Request for Information #2 Responses
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127Q19R7001_RFI_1.pdf | ||
| SCA_WAGE_DETERMINATION.pdf | ||
| SOLICITATION_DOCUMENTS.pdf | ||
| OPFOR_REQUIREMENTS_TIMELINE.xlsx | XLSX spreadsheet | |
| PWS_SS_19_OPFOR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9127W-19-R-7001 RFI #2
1. Facility Clearance (FCL) Letter statement - The Contractor believes this may be incorrectly abbreviated. We request clarification on if the Government is requiring an FCL letter? If so, please advise whose letterhead is appropriate for this letter, should this be (Contractor or Govt)?
For all FCL-related questions, or status updates on your FCL sponsorship submission, contact the DSS Knowledge Center at 888-282-7682 and select option #3.
http://www.dss.mil/isp/fac_clear/fac_clear.html
2. Paragraph 1.10.8 states, “Contractor shall provide training liaisons each three locations to work directly with the white cell staff and those individuals shall have at a minimum a secret clearance with access to classified facilities. Contractor shall provide personnel to act in the roles of the provided script, 2 to 4 French speaking personnel per event and the total number of personnel in accordance with attachment 1 (OPFOR roll up). Contractor shall have an active Facility Clearance Letter (FCL) to access classified information and/or operate in a classified environment. Contracted individuals performing liaison duties within the secure facilities must have been granted access to classified information at or above the SECRET level and indoctrinated with a non-disclosure agreement (NDA) on file in the Joint Personnel Adjudication System (JPAS).”
We ask the Government to please clarify the entire paragraph. For example, we have noticed the following: •There is no mention of events requiring French speakers in attachment 1 (OPFOR roll up). How many French speakers are required and what events are they needed for? Do the French speaker require a security clearance?
These personnel will not need to have Secret Clearance since they will be passing pre-established information. Section 1.10.8 details the minimum number of French speaking personnel as at least 2
•Facility Clearance Letter, is there a classified PWS or other document that requires our review?
There is no classified contract portion, the access to classified contract is how this was determined to be a classified contract, not a contract on the classified network.
3. Paragraph 4.7.1 POP is 17-29 Jan. There are three training events that begin on 17 Jan at 1300. Request the POP be adjusted to 16-29 Jan. This will allow the PM and site leads to arrive and meet with the SSTK staff 24 hours prior to the start of training.
The PWS states that the PM needs to arrive on the 8th of Jan. Period of performance will be 8 -29 January 2019.
4. . I personally hold a current SECRET security clearance. If my Company has to have a FCL to perform the work on the contract can I partner with another Company with a FCL and perform the work?
Please contact DSS directly for this question.
For all FCL-related questions, or status updates on your FCL sponsorship submission, contact the DSS Knowledge Center at 888-282-7682 and select option #3.
http://www.dss.mil/isp/fac_clear/fac_clear.html
A FCL is an administrative determination that, from a national security standpoint, a facility is eligible for access to classified information at the same or lower classification category as the FCL granted to the facility.
What is a Facility Clearance (FCL)?
A government contracting activity (GCA) or a currently Cleared Defense Contractor (CDC) may sponsor an uncleared company for an
FCL.
The sponsorship package should include the following:
Justification demonstrating bona fide procurement requirement to access classified information. Most common form is DD Form 254.
Written GCA or Intelligence Community (IC) Authorization.
Statement of Work (SOW)/Performance Work Statement (PWS): Highly recommended that a contract or subcontract specific SOW or PWS be included.
Considering Starting a Joint Venture (JV) ?
With new Mentor-Protégé Programs available to small businesses, more joint ventures are being considered. If you form a JV that is awarded a classified contract, the JV entity will require a FCL. This applies to all JVs, regardless if the separate entities of the JV currently hold a FCL.
There also can be confusion associated with populated and unpopulated JVs. The Facility
Security Officer (FSO), the Insider Threat Program Senior Official (ITPSO), and the SMO Senior Management Official (SMO) must be employees of the organization holding the Facility Clearance. Therefore, the JV must have at least one employee who hold these positions. The SBA regulations, 13 CFR 121.103 (h) do allow a joint venture to have its own separate employees to perform administrative functions. Thus, a joint venture may be populated with employee(s) and still be considered an unpopulated joint venture so long as these employees are not performing the contracts awarded to the joint venture.
Defense Security Service Small Business Guide
Facility Clearance Process
Who Can Sponsor a Facility for a FCL?
www.dss.mil TIP: When forming a JV, review the security requirements of the contracts you will be bidding on and ensure FCL sponsorship and timelines are considered.
http://www.dss.mil/isp/foci/fso.html https://www.ecfr.gov/cgi-bin/text-idx?rgn=div5;node=13%3A1.0.1.1.17#se13.1.121_1103 https://www.dss.mil/oa/index.html http://www.dss.mil/
Su bm it Sp on so rs hi p Pa ck ag e Submit a Sponsorship Package to DSS, via National Industrial Security System (NISS)
It must include:
1.Justification (ex.
