W912BU21B0015-Dwgs.pdf
PDF 24 MB Posted
- Attached to
- Polyester Polymer Concrete Deck Overlay William V. Roth, Jr. Bridge Federal contract opportunity
- Solicitation number
- W912BU21B0015
About this file
This document outlines a federal contract opportunity for repair work on the Senator Roth Bridge over the Chesapeake and Delaware Canal. The U.S. Army Corps of Engineers, Philadelphia District, will award a firm fixed-price contract to remove the existing 1.5-inch polymer concrete overlay from both the southbound and northbound lanes of the bridge, clean and prepare the substrate, and install a new concrete overlay with a screed. Additional work includes temporary traffic control, asphalt shoulder replacement, concrete spall repairs, and lane striping. The estimated quantity of overlay to be removed is 3,620 cubic yards. The period of performance is from October 15, 2021 through December 14, 2022. The contract value is estimated between $10-25 million. Bids must be submitted through the SAM.gov website by the solicitation response date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_W912BU21B0015-W912BU21C0076.pdf | ||
| W912BU21B0015_SPECS-AM0001.pdf | ||
| W912BU21B0015_DWGS-AM0001.pdf | ||
| W912BU21B0015-Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
| S-001 |
| S-002 GEN INFORMATION |
| G-100 GEN PLAN |
| G-101 GENERAL PLAN |
| G-102 GENERAL PLAN |
| G-103 GENERAL PLAN |
| G-104 SUPERSTRUCTURE SURVEY MARKER |
| S-101 TYPICAL SECTIONS |
| S-102 Traffic Lane Closures |
| S-103 Traffic Lane Closures 2 |
| S-104 MISC CONCRETE REPAIRS |
| S-105 MISC CONCRETE REPAIRS 2 |
| S-106 MISC CONCRETE REPAIRS 3 |
| S-107 MISC CONCRETE REPAIRS 4 |
| Reference Drawings |
File details come from the government source that posted it. Updated .