Amendment_0003_-_W9128F-18-B-0014.pdf

PDF 726 KB Posted

Attached to
Chiller Plant Optimization
Solicitation number
W9128F18B0014
Issued by

About this file

Amendment 0003 - W9128F-18-B-0014

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0003 W9128F

CHILLER PLANT OPTIMIZATION, PN GLEN16-2703, SCHRIEVER AFB, COLORADO

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of bids is 4 MAR 2019 at 1400 hours

Government Point of Contact: Lauren Levy, Contract Specialist (402) 995-2049

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

1616 CAPITOL AVE.

OMAHA, NE 68102-4901

See Item 6

W9128F-18-B-0014

02/27/2019

01/11/2019

02/27/2019

Am #0003 - 1

Am #0003 - 2 (Continuation of SF 30)

27 FEB 2019

Solicitation No. W9128F 18 B 0014

Date of Issue: 11 JAN 2019 Date of Opening: 04 MAR 2019

SUBJECT: Amendment No. 0003 to Specifications and Drawings for Construction of

CHILLER PLANT OPTIMIZATION, PN GLEN16-2703.

TO: Prospective Bidders and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number CO190022 in its entirety and substitute General Wage Rate Decision Number CO190022 dated 02/22/2019. General Wage Rate Decision Number CO190022 dated 02/22/2019 is included as an attachment to this Amendment.

2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged. If the bids have been mailed prior to receiving this amendment, you will notify the office where bids are opened, in the specified manner, immediately of its receipt and of any changes in your bid occasioned thereby.

a. Hand-Carried Bids shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.

b. Mailed Bids shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.

3. Bids will be received until 2:00 p.m., local time at place of bid opening, 04 MAR 2019.

Attachments:

General Wage Decision No. CO190022 dated 02/22/2019 Pump Motor Frame Size – For Information Only

U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901

27 FEB 2019

nep/2160

Am #0003 CO190022 - 1 02/22/2019

General Decision Number: CO190022 02/22/2019 CO22

Superseded General Decision Number: CO20180032

State: Colorado

Construction Type: Building

County: El Paso County in Colorado.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 02/01/2019 2 02/22/2019

Am #0003 CO190022 - 2 02/22/2019

ASBE0028-002 07/01/2018

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 31.73 14.23

ELEC0113-005 06/01/2018

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring)..................$ 31.80 15.90

ELEV0025-001 01/01/2019

Rates Fringes

ELEVATOR MECHANIC................$ 45.05 34.125

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0009-017 05/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR

(Crane) 141 tons and over...........$ 29.82 10.10 50 tons and under...........$ 27.75 10.10 51 to 90 tons...............$ 27.92 10.10 91 to 140 tons..............$ 28.55 10.10

* IRON0024-009 01/01/2019

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 29.85 11.42

* IRON0024-011 01/01/2019

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 29.85 11.42

Am #0003 CO190022 - 3 02/22/2019

PAIN0079-009 08/01/2017

Rates Fringes

PAINTER (Spray)..................$ 20.50 8.41

PLAS0577-002 05/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 27.13 12.10

PLUM0058-003 07/01/2018

Rates Fringes

PLUMBER (Excludes HVAC Duct, Pipe and Unit Installation)......$ 32.75 14.85

PLUM0058-004 07/01/2018

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation (Excludes HVAC Duct and Unit Installation)....................$ 32.75 14.85

SFCO0669-002 04/01/2017

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 36.73 20.47

SHEE0009-005 07/01/2018

Rates Fringes

SHEET METAL WORKER (Excludes HVAC Duct, Pipe and Unit Installation)....................$ 34.02 17.49

SUCO2013-008 07/31/2015

Rates Fringes

BRICKLAYER.......................$ 21.96 0.00

CARPENTER........................$ 22.63 6.98

LABORER: Common or General......$ 13.40 1.40

LABORER: Mason Tender - Brick...$ 15.99 0.00

Am #0003 CO190022 - 4 02/22/2019

LABORER: Mason Tender - Cement/Concrete..................$ 16.00 0.00

LABORER: Pipelayer..............$ 16.96 3.68

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 20.26 8.62

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.58 2.42

OPERATOR: Grader/Blade..........$ 21.50 0.00

PAINTER (Brush and Roller).......$ 17.20 0.00

ROOFER...........................$ 16.71 0.00

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 25.18 6.30

SHEET METAL WORKER (HVAC Unit Installation Only)...............$ 24.00 2.18

TRUCK DRIVER: Dump Truck........$ 17.34 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

Am #0003 CO190022 - 5 02/22/2019

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Am #0003 CO190022 - 6 02/22/2019

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Am #0003 CO190022 - 7 02/22/2019

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

This page was intentionally left blank for duplex printing.

