Abstract_of_Offers_-_W9128F-18-B-0014.pdf

PDF 18 KB Posted

Attached to
Chiller Plant Optimization
Solicitation number
W9128F18B0014
Issued by

About this file

The purpose of this posting is to display the results of the bid opening conducted on 4 March 2019 at 2 PM. The Contracting Officer is conducting an internal review of the bids for compliance with the solicitation. This is only an abstract and final award is pending.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

USACE, Omaha District (CENWO-CT-M) 1616 Capitol Avenue Omaha, NE 68102

Chiller Plant Optimization, PN GLEN16-2703, Schriever AFB, CO

1 Construct Chiller Plant Optimization JB1 3,471,370.00 3,471,370.00 2,501,128.002,501,128.00 4,854,732.00 4,854,732.00

W9128F-18-B-0014 1 2

Beckrich Construction, LLC SEA PAC Engineering, Inc

Bid Bond 20% of bid price Bid Bond 20% of bid price

3 3

03/04/201901/11/2019

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W9128F-18-B-0014

Chiller Plant Optimization, PN GLEN16-2703, Schriever AFB, CO

Bid Bond 20% of bid price Bid Bond 20% of bid price Bid Bond 20% of bid price

3 3 3

1 1 JB 3,644,889.00 3,644,889.00 4,202,158.00 4,202,158.00 5,805,764.00 5,805,764.00

2 2

3 4 5

Guardian Construction, Inc. Bristol Construction Services, LLC

Komada, LLC

OF 1419 - Chiller Upgrade___
OF 1419A - Chiller____

File details come from the government source that posted it.