This is a combined synopsis and solicitation for dredged material disposal area site drainage and earthwork preparation services. The U.S. Army Corps of Engineers, Philadelphia District intends to award a firm-fixed-price contract requiring the contractor to provide all management, tools, supplies, equipment, and labor necessary to provide drainage and earthwork preparation services at the Killcohook complex of dredged material disposal areas in Salem County, New Jersey. The contractor must provide amphibious excavators, bull dozers, dump trucks, tracked excavators and associated items over two phases - drainage services using excavators over 330 work days, then earthwork preparation services using additional equipment upon drainage completion. The contractor will perform to standards in the performance work statement for an estimated cost between $5-10 million. The solicitation number is W912BU-21-R-0034 and proposals are due by September 23, 2021. This is a 100% 8(a) small business set-aside with a NAICS code of 238910 and size standard of 500 employees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912BU21R0034 23-Aug-2021
b. TELEPHONE NUMBER
215-656-6761
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 20 Sep 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BU9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
TIFFANY Z CHISHOLM
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W25PHS 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
OPS DIV-MGMT SPT BR
TIMOTHY ROONEY
USACE PHILADELPHIA DISTRICT
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
TEL: 215-656-6592 FAX: 215-656-2145
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
238910
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF83
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
STATEMENT OF WORK
PERFORMANCE WORK STATEMENT (PWS)
DREDGED MATERIAL DISPOSAL AREA SITE DRAINAGE AND EARTHWORK PREPARATION
SERVICES CONTRACT, KILLCOHOOK CELL 1 DISPOSAL AREA
SALEM COUNTY, NEW JERSEY
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to provide drainage and earthwork preparation services at the Killcohook complex of dredged material disposal areas in Salem County, New Jersey. The purpose of these disposal areas is to provide a place to dispose of dredged material removed during USACE maintenance dredging operations in the Delaware River. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor, who in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, 4 amphibious crawler mounted backhoe/excavators, 4 D6 bull dozers, 8 articulated dump trucks, 2 tracked excavators and all associated supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the required services to the Killcohook disposal areas as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract. Services provided under this contract will be performed in two phases. The first phase will be for drainage and include the four (4) amphibious excavators. The second phase will be for earthwork preparation services and include the bull dozers, dump trucks and excavators and will not begin until completion of the first phase.
1.2 Background: The Killcohook complex of dredged material disposal areas are comprised of a system of earthen dikes with approximately 1200 acres of containment space designed to hold dredged materials. This site allows soil sediments transported as dredge slurry to settle out before water is discharged back into the waterway through a sluice structure. Drainage services are aimed at drying and consolidating materials in-place, as the water is discharged back into to the waterway through a series of drainage ditches leading to the sluiceway. Earthwork preparation services are aimed at excavating, moving and compacting soils within the limits of the Killcohook complex of dredged material disposal areas to properly enable concurrent dike construction by the government.
Compaction of dredged material soils is accomplished nominally by placing material in approximately equal layers not exceeding 12 inches in loose thickness and compacting by the controlled traffic of spreading and/or hauling equipment over each layer.
1.3 Objectives: The purpose of this contract is to provide all management, tools, supplies, equipment and labor necessary to provide drainage and earthwork preparation services at the Killcohook complex of dredged material disposal areas.
1.4 Scope:
1.4.1 Drainage Services: It is essential that the contractor ensure that the disposal site experiences significant drying by providing adequate drainage throughout the period of performance. To provide for adequate drainage, the contractor must ensure that, at a minimum:
1.4.1.1 Drainage ditches are excavated along the entire inside perimeter of the earthen disposal area dike lines. The perimeter ditch will be located approximately 50-feet from the inside toe of the existing dike-line. The ditch must be excavated to a minimum depth and width of 4-feet.
1.4.1.2 “Finger drainage ditches” are constructed perpendicular to the perimeter ditches at a distance of approximately 500 feet inside the disposal area starting from and connecting to the perimeter ditch. The spacing between the “Finger Drainage Ditches” will be approximately 200-feet. The contractor will be responsible for determining the distance/interval between the finger ditches to allow for maximum drainage and drying. Finger ditches must be excavated to a minimum depth and width of 4-feet.
1.4.1.3 A clear drainage flow way to the sluice boxes must be maintained. The contractor will periodically be required to coordinate with the government representative to have the wooden stop logs of the sluice manipulated to maximize and maintain drainage flow.