PLATE

REFERENCE

NUMBER

A

U G

U

ST

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

: D

FI

LE

N

AM

E:

D

AT

E:

AI

R

F O

R C

E C

O N

TR

AC

T N

O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

G

LE

N

6-

SY

M

BO

L

D

ES

C R

IP

TI

O N

D

AT

E

BY

C

KD

B Y:

US Army Corps of Engineers ®

" x

4"

O M

AH

A

D

IS

TR

IC

T O

M

AH

A, N

EB

R

AS

KA

C

AP

IT

AL

S

TR

EE

T

O M

AH

A, N E

C

AT

EG

O R

Y C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

m m

/d d/ yy yy

:0

0:

A M

SHEET

R

EP

AI

R

B Y

IN

ST

AL

LI

N G

C H

IL

LE

R

SE

Q U

EN

C

IN

G

D D

C P

AN

EL

B

SC

H R

IE

VE

R A

FB

, C

O

D

C

B

A

Omaha District

SC

H

-M -M

H

1.

dw g

MH601

M

EC

H

AN

IC

AL

SC

H

ED

U

LE

S

M

TS

1/ 8"

-'0

G

EW

AK

B

COOLING TOWER MOTOR REPLACEMENT SCHEDULE

TAG LOCATION DRIVE

FRAME

VFD ELECTRICAL NOTES

HP V PH

CT-CP-101 EXISTING COOLING TOWER 326T Y 40 460 3 1,2,3

CT-CP-102 Y 40 460 3

CT-CP-103 Y 40 460 3

ENCLOSURE

EXISTING COOLING TOWER

EXISTING COOLING TOWER

EXISTING COOLING TOWER

326T

326T

326T Y 40 460 3

TEFC

TEFC

TEFC

TEFCCT-CP-104

HEAT EXCHANGER SCHEDULE

TAG HOT SIDE APPROX

WEIGHT

LB. W/ WATER

BASIS OF DESIGN TYPE

HX-1 1,520 7600 ALFALAVALAQ8-FG

MATERIAL

GPM EWT

°F

LWT

°F

WPD

PSI

FLUID

COLD SIDE

GPM EWT

°F

LWT

°F

WPD

PSI

FLUID

MBH

4355 10 WATER 1,520 40 52 10 WATER 9,120 304 SS

PUMP MOTOR SCHEDULE

TAG SERVICE PUMP TYPE RPM VFD ELECTRICAL NOTES

HP V PH

P-CP-217 EXISTING CONDENSER PUMP VERTICAL TURBINE N 100 460 3 2,3

P-CP-216 100 460 3

P-CP-12 100 460 3

NOTES:

