Spec_01_11_00_Amendment_8.pdf

PDF 18 KB Posted

Attached to
Submission of proposals update #2 Federal contract opportunity
Solicitation number
W9128F-16-T-0053
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Spec 01 11 00 Amendment 8

View the file

Other files for this federal contract opportunity

Other files attached to Submission of proposals update #2, newest first.
File Type Posted
Q&As,_Amend__9_(3_Feb_2017).pdf PDF
W9128F-16-T-0053-0009.pdf PDF
Revised_Bid_Schedule,_Amend__9_(3_Feb_2017).pdf PDF
W9128F-16-T-0053-0008.pdf PDF
Bid_Schedule(revised_30_Jan_2017.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Drawing-MRN4OA101_Amend_8.pdf PDF
Drawing_83E304.10_THREE_LINE_SHEET_1.pdf PDF
Bid_Schedule(revised_23_Jan_2017.pdf PDF
Amendment__7,__W9128F-16-T-0053.pdf PDF
Amendment__6,_W9128F-16-T-0053.pdf PDF
Drawing_Updates_(Amendment_5).pdf PDF
Summary_of_Work_(01_11_00_Amendment_5).pdf PDF
Amendment__5,_W9128F-16-T-0053.pdf PDF
Drawings_for_Oahe_(Addional_For_Information_Only)_.pdf PDF
Summary_of_Changes.pdf PDF
Questions_and_Answers.pdf PDF
Bid_Schedule_Updated_(revised_13_Dec_2016).pdf PDF
Amendment__4_,_W9128F-16-T-0053.pdf PDF
Amendment__3_ _W9128F-16-T-0053.pdf PDF
W9128F-16-T-0053_(Amendment__1).pdf PDF
W9128F-16-t-0053_(Amendment__2).pdf PDF
Site_vist_POCs.docx DOCX document
Site_vist_POCs.docx DOCX document
Replace_Powerhouse_Potential_and_Current_Transformer_Dwgs.pdf PDF
FBO_Solicitation_copy.pdf PDF
Replace_Powerhouse_Potential_and_Current_Transformers_Specs.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

This project involves replacing the generator and station service Potential Transformers (PTs) and the Current Transformers (CTs) at multiple power plants. The PTs and CTs are types of instrument transformers used to transform otherwise dangerous inputs from the power train and make the signals safe for use in the protection circuits and metering circuits in the station control boards. The PTs and CTs are connected to the generators, jack bus, and station service equipment.

The work at Fort Peck includes Plant 1 Current Transformers:

Generator (3 Units) Install 3 new 2- circuit CT's on each Unit. These will be installed on the bus bar identified on the drawings.

Unit 1 & 3 CT's are to be metering class, 2500/5A Unit 2 CT's are to be metering class, 1000/5A Potential Transformers:

Generator (3 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 7960/66.4V.

PT's are located in cabinets.

Exciter (3 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 7960/66.4V.

PT's are located in cabinets.

Plant 2 Current Transformers:

Generator (2 Units) Replace 3 Metering CT's per unit.

CT's are to be metering class, 2500/5A.

Potential Transformers:

Generator (2 Units) Replace 2 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

PT's are located in drawers.

Exciter (2 Units) Replace 2 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

PT's are located in drawers.

Station Service Current Transformers:

Replace 6 Metering CT's CT's are to be metering class, 300/5A.

Potential Transformers:

Replace 6 Metering PT's PT's are to be metering class, 2400/120V.

The work at Oahe includes Current Transformers:

Generator (7 Units) Replace 3 Metering CT's per unit CT's are to be metering class, Donut Type, 5000/5A.

Potential Transformers:

Generator (7 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

PT's are located in cabinets.

Rework cabinets to adjust for new PT design Exciter (7 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

PT's are located in cabinets.

Rework cabinets to adjust for new PT design Jack Bus (3 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

PT's are located in cabinets.

Rework cabinets to adjust for new PT design Station Service Current Transformers:

CT's are to be metering class, 150/5A.

480V Main Station Service Switchgear Replace 9 Metering CT's CT's are to be metering class, 1500/5A.

Potential Transformers:

Replace 9 Metering PT's PT's are to be metering class.

PT's are located in buckets.

The work at Big Bend includes Current Transformers:

Generator (8 Units) Replace 3 Metering CT's per unit CT's are to be metering class, 3000/5A, Donut Type.

Potential Transformers:

Generator (8 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

Exciter (8 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

Jack Bus (4 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

Station Service Current Transformers:

Replace 12 Metering CT's SS1 & SS2 CT's are to be metering class, 2000/5A.

SS3 CT's are to be metering class, 50/5A.

Potential Transformers:

Replace 9 Metering PT's PT's are to be metering class, 480/120V.

g6ct9mld Highlight

The work at Fort Randall includes

Potential Transformers:

Generator (8 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

Exciter (8 Units) Replace 3 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

Jack Bus (4 Units) Replace 2 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

Station Service Current Transformers:

Replace 6 Metering CT's located at breaker 104 and breaker 204 CT's are to be metering class 150:5 ratio on the 13.8kV breakers.

The work at Gavin's Point includes Current Transformers:

Generator (3 Units) Install 3 new CT's per unit.

CT's are to be metering class, 2000/5A.

Leave existing CT's connected to relaying equipment.

Potential Transformers:

Generator (3 Units) Replace 2 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

Replace PT drawers Exciter (3 Units) Replace 2 Metering PT's per unit.

PT's are to be metering class, 14400/120V.

Replace PT drawers Station Service Current Transformers:

Install 6 new Metering CT's CT's are to be metering class, 100/5A.

Potential transformers:

Replace 4 Metering PT's PT's are to be metering class 14400/120V Replace the two associated PT Drawers.

1.1.2 Location

The work is located at Fort Peck Dam, Oahe Dam, Big Bend Dam, Fort Randall Dam, and Gavins Point Dam, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.2 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

g6ct9mld Highlight g6ct9mld Highlight

[PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --