspection
Asbestos-Containing Materials
Lead-Base Paint