1. PROVIDE SHAFT GROUNDING KIT FOR NEW MOTOR.

2. MATCH EXISTING FRAME TYPE AND SERVICE, ALIGN NEW MOTORS.

3. PROVIDE NEW FLEXIBLE COUPLING.

CHWP-CC-CP-212 JNTF SECONDARY CHILLED WATER Y 50 460 3

CHWP-CC-CP-213

CHWP-CC-CP-214

CHWP-CC-CP-215

EXISTING CONDENSER PUMP

EXISTING CONDENSER PUMP

VERTICAL TURBINE

VERTICAL TURBINE

Y

Y

Y

460 3

460 3

460 3

CHWP-CC-CP-1 1,770 Y 100 460 3

CHWP-CC-CP-2 Y 100 460 3

CHWP-CC-CP-3

CSOC SECONDARY CHILLED WATER VERTICAL SPLIT CASE

Y 100 460 3

1,770

1,770

P-CP-13 EXISTING CONDENSER PUMP VERTICAL TURBINE 100 460 3

P-CP-14 100 460 3

P-CP-15 100 460 3

EXISTING CONDENSER PUMP

EXISTING CONDENSER PUMP

VERTICAL TURBINE

VERTICAL TURBINE

P-CP-16 100 460 3EXISTING CONDENSER PUMP VERTICAL TURBINE

CT-CP-105 Y 40 460 3

CT-CP-201 Y 40 460 3

EXISTING COOLING TOWER

EXISTING COOLING TOWER

EXISTING COOLING TOWER

326T

326T

326T Y 40 460 3

TEFC

TEFC

TEFCCT-CP-202

HX-2 1,520 76004355 10 WATER 1,520 40 52 10 WATER 9,120 304 SS

1,770

1,770

1,770

1,770

1,770

1,770

1,770

1,770

1,770

1,770

1,770

2,3

2,3

2,3

2,3

2,3

2,3

1,2,3

1,2,3

1,2,3

1,2,3

1,2,3

1,2,3

1,2,3

JNTF SECONDARY CHILLED WATER

JNTF SECONDARY CHILLED WATER

JNTF SECONDARY CHILLED WATER

CSOC SECONDARY CHILLED WATER

CSOC SECONDARY CHILLED WATER

EQUIPMENT FLOW SCHEDULE

TAG EQUIPMENT CAPACITY

CC-CP-101 CHILLER 950 TON

CC-CP-102

CC-CP-103

CC-CP-201

CC-CP-203

CC-CP-309

GENERATOR 4

GENERATOR 5

GENERATOR 6

GENERATOR 7

CT-CP-101

CT-CP-102

CT-CP-103

CT-CP-104

CT-CP-105

CT-CP-201

CT-CP-202

P-CP-206

P-CP-208

P-CP-209

P-CP-210

P-CP-211

P-CP-309

CHILLER

CHILLER

CHILLER

CHILLER

CHILLER

GENERATOR

GENERATOR

GENERATOR

GENERATOR

COOLING TOWER

COOLING TOWER

COOLING TOWER

COOLING TOWER

COOLING TOWER

COOLING TOWER

COOLING TOWER

CHILLED WATER PUMP

CHILLED WATER PUMP

CHILLED WATER PUMP

CHILLED WATER PUMP

CHILLED WATER PUMP

CHILLED WATER PUMP

1000 TON

P-CP-13

P-CP-14

P-CP-15

P-CP-16

P-CP-216

P-CP-217

CONDENSER WATER PUMP

P-CP-12 CONDENSER WATER PUMP

CONDENSER WATER PUMP

CONDENSER WATER PUMP

CONDENSER WATER PUMP

CONDENSER WATER PUMPCONDENSER WATER PUMP

CONDENSER WATER PUMP

EVAPORATOR/CHILLED WATER GPM

2,000

2,000

2,000

1,520

1,520

1,000

1,520

1,520

2,000

2,000

2,000

1,000

YEAR

12/1983

10/16/2001

12/1983

3/6/1989

3/6/1989

4/12/2004

12/1983

3/6/1989

3/6/1989

4/12/2004

3/6/1989

3/6/1989

NOTES

TRANE, EXISTING

GENERATOR CUTSHEETS INDICATE 700 GPM

950 TON

950 TON

950 TON

950 TON

500 TON

1000 TON

1000 TON

1000 TON

1000 TON

1000 TON

1000 TON

CONDENSER GPM

12/1983

12/1983

12/1983

12/1983

TRANE, EXISTING

TRANE, EXISTING

GENERATOR CUTSHEETS INDICATE 700 GPM

GENERATOR CUTSHEETS INDICATE 700 GPM

GENERATOR CUTSHEETS INDICATE 700 GPM

CHWP-CC-CP-212

CHWP-CC-CP-213

CHWP-CC-CP-214

CHWP-CC-CP-215

CHWP-CC-CP-1

CHWP-CC-CP-2

CHWP-CC-CP-3

JNTF PUMP

JNTF PUMP

JNTF PUMP

JNTF PUMP

CSOC PUMP

CSOC PUMP

CSOC PUMP

MAX MIN

MODEL SERIAL #

MAX MIN

CVHF058

CVHE089

CVHE089

CVHF128

CVHF106

CVHF128

L04L05147

L89D01305

L89D01300

L04H03776

L02M22823

L05K04501536

CONTROL VALVE SCHEDULE

VALVE # TYPE SIZE

CV-1 BUTTERFLY 12

EXISTING

X

NEW EXISTING

ACTUATION

ACTUATION

TYPE

DESCRIPTION

PUMP TO HX-1

WEST LOOP SOUTH END

PUMP TO HX-2

TO HEADER

SERIES CONFIGURATION

TO HEADER

CV-2

CV-3

CV-4

CV-5

CV-6

CV-7

CV-8

CV-9

CV-10

CV-11

CV-12

CV-13

CV-14

CV-15

CV-17

CV-16

CV-18

CV-19

CV-20

CV-21

CV-22

CV-23

CV-24

CV-25

CV-26

CV-27

CV-28

CV-29

CV-30

CV-31

CV-32

CV-33

CV-34

CV-35

CV-36

CV-37

CV-38

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

BUTTERFLY

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

MANUAL

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

ED

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

MODULATING

MODULATING

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

MODULATING

MODULATING

MODULATING

MODULATING

MODULATING

MODULATING

MODULATING

TRANE, EXISTING

TRANE, EXISTING

TRANE, EXISTING

CV-39 BUTTERFLY 2 X MODULATING

CV-40 BUTTERFLY 2 X MODULATING

CV-41 BUTTERFLY 2 X MODULATING

CV-42 BUTTERFLY 2 X MODULATING

CV-43 BUTTERFLY 2 X MODULATING

CV-44 BUTTERFLY 2 X MODULATING

CV-45 BUTTERFLY 2 X MODULATING

PLATE AND FRAME

PLATE AND FRAME

NOTES

MEETS ASME STANDARDS

MEETS ASME STANDARDS

GENERAL NOTES:

1. PROVIDE SHAFT MOTOR GROUNDING KIT FOR NEW FAN MOTOR

2. PROVIDE GALVANIZED GRDR ADAPTOR PLATE AND HARDWARE/SHIM KIT.

3. BID OPTION 1: PROVIDE DIRECT DRIVE MOTORS.

CONVERT TO

AUTO

CONVERT TO

MODULATING

AUTO

AUTO

MANUAL

MANUAL

MANUAL

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

AUTO

X

X

X

X

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

OPEN / CLOSE

X

X

X

X

X

X

X

X

X

X

X

X

X

FLOW TO HEADER

FLOW TO CHILLER

FLOW TO HEADER

FLOW TO CHILLER

FLOW TO CHILLER

FLOW TO CHILLER

CONDENSER THROTTLING

CONDENSER THROTTLING

CONDENSER THROTTLING

CONDENSER THROTTLING

CONDENSER THROTTLING

CONDENSER THROTTLING

SERIES CONFIGURATION

FLOW TO HX-1

FLOW TO HX-2

WEST LOOP SOUTH END

WEST LOOP NORTH END

WEST LOOP NORTH END

BALANCE FLOW TO TOWER

BALANCE FLOW TO TOWER

BALANCE FLOW TO TOWER

BALANCE FLOW TO TOWER

BALANCE FLOW TO TOWER

BALANCE FLOW TO TOWER

BALANCE FLOW TO TOWER

BYPASS TOWER TO SUMP

BYPASS TOWER TO SUMP

BYPASS TOWER TO SUMP

BYPASS TOWER TO SUMP

BYPASS TOWER TO SUMP

BYPASS TOWER TO SUMP

BYPASS TOWER TO SUMP

TOWER SUMP FILL

TOWER SUMP FILL

TOWER SUMP FILL

TOWER SUMP FILL

TOWER SUMP FILL

TOWER SUMP FILL

TOWER SUMP FILL

1,520

1,520

1,520

1,520

2,500

2,500

2,500

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

NOTES:

1. CONTRACTOR TO DETERMINE THE MINIMUM ALLOWABLE FLOW RATE BASED ON FUNCTIONAL TESTING AND COLLABORATION WITH SITE PERSONNEL.

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

VERTICAL SPLIT CASE

VERTICAL SPLIT CASE

ALFALAVALAQ8-FG

NOTE: ALL NEW VALVES TO HAVE AUTO ACTUATION. ALL VALVES BEING CONVERTED TO MODULATING SHALL HAVE THE ACTUATORS REPLACED WITH NEW MODULATING TYPE ACTUATORS.