1.4.1.4 Stockpile materials within the disposal area in a manner that enhances the drying process. The
Government reserves the right to inspect the stockpiles and advise the contractor if changes are required to better enhance the drying process.
1.4.2 Earthwork Preparation Services: It is essential that the contractor move and place a sufficient amount of on-site materials which will support the construction of a new dike by the government work force. To provide for adequate earthwork preparation, at a minimum, the contractor must:
1.4.2.1 Move, push-up and place on-site materials to be used by the government to raise the elevation of the existing earthen disposal area dike lines. Grade stakes will be set by USACE to indicate existing site elevations and proposed lay down limits. The overall average width of contract lay down limits from the inside toe of the existing dike out into the disposal area is approximately 70 feet. The contractor must maintain a sufficient supply of stockpiled material within the laydown area to support the government work effort constructing a new dike throughout the period of performance.
1.4.2.2 Demonstrate a continued daily progress of moving, shaping and compacting dredged materials within the lay down limits of the existing earthen dike. Placement within identified final lay down area must conform to the elevation grade stakes and work boundary markers. All work will be monitored by the government.
The Contractor will be required to complete a minimum daily linear footage of 100-feet within the designated work area.
1.4.2.3 Stockpile materials inside the disposal area in a manner that enhances the drying process and provides dry, workable materials after rain events. The Government reserves the right to inspect the stockpiles and advise the contractor if changes are required to better enhance the drying process.
1.5 Period of Performance: This service contract includes 30 calendar days for mobilization and submittal procedures, 240 operating days for drainage services (Phase 1) and 90 operating days for earthwork preparation services (Phase 2). Weekends & Holidays are not included in operating days. The anticipated period of performance will be from approximately 1 October 2021 to 1 March 2022 but will be adjusted based on the actual contract notice to proceed (NTP) from the Contracting Officer.
1.5.1 Recognized Federal Holidays: Work days do not include the Federal Holidays listed below:
New Year’s Day Martin Luther King Jr.’s Birthday Labor Day President’s Day Columbus Day Memorial Day Veteran’s Day Juneteenth Thanksgiving Day Independence Day Christmas Day
1.5.2 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0700 am and 15:30 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind the continuity of the workforce are essential. There will be no work during a holiday break period between 20-31 December 2021.
1.6 Required Submittals: The contractor shall be required to submit four separate documents within 14 calendar days of notice to proceed (NTP) for government approval prior to mobilization of any equipment; a work plan, health and safety plan, an accident prevention plan and a quality control plan as detailed in Part 5 of this PWS, Specific Tasks.
1.7 General Information:
1.7.1 Quality Control The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which they assure themselves that their work complies with the requirement of the contract. The Contractor shall be responsible for contract performance quality control. To facilitate this effort, the Contractor shall establish an inspection system acceptable to the Government. The Contractor shall provide a Quality Control Plan (QCP) which addresses methods for meeting the requirements of this contract. The complete QCP shall be submitted to COR in accordance with the delivery schedule. Contractor shall revise the QCP at no additional cost to the Government if ordered by the Contracting Officer. The Contractor shall conduct weekly on-site meetings with the Government QA representative to discuss work activities, milestones and any other pertinent issues and provide meeting minutes of said meetings within 3 days of each meeting. The QCP plan shall include a concise daily report that a minimum discusses personnel and equipment on site, significant issues, working status of each piece of equipment, weather, and all other pertinent information.
a. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
b. Government verification of services shall not constitute acceptance nor replace the contractor inspection or in any way relieve the contractor of any responsibility to take all actions necessary to assure highest quality of service rendered.
c. Final Acceptance. Prior to contract completion, Government Superintendent will perform a final inspection of the contract area to ensure that the contractor has complied with all contract requirements. The results of that inspection will be documented by Government Superintendent for the contract file.
1.7.2 Place of Performance: The work under this contract will be performed at the Pedricktown complex of dredged material disposal areas in Salem County, New Jersey. Ensure all contractors adhere to posted speed limits entering or exiting the Disposal Area. Any trash, mud or debris must be clean when entering or exiting the disposal areas at the main gates.
1.7.3 Physical Security: The contractor shall be responsible for safeguarding all, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.7.4 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE:
All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated.
The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the
Government and the total cost deducted from the monthly payment due the Contractor. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.7.5 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.7.6 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.7.7 Key Personnel: The follow personnel are considered key personnel by the government: see list below. The contractor shall provide a contract manager who shall be responsible for the performance of the work.
