W912BU19B0015
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Correction to and Addition of Missing Sections Correction to Clauses Disregard original IFB.
Please use Corrected IFB included as an Attachment to Amendment 1
1. CONTRACT ID CODE PAGE OF PAGES
1 104
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU19B0015
X 9B. DATED (SEE ITEM 11)
15-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jul-2019
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: ROBERT HUTCHEON
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 12-Aug-2019 11:00 PM to 16-Aug-2019 11:00 PM.
The solicitation issue date has changed from 12-Jul-2019 to 15-Jul-2019.
The following have been added by reference:
52.212-1 52.214-29 52.246-18 Alt IV
The following have been added by full text:
SECTION C
Section C – Descriptions and Specifications
SCOPE OF WORK
C000 GENERAL
C001 PROJECT DESCRIPTION
The Marine Design Center (MDC) of the U.S. Army Corps of Engineers (USACE) has issued this Invitation for Bid (IFB), to acquire one non self-propelled floating crane barge replacement. The barge will serve as a floating crane to lift and carry debris or cargo on the deck.
The primary area of operation is on rivers, inshore, intra-coast and protected waters within the Norfolk District area of operations (AOR).
C002 PRINCIPAL CHARACTERISTICS
The principal dimensions of the barge shall be as follows:
Construction Material ............................................ ABS Grade-A mild steel Length (Molded) ................................................................................. 80'- 0" Beam (Molded) ................................................................................... 30'- 0" Depth (Molded at Centerline) ............................................................... 6’-6”
Depth (Molded at Side) ......................................................................... 6’-3” Bow ..................................................................................................... Raked Stern .................................................................................................... Raked
C003 DESIGN STANDARDS
The barge shall be designed and constructed in accordance with the contract drawings, and the latest edition and interpretations of the rules, regulations, requirements and standards of the Legislation, Regulatory Agencies and technical organizations listed below. The contractor is required to incorporate into the barge any revisions to the rules and regulations listed below as well as those stipulated in the respective specification clauses.
U.S. Army Corps of Engineers, Publication No. EM 385-1-1; “Safety and Health Requirements Manual.”
American Bureau of Shipping (ABS) "Rules for Building and Classing Steel
Vessels for Service on Rivers and Intracoastal Waterways."
American Bureau of Shipping (ABS) "Rules for Building and Classing Steel Vessels":
o Part 2 – Rules for Materials and Welding
International Association of Classification Societies (IACS) “No. 47 Shipbuilding and Repair Quality Standard”
46 CFR Subchapter C – Uninspected Vessels. USCG inspection and certification is not required.
46 CFR, Subchapter C – Part 28, Subpart E - Stability
46 CFR Subchapter S – Part 170, Subpart E – Weather Criterion
46 CFR Subchapter S – Part 173, Subpart B – Lifting
46 CFR Subchapter S – Part 174, Subpart B – Special Rules Pertaining to Deck
Cargo Barge
ASME/ANSI B30.8 – Floating Cranes and Floating Derricks; or
API 2C – Specification for Offshore Pedestal Mounted Cranes
U.S. Maritime Administration Schedule for Pipes, Joints, Valves and Fittings
The National Shipbuilding Research Program (NSRP 0490), January 1998, “Industrial Standards for Hull Structural Penetration Design Criteria and Details.”
C004 CLASSIFICATION & CERTIFICATION
A. ABS CLASSIFICATION
The contractor shall be responsible obtaining necessary regulatory body reviews and approvals, obtaining necessary inspections and surveys during construction and for the certification and classing of the barge as follows:
ABS classification for Maltese Cross A1, Floating Crane, Rivers and Intra-Coastal Waterways for use as a Government Floating Crane, with Reinforcement B
Other ABS Notations: CRC (Crane Register Certificate)
ABS Vessel ID No.: TBD
The recommended ABS point of contact is Mr. Robert (Bob) Smith (Manager – US
Government Programs, ABS Americas), who can be reached by phone, email or mail, at: (703) 519-9970, RSmith@eagle.org.
If the contractor intends to launch, test, operate or tow the barge “out of class”, the contractor must specifically advise ABS of such intent and incorporate any and all modifications required by that agency for such operation at no additional cost to the Government and at no additional contract time. Any such modifications which, in the opinion of the COR, affects the arrangements, operability, or suitability of the vessel shall be removed from the vessel by The contractor at no additional cost or time and the vessel returned to new condition prior to Final Acceptance.
B. VESSEL DESIGN AND CLASSIFICATION REVIEW STATUS
The Government has developed the barge’s design and drawings in accordance with ABS rules and these specifications. These drawings have not been submitted to ABS for their review or approval.
The contractor shall initiated and is responsible for the ABS Class process, including the engineering review. For the purpose of bidding, all of the contract drawings in this solicitation shall be assumed to be approved by ABS as issued. If ABS issues technical comments that require revisions to the design, the Government will coordinate with the contractor to resolve the comments and issue a contract modification(s) if required. The Government does not consider technical comments associated with final equipment selection, material selection, and/or standard shipyard construction/installation practices in the category of those that require revisions to the drawings/design. As such, those types of comments are the responsibility of the contractor.
The contractor shall be responsible for all costs associated with applications, additional plan submittals, and inspections required to obtain such certification/documentation. Please note that the Government has not designed the crane pedestal/foundation or the associated hull support structure. The contractor shall be responsible for this part of the design. In addition, the contractor shall be responsible for all ABS Surveyor comments and technical comments related to final equipment, material selection, and standard shipyard construction/installation practices.
C. VESSEL OWNER AND ADDRESS
For the ABS certificate of classification, the owner shall be listed as “U.S. Army Corps of Engineers, Norfolk District”. The owner’s address of record shall be listed as:
US ARMY CORPS OF ENGINEERS –NORFOLK DISTRICT
803 Front Street
Norfolk, VA 23510
D. ABS ENGINEERING MANAGER ACCESS & DISCLOSURE
The MDC will be the “Owner’s Representative” on this project and all correspondence with ABS shall be made available to the COR. In order to facilitate the communication process and reduce the paperwork burden on all parties, the contractor, and all sub-contractors, shall utilize the ABS Eagle Construct Engineering Manager Portal (02E) for all drawing submittals and correspondence. The contractor and all sub-contractors shall make the necessary arrangements with ABS to ensure that the Marine Design Center is granted the following Oversight Permissions for this Contract:
View project and drawing status View comments View transmittals Download approved drawings and review letters E-Mail notification of approval E-Mail notification of transmittal Status Disclaimer
The Marine Design Center’s ID/WCN number is 615255 and the point of contact with respect to the ABS Coordination/Engineering Manager Portal (02E) is Mr. Tim Keyser, Timothy.J.Keyser@usace.army.mil, Phone: (215) 656-6171.
The contractor shall ensure that, as a part of its contract with ABS The contractor authorizes ABS to disclose to and discuss with the Army Corps of Engineers any Rule or certification criteria issues, design assumptions and their impact on classification and certification, and any other technical considerations on which classification is to be based or which may affect future classification or certification of the barge.
The contractor shall authorize ABS to provide the Army Corps of Engineers at its request with a copy of all correspondence related to classification, statutory certification or other compliance verification for which ABS is responsible as it is promulgated and initially distributed.
This is to include drawings and other engineering work requiring ABS approval as well as correspondence generated which relates to such approvals, including all such correspondence dealing with vendors.
In addition, the contractor shall copy the Army Corps of Engineers with correspondence regarding classification, statutory certification and other compliance verification for which ABS is responsible. The contractor shall also authorize ABS to establish and maintain contact with other certification, verification and compliance agents involved on the barge being built.
Upon request by the COR, The contractor shall request ABS to furnish the Government with the project comment list. The list shall include open and closed technical and surveyor comments. The surveyor comments shall not only include comments generated during the drawing review process, but also comments generated by the ABS Surveyor during construction inspections. The comment list shall be sent directly from ABS to the COR via email as a .pdf file.
At the completion of the ABS review process, the contractor shall download all ABS
“Eagle Stamped” drawings and provide them on a CD or DVD to The Government in .pdf format.
C005 VESSEL IDENTIFICATION
The barge to be acquired through this solicitation has been assigned the following Marine Design Center project number, name and hull number:
MDC Project Number MDC Hull Numbers Vessel Names .......................................................................TBD
The MDC hull number 855 shall be used on all documents and drawings.
The vessel name has not been selected at this time. For the purpose of initial documents and drawing preparation, the title used shall be:
“CENAO ND-6 CRANE BARGE REPLACEMENT”
Upon selection of the official name for the vessel by the Government, the contractor shall incorporate the name into all “As-Built” documents and the construction drawing of the hull markings. The MDC hull number shall be used in lieu of an “Official Number”.
C006 SCOPE OF WORK
A. CONTRACTOR’S RESPONSIBILITY
The contract consists of two phases:
Phase I ...................... Planning, Scheduling and Engineering Phase II...................................... Construct, Test and Deliver
In accordance with the two phases, the contractor assumes complete responsibility for building and testing the vessel to meet the requirements of the contract. Should the contractor determine at any time that he is unable to fulfill those responsibilities, he shall notify the COR immediately of the problem experienced and his proposed manner of correction.
B. CONTRACT LEVEL DESIGN
The contract drawings have been prepared in accordance with ABS Rules as per Contract Clause C004 and the performance specification of this solicitation. For the purpose of bidding, the contractor shall assume the drawings, as issued in this solicitation, are approved by ABS.
The contract drawings provide a contract level design assumed to be in accordance with ABS and suitable for bidding with confidence. The contract level design shall serve as the basis for the contractor’s construction engineering and production development. Such contractor engineering can include: secondary structure and foundations, piping and cable routings, miscellaneous details, complete material list, purchase specifications, shop drawings, construction details, As-Built drawings, and other engineering and technical development necessary to support administration, operation, and production practices.
