Amendment_2.pdf

PDF 165 KB Posted

Attached to
ND-6 Barge Replacement
Solicitation number
W912BU19B0015
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Answ ering Requests for Information Last Day for RFIs Noon ECT August 9, 2019

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU19B0015

X 9B. DATED (SEE ITEM 11)

15-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2019

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU19B0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 2

Requests for Information W912BU19Q0015 ND-6 Barge Question 1: RFP Section C733 Electrical Power Plant – Cummins has told us that Cummins Onan Quiet Diesel generator specified in Section C733 does not offer a marine generator that is radiator cooled in this size. Cummins does offer the Onan generators with radiators for non-marine use with radiators, but they have stated that all warranties would be voided if these generators are used for a marine application. We could offer a marine generator but would have to include cooling pumps, piping, and either keel cooler or heat exchanger. The other option is to allow the non-marine generator application to be used and accept the voided warranty. Please clarify?

Answer 1: The diesel generator set shall have a minimum continuous rating of 11.5kW at 0.8 power factor at 60-Hz.

The generator shall be set up to supply 240/120 volt AC, single-phase, 3-wire, ungrounded, 60-Hz electrical power.

The diesel generator shall be EPA Marine rated in accordance with emission regulations.

The reference to Cummins was related to size only.

The provided unit is to be a marine unit, radiator cooled. Northern Lights Model NL843NW4 would be an example of a unit that meets the requirements.

Question 2: We received a request for crane info from a barge builder. They too are interested in better definition in order to be as accurate as possible in their proposal.

A crane of this size, if it has the same bells and whistles as the specified Mantis/Tadano, will be a significant part of the cost. There are some conflicts in this solicitation, for example, it calls for a pedestal crane, designed in accordance with API 2C for floating cranes, and the outreach appears to be significantly less than the specified Mantis/Tadano crawler crane. The Mantis/ Tandano does not really fit into the pedestal, API 2C parameter, and although we will design to perfectly meet your requirements.

We need better definition of what the maximum outreach is-and loads to be lifted, in order to accurately design and estimate cost ?

Answer 2: IAW the solicitation the crane is to be pedestal mounted. The pedestal and attachment to the barge shall be designed IAW API2C. Further definition of the lifting capacity is:

The main hoist of the crane shall be able to meet or exceed the following mission lift capacities in a duty cycle lift configuration:

• 55,910 lbs. @ 10' radius at 0 degree and 180 degree rotation

• 23,070 lbs. @ 30’ radius at 0 degree and 180 degree rotation

• 11,000 lbs. @ 45’ radius at 0 degree and 180 degree rotation

• 7,000 lbs. @60’ radius at 0 degree and 180 degree rotation The auxiliary hook shall have a minimum capacity of 11,000 lbs. @ 30’ radius.

All capacities shall be rated for the required machine list and trim Question 3: RFP Section C406 Coating Systems – Please clarify if the barge requires below hull anti-fouling coating systems. Drawing 855-B406-01 includes anti-fouling coating systems, but the specification Section C406 does not mention the requirement for the anti-fouling systems?

Answer 3: The anti-fouling requirement was left out of section 406, however IAW the “Order of Precedence” clause of the contract, drawings take precedence. Therefore anti-fouling paint is required.

Question 4: Please provide required lifting capacity for the crane, in order for "or equal" cranes to be evaluated?

Answer 4: IAW the solicitation the crane is to be pedestal mounted. The pedestal and attachment to the barge shall be designed IAW API2C. Further definition of the lifting capacity is:

The main hoist of the crane shall be able to meet or exceed the following mission lift capacities in a duty cycle lift configuration:

• 55,910 lbs. @ 10' radius at 0 degree and 180 degree rotation

• 23,070 lbs. @ 30’ radius at 0 degree and 180 degree rotation

W912BU19B0015

• 11,000 lbs. @ 45’ radius at 0 degree and 180 degree rotation

• 7,000 lbs. @60’ radius at 0 degree and 180 degree rotation The auxiliary hook shall have a minimum capacity of 11,000 lbs. @ 30’ radius.

All capacities shall be rated for the required machine list and trim Question 5: Question about the crane what is required Safe Working Load (SWL)?

Answer 5: IAW the solicitation the crane is to be pedestal mounted. The pedestal and attachment to the barge shall be designed IAW API2C. Further definition of the lifting capacity is:

The main hoist of the crane shall be able to meet or exceed the following mission lift capacities in a duty cycle lift configuration:

• 55,910 lbs. @ 10' radius at 0 degree and 180 degree rotation

• 23,070 lbs. @ 30’ radius at 0 degree and 180 degree rotation

• 11,000 lbs. @ 45’ radius at 0 degree and 180 degree rotation

• 7,000 lbs. @60’ radius at 0 degree and 180 degree rotation The auxiliary hook shall have a minimum capacity of 11,000 lbs. @ 30’ radius.

All capacities shall be rated for the required machine list and trim Question6: Question about the crane what, if any, are required critical lifts (specified load at certain radii) required for the USACE?

Answer 6: IAW the solicitation the crane is to be pedestal mounted. The pedestal and attachment to the barge shall be designed IAW API2C. Further definition of the lifting capacity is:

The main hoist of the crane shall be able to meet or exceed the following mission lift capacities in a duty cycle lift configuration:

• 55,910 lbs. @ 10' radius at 0 degree and 180 degree rotation

• 23,070 lbs. @ 30’ radius at 0 degree and 180 degree rotation

• 11,000 lbs. @ 45’ radius at 0 degree and 180 degree rotation

• 7,000 lbs. @60’ radius at 0 degree and 180 degree rotation The auxiliary hook shall have a minimum capacity of 11,000 lbs. @ 30’ radius.

All capacities shall be rated for the required machine list and trim Question 7: On drawing 855-B427-01 the inclining stairway Detail 2 -C Refers to Mc Nichols Thread and gives a model 640431T413 upon looking it up it says its 30" wide threads but the drawings also states that they're 36" wide.

To clarify the stair threads are 36" wide, correct? The model number is wrong?

Answer 7: The referenced tread is available in both 30 and 36 inch widths. The drawing as posted is correct for the government's needs.

Question 8: On the manual winches model # DF-156-40-11-M is discontinued? Is there a replacement perhaps Nabrico DF-356-40-M that would also work?

Answer 8: The government recognizes that the listed winch has been discontinued. A substitute winch w the same or greater characteristics (such as the NABRICO DF-356-40-11-M) is acceptable.

Last Day for RFIs is Noon ECT August 9, 2019

(End of Summary of Changes)