The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0700 to 1600 P.M., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
Contracting Officer Representative (COR): Jeff McAleer (267) 446-2417
Government Superintendent: Joseph Pintal (856) 953-6351
Government QA: Michael Cox (609) 929-0384
Project Manager: Tim Rooney (609) 217-8525
Safety Officer: Sam Crispin (215) 656-6933
1.7.8 Identification of Contractor Employees: All contract personnel attending meetings, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials.
They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.7.9 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.7.10 Weather Delays: It is anticipated that the amphibious excavators during execution of the Phase 1 drainage services can continue to work in all but the most severe weather conditions. During the Phase 2 earthwork Preparation Services, weather delays should be expected. In order for the Contracting Officer to award any time extensions, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather-dependent activities. For the purpose of this contract, unusually severe weather is defined as daily precipitation equal to or exceeding 0.5 inches and/or the maximum daily temperature not exceeding 32 degrees F.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON (5) DAY WORK
WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
5 2 2 2 2 2 2 2 2 2 2 2
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor shall record on the daily CQC report, the occurrence of adverse weather and resultant impact to normal scheduled work.
Actual adverse weather days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month and be recorded as full days. Unit rates of equipment and labor for works days partially impacted by weather shall be reimbursed as following: on work days when workers show up, but no work can be conducted, unit rates will be compensated for two hours;
when work must stop within the first two hours of the workday, unit rates will be compensated for four hours; when work must be stopped after two hours, unit rates will be compensated for a full day. No compensation will be granted if Contractor is notified at least sixteen (16) hours prior to start of the next workday that no work can be conducted due to severe weather. Partially compensated days shall be accumulated to full days and be included as part of the total workdays available in the appropriate phase of work.
1.7.11 Mechanical Delays: The contractor shall ensure that all equipment mobilized to the project work site is in good working condition and maintained to that standard for the duration of the contract. Days or portions of days when equipment is non-functional due to mechanical issues will be monitored and tracked by the contractor’s quality control manager on the daily QC Report as described in Section 1.7.1 of this PWS. All delays due to mechanical issues will be added to the duration of the contract, based on specific equipment type, at no additional cost to the government.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE SURVEILANCE PLAN(QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAYS. The number of credited eight (8) hour days or summed portions of days the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: N/A
3.2 Facilities; N/A
3.3 Utilities; N/A
3.4 Equipment; N/A
3.5 Materials; N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this PWS. The contractor shall provide all personnel, 4 amphibious crawler mounted backhoe/excavators, 4 D6 bull dozers, 8 articulated dump trucks, 2 tracked excavators and all associated supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the required services at the Pedricktown complex of dredged material disposal areas as defined in this Performance Work Statement (PWS).
4.2. Equipment: The Contractor will be operating in soft to very soft soil conditions. In order to show that the Contractor is capable of completing the performance requirements, the contractor must show that it owns or has access to the following piece of equipment for the appropriate durations in the Period of Performance as listed below. Contractor must also provide the Government with all contractor owned equipment or access to rentals as a separate attachment when submitting their bid:
4.2.1 Phase 1 - Drainage Services: This phase will require the three amphibious crawler mounted backhoe/excavators and will begin at NTP and will include 240 workdays.
4.2.1.1 Amphibious Crawler mounted backhoe (excavator) on pontoons suitable for operations in swamp like conditions. The backhoe/excavator must meet the following minimum specifications:
i. Class: 325
ii. Long Reach Boom: 60-foot.
iii. Track Roller Chain: Heavy duty, Engineer class
iv. Steering: Two pivoting foot pedals with detachable levers with each pedal/lever operating its corresponding track.
If the backhoe/excavator is equipped with a 1 cubic yard capacity bucket, then 1 cubic yard heaps of dredge material will be acceptable during the performance of the contract requirements. To be acceptable, the backhoe/excavator must be sized and factory rated to perform with the associated bucket.
4.2.2 Phase 2 – Earthwork Preparation Services: This phase will require the 4 D6 bull dozers, 8 articulated dump trucks and 2 tracked excavators and will include 90 work days. This Phase will begin immediately upon completion of Phase 1.