DD254)
2.Written GCA or IC Authorization
3. SOW/PWS
DA
Y
Sponsorship Package Accepted
•Package accepted by DSS and you receive a welcome email with your specific deadlines and instructions
•Within 5-10 days a telephonic survey is conducted to discuss your specific situation
DA
Y
Submit Business Documents via eFCL
•Once the complete FCL package is submitted, your assigned Industrial Security Representative (IS Rep) from your local field office will review the package.
If the package is complete, the IS Rep will forward the package for additional internal reviews and notify FCB to process any Key Management Personnel (KMP) personnel security clearances that are needed
DA
Y
Submit KMP Clearance Documents
•Completed Electronic Questionnaire for Investigations Processing (e-QIP)
•Electronic Fingerprints
•Verification of current clearnance as applicable
Fa ci lit y
Cl ea ra nc e Is su ed
Resources Available to you:
• Visit www.DSS.mil to view a detailed and very helpful handbook on the FCL process, FCL checklist, FAQs, NISPOM.
• Call the DSS Knowledge Center at 888-282- 7682 and select option #3 for all FCL-related questions or status updates on your submission.
• Visit www.CDSE.edu for FREE training, toolkits, job aids, security shorts and more such as FSO training, FSO Toolkit, and Merger/Acquisition/Reorganizations Job Aids.
Tips for Small Businesses
• Cleared contractors can process individual consultants for a PCL and NOT a FCL when the consultant and immediate family members are the sole owners and only the consultant requires access to classified information. Be aware of this when looking into subcontracting opportunities!
• DSS Facility Clearance Branch (FCB) cannot adjust agency contract requirements that require a FCL at time of bid. If you have a concern, engage with the agency directly.
• The government funds the processing of PCLs and FCLs for access to classified information. The only cost to you to go through the process is to ensure the business is in compliance with the National Industrial Security Program Operating Manual (NISPOM).
• Leverage your business relationships and small business status to find subcontracting opportunities that will sponsor your business.
• See back flap for important information on joint ventures.
How long will the whole process take?
• It depends on the individual situation. The two main hold points in the process that add time are processing of Personnel Clearances (PCL) for Key Management Personnel (KMP) and mitigations for businesses with Foreign Ownership or Controlling Interest (FOCI). Interims are granted, when possible, to allow contractors to begin performance.
• Example: If you are a business where the KMP currently holds an active personnel clearance at the level required by the contract and have no FOCI then the process will most likely go faster.
The same is likely for two cleared businesses that form a Joint Venture (JV) and require the JV to be cleared.
The FCL Process
IMPORTANT: Waiting until the last day on these timelines could potentially lead to the process being discontinued if the timelines are not met or correct documents are not provided. In those instances, the company will have to be re-sponsored and the process begins all over again so timeliness and quality are paramount.
TIP: Please note that the biggest opportunity to expedite your Facility Clearance Process is in being prepared to provide the required information and documentation quickly at each stage of the process.
TIP: Due to review and coordination timeframe, this may require a quick turnaround to complete e- QIPs. Search the Standard Form 86 PDF on any search engine to start collecting the information that you will need to upload into the e-QIP prior to it being released to you.
https://nbib.opm.gov/e-qip-background-investigations/ http://www.dss.mil/ http://www.dss.mil/documents/facility-clearances/FCL_Orientation_Handbook_18FEB15.pdf http://www.dss.mil/isp/fac_clear/download_nispom.html http://www.cdse.edu/ https://www.cdse.edu/toolkits/fsos/new-fso.html https://www.cdse.edu/toolkits/fsos/index.php http://www.dss.mil/isp/foci/foci_info.html
W9127W-19-R-7001 RFI #1
a.) The "OPFOR_REQUIREMENTS_TIME" spreadsheet mentions Technicals at training sites but there is no further requirement explanation on them. Do these guns mounted on trucks need to be UTM/ Sim, blank, or pneumatic weapons?
They will need to be pneumatic/Blank firing.
b.) In the "Other Equip/ Not Contracted" column of the spreadsheet, it mentions mystic dummies as well as "multiple prepared victims". Will the contractor be responsible for providing mystic dummies and/ or providing special effects moulage to dummies or Role Players?
Just needs to be special effects moulage at a minimum/ Preferrably the Dummies that replicate combat scenarios. If using a Role player for moulage they will need to be able/ Cleared to fly on a US Military aircraft c.) What time on 20-Jan will the 80' vessel need to be in place for infil of US Forces?
Infil to Fort Morgan, Alabama by 1900L CST near the following grid 16R DU 02949 43322 d.) Is there a minimum or maximum freeboard height for the vessels?
10’ to 20’ e.) Can you provide coordinates (either 6-digit or lat/long) for the vessel locations during operations? This will effect mileage which will effect cost.
16R DU 02949 43322 Fort Morgan, 16r CU 35154 42485 near Horn Island f.) Are the 80' and 120' vessel specifications the minimum required lengths or a maximum?
Minimum