AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 1 is to make revisions to the Bid Schedule.
All other terms and conditions remain unchanged.
The point of contact is Ashanti Griffin at ashanti.d.brow n@usace.army.mil or 501-340-1257.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S19Q0034
X 9B. DATED (SEE ITEM 11)
26-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Aug-2019
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127S19Q0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0006
The cost constraint NTE has been added.
CLIN 0055
The cost constraint NTE has been added.
CLIN 1006
The cost constraint NTE has been added.
CLIN 1055
The cost constraint NTE has been added.
CLIN 2006
The cost constraint NTE has been added.
CLIN 2055
The cost constraint NTE has been added.
(End of Summary of Changes)
NORFORK BASE PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement at Mountain Home Project Office and Norfork Lake for the period of 1 June 2019 or date of award whichever is later, through 31 May 2020 or 12 months from actual award date.
EST. UNIT
ITEM # DESCRIPTION QUANT UNIT PRICE AMOUNT
0001 Service Call 300 EA
0002 Emergency Service Call 150 EA
0003 Unscheduled Labor Hours, General 700 HR
0004 Unscheduled Labor Hours, Plumbing 700 HR
0005 Unscheduled Labor Hours, Electrical 700 HR
0006 Materials Cost 100000 US Dollar NTE $100,000.00
0007 Debris Removal - land acces 1500 CY
0008 Debris Removal - water acces 2000 CY
0009 Carpentry Repair Hours 700 HR
0010 Replace Exterior Toilet Screen Door and Door Frame 3 EA
0011 Replace Exterior Steel Door and Frame 3 EA
0012 Install Landscape Anchor Timbers 300 LF
0013 Install Landscape Timbers 450 LF
0014 Replace/Install Lantern Hanger 15 EA
0015 Replace/Install Fire Ring Grill 45 EA
0016 4x4 Sign Mounting Placement 60 EA
0017 6x6 Sign Mounting Placement 30 EA
0018 Shingle Roofing 2000 SQ. FT
0019 Metal Roofing 4000 SQ. FT
0020 Remove/Re-install existing Picnic Canopies 100 each
0021 Place 4" Concrete Slab 1500 SF
0022 Place 6" Concrete Slab 1500 SF
0023 Place Launch Ramp Concrete 400 SF
0024 Replace/Install Concrete Wheel Stop 40 EA
0025 Install Drainage Culvert CMP 150 LF
0026 Dump Truck with Driver 250 HR
0027 Backhoe with Operator 300 HR
0028 Skid Steer with Operator 300 HR
0029 Mini Excavator with Operator 150 HR
0030 Bulldozer with Operator 150 HR
0031 Excavator 100 HR
0032 Vibratory Plate Compactor with Operator 120 HR
0033 Vibratory Roller with Operator 150 HR
0034 Concrete/Asphalt Saw with Operator 60 HR
0035 Park Preseason Electrical Check 8 EA
0036 Excavation for Electrical Lines 1000 LF
0037 Replace/Install Electric Riser 10 EA
0038 Replace/Install Electric Panel board 10 EA
0039 Replace/Install Electric Wire way 10 EA
0040 Replace/Install Electric Safety Disconnect 3 EA
0041 Utility Road Crossing 125 LF
0042 Rock Excavation for Utility Lines 600 LF
0043 Repair Water Leak 15 EA
0044 Unplug Sewer System 10 EA
0045 Replace/Install Underground Water Line 3/4 - 2" 3000 LF
0046 Replace/Install Underground sewer line 1200 LF
0047 Replace Water Hydrant 30 EA
0048 Inspect Reducer Pressure Zone Assembly 9 EA
0049 Inspect Septic System 6 EA
BASE PERIOD - LINE ITEM 0001 - 0049 TOTAL:
BULL SHOALS BASE PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement at Mountain Home Project Office and Bull Shoals Lake for the period of 1 June 2019 or date of award whichever is later, through 31 May 2020 or 12 months from actual award date.
