This document outlines a solicitation for dredged material disposal site drainage and earthwork preparation services. The U.S. Army Corps of Engineers, Philadelphia District is seeking these services for the Killcohook disposal area complex in Salem County, New Jersey, with an estimated contract value between $5-10 million. The contractor will provide equipment including four amphibious excavators, four bulldozers, eight dump trucks, and two excavators, as well as labor, to perform drainage and earthwork preparation in two phases. The first phase involves drainage work using the excavators over approximately 17 months, followed by earthwork preparation using additional equipment. The solicitation number is W912BU-21-R-0034 and responses are due by September 23, 2021. This is a 100% small business 8(a) set-aside and will be awarded using lowest price procurement. The place of performance is the Killcohook disposal area complex and work must comply with site requirements and procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SHEET FOR DREDGED MATERIAL DISPOSABLE SITE DRAINAGE AND EARTHWORK PREPARATION SERVICES
CONTRACT FOR THE KILLCOHOOK DISPOSAL AREA COMPLEX.
ITEM UNIT QUANTITY UNIT PRICE TOTAL
Amphibious Excavator
Mobilization/Demobilization Each 4 ___________ _____________
Daily Rate Work Days 960 ___________ _____________
Operator Daily Rate Work Days 1004 ___________ _____________
Widetrack Bulldozer
Mobilization/Demobilization Each 4 ___________ _____________
Daily Rate Work Days 360 ___________ _____________
Operator Daily Rate Work Days 388 ___________ _____________
Crawler Excavator
Mobilization/Demobilization Each 2 ___________ _____________
Daily Rate Work Days 180 ___________ _____________
Operator Daily Rate Work Days 194 ___________ _____________
Articulated Dump Truck
Mobilization/Demobilization Each 8 ___________ _____________
Daily Rate Work Days 720 ___________ _____________
Operator Daily Rate Work Days 776 ___________ _____________
HASP/AAP, QC & Work Plans Each 4 ___________ _____________
Mechanic Labor Work Days 348 ___________ _____________
Safety/QA Labor Work Days 348 ___________ _____________
Sub Total for Equipment & Labor _____________
G&A ___________% _____________
Sub Total with G&A _____________
Profit ___________% _____________
Total Contract Cost with Profit _____________
Daily rate per piece of equipment includes all costs, to include, but not limited to: rental, taxes, fuel, oil, maintenance, parts, repairs and insurance to ensure each piece of equipment is fully capable of executing the requirements of this contract every work day, as appropriate for each Phase of work. Mechanic Labor includes manpower efforts to support equipment maintenance. Labor workdays include an estimated 11 paid holidays during anticipated period of performance for Phase 1 and 7 paid holidays for Phase 2.