BASIS OF DESIGN

BRAY VALVE

PART #

BRAY

ACTUATOR

PART #

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

MKL2-C120

MKL2-C120

MKL2-C120

MKL2-C120

MKL2-C120

MKL2-C120

MKL2-C120

MKL2-C120

DR16B2-XXX

DR16B2-XXX

DR16B2-XXX

DR16B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B2-XXX

DR12B3-XXX

DR12B3-XXX

DR12B3-XXX

DR12B3-XXX

DR12B3-XXX

DR12B3-XXX

DR12B3-XXX

DR2B2-XXX

DR2B2-XXX

DR2B2-XXX

DR2B2-XXX

DR2B2-XXX

DR2B2-XXX

DR2B2-XXX

70-0651

70-0651

70-0651

70-0651

70-0651

70-0651

70-0651SVH

70-0651SVH

70-0651SVH

70-0651SVH

70-0651SVH

70-0651SVH

70-0501

70-0501

70-0501

70-0501

70-0501

70-0501

70-0501SVH

70-0501SVH

AU-2130

AU-2130

AU-2130

AU-2130

70-0651SVH

70-0651SVH

70-0651SVH

70-0651SVH

70-0651SVH

70-0651SVH

70-0651SVH

70-1300SVH

70-1300SVH

70-1300SVH

70-1300SVH

70-1300SVH

70-1300SVH

70-1300SVH

DCMS24-140A

DCMS24-140A

DCMS24-140A

DCMS24-140A

DCMS24-140A

DCMS24-140A

DCMS24-140A

1,2,3

1,2,3

1,2,3

1,2,3

1,2,3

1,2,3

N

N

N

N

N

N

X

X

X

X

X

X

P-CP-206 60 460 3

60 460 3

EXISTING CHILLER PUMP VERTICAL TURBINE

VERTICAL TURBINE

VERTICAL TURBINE 50 460 3

50 460 3

50 460 3

VERTICAL TURBINE

VERTICAL TURBINE

25 460 3VERTICAL TURBINE 1,770

1,770

1,770

1,770

1,770

1,770 2,3

2,3

2,3

2,3

2,3

2,3

N

N

N

N

N

N

EXISTING CHILLER PUMP

EXISTING CHILLER PUMP

EXISTING CHILLER PUMP

EXISTING CHILLER PUMP

EXISTING CHILLER PUMP

P-CP-208

P-CP-209

P-CP-210

P-CP-211

P-CP-309

\\hnc-netapp2\DS1\ED\CAD_BIM\CAD_Projects\Schriever Airforce Chiller Project\BIM Model\SCH-M-MH601.dwg, 8/15/2018 9:20:06 AM, _AutoCAD PDF (General Documentation).pc3

SB

M

T

BY

SB

M T

BY

PL

O

T D

AT

E

PL

O

T D

AT

E::

m m

/d d/ yy yy

AM

AM

SOLICITATION NO.: W9128F-18-B-0014

ISSUE DATE: JANUARY 2019

Am #0003 For Information Only g6rmfcaj Highlight

FRAME SIZE TYPE ENCLOSURE

P-CP-217 404TP RUS WPI

P-CP-216 404TP RUS WPI

P-CP-12 404TP RUS WPI

P-CP-13 404TP RUS WPI

P-CP-14 404TP RUS WPI

P-CP-15 404TP RUS WPI

P-CP-16 404TP RUS WPI

P-CP-206 324T SCE DP

P-CP-208 206 TDC DR PR

P-CP-209 326T

P-CP-210 326T FD DP

P-CP-211 D326T MOGB DP

P-CP-309 284T DPSB

CHWP-CC-CP-212 326T SCE DP

CHWP-CC-CP-213 326T SCE DP

CHWP-CC-CP-214 326T SCE DP

CHWP-CC-CP-215 326T SCE DP

CHWP-CC-CP-1 404T DP

CHWP-CC-CP-2 404T ODP

CHWP-CC-CP-3 404TS K DP

MOTOR

TAG NOTES

Am #0003 For Information Only

Standard_Form_30
Am-0003_W9128F-18-B-0014_Narrative
Attachments
CO190022 - Building
Pump Motor Frame Size - For Information Only
Chiller Upgrade Equipment Schedule
Chiller Upgrade Pump Motor Frame size

File details come from the government source that posted it.