0050 Service Call 300 EA
0051 Emergency Service Call 150 EA
0052 Unscheduled Labor Hours, General 900 HR
0053 Unscheduled Labor Hours, Plumbing 700 HR
0054 Unscheduled Labor Hours, Electrical 700 HR
0055 Materials Cost 150000 US Dollar NTE $150,000.00
0056 Debris Removal - land acces 100 CY
0057 Debris Removal - water acces 20 CY
0058 Carpentry Repair Hours 700 HR
0059 Replace Exterior Toilet Screen Door and Door Frame 3 EA
0060 Replace Exterior Steel Door and Frame 3 EA
0061 Install Landscape Anchor Timbers 600 LF
0062 Install Landscape Timbers 900 LF
0063 Replace/Install Lantern Hanger 30 EA
0064 Replace/Install Fire Ring Grill 45 EA
0065 4x4 Sign Mounting Placement 60 EA
0066 6x6 Sign Mounting Placement 30 EA
0067 Shingle Roofing 2000 SQ. FT
0068 Metal Roofing 4000 SQ. FT
0069 Remove/Re-install existing Picnic Canopies 150 each
0070 Place 4" Concrete Slab 3000 SF
0071 Place 6" Concrete Slab 3000 SF
0072 Place Launch Ramp Concrete 400 SF
0073 Replace/Install Concrete Wheel Stop 50 EA
0074 Install Drainage Culvert CMP 150 LF
0075 Dump Truck with Driver 250 HR
0076 Backhoe with Operator 300 HR
0077 Skid Steer with Operator 300 HR
0078 Mini Excavator with Operator 250 HR
0079 Bulldozer with Operator 150 HR
0080 Excavator 100 HR
0081 Vibratory Plate Compactor with Operator 200 HR
0082 Vibratory Roller with Operator 150 HR
0083 Concrete/Asphalt Saw with Operator 60 HR
0084 Park Preseason Electrical Check 9 EA
0085 Excavation for Electrical Lines 1000 LF
0086 Replace/Install Electric Riser 10 EA
0087 Replace/Install Electric Panel board 10 EA
0088 Replace/Install Electric Wire way 10 EA
0089 Replace/Install Electric Safety Disconnect 3 EA
0090 Utility Road Crossing 125 LF
0091 Rock Excavation for Utility Lines 600 LF
0092 Repair Water Leak 25 EA
0093 Unplug Sewer System 10 EA
0094 Replace/Install Underground Water Line 3/4 - 2" 3000 LF
0095 Replace/Install Underground sewer line 1200 LF
0096 Replace Water Hydrant 30 EA
0097 Inspect Reducer Pressure Zone Assembly 9 EA
0098 Inspect Septic System 6 EA
BASE PERIOD - LINE ITEM 0050 - 0098 TOTAL:
NORFORK BASE PERIOD - OPTION 1 SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement at Mountain Home Project Office and Norfork Lake for the period of 1 June 2020 or date of award whichever is later, through 31 May 2021 or 12 months from actual award date.
1001 Service Call 300 EA
1002 Emergency Service Call 150 EA
1003 Unscheduled Labor Hours, General 700 HR
1004 Unscheduled Labor Hours, Plumbing 700 HR
1005 Unscheduled Labor Hours, Electrical 700 HR
1006 Materials Cost 100000 US Dollar NTE $100,000.00
1007 Debris Removal - land acces 1500 CY
1008 Debris Removal - water acces 2000 CY
1009 Carpentry Repair Hours 700 HR
1010 Replace Exterior Toilet Screen Door and Door Frame 3 EA
1011 Replace Exterior Steel Door and Frame 3 EA
1012 Install Landscape Anchor Timbers 300 LF
1013 Install Landscape Timbers 450 LF
1014 Replace/Install Lantern Hanger 15 EA
1015 Replace/Install Fire Ring Grill 45 EA
1016 4x4 Sign Mounting Placement 60 EA
1017 6x6 Sign Mounting Placement 30 EA
1018 Shingle Roofing 2000 SQ. FT
1019 Metal Roofing 4000 SQ. FT
1020 Remove/Re-install existing Picnic Canopies 100 each
1021 Place 4" Concrete Slab 1500 SF
1022 Place 6" Concrete Slab 1500 SF
0123 Place Launch Ramp Concrete 400 SF
1024 Replace/Install Concrete Wheel Stop 40 EA
1025 Install Drainage Culvert CMP 150 LF
1026 Dump Truck with Driver 250 HR
1027 Backhoe with Operator 300 HR
1028 Skid Steer with Operator 300 HR
1029 Mini Excavator with Operator 150 HR
1030 Bulldozer with Operator 150 HR
1031 Excavator 100 HR
1032 Vibratory Plate Compactor with Operator 120 HR
1033 Vibratory Roller with Operator 150 HR
1034 Concrete/Asphalt Saw with Operator 60 HR
1035 Park Preseason Electrical Check 8 EA
1036 Excavation for Electrical Lines 1000 LF
1037 Replace/Install Electric Riser 10 EA
1038 Replace/Install Electric Panel board 10 EA
1039 Replace/Install Electric Wire way 10 EA
1040 Replace/Install Electric Safety Disconnect 3 EA
1041 Utility Road Crossing 125 LF
1042 Rock Excavation for Utility Lines 600 LF
1043 Repair Water Leak 15 EA
1044 Unplug Sewer System 10 EA
1045 Replace/Install Underground Water Line 3/4 - 2" 3000 LF
1046 Replace/Install Underground sewer line 1200 LF
1047 Replace Water Hydrant 30 EA
1048 Inspect Reducer Pressure Zone Assembly 9 EA
1049 Inspect Septic System 6 EA
OPTION 1 PERIOD - LINE ITEM 1001 - 1049 TOTAL:
BULL SHOALS OPTION 1 PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement at Mountain Home Project Office and Bull Shoals Lake for the period of 1 June 2020 or date of award whichever is later, through 31 May 2021 or 12 months from actual award date.
