Provide and Install Working Air Compressors & Dryers

PERFORMANCE WORK STATEMENT (PWS)

FOR

Provide and Install Working Air Compressors & Air Dryers 6 September 2018

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to provide and install working air compressors and accompanying dryers, as defined in this PWS

1.2 Background: Located in buildings 102 and 235, there are three air compressors and four air dryers that are essential for maintenance repairs on the C-17 Aircraft and Support Equipment. The existing compressors and dryers are inoperable and the constant repairs and down time have caused delays in Aircraft repairs.

1.3 Period of Performance (PoP): The Period of Performance shall be within 45 days from award notification.

1.4 General Information:

1.4.1 Quality Control (QC): Quality Control shall be maintained through periodic visual inspection of the installation.

1.4.2 Quality Assurance (QA): The Government shall evaluate the contractor’s performance and quality of service through visual and sound technical inspection.

1.4.3 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days:

1.4.3.1 New Year’s Day

1.4.3.2 Martin Luther King, Jr.’s Birthday

1.4.3.3 President’s Day

1.4.3.4 Memorial Day

1.4.3.5 Independence Day

1.4.3.6 Labor Day

1.4.3.7 Columbus Day

1.4.3.8 Veteran’s Day

1.4.3.9 Thanksgiving Day

1.4.3.10 Christmas Day

1.4.4 Place and Performance of Services: The contractor shall provide services between the hours of __0700-1600_____ on _Monday through Friday except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at _172d AW Thompson Fld.

Jackson MS; Bldg. #102 & Bldg. #235__ The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons.

When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.4.1 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.4.2 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.

1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 COMSEC/IT Security. All communications with DOD organizations are subject to communications security (COMSEC) review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, the contractor is advised that any time contractor place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DOD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.2 - 1.4.5.11 Reserved

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7 Special Qualifications: Contractor must be licensed, bonded, and insured.

Contractor must be able to show proof to 172d Contracting office if asked by contracting officer prior to any work or service being performed.

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government.

Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, (or the KO if a COR is not assigned), to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: Badges will be issued by 172d Security Forces to all contractors requiring access to the installation and have passed a security clearance/ background check. The contractor shall retrieve all identification media (including vehicle passes) from their employees who depart employment for any reason.

All identification media (i.e., badges and vehicles passes) shall be returned to the KO within 14 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The Contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 - 1.4.16 Reserved

2.0 Definitions and Acronyms:

2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations.

This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 ACRONYMS:

AT/OPSEC Antiterrorism/Operational Security COR Contracting Officer Representative KO Contracting Officer MFR Manufacturer PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control TE Technical Exhibit

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: None

3.2 Materials: None

3.3 Equipment: None

3.4 Services: None

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall:

5.1 Remove existing air compressors and dryers (Bldg. #235 Gardner Denver, Model #EBM99K compressor 2ea. and dryers Gardner Denver, Model #9VXRD200A3, 3ea) & (Bldg. #102 Ingersoll Rand, Model #SSR-EPE50 1ea. and dryer ZEKS, Model #250HSGA400 1ea.) in accordance with industry standards and any applicable state, federal, or local regulations.

5.2 Provide and install new air compressors (3ea.) and dryers (4ea.) and ensure units are fully operational per manufacturer specifications, upon installation completion.

5.2.1 New Compressors must meet minimum specifications listed below:

-Industrial Machine rated at cubic feet per minute of 125PSI to 145PSI.

-Voltage 460v

-30 horse power, gear driven

-Low Sound not to exceed 85dba

-High efficiency rotary screw

-Air cooled

-Floor mounted

-Compressor- safety relief valve

-Full sound enclosure with access doors or panels

-ACFM (Actual cubic feet per minute) must meet or exceed 130 @ 125PSI

-Max PSIG (pounds per square inch gauge): 150

-Compressor installation location size restrictions: Length: 10 Feet. Width: 4 feet 8 inches. Height: 6 feet

-Must include all user manuals needed to operate machine

5.2.2 New Dryers must meet minimum specifications listed below:

-Desiccant dryer

-Floor mounted

-Air exhaust silencer (not to exceed 85dba)

-SCFM must meet or exceed 125PSI

-Rated to operate with minimum of 30HP air compressor

-Must include all user manuals needed to operate dryer

5.3 Clean up and properly dispose of, off-site, all debris, old hardware, packaging, or other trash created during the removal/installation process.

5.4 Provide on-site operator training on the new air compressors and dryer units; to include: correct operational processes and any regular minor maintenance or servicing required.

5.5 Contractor Manpower Reporting Application (CMRA):

5.5.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 172d Maintenance Group via a secure data collection site.

5.5.2 The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported within 30 days of completion of the project but no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.ecmra.mil.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

NONE

http://www.ecmra.mil/ http://www.ecmra.mil/

TECHNICAL EXHIBIT 1

Performance Requirements Summary

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

PWS Paragraph Task Performance

Standard Acceptable Quality

Levels (AQL) Surveillance Method /

By Whom 5.1, 5.2 Remove existing equipment then provide and install new air compressors and dryers per MFR specifications.

The contractor shall ensure units operate within MFR’s parameters

Units most meet MFR requirements before installation is acceptable.

On site testing observed by the COR.

5.4 Train on site

personnel on startup, functions, and shut down

Training completed when end item user can operate units

Training is documented by

Contractor

Training is recorded by end item user