Powerhouse__Bid_Sheet_-_12-28-15.pdf
PDF 114 KB Posted
- Attached to
- Janitorial Services
- Solicitation number
- w9128f-15-t-0015
About this file
Bid Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| Solicitation.pdf | ||
| Janitorial_Cleaning_Powerhouse_PWS_12-11-14.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SHEET
OAHE PROJECT POWERHOUSE JANITORIAL CLEANING
Task Duties in accordance with Technical Exhibit 4
Base Period – 3/1/2016 – 2/28/2017
Quantity Unit Unit Price Total Amount
(Qty x Unit Price)
0001 Perform the daily, weekly & monthly janitorial service 12 MO $ $
0001a Perform the daily Janitorial service 251 Day $ $
0001b Perform the weekly Janitorial service 52 WK $ $
0001c Perform the monthly Janitorial service 12 MO $ $
0002 Perform the semiannual janitorial service 2 JB $ $
0003 Perform the annual requirements - NOTE: Each performance is bid as a separate item. This section is for annual services. Performances completed can be billed separately.
0003a Draft Tube Deck and Transformer Vaults, 1456 elevation, Bays 1-7
1 JB $ $
0003b Office and Lobby Area 1 JB $ $
0003c Office Area, 1475 elevation 1 JB $ $
0003d Electric Shop, 1438 elevation and Machine Shop, 1456 elevation.; Wooden block floors
1 JB $ $
0003e Draft Tube Gallery, 1398 & 1402 elevation 1 JB $ $
0003f Walls, 1475-1456 & 1438 elevation 1 JB $ $
0003g Cable Tunnel, 1438 elevation from Powerhouse to 115KV &
230KV switchyard entrances, including house areas at end of
115 KV & 230 KV tunnels
1 JB $ $
0003h Surge Tank area, 1456 elevation., including Bays 1-7 1 JB $
Total Annual Services 1 JB $
Total Amount for BASE PERIOD (Sum of Items 0001 thru 0003) $
Option 1 Period – 3/1/2017 – 2/28/2018
Quantity Unit Unit Price Total Amount
(Qty x Unit Price)
0004 Perform the daily, weekly & monthly janitorial service
12 MO $ $
0004a Perform the daily Janitorial service 251 Day
0004b Perform the weekly Janitorial service 52 WK
0004c Performa the monthly Janitorial service 12 MO
Perform the semiannual janitorial service 2 JB $ $
0006 Perform the annual requirements - NOTE: Each performance is bid as a separate item. This section is for annual
0006a Draft Tube Deck and Transformer Vaults, 1456 elevation, Bays 1-7
1 JB $ $
0006b Office and Lobby Area 1 JB $ $
0006c Office Area, 1475 elevation 1 JB $ $
0006d Electric Shop, 1438 elevation and Machine Shop, 1456 elevation.; Wooden block floors
1 JB $ $
0006e Draft Tube Gallery, 1398 & 1402 elevation 1 JB $ $
0006f Walls, 1475-1456 & 1438 elevation 1 JB $ $
0006g Cable Tunnel, 1438 elevation from Powerhouse to 115KV &
230KV switchyard entrances, including house areas at end of
115 KV & 230 KV tunnels
1 JB $ $
0006h Surge Tank area, 1456 elevation., including Bays 1-7 1 JB $ $
Total Annual Services 1 JB $
Total Amount for OPTION PERIOD 1 (Sum of Items 0004 thru 0006) $
Option 2 Period – 3/1/2018 – 2/28/2019
Quantity Unit Unit Price Total Amount
(Qty x Unit Price)
0007 Perform the daily, weekly & monthly janitorial service 12 MO $
0007a Perform the daily Janitorial service 251 Day
0007b Perform the weekly Janitorial service 52 WK
0007c Performa the monthly Janitorial service 12 MO
Perform the semiannual janitorial service 2 JB $ $
0009 Perform the annual requirements - NOTE: Each performance is bid as a separate item. This section is for annual
0009a Draft Tube Deck and Transformer Vaults, 1456 elevation, Bays 1-7
1 JB $ $
0009b Office and Lobby Area 1 JB $ $
0009c Office Area, 1475 elevation 1 JB $ $
0009d Electric Shop, 1438 elevation and Machine Shop, 1456 elevation.; Wooden block floors
1 JB $ $
0009e Draft Tube Gallery, 1398 & 1402 elevation 1 JB $ $
0009f Walls, 1475-1456 & 1438 elevation 1 JB $ $
0009g Cable Tunnel, 1438 elevation from Powerhouse to 115KV &
230KV switchyard entrances, including house areas at end of
115 KV & 230 KV tunnels
1 JB $ $
0009h Surge Tank area, 1456 elevation., including Bays 1-7 1 JB $ $
Total Annual Services 1 JB $
Total Amount for OPTION PERIOD 2 (Sum of Items 0007 thru 0009) $
GRAND TOTAL for BASE & OPTION PERIODS
(Sum of 0001 – 0009)
File details come from the government source that posted it. Updated .