1050 Service Call 300 EA
1051 Emergency Service Call 150 EA
1052 Unscheduled Labor Hours, General 900 HR
1053 Unscheduled Labor Hours, Plumbing 700 HR
1054 Unscheduled Labor Hours, Electrical 700 HR
1055 Materials Cost 150000 US Dollar NTE $150,000.00
1056 Debris Removal - land acces 100 CY
1057 Debris Removal - water acces 20 CY
1058 Carpentry Repair Hours 700 HR
1059 Replace Exterior Toilet Screen Door and Door Frame 3 EA
1060 Replace Exterior Steel Door and Frame 3 EA
1061 Install Landscape Anchor Timbers 600 LF
1062 Install Landscape Timbers 900 LF
1063 Replace/Install Lantern Hanger 30 EA
1064 Replace/Install Fire Ring Grill 45 EA
1065 4x4 Sign Mounting Placement 60 EA
1066 6x6 Sign Mounting Placement 30 EA
1067 Shingle Roofing 2000 SQ. FT
1068 Metal Roofing 4000 SQ. FT
1069 Remove/Re-install existing Picnic Canopies 150 each
1070 Place 4" Concrete Slab 3000 SF
1071 Place 6" Concrete Slab 3000 SF
1072 Place Launch Ramp Concrete 400 SF
1073 Replace/Install Concrete Wheel Stop 50 EA
1074 Install Drainage Culvert CMP 150 LF
1075 Dump Truck with Driver 250 HR
1076 Backhoe with Operator 300 HR
1077 Skid Steer with Operator 300 HR
1078 Mini Excavator with Operator 250 HR
1079 Bulldozer with Operator 150 HR
1080 Excavator 100 HR
1081 Vibratory Plate Compactor with Operator 200 HR
1082 Vibratory Roller with Operator 150 HR
1083 Concrete/Asphalt Saw with Operator 60 HR
1084 Park Preseason Electrical Check 9 EA
1085 Excavation for Electrical Lines 1000 LF
1086 Replace/Install Electric Riser 10 EA
1087 Replace/Install Electric Panel board 10 EA
1088 Replace/Install Electric Wire way 10 EA
1089 Replace/Install Electric Safety Disconnect 3 EA
1090 Utility Road Crossing 125 LF
1091 Rock Excavation for Utility Lines 600 LF
1092 Repair Water Leak 25 EA
1093 Unplug Sewer System 10 EA
1094 Replace/Install Underground Water Line 3/4 - 2" 3000 LF
1095 Replace/Install Underground sewer line 1200 LF
1096 Replace Water Hydrant 30 EA
1097 Inspect Reducer Pressure Zone Assembly 9 EA
1098 Inspect Septic System 6 EA
OPTION 1 PERIOD - LINE ITEM 1050 - 1098 TOTAL:
NORFORK OPTION 2 PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement at Mountain Home Project Office and Norfork Lake for the period of 1 June 2021 or date of award whichever is later, through 31 May 2022 or 12 months from actual award date.
