1. SOLICITATION NO.2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1 PAGES

4/25/2018 5/25/2018

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY

X (WITHOUT PROFIT) 20% of bid price 20% of bid price

C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED (INCLUDING PROFIT) Amd. 0002 Yes Amd. 0002 Yes

6. NUMBER OF ADDENDA ISSUED 1

7A.

ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT No. 1 vs IGE No. 2 vs IGE

0001 Mobilization and Demobilization 1 JOB 439,297.00$ 439,297.00$ 500,000.00$ 500,000.00$ 1,400,000.00$ 1,400,000.00$ -$ 13.8% 218.7% 0002 Rogue River Dredging and Placement of Materials: EC 50000 CY 8.17$ 408,500.00$ 10.25$ 512,500.00$ 11.00$ 550,000.00$ -$ 25.5% 34.6% 0003 Rogue River Dredging and Placement of Materials: USCG 22000 CY 8.41$ 185,020.00$ 11.25$ 247,500.00$ 22.00$ 484,000.00$ -$ 33.8% 161.6%

Rogue River Dredging and Placement of Materials: EC (OPTION) 10000 CY 8.67$ 86,700.00$ 9.00$ 90,000.00$ 12.00$ 120,000.00$ -$ 3.8% 38.4%

Rogue River Dredging and Placement of Materials: BBAC (OPTION) 20000 CY 8.40$ 168,000.00$ 9.00$ 180,000.00$ 23.75$ 475,000.00$ -$ 7.1% 182.7%

Rogue River Dredging and Placement of Materials: BBAC (OPTION) 20000 CY 8.40$ 168,000.00$ 9.00$ 180,000.00$ 23.75$ 475,000.00$ -$ 7.1% 182.7%

Upland Earth Moving Equipment: Mob/Demob (OPTION)

1 JOB 32,884.00$ 32,884.00$ 12,500.00$ 12,500.00$ 75,000.00$ 75,000.00$ -$ -62.0% 128.1% 0008 Rogue River Site Prep & Clean-up (OPTION) 1 JOB 59,820.00$ 59,820.00$ 12,500.00$ 12,500.00$ 75,000.00$ 75,000.00$ -$ -79.1% 25.4% 0009 Rogue River Upland Placement (OPTION)

0009AA

Rogue River Upland Placement: First 20,000 CY (OPTION)

20000 CY 15.08$ 301,600.00$ 3.00$ 60,000.00$ 20.00$ 400,000.00$ -$ -80.1% 32.6%

0009AB

Rogue River Upland Placement: Over 20,000 CY (OPTION)

10000 CY 15.08$ 150,800.00$ 3.00$ 30,000.00$ 20.00$ 200,000.00$ -$ -80.1% 32.6%

0010 Dredging and Placement of Materials; Port Orford 25000 CY 8.36$ 209,000.00$ 6.50$ 162,500.00$ 11.00$ 275,000.00$ -$ -22.2% 31.6%

Dredging and Placement of Materials; Port Orford (OPTION)

10000 CY 7.44$ 74,400.00$ 6.00$ 60,000.00$ 11.00$ 110,000.00$ -$ -19.4% 47.8%

0012 Dredging and Placement of Materials; Baker Bay 60000 CY 8.77$ 526,200.00$ 6.75$ 405,000.00$ 9.50$ 570,000.00$ -$ -23.0% 8.3%

Dredging and Placement of Materials; Baker Bay (OPTION)

20000 CY 8.97$ 179,400.00$ 6.00$ 120,000.00$ 9.50$ 190,000.00$ -$ -33.1% 5.9%

Baker Bay Photogrammetric Scow Load Measurement Testing (OPTION) 1 JOB 12,000.00$ 12,000.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ -$ -79.2% -79.2%

Baker Bay; Photogrammetric Scow Load Measurement Testing (OPTION) 1 JOB 10,000.00$ 10,000.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ -$ -75.0% -75.0%

ABSTRACT OF OFFERS

W9127N18B0010

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

HME Construction, Inc.

6801 NW Old Lower River Road Vancouver, WA 98660

Oregon Coast Clamshell Maintenance Dredging 2018

7B. DESCRIPTION OF OFFERED ITEM

7C. EST D.

J.E. McAmis, Inc.

621 Country Drive Chico, CA 95928

B. BID SECURITY B. BID SECURITY

Dredging and Placement of Materials; Astoria Turning Basin (OPTION) 15000 CY 9.60$ 144,000.00$ 6.00$ 90,000.00$ 9.50$ 142,500.00$ -$ -37.5% -1.0%

Dredging and Placement of Materials; Astoria Turning Basin (OPTION) 10000 CY 8.16$ 81,600.00$ 6.00$ 60,000.00$ 9.50$ 95,000.00$ -$ -26.5% 16.4%

SUBTOTAL FOR MANDATORY LINE ITEMS 1,768,017.00$ 1,827,500.00$ 3,279,000.00$ -$ 3.4% 85.5% SUBTOTAL FOR OPTIONAL LINE ITEMS 1,469,204.00$ 900,000.00$ 2,362,500.00$ -$ -38.7% 60.8%

3,237,221.00$ 2,727,500.00$ 5,641,500.00$ -$ -15.7% 74.3%

NSN 7540-01-150-0981 1419-101

TOTAL

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

STANDARD FORM 1419 (10-3)