4.2.2.1 Bull Dozer
i. Class: Medium Track-Type Tractor
ii. Series: D6
iii. Tracks: Low Ground Pressure Version with extra wide tracks
iv. Net Flywheel Horsepower: 185 net
4.2.2.2 Tracked Excavator
i. Class: Medium
ii. Bucket: 2 cubic yard
iii. Type: Crawler Mounted
iv. Net Flywheel Horsepower: 161
4.2.2.3 Dump Trucks
i. Type: Articulated Off-Highway
ii. Drive Configuration: 6x6 (six wheel drive)
iii. Payload Rating (US Tons) 25-31
iv. Net Horsepower:300
4.3 Preparation of equipment, such as fueling, lubricating and other preventive maintenance measures shall be performed by the Contractor prior to start of regular work day. During periods of minor repairs and servicing, such as lubricating, during the work day, the equipment will be considered not to be in continuous operation.
4.4 Upon inspection of equipment, a government representative shall make the final determination as to acceptability for meeting satisfactory safety, performance and production requirements. The contractor is responsible for determining which pieces of equipment are required to complete work on a daily basis.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1 Work Plan. The Work Plan shall be prepared and implemented by the Contractor as part of its project work.
The Work Plan shall apply to all tasks/activities and products required by this contract. The Work Plan shall be submitted in a report format, and approved by the Contracting Officer’s Representative (COR) before field activities can commence. The Contractor shall provide one electronic copy of the Draft Final Work Plan to COR who will then state what changes must be made, or accept the draft as a final. The project specific work plan shall include, at a minimum:
a. Detailed project schedule through the entire period of performance.
b. Procedures for maintain equipment during period of performance.
c. Plan for completing and submitting all reports in a timely manner.
5.2 Health and Safety Plan. The Contractor will be responsible for providing appropriate on-site management and supervision to accomplish work tasks and comply with the US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.
a. EM 385-1-1 and its changes are available at:
http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx.
b. The Contractor shall be responsible for complying with the current edition and all changes posted on the web through the date that is 10 calendar days prior to the date offers are due. If the solicitation is amended to extend the time set for receipt of offers, the 10 calendar days rule stated above shall be applied against the amended date. (For example, if offers are due on 10 April, all changes posted on or before 31 March shall apply to the contract. If the time for receipt of offers is extended from 10 April to 20 April, all changes posted on or before 10 April shall apply to the contract.) Equipment and operators must be onsite and ready to work no later than the date specified in the notice to proceed unless otherwise specified within the contract.
c. The Contractor shall submit a project specific health and safety plan (HASP) for review and approval prior to initiation of any fieldwork. The final HASP shall include all review comments and Contractor’s responses. The HASP will comply with OSHA, EM 385-1-1 (current version) and any other federal, state or local requirements. The HASP will detail personnel training and responsibilities, project equipment, necessary personal protective equipment, decontamination, medical surveillance, and other applicable procedures and protocols for maintaining complete project safety. Any action required protecting the surrounding environment, community and other third parties (e.g. visitors) will be discussed. The Contractor shall ensure that his/her personnel are not only aware of, but also comply with the safety requirements. Adherence to the plan and protection of the environment is the responsibility of the Contractor.
d. Draft Final HASP shall be submitted electronically in a report format to COR and approved by COR before field activities are authorized to commence. Upon approval from COR, the Contractor shall provide the Final HASP for the project records.
5.3 Accident Prevention Plan. The contractor shall submit a project specific Accident Prevention Plan. It is expected that the Accident Prevention Plan will require the Contractor to immediately notify COR and designated US government safety officer of all accidents or incidents involving employee use of or damage or injury to facilities, equipment, or personnel.
5.4 Contractor Quality Control Plan. The Contractor shall be responsible for contract performance quality control. To facilitate this effort, the Contractor shall establish an inspection system acceptable to the Government. The Contractor shall provide a Quality Control Plan (QCP) which addresses methods for meeting the requirements of this task order. The complete QCP shall be submitted to COR in accordance with the delivery schedule. Contractor shall revise the QCP at no additional cost to the Government if ordered by the Contracting Officer.
PART 6
APPLICABLE PUBLICATIONS
N/A
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1.
The contractor shall provide excavation of perimeter ditch.
Excavates a drainage ditch along the inside perimeter of the stand-alone earthen disposal area dike line. The perimeter ditch will be located approximately 50-feet from the inside toe of the dike-line. The ditch must be excavated to a minimum depth and width of 4-feet.
Excavation completed in accordance with milestone schedule.
