Abstract_W912BU21B0015-W912BU21C0076.pdf

PDF 170 KB Posted

Attached to
Polyester Polymer Concrete Deck Overlay William V. Roth, Jr. Bridge
Solicitation number
W912BU21B0015
Issued by

About this file

This document provides details on a federal contract solicitation for repair work on the Senator Roth Bridge. The U.S. Army Corps of Engineers, Philadelphia District, is seeking a firm fixed-price contract to remove and replace the existing 1.5-inch latex modified concrete overlay across both the southbound and northbound lanes of the bridge. The work also includes cleaning and preparing the substrate, applying a new concrete overlay, re-striping the lanes, and some asphalt and concrete repair work. The period of performance is from October 15, 2021 through December 14, 2022. The contract value is estimated between $10-25 million. The solicitation will be available on SAM.gov and bids are due on the specified date. Davis Bacon wage rates and affirmative action requirements apply to this contract.

View the file

Other files

File Type Posted
W912BU21B0015_DWGS-AM0001.pdf PDF
W912BU21B0015_SPECS-AM0001.pdf PDF
W912BU21B0015-Specs.pdf PDF
W912BU21B0015-Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT – W912BU21B0015/W912BU21C0076

Gregory Keaton Contracting Officer_________________________________ **IGE pricing was revised and revised 09.27.2021

File details come from the government source that posted it. Updated .