The crane pedestal/foundation and required hull support structure have not been designed or approved by ABS. Upon selection of the crane, the contractor shall be responsible for the structural design and integration, along with ABS class review for the crane and support structure.
The contractor shall not deviate from the contract level design without approval from COR.
For specific design and engineering drawings and calculations required by the contractor, see C006.D below.
C. DRAWING CHANGES
The contract drawings represent a contract level design and are not intended to be revised by the contractor, except in way of the crane pedestal/foundation. The contractor is expected to build the barge as shown in the Contract Drawings. The Government recognizes that minor design developments may be necessary to suit the contractor’s construction and business practices. All design developments shall be provided to the COR for approval and to confirm a contract modification is not required. If approved, any design developments shall be incorporated into the As-Built drawing package as necessary.
Should the contractor find any issues with the engineering and design of the barge as it relates to this solicitation and Contract Drawing package, The contractor shall bring it to the attention of the COR for resolution. If determined necessary by the Contract Officer, an appropriate contract modification will be developed to address the issue.
D. DRAWINGS PROVIDED & REQUIRED
1. Contract Drawings
Contract Drawings that are part of this solicitation are listed in Contract Section J, Clause J01, Contract Drawings. All Contract Drawings will be available to the successful bidder in CAD format.
The Contract Drawings reflect the Contract Level Design described above.
2. Drawing Requirements
Contract Section H, Clause H12, Engineering and Drawings, contains a list with the minimum drawings/calculations required to be finalized and/or developed by the contractor. Along with all drawings to be developed by the contractor, all contract drawings (unless otherwise noted) shall be updated at the completion of the project to provide a complete “As-Built” record of the vessel.
E. DEVIATIONS FROM THE CONTRACT DESIGN
Should the contractor desire to deviate from this Specification and/or the Contract Drawings, they shall submit their request in writing to the COR. Each proposed deviation requested shall be accompanied with a detailed analysis and comparison of the equipment, material or arrangement specified, and the equipment, material or arrangement proposed, including features, dimensions, performance characteristics, benefit to the Government, and compelling reason(s) why the deviation should be made. The request shall include, but is not limited to:
Desired deviation Reason(s) for the deviation Detailed analysis (as stated above) Impact on schedule Impact on cost Impact on weight, draft, and trim.
Impact of regulatory review and classification Supporting documentation (i.e. cut sheets, engineering drawings, photos, etc.)
In the absence of compelling reason(s) for making the deviation, the contractor’s proposal may be denied.
The Government will review the request and render a decision within 14 calendar days of receipt of a complete request for deviation. Requests that do not provide all of the information identified above may not be reviewed within 14 days, or may be returned as incomplete, with no review action.
If approved, the contractor shall be responsible for any cascading effects on the design, drawings or scientific reports as determined by the Government. The contractor shall be responsible for integrating the deviation into the design at no increase in contract cost or no extension of contract completion.
The contractor bears ultimate responsibility for satisfactory performance of all systems/arrangements impacted or affected by approved deviations as well as the operation of the completed vessel, as affected by the deviation.
No work deviation shall commence without a written approval from the KO.
If a deviation is approved by the COR, it is the sole responsibility of the contractor to coordinate with ABS and provide any additional engineering effort to meet the conditions of classifications and this specification.
The contractor shall bear all costs associated with any requested and/or approved deviations, including engineering, estimating, administrative and overhead, regulatory review and approval, construction and test and trials.
C010 DEFINITIONS
The following definitions are applicable to phrases and acronyms used throughout this contract:
ABS – Acronym for American Bureau of Shipping
COR – Contracting Officer’s Representative - a member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties. A copy of the COR’s authority letter is furnished to the contractor.
K.O. – Contracting Officer - A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.
MDC – Acronym for the Marine Design Center.
QC – Quality Control - Quality Control is a function of the contractor. Refer to clause E03. Quality Assurance (QA) is a function of the Government.
USACE – Acronym for United States Army Corps of Engineers.
USCG – Acronym for United States Coast Guard
C025 CONTRACTOR QUALITY STANDARDS
A. GENERAL
The contractor shall be responsible for the construction of a complete and functioning vessel.
Inspection by the Marine Design Center is for the purpose of verifying the proper function of the contractor’s quality control measures and is not to be used as a substitute for control of quality by the contractor.
Every effort shall be made during production planning to construct the vessel in an efficient sequence minimizing re-work and repair. Care shall be taken to assure the latest revisions of the Final Design plans are being used.
B. STRUCTURAL MATERIALS
Unless otherwise specified or noted on the contract drawings, all structural hull material shall be in accordance with the following specifications:
American Bureau of Shipping (ABS), “Rules for Building and Classing Steel
Vessels” and “Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways”.
Welding Materials - ABS “Approved Welding Electrodes, Wire-Flux and Wire Gas
Combination.”