QC
Representative Via
COR
PRS # 2
Construction of finger ditches
Perpendicular to the perimeter ditches at a distance of 500-feet inside the disposal area starting from and connecting to the perimeter ditch. The spacing between the “Finger Drainage Ditches” will be 200-feet. The contractor will be responsible for determining the distance/interval between the finger ditches to allow for maximum drainage and drying. Finger Ditches must be excavated to a minimum depth and width of 4-feet.
Construction completed in accordance with milestone schedule.
QC
Representative Via
COR
PRS # 3
Maintain drainage flow by maintaining ditch stability and actively managing sluice box boards.
Maintains clear drainage flow way to the sluice box. The contractor will periodically be required to coordinate with government representatives to have the wooden stop logs of the sluice manipulated to maximize and maintain drainage flow.
Ensure sufficient drainage of project site. The perimeter ditch will be constructed in accordance with the requirements described in the referenced paragraph, and maintained to continue drainage.
Additionally, active management of the sluice box boards to facilitate continual drainage is occurring.
QC
Representative Via
COR
PRS # 4
Stockpiling/Drying Excavated Materials
Stockpile materials within the disposal area in a manner that enhances the drying process. The Government reserves the right to inspect the stockpiles and advise the contractor if changes are required to better enhance the drying process.
Ensuring that on-site construction materials are manipulated and properly placed to enhance drying process to provide dry workable material throughout the Period of Performance.
QC
Representative Via
COR
PRS#5
Move, place and push-up materials within the required lay down areas.
Move, push-up and place on-site materials to be used by the government to raise the elevation of the existing earthen disposal area dike line where required.
The contractor must maintain a sufficient supply of stockpiled material within the laydown area to support the government work effort throughout the period of performance
QC
Representative Via
COR
PRS#6
Demonstrate daily progress of moving, shaping and compacting dredged materials.
Placement within identified final lay down area must conform to the elevation grade stakes and work boundary markers.
The Contractor will be required to complete a minimum daily linear footage of 100-feet within the designated work area.
QC
Representative Via
COR
PRS#7
Stockpile materials to enhance and provide dry, workable materials.
Stockpile materials within the disposal area in a manner that enhances the drying process. The Government reserves the right to inspect the stockpiles and advise the contractor if changes are required to better enhance the drying process.
Ensuring that on-site construction materials are manipulated and properly placed to enhance drying process to provide dry workable material throughout the Period of Performance.
QC
Representative Via
COR
PRS#8
Weekly Meetings
Holds weekly meetings on-site to discuss proposed work activities, milestones, and other contract related issues. The contractor will submit meeting minutes to Government Superintendent within 3 days each weekly meeting.
Maintain 90% satisfaction of this requirement.
QC
Representative Via
COR
PRS#9
Work Plan
See Ref 5.1 Acceptance by Government.
QC
Representative Via
COR
PRS#10
HASP
See Ref 5.2 Acceptance by Government.
QC
Representative Via
COR
PRS#11
Accident Prevention Plan
See Ref 5.3 Acceptance by Government.
QC
Representative Via
COR
PRS#12
Quality Control Plan
See Ref 5.4 Acceptance by Government.
QC
Representative Via
COR
WAGE RATE REQUIREMENTS
"REGISTER OF WAGE DETERMINATIONS UNDER |U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor|WAGE AND HOUR DIVISION
|WASHINGTON D.C. 20210
| Wage Determination No.: 2015-4215 Daniel W. Simms | Division of |Revision No.: 14 Director Wage Determinations | Date Of Last Revision: 07/21/2021 Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015. If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2021. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
States: Delaware Maryland New Jersey
Area: Delaware County of New Castle Maryland County of Cecil New Jersey County of Salem
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations
01011 - Accounting Clerk I 17.54 01012 - Accounting Clerk II 19.70 01013 - Accounting Clerk III 22.03 01020 - Administrative Assistant 32.88 01035 - Court Reporter 26.30 01041 - Customer Service Representative I 15.39 01042 - Customer Service Representative II 16.79 01043 - Customer Service Representative III 18.86 01051 - Data Entry Operator I 15.95
01052 - Data Entry Operator II 17.40 01060 - Dispatcher Motor Vehicle 19.64 01070 - Document Preparation Clerk 17.38 01090 - Duplicating Machine Operator 17.38 01111 - General Clerk I 15.38 01112 - General Clerk II 16.78 01113 - General Clerk III 18.85 01120 - Housing Referral Assistant 24.11 01141 - Messenger Courier 14.30 01191 - Order Clerk I 16.11 01192 - Order Clerk II 17.25 01261 - Personnel Assistant (Employment) I 16.85 01262 - Personnel Assistant (Employment) II 18.84 01263 - Personnel Assistant (Employment) III 21.00 01270 - Production Control Clerk 24.93 01290 - Rental Clerk 16.83 01300 - Scheduler Maintenance 19.12 01311 - Secretary I 19.12 01312 - Secretary II 21.84 01313 - Secretary III 24.11 01320 - Service Order Dispatcher 17.55 01410 - Supply Technician 32.88 01420 - Survey Worker 18.62 01460 - Switchboard Operator/Receptionist 15.77 01531 - Travel Clerk I 17.17 01532 - Travel Clerk II 18.16 01533 - Travel Clerk III 19.39 01611 - Word Processor I 17.50 01612 - Word Processor II 19.65 01613 - Word Processor III 21.98
05000 - Automotive Service Occupations
05005 - Automobile Body Repairer Fiberglass 24.93 05010 - Automotive Electrician 22.35 05040 - Automotive Glass Installer 20.34 05070 - Automotive Worker 21.19 05110 - Mobile Equipment Servicer 19.63 05130 - Motor Equipment Metal Mechanic 22.81 05160 - Motor Equipment Metal Worker 21.22 05190 - Motor Vehicle Mechanic 22.83 05220 - Motor Vehicle Mechanic Helper 18.71 05250 - Motor Vehicle Upholstery Worker 20.54 05280 - Motor Vehicle Wrecker 21.22 05310 - Painter Automotive 22.14 05340 - Radiator Repair Specialist 21.22 05370 - Tire Repairer 14.03 05400 - Transmission Repair Specialist 23.49
07000 - Food Preparation And Service Occupations
07010 - Baker 13.52 07041 - Cook I 17.11
07042 - Cook II 18.84 07070 - Dishwasher 11.41 07130 - Food Service Worker 11.88 07210 - Meat Cutter 21.72 07260 - Waiter/Waitress 11.39
09000 - Furniture Maintenance And Repair Occupations
09010 - Electrostatic Spray Painter 20.52 09040 - Furniture Handler 17.39 09080 - Furniture Refinisher 22.85 09090 - Furniture Refinisher Helper 19.50 09110 - Furniture Repairer Minor 21.21 09130 - Upholsterer 19.43
11000 - General Services And Support Occupations
11030 - Cleaner Vehicles 12.81 11060 - Elevator Operator 14.42 11090 - Gardener 20.11 11122 - Housekeeping Aide 14.42 11150 - Janitor 14.42 11210 - Laborer Grounds Maintenance 16.44 11240 - Maid or Houseman 13.48 11260 - Pruner 15.18 11270 - Tractor Operator 18.94 11330 - Trail Maintenance Worker 16.44 11360 - Window Cleaner 15.62
12000 - Health Occupations
12010 - Ambulance Driver 20.22 12011 - Breath Alcohol Technician 25.00 12012 - Certified Occupational Therapist Assistant 29.44 12015 - Certified Physical Therapist Assistant 29.87 12020 - Dental Assistant 20.30 12025 - Dental Hygienist 40.84 12030 - EKG Technician 30.31 12035 - Electroneurodiagnostic Technologist 30.31 12040 - Emergency Medical Technician 20.22 12071 - Licensed Practical Nurse I 22.36 12072 - Licensed Practical Nurse II 25.00 12073 - Licensed Practical Nurse III 27.87 12100 - Medical Assistant 17.42 12130 - Medical Laboratory Technician 27.70 12160 - Medical Record Clerk 19.70 12190 - Medical Record Technician 23.51 12195 - Medical Transcriptionist 18.00 12210 - Nuclear Medicine Technologist 38.50 12221 - Nursing Assistant I 12.80 12222 - Nursing Assistant II 14.38 12223 - Nursing Assistant III 15.69 12224 - Nursing Assistant IV 17.62 12235 - Optical Dispenser 21.62 12236 - Optical Technician 21.24
