Amendment 3 W912BU20B0016.pdf

PDF 195 KB Posted

Attached to
MDC 3281 Workboats Pittsburg, Allegheny River
Solicitation number
W912BU20B0016
Issued by

About this file

This amendment provides responses to industry questions regarding solicitation number W912BU20B0016 to acquire two all-welded aluminum work boats for the U.S. Army Corps of Engineers Pittsburgh District. The vessels will operate on the Allegheny River to transport and place buoys around locks AR2 through AR9, with an option for a third vessel. The amendment responds that vessel specifications must meet requirements in sections C003 through C455, with clarification around certification, ramp design parameters, and crane lifting capacity.

View the file

Other files

File Type Posted
Amendment 5 W912BU20B0016.pdf PDF
Amendment 4 W912BU20B0016.pdf PDF
Amendment 2 W912BU20B0016.pdf PDF
Amendment 1 W912BU20B0016.pdf PDF
W912BU20P0016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Provide a response to industry for requests for information (RFI) Questions and Answ ers (11)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU20B0016

X 9B. DATED (SEE ITEM 11)

20-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Apr-2020

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU20B0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 3

Amendement 3

Question 1. C004 asks the Contractor to obtain a PW stamp for all drawings certifying that the design is in accordance with the contract Design Standards in Section C003. Will the USACE accept the certification from a Naval Architect who would be more conversant with the marine standards noted?

Response 1. The design shall meet the requirements of the specification Section C004.

Question 2. C 410 the ramp specified is very long based on most Landing craft style workboats. Is it intended to be hinged to raise and lower?

Response 2. The ramp shall meet the requirements of the specification Section C410.

Question 3. What angle when raised would be an acceptable angle?

Response 3. The ramp shall meet the requirements of the specification Section C410.

Question 4. Is the ramp intended to bi-fold in the middle?

Response 4. The ramp shall meet the requirements of the specification Section C410.

Question 5. Is the ramp intended to hinge 180 degrees and lay on the deck when not in use, so the A-frame can work over it?

Response 5. The ramp shall meet the requirements of the specification Section C410.

Question 6. Are the sight lines from the helm to see through the ramp via louvers etc. or must see over?

Response 6. The vessel shall meet the requirements of the specification. Pilothouse shall have sufficient sight lines to safely operate the vessel.

Question 7. What weight must the ramp be designed for?

Response 7. The ramp shall meet the requirements of the specification Section C410. Per this section, the ramp shall be sized for personnel exit and entry.

Question 8. What other information can you provide for the design of the ramp, any sketches or photos available?

Response 8. The ramp shall meet the requirements of the specification Section C410.

Question 9. C455 asks for lift capacity of 4000 lbs. at 10’ reach. This would be the equivalent of 40,000 Ft lbs. of righting moment, which is excessive. The previous specification asked for only 500 lbs. at 10’. Can you please review the weight of the buoys and anchors and advise if this may be an incorrect amount of lift capacity?

Response 9. The cranes shall meet the requirements of the specification Section C455.

Question 10. C455 the A-frame is stated as having 10-15 feet outreach forward. Is the A-frame intended to carry a 3000 load over and beyond the 12’ long ramp?

Response 10. The crane shall meet the requirements of the specification Section C455.

W912BU20B0016

Question 11. If so what is the size of the load intended so the height of the A-frame can be designed accordingly.

Response 11. The crane shall meet the requirements of the specification Section C455.

(End of Summary of Changes)