Bolts, nuts, and screws – ASTM A307-82, Specification for Carbon Steel
Externally and Internally Threaded Standard Fasteners.
Materials not included in ABS specifications noted herein, shall be of commercial quality to ASTM, ANSI or SAE specifications.
C. STANDARD PARTS & MATERIALS
All articles, fittings, equipment, machinery, supplies, and materials used in the construction and outfitting of the barge shall be the highest grade, free from defects and imperfections, unused and, be the standard product of reputable manufacturers, to the maximum extent practicable. Any material not specified shall be the best of their kind for the purpose intended.
Materials specified herein to meet the requirements of standard specifications published by national authorities shall conform to the respective editions, including amendments, specified. No salvage materials shall be used in the work.
D. WORKMANSHIP
All labor shall be especially skilled for each kind of work and under competent direction.
Where work of one trade joins, passes through, or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damage of previously acceptable construction shall be cause for rejection. All parts of the vessel intended to join or bear upon other parts shall have complete and solid contact and shall fit together without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit.
All frames and longitudinal members, where applicable, shall be provided with limber holes and/or snipes of adequate size to allow water in bilges to flow to the lowest point of each compartment. Limber holes shall also be provided to allow for the passage of air in tanks. Limber holes shall be located at the plate edge.
Ends of outstanding flanges shall be cropped. Lighting holes may be punched or flame-cut and all edges shall have burrs removed.
All holes for machinery mounting bolts shall be drilled or punched; burning is not acceptable. Holes in members having sharp curvature shall be avoided.
All hull casting shall be machined or ground to bear solidly against the connecting structure.
E. WELDERS
All welding under this contract shall be done only by welders who have successfully passed qualification tests accepted by the American Bureau of Shipping or other regulatory bodies acceptable to ABS.
The contractor shall bear the expense of conducting these tests and shall certify, by name to the Contracting Officer, welders who have successfully passed the prescribed tests and hold current, valid certifications.
The contractor shall require any welder to repeat these tests when in the opinion of the Contracting Officer, the work of the welder indicates a reasonable doubt of his proficiency. In such cases the welder shall be re-certified as above if he successfully passed the retest; otherwise, he shall be disqualified until he has successfully passed the retest.
The contractor shall maintain records of welder’s certification during the course of the contract. The records are to be available for examination upon request of the Contracting Officer.
F. WELDING
All welding shall be in accordance with the current rules and Quality Standards of the American Bureau of Shipping and ANSI/AWS D3.5-85. All welding equipment used on the work shall be of a modern type subject to close control. The electrodes used throughout the work shall be suitable for use with the parent metal at weld, and be approved by ABS.
Welding procedures, as to direction, length, numbers, and sequence of beads, shall be carefully planned to minimize lock-up stresses. Care shall be exercised to produce smooth even beads, especially on all exposed plating and fittings. Beads shall be chipped and ground where directed by the COR.
The contractor shall employ appropriate welding procedures and grounding connections to preclude the possibility of anodic erosion of the hull after launching.
A detailed description of all welding procedures being employed in the construction shall be available to the Contracting Officer or his authorized representative.
G. INSTALLATION
Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer, and in compliance of this specification and the contract documents. The installation shall be accomplished by workmen especially skilled for each kind of work and under competent direction.
H. FAIRNESS & CONSTRUCTION TOLERANCES
Steel plating and structure shall be installed using proper welding procedures and sequences to insure fair, undistorted plating panels. The use of filler materials to surface unfair areas is not acceptable.
Maximum allowable construction distortion and tolerances are defined in the IACS “No.
47 Shipbuilding and Repair Quality Standard”. Distortion shall not exceed the amounts in this guide.
I. CONSTRUCTION STANDARDS
All material, machinery and equipment shall be new, of current manufacture and suitable for the marine service intended. Spare parts and service shall be readily obtainable.
All material, unless otherwise specified in these specifications or in the drawings, shall be of commercial quality to ASTM, ANSI, or SAE specifications.
During construction and before delivery, the contractor shall be responsible for protection of all material, equipment, etc., intended for the barge.
The overweight tolerance of members shall be within the limits defined by the specifications of the American Society for Testing and Materials (ASTM).
All materials shall be free of imperfections due to manufacturing processes and from defects which adversely affect appearance or serviceability.
All plating shall be neatly cut, fitted and welded. All sharp edges or projections which constitute a personnel hazard shall be removed or ground smooth. All notches shall have a radius to prevent stress concentrations.
Where aluminum must be attached to dissimilar metals or between dissimilar alloys of aluminum, fasteners shall be of stainless steel of an approved design with insulation as required to eliminate metal to metal contact.
All galvanizing shall be done after fabrication by the hot dip process, and the zinc shall be not less than 98% pure. In instances where some types of metals cannot be hot dip galvanized, zinc silicate coating may then be substituted.
C100 SCIENTIFIC
The Government will be responsible for all scientific calculations and reports including the following:
Weight Estimate Hydrostatic Calculations Tank Capacity Tables Intact Stability Calculations Damaged Stability Calculations Load Handling Stability
C105 HULL GEOMETRY
A. CONTRACT DRAWING
855-B105-01 HULL LINES
B. GENERAL
The hull geometry is defined as shown on the above contract drawing. The vessel’s principal characteristics are as follows:
Length Overall (Molded) ........................................................ 80’-0” Beam (Molded) ....................................................................... 30’-0” Depth (Molded at Centerline) ................................................... 6’-6” Depth (Molded at Side) ............................................................. 6’-3” Design Draft (Unloaded)........................................................... 2’-6”
C115 LIGHTWEIGHT SURVEY
A. CONTRACT DRAWINGS
855-B115-01 WEIGHT ESTIMATE
B. USE OF WEIGHT ESTIMATE FOR BIDDING
The weight estimate has been developed commensurate with the contract level design and uses margins for the purposes of vessel performance. The Government does not consider the weight estimate to be suitable for detailed bidding purposes. The Government is not responsible for contractor use of the weight estimate in bid preparation.
C. WEIGHT & CENTER OF GRAVITY ESTIMATES & MONITORING
The contractor shall implement a careful weight estimating and monitoring procedure.
During Phase I, The contractor shall create and update the weight and center of gravities (CG) each month with details on the final equipment selected and purchased, and system/outfitting design developments. The weight estimate shall be submitted monthly as document 855-C115-01.
During Phase II, The contractor shall update the weight and CG estimate each month. The update shall reflect actual equipment location, quantity and location of machinery systems/electrical items, actual quantity and location of outfitting items, and any changes to the structural weight.
The Government will review the monthly weight estimate to ensure the anticipated draft, trim and stability conditions of the vessel are satisfactory. If weight growth that adversely impacts the vessel trim and stability is found, the Government will coordinate with the contractor to determine the cause and develop remedial action
D. INCLINING AND DEADWEIGHT SURVEY
Upon completion of all work and after the crane has been installed, with the vessel in the lightship condition and the crane in the stowed position, the contractor shall conduct an inclining test and deadweight survey. The inclining test shall be carried out in accordance with ASTM F 1321-14 with the spuds in their upper stowed position.
The contractor shall be responsible for developing a test plan, providing all inclining weights, pendulum setup, support equipment and personnel. The test plan shall be titled “Incline Test Plan” and numbered 855-D115-02. The contractor shall submit the test plan to the Government and ABS for review and approval. The contractor shall direct the inclining experiment, record all data and complete the inclining test report (855-D115-03). The contractor shall submit the incline experiment results to the Government and ABS for review and approval.
E. NO LOAD CRANE MOVEMENTS
After the inclining test, several (no load) crane movements shall be performed (crane shall be operated by the crane manufacturer):
With no load on the hook, the crane shall swing to 90 degrees (starboard side), and next to 270 degrees, (port side). Pendulum readings shall be taken after each movement, as well as the vessel draft readings at the four corners of the barge. The initial and final boom angle shall be also recorded. This will be used to assess the heeling moment due to the crane’s own weight and CG. The change in LCG and VCG shall be ignored during the experiment.
The crane test shall be performed at least three (3) boom lengths; Fully Extracted, Mid Extended and Fully Extended. The crane test in each length shall be processed in accordance with the above procedure.
Document #855-C115-02 (INCLINE EXPERIMENT PLAN) shall include the plan and description for these movements. Document #855-D115-03 (INCLINE EXPERIMENT RESULT) shall include the data and results of these movements.
F. CRANE TEST
The load test of the crane cannot occur until:
Incline experiment is completed and the contractor submits the results to the Government and ABS
The Government and ABS approved the incline results Within 14 calendar days of received the approved incline experiment results, the
Government will update all stability documents and provide them to the contractor.
This will include:
o 855-D125-01 Hydrostatic Calculations o 855-D130-01 Tank Capacity Tables o 855-D150-01 Damage Stability Calculations o 855-D155-01 Intact Stability Calculations o 855-D160-01 Naval Architectural Analysis (Lifting Stability) o 855-D160-02 Floating Service Load Chart
The contractor shall submit the above documents/reports to ABS for review and
Following ABS approval of all stability related documents, the crane load tests can be scheduled.
C125 HYDROSTATICS, TANK CAPACITY, DAMAGE STABILITY & INTACT
STABILITY
855-B125-01 HYDROSTATIC CALCULATIONS
855-B130-01 TANK CAPACITY TABLES
855-B150-01 DAMAGE STABILITY CALCULATIONS
855-B155-01 INTACT STABILITY CALCULATIONS
The Government does not require additional review for the Hydrostatics, Tank Capacity, Damage Stability and Intact Stability.
C170 DRY DOCKING
855-B170-01 DRY DOCKING PLAN
855-B170-02 DRY DOCKING CALCULATION
The contractor is not responsible for preparing a dry docking plan. The Government will use the results of the inclining experiment, and the constructed hull form to verify our calculations and prepare the “As-Built” Dry Docking Plan.
C185 TEST & TRIALS
The barge and its component parts shall undergo testing and trials in accordance with Section E of the contract.
C200 ARRANGEMENTS
C215 GENERAL ARRANGEMENTS
855-B205-01 OUTBOARD PROFILE
855-B215-01 GENERAL ARRANGEMENT
The configuration of the hull and deck arrangements shall be as shown on the contract drawings and as stated within this specification. The bulkheads, subdivisions and tanks within the hull shall be as shown on the contract drawings and as stated within this specification. Additional bulkhead and structural support may be required to support the crane.
The Government does not require additional review for the Contract Drawings listed in
Paragraph A above.
The contract arrangements show most of the major equipment generally located in an acceptable location. The contractor, in conjunction with the COR or their representative, shall determine the final location of the equipment during construction.
All equipment and machinery shall be positioned to avoid interference, and to provide easy and adequate access from all sides for inspection maintenance and repair. Furthermore, all equipment and machinery installed within the hull shall be provided with an easy path for removal.
C. “AS-BUILT” DRAWINGS
For the “As-Built” drawings, the contractor shall update all of the arrangements with the actual locations of machinery, equipment, and outfitting items. All major components shall be shown in actual outline (not as boxes) and identified in the drawing. Sections and elevations shall be included to the extent required to define the location of components.
C300 STRUCTURE
C305 HULL STRUCTURE
855-B105-01 HULL LINES
855-B305-01 WELDING SCHEDULE
855-B307-01 DECK & BOTTOM STRUCTURE
855-B307-02 SIDE PLATING
855-B309-01 TRANSVERSE STRUCTURE
855-B311-01 LONGITUDINAL STRUCTURE
The hull steel plate shall be ABS Grade A Steel. The steel structural shapes, stiffeners, and angles shall be ASTM A36 steel.
All welding and weld sizes shall be in accordance with ABS rules. Any area of welding not defined in the contract drawings shall be developed by the barge contractor and approved by ABS as required. All welding shall be performed in accordance with AWS and ABS specifications and procedures.
The shell and deck plating shall be constructed of longitudinal strakes of lengths consistent with accepted practice for hulls. All seams shall be connected with full penetration welds, except the bilge radius and the deck edge, which shall be lap joints, joined with 100% weld, inside and out. Seams shall not be aligned directly over bulkhead plating or over the webs of stiffeners and transverses.
C. INSERT PLATES
Insert plates shall be provided under all deck fittings (kevels, chocks and bitts), deck winches, the crane pedestal and spud wells. The insert plates shall be connected with full penetration welds to the reminder of the deck and hull plating as shown on the contract drawings.
C330 FOUNDATIONS
The contractor shall be provided and installed foundations for the fixed machinery, fittings and equipment including deck winches. The details for the deck winch foundations shall be shown on drawing 855-C456-01. Support calculations shall be provided. The contractor shall weld and/or bolt the foundation to the hull and deck plate, using the details provided by the manufactures.
B. CRANE
The contractor shall obtain from the selected crane manufacturer a complete pedestal and foundation design. The pedestal and foundation shall be integrated into the hull structure and be designed in accordance with API 2C. The drawing(s) shall be reviewed by the Government and ABS. The drawing(s) shall include the following:
Bolting flange with machined surface for connection of crane to pedestal Bolt holes sized and machined for a no-slop fit Flange stiffening brackets (gusset plates) Full-height crane pedestal extending above deck and down to the hull bottom shell plate –crane pedestal height Diaphragm plate inside crane pedestal, with provision for drainage of fluid collected above diaphragm plate Bolts, nuts and washers
The contractor shall weld the crane pedestal to the hull and deck plate, using weld details provided by the crane manufacturer.
The crane pedestal shall be constructed from ASTM A36 steel.
Connection bolts and hex nuts conforming to SAE Grade 8 steel material and two sets of flat washers conforming to ASTM A490 steel material, shall be used to mount the crane on the crane pedestal. One set of these washers shall be provided between the bolt heads and the bolting flange and the other set provided between the bolting flange and the nuts. The lengths of these bolts shall be sufficient such that the threaded sections of these bolts are clear of the bolting flanges on the crane and crane pedestal.
C399 STRUCTURAL CALCULATIONS
855-B399-01 STRUCTURAL CALCULATIONS
B. GENRAL
The government has designed and developed the hull structure in accordance with the applicable ABS rules for the purposes of the vessel. The structure calculations have not been submitted to ABS for their review or approval. See Contract Clause C006.
C400 OUTFIT
C405 CATHODIC PROTECTION
855-B405-01 CATHODIC PROTECTION
855-B405-02 ANODE WEIGHT CALCUALATION
The contractor shall provide and install at least 130-lbs MIL-SPEC Aluminum Alloy Anodes. The anodes shall be manufactured and installed in accordance with MIL-SPEC MIL-A- 24779. The anodes shall be designed for use on hulls of ships, tugs, barge, etc. All anodes shall be faired or tapered to minimize turbulence. The anodes shall be manufactured with steel core straps and welded to the hull after paint is applied to the hull. The paint on the hull (exterior and interior) shall be restored after installation. The anodes shall not be painted.
Documentation certifying the anodes were manufacturer in accordance with MIL-A-24779 shall be provided.
C406 COATING SYSTEM
855-B406-01 PAINT SCHEDULE - MDC STANDARD FLOATING PLANT
B. SURFACE PREPARATION
Surface preparation for all structural steel shall be in accordance with Steel Structures Painting Council Standards SSPC-SP10-85 (Near White Metal Blast) throughout. Profile blasting shall be in accordance with the primer manufacturer’s requirements. All mill scale, weld spatter, dirt, oil and grease shall be removed.
Immediately upon completion of surface preparation, all steel shall be coated with the coating system described in the following.
The contractor shall use either pre-construction primer or limit initial coating to base coat only. If initial coating with base coat is selected, prior to application of subsequent coats, all steel shall be sand swept clean (light blast) or water blasted and any damaged areas repaired prior to application of the remainder of the system. All areas needing repair shall be cleaned to bare metal, spot blasted to restore profile and re-coated with the base coat.
C. PAINT REQUIREMENTS
Paint shall be delivered in sealed containers with labels to indicate manufacturer, date of manufacture, contents, and any special instructions. Paints and painting materials shall be stored under cover and protected from extreme temperatures.
Paints shall not be used if they have exceeded the closed shelf or pot life, recommended by the manufacturer. Additionally, paints shall not be applied in weather or humidity conditions not recommended by the manufacturer.
D. APPLICATION OF COATINGS
Surface preparation and paint application shall be in strict compliance with the coating manufacturer’s recommendations. The contractor shall take particular care to ensure that coating system requirements are met in all areas, especially those difficult to coat, such as flange undersides. All painting on both the interior and exterior surfaces below the deck shall be accomplished prior to launching the barge.
E. COATING SYSTEM
The system is composed of the following coating types:
Self priming epoxy base coat Abrasion resistant epoxy barrier coat Fade resistant urethane top coat
Additionally, in specified spaces/compartments the coating system may include an “Insulation Coating.”
F. PRE-QUALIFIED COATINGS
Coating systems from PPG Amercoat, International Paint, Sherwin-Williams, Carboline, and Jotun have been reviewed and are pre-qualified to meet the coating requirements of this section. The contractor may select any of these systems at his discretion. However, the systems may not be “mixed”. The specific coating designations to be used are listed on Contract Drawing.
If a pre-construction primer is used, only the pre-construction primers compatible with the pre-qualified coating system chosen will be accepted. The pre-construction primer shall be “weldable” and the coating thickness recommended by the paint manufacturer shall be strictly followed.
G. NUMBER OF COATS & PAINT SCHEDULE
The number of coats is not specified. The contractor is required to provide the number of coats necessary to attain the DFT thicknesses in accordance with the Contract Drawing. Thickness applied per coat may not exceed the manufacturer’s recommended maximum thickness.
The Contractor shall update and submit the paint schedule as 855-C406-01 during Phase II to list each coat to be applied to each area of the vessel, the paint manufacturer the Contractor elects to use, the color to be applied and corresponding FS595 number, wet mils, dry mils, overcoat time, thinner, method of application, and tip size. Include any appropriate General Notes for painting.
H. COATING “TYPE” AND DFT SCHEDULE
The coating types and DFT for all areas of the barge shall be in accordance with the Contract Drawing.
All areas of each barge shall be coated in accordance with the following schedule:
1. Hull Exterior
All surfaces shall be coated with barrier coat at 10-12 mils DFT minimum.
Lettering and numerals on the hull exterior shall be overcoated (over the barrier coat) with top coat at 2 mils DFT minimum.
Multiple coats shall be the same color.
All surfaces above the lightship waterline shall be over-coated (over the barrier coat) with a top coat at 4 mils DFT minimum.
2. Deck
All steel surfaces shall be coated with a base coat at 10 mils DFT minimum.
Non-skid garnet, 36-mesh 0.3lbs/sq. ft. garnet grit, shall be applied to the entire main deck.
Top coat of 2 mils DFT minimum.
All deck fittings shall receive a base coat at 8-10 mils DFT minimum and be overcoated (over the base coat) with a top coat at 2 mils DFT minimum
3. Hull Interior, Crane Pedestal Exterior Below Deck, Crane Pedestal Interior Above and Below Deck, and Spud Well Interior Below Deck
All steel surfaces within the hull, including the crane pedestal exterior surface below the deck and the crane pedestal interior surface above and below the deck, shall be coated with a base coat at 8-10 mils DFT minimum. All steel surfaces shall be overcoated (over the base coats) with a top coat at 2 mils DFT minimum.
