B.08.02_W9127S19Q0034_Amd_2_w_Q&A_sign.pdf

PDF 1015 KB Posted

Attached to
IDIQ Park Maintenance - MHPO Federal contract opportunity
Solicitation number
W9127S19Q0034
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

Amendment 0002 with Question/Answers

View the file

Other files for this federal contract opportunity

Other files attached to IDIQ Park Maintenance - MHPO, newest first.
File Type Posted
B.08.02_W9127S19Q0034_Amd_3_w_Q&A.pdf PDF
B.08.02_W9127S19Q0034_Amd_2_w_Q&A_signed.pdf PDF
B.08.02_W9127S19Q0034_Amd_1_w_Bid_Sheet_rev1.pdf PDF
Synopsis-Solicitation_W9127S19Q0034_rev1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

1. What is the Emergency response time? Three hours for emergency; 24 for Normal response (5.2.1 Service Calls)

2. How will time be negotiated for additional duties? We plan to define the project before it is initiated. Any additional work will be evaluated on a case by case basis. (5.2.2 Unscheduled Labor Hours)

3. How are heavy equipment hours tracked? Payment will be made for operating hours only, idle equipment shall not be means for payment. (5.2.20 Equipment Hours)

4. How is a man-hour defined? Each hour will be for one qualified worker. (5.2.2 Unscheduled Labor Hours)

5. In the concrete line items, what is included? This is for the concrete materials and labor. (5.2.16

& 5.2.17 Concrete Slab & Launch Ramp).

6. What quantities will be used in the contract? We anticipate using it as our primary tool for all work listed based on need and available funding. There is a minimum guarantee, 1%. (1.6.8 Type of Contract)

7. Will all this type of work be directed to whomever receives the bid? We will use this contract primarily but not exclusively. (1.6.8 Type of Contract)

8. In the water line item, what is included? Labor and equipment only. (2.2.40 Replace/Install Underground Water Line) Materials will be provided by the Government or will be reimbursed at cost + 5%. (5.2.3 Materials Cost)

9. What are the details of the debris removal CLINS? Removal of debris may include cleanup of the following: fallen trees and tree limbs, manmade debris, tires, Styrofoam, plastic containers, glass, drift materials on shorelines, campsites, roadways and other areas located in recreation areas or other government operated lands around Norfork and Bull Shoals Lakes. (5.2.3 Debris Clean Up)