12250 - Pharmacy Technician 16.50 12280 - Phlebotomist 18.63 12305 - Radiologic Technologist 29.90 12311 - Registered Nurse I 29.51 12312 - Registered Nurse II 32.76 12313 - Registered Nurse II Specialist 32.76 12314 - Registered Nurse III 39.32 12315 - Registered Nurse III Anesthetist 39.32 12316 - Registered Nurse IV 47.11 12317 - Scheduler (Drug and Alcohol Testing) 30.96 12320 - Substance Abuse Treatment Counselor 23.73
13000 - Information And Arts Occupations
13011 - Exhibits Specialist I 26.41 13012 - Exhibits Specialist II 32.70 13013 - Exhibits Specialist III 40.01 13041 - Illustrator I 26.81 13042 - Illustrator II 33.22 13043 - Illustrator III 40.03 13047 - Librarian 36.78 13050 - Library Aide/Clerk 16.83 13054 - Library Information Technology Systems 33.22 Administrator 13058 - Library Technician 20.40 13061 - Media Specialist I 23.60 13062 - Media Specialist II 26.41 13063 - Media Specialist III 29.43 13071 - Photographer I 19.31 13072 - Photographer II 21.62 13073 - Photographer III 26.78 13074 - Photographer IV 32.76 13075 - Photographer V 39.63 13090 - Technical Order Library Clerk 16.94 13110 - Video Teleconference Technician 23.34
14000 - Information Technology Occupations
14041 - Computer Operator I 20.35 14042 - Computer Operator II 22.77 14043 - Computer Operator III 25.37 14044 - Computer Operator IV 28.20 14045 - Computer Operator V 31.23 14071 - Computer Programmer I (see 1)
14072 - Computer Programmer II (see 1)
14073 - Computer Programmer III (see 1)
14074 - Computer Programmer IV (see 1)
14101 - Computer Systems Analyst I (see 1)
14102 - Computer Systems Analyst II (see 1)
14103 - Computer Systems Analyst III (see 1)
14150 - Peripheral Equipment Operator 20.35 14160 - Personal Computer Support Technician 28.20 14170 - System Support Specialist 34.18
15000 - Instructional Occupations
15010 - Aircrew Training Devices Instructor (Non-Rated) 33.58 15020 - Aircrew Training Devices Instructor (Rated) 40.64 15030 - Air Crew Training Devices Instructor (Pilot) 48.70 15050 - Computer Based Training Specialist / Instructor 33.58 15060 - Educational Technologist 34.07 15070 - Flight Instructor (Pilot) 48.70 15080 - Graphic Artist 28.17 15085 - Maintenance Test Pilot Fixed Jet/Prop 48.70 15086 - Maintenance Test Pilot Rotary Wing 48.70 15088 - Non-Maintenance Test/Co-Pilot 48.70 15090 - Technical Instructor 27.19 15095 - Technical Instructor/Course Developer 33.25 15110 - Test Proctor 21.94 15120 - Tutor 21.94
16000 - Laundry Dry-Cleaning Pressing And Related Occupations
16010 - Assembler 13.13 16030 - Counter Attendant 13.13 16040 - Dry Cleaner 15.02 16070 - Finisher Flatwork Machine 13.13 16090 - Presser Hand 13.13 16110 - Presser Machine Drycleaning 13.13 16130 - Presser Machine Shirts 13.13 16160 - Presser Machine Wearing Apparel Laundry 13.13 16190 - Sewing Machine Operator 15.65 16220 - Tailor 16.48 16250 - Washer Machine 13.76
19000 - Machine Tool Operation And Repair Occupations
19010 - Machine-Tool Operator (Tool Room) 27.71 19040 - Tool And Die Maker 32.31
21000 - Materials Handling And Packing Occupations
21020 - Forklift Operator 19.21 21030 - Material Coordinator 24.27 21040 - Material Expediter 24.27 21050 - Material Handling Laborer 14.91 21071 - Order Filler 15.10 21080 - Production Line Worker (Food Processing) 19.21 21110 - Shipping Packer 16.81 21130 - Shipping/Receiving Clerk 16.81 21140 - Store Worker I 16.77 21150 - Stock Clerk 21.29 21210 - Tools And Parts Attendant 19.21 21410 - Warehouse Specialist 19.21
23000 - Mechanics And Maintenance And Repair Occupations
23010 - Aerospace Structural Welder 38.35 23019 - Aircraft Logs and Records Technician 32.54 23021 - Aircraft Mechanic I 36.87 23022 - Aircraft Mechanic II 38.35 23023 - Aircraft Mechanic III 39.71
23040 - Aircraft Mechanic Helper 29.08 23050 - Aircraft Painter 35.51 23060 - Aircraft Servicer 32.54 23070 -…