A.07.24_Updated_Price_Schedule_Amd_0002.pdf

PDF 57 KB Posted

Attached to
2018 Oregon Coast Maintenance Dredging
Solicitation number
W9127N18B0010
Issued by

About this file

Amendment 0002 Updated Price Schedule, W9127N18B0010

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9127N18B0010

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mobilization and Demobilization

FFP

Mobilization and Demobilization FOB: Destination

NET AMT

0002 50,000 Cubic

Yard

Rogue River Dredging and Placement: EC

FFP

Dredging and Placement of Materials: Rogue River Entrance Channel

0003 22,000 Cubic

Rogue River Dredging and Placement: USCG

Dredging and Placement of Materials: Rogue River US Coast Guard Access Channel

0004 10,000 Cubic

OPTION Rogue River Dredging and Placement: EC

Dredging and Placement of Materials: Rogue River Entrance Channel

(OPTIONAL)

0005 20,000 Cubic

OPTION Rogue River Dredging and Placement: BBAC

Dredging and Placement of Materials: Rogue River Boat Basin Access Channel

0006 20,000 Cubic

OPTION Rogue River Dredging and Placement: BBAC

Dredging and Placement of Materials: Rogue River Boat Basin Access Channel

0007 1 Job OPTION Upland Earth Moving Equipment: Mob/Demob

FFP

Rogue River Upland Earth Moving Equipment Mobilization/Demobilization

0008 1 Job OPTION Rogue River Upland Site Prep & Clean-Up

FFP

Rogue River Upland Site Preparation and Clean-Up (OPTIONAL)

Rogue River Increment Upland Placement

Increment For Upland Placement (Informational) (OPTIONAL)

0009AA 20,000 Cubic

OPTION First 20,000 CY

Rogue River Increment For Upland Placement First 20,000 CY

0009AB 10,000 Cubic

OPTION Over 20,000 CY

Rogue River Increment For Upland Placement Over 20,000 CY

0010 25,000 Cubic

Port Orford Dredging and Placement

Dredging and Placement of Materials: Port Orford

0011 10,000 Cubic

OPTION Port Orford Dredging and Placement

Dredging and Placement of Materials: Port Orford (OPTIONAL)

0012 60,000 Cubic

Baker Bay Dredging and Placement

Dredging and Placement of Materials: Baker Bay

0013 20,000 Cubic

OPTION Baker Bay Dreding and Placement

Dredging and Placement of Materials: Baker Bay (OPTIONAL)

0014 1 Job OPTION Baker Bay: Photogrammetric Scow Load

FFP

Baker Bay: Photogrammetric Scow Load Measurement Testing (OPTIONAL)

0015 1 Job OPTION Baker Bay: Photogrammetric Scow Load

FFP

Baker Bay: Photogrammetric Scow Load Measurement Testing (OPTIONAL)

0016 15,000 Cubic

OPTION Astoria Basin Dredging and Placement

Dredging and Placement