4. Crane Pedestal Exterior Above Deck, Spud Wells Above Deck, Spuds & Handrails
All steel surfaces shall be coated with a base coat at 10-12 mils DFT minimum.
All steel surfaces shall be over-coated (over the base coat) with a top coat at 4 mil DFT minimum.
I. COATING COLOR SCHEDULE
Colors shall conform to Federal Standard No. 595B Colors Identification Numbers. The color book as well as individual paint chips (3” x 5”) may be procured from the General Services Administration/Federal Supply Service as follows:
E-Mail: www.fss.gsa.gov/pub/fedspecs/
GSA/Federal Supply Service FSS Product Acquisition Center Supply Standards Division (FLAS) Arlington, VA 22202
Phone: (703) 605-2567
FAX: (703) 605-9856
The coloring schedule shall be as follows:
AREA COLOR/FS595 NUMBER
Hull Exterior Black/17038
Hull & Draft Markings White/27880
Deck Fittings Yellow/13655
Hull Interior White/27880
Deck Red/10076
Spud Wells Exterior Black/17038
Spuds Black/17038 & Yellow/13655
Handrails Black/17038
Crane Pedestal , above deck Black/17038
Crane Pedestal, below deck White/27880
The “under coats” of all multiple coat applications (except the hull interior) shall be “contrast tinted” to ensure complete coverage of successive coats.
All top coating shall be thick enough to provide complete opaque color coverage.
Thickness increased over the DFT minimums required above shall be provided if required for opaque color coverage.
Painted surfaces damaged in handling and installation shall be repainted.
J. FINAL INSPECTION OF PAINTING
The contractor is responsible for delivering the barge with all painted surfaces in sound condition, and in accordance with this specification.
Prior to launching of the barge, all interior and exterior painting shall be thoroughly inspected. Notice shall be given to the COR, 10 days in advance of the scheduled launching for this purpose. If there are any defects or damage in the coating of the barge, the contractor shall repair the coating to restore the integrity of the paint system, and to meet the requirements of this specification. All damage shall be cleaned to bare metal, spot blasted to restore profile, and re-coated with the entire system schedule.
The barge shall not be launched until:
The painting documentation as required in paragraph K below has been provided to the COR. The documentation must show compliance with this specification in all areas, and all readings taken.
The painting has been inspected by an MDC representative and approved by the COR. Contractor must provide documentation prior to MDC inspection.
If outfitting is required after launching, all interior and exterior painting shall be re-inspected prior to Provisional Acceptance, and any damaged areas of the coating shall be repaired by the contractor as necessary to restore the integrity of the paint system.
Any additional painting required as a result of the Final Inspection shall be done as required to meet this specification at no additional cost to the Government.
K. DOCUMENTATION & WARRANTY
1. Documentation
The contractor shall provide a written, signed statement from the paint manufacturer certifying that all coating application and surface preparation is in accordance with the coating system manufacturer’s requirements for barge, and that the coating application meets all requirements in this specification.
The contractor shall provide documentation logs for coating applied. The logs shall include the following parameters:
a. Coating (per specification) type.
b. Coating manufacturer’s requirements for preparation, environmental conditions and application.
c. Date and time of preparation and application.
d. Extent and location of area coated.
e. Surface: preparation, condition at time of coating, temperature at time of coating, dew point at time of coating.
f. DFT measurements for applied coating type. Measurements shall be taken as follows:
all flat surfaces, one reading per every 200 square feet, uniformly distributed, but a minimum of once per frame, per surface.
undersides of all flanges, one reading per every 50 linear feet of flange, uniformly distributed, but a minimum of two readings per surface, per compartment.
all free standing structural members, i.e. stanchions, truss diagonals, etc., one reading per 50 linear feet of length surface, but a minimum of two readings per surface.
Wet film measurements may be taken and converted to DFT as an alternative to direct DFT. In areas where multiple coating types are required, the above DFT requirements are applied to coating type.
g. Services provided by paint manufacturer’s representative (i.e. DFT readings, dew points, etc.) if present during the application.
h. Signature of paint manufacturer’s representative on site, if present.
2. Warranty
For the barge, the contractor shall warranty the coating system for one calendar year, commencing at Final Acceptance. The contractor shall repair any coating failures during this time period at his cost.
L. SAFETY & HEALTH STANDARDS
The U.S. Occupational Safety and Health Administration Regulations (OSHA) for shipyard employees engaged in surface preparation and coatings application shall be in accordance with the OSHA regulations stated in 29 CFR, subpart C.
These regulations require the contractor to have access to a “competent person” to test compartment atmosphere quality. The “competent person” shall be in accordance with OSHA regulations, stated in 29 CFR, subpart A, 1915.7.
The regulations also require that frequent testing of the atmosphere shall be made in compartments being coated or preserved (or prepared for…