2001 Service Call 300 EA
2002 Emergency Service Call 150 EA
2003 Unscheduled Labor Hours, General 700 HR
2004 Unscheduled Labor Hours, Plumbing 700 HR
2005 Unscheduled Labor Hours, Electrical 700 HR
2006 Materials Cost 100000 US Dollar NTE $100,000.00
2007 Debris Removal - land acces 1500 CY
2008 Debris Removal - water acces 2000 CY
2009 Carpentry Repair Hours 700 HR
2010 Replace Exterior Toilet Screen Door and Door Frame 3 EA
2011 Replace Exterior Steel Door and Frame 3 EA
2012 Install Landscape Anchor Timbers 300 LF
2013 Install Landscape Timbers 450 LF
2014 Replace/Install Lantern Hanger 15 EA
2015 Replace/Install Fire Ring Grill 45 EA
2016 4x4 Sign Mounting Placement 60 EA
2017 6x6 Sign Mounting Placement 30 EA
2018 Shingle Roofing 2000 SQ. FT
2017 Metal Roofing 4000 SQ. FT
2020 Remove/Re-install existing Picnic Canopies 100 each
2021 Place 4" Concrete Slab 1500 SF
2022 Place 6" Concrete Slab 1500 SF
2023 Place Launch Ramp Concrete 400 SF
2024 Replace/Install Concrete Wheel Stop 40 EA
2025 Install Drainage Culvert CMP 150 LF
2026 Dump Truck with Driver 250 HR
2027 Backhoe with Operator 300 HR
2028 Skid Steer with Operator 300 HR
2029 Mini Excavator with Operator 150 HR
2030 Bulldozer with Operator 150 HR
2031 Excavator 100 HR
2032 Vibratory Plate Compactor with Operator 120 HR
2033 Vibratory Roller with Operator 150 HR
2034 Concrete/Asphalt Saw with Operator 60 HR
2035 Park Preseason Electrical Check 8 EA
2036 Excavation for Electrical Lines 1000 LF
2037 Replace/Install Electric Riser 10 EA
2038 Replace/Install Electric Panel board 10 EA
2039 Replace/Install Electric Wire way 10 EA
2040 Replace/Install Electric Safety Disconnect 3 EA
2041 Utility Road Crossing 125 LF
2042 Rock Excavation for Utility Lines 600 LF
2043 Repair Water Leak 15 EA
2044 Unplug Sewer System 10 EA
2045 Replace/Install Underground Water Line 3/4 - 2" 3000 LF
2046 Replace/Install Underground sewer line 1200 LF
2047 Replace Water Hydrant 30 EA
2048 Inspect Reducer Pressure Zone Assembly 9 EA
2049 Inspect Septic System 6 EA
OPTION 2 PERIOD - LINE ITEM 2001 - 2049 TOTAL:
BULL SHOALS OPTION 2 PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement at Mountain Home Project Office and Bull Shoals Lake for the period of 1 June 2021 or date of award whichever is later, through 31 May 2022 or 12 months from actual award date.
2050 Service Call 300 EA
2051 Emergency Service Call 150 EA
2052 Unscheduled Labor Hours, General 900 HR
2053 Unscheduled Labor Hours, Plumbing 700 HR
2054 Unscheduled Labor Hours, Electrical 700 HR
2055 Materials Cost 150000 US Dollar NTE $150,000.00
2056 Debris Removal - land acces 100 CY
2057 Debris Removal - water acces 20 CY
2058 Carpentry Repair Hours 700 HR
2059 Replace Exterior Toilet Screen Door and Door Frame 3 EA
2060 Replace Exterior Steel Door and Frame 3 EA
2061 Install Landscape Anchor Timbers 600 LF
2062 Install Landscape Timbers 900 LF
2063 Replace/Install Lantern Hanger 30 EA
2064 Replace/Install Fire Ring Grill 45 EA
2065 4x4 Sign Mounting Placement 60 EA
2066 6x6 Sign Mounting Placement 30 EA
2067 Shingle Roofing 2000 SQ. FT
2068 Metal Roofing 4000 SQ. FT
2069 Remove/Re-install existing Picnic Canopies 150 each
2070 Place 4" Concrete Slab 3000 SF
2071 Place 6" Concrete Slab 3000 SF
2072 Place Launch Ramp Concrete 400 SF
2073 Replace/Install Concrete Wheel Stop 50 EA
2074 Install Drainage Culvert CMP 150 LF
2075 Dump Truck with Driver 250 HR
2076 Backhoe with Operator 300 HR
2077 Skid Steer with Operator 300 HR
2078 Mini Excavator with Operator 250 HR
2079 Bulldozer with Operator 150 HR
2080 Excavator 100 HR
2081 Vibratory Plate Compactor with Operator 200 HR
2082 Vibratory Roller with Operator 150 HR
2083 Concrete/Asphalt Saw with Operator 60 HR
2084 Park Preseason Electrical Check 9 EA
2085 Excavation for Electrical Lines 1000 LF
2086 Replace/Install Electric Riser 10 EA
2087 Replace/Install Electric Panel board 10 EA
2088 Replace/Install Electric Wire way 10 EA
2089 Replace/Install Electric Safety Disconnect 3 EA
2090 Utility Road Crossing 125 LF
2091 Rock Excavation for Utility Lines 600 LF
2092 Repair Water Leak 25 EA
2093 Unplug Sewer System 10 EA
2094 Replace/Install Underground Water Line 3/4 - 2" 3000 LF
2095 Replace/Install Underground sewer line 1200 LF
2096 Replace Water Hydrant 30 EA
2097 Inspect Reducer Pressure Zone Assembly 9 EA
2098 Inspect Septic System 6 EA
OPTION 2 PERIOD - LINE ITEM 2050 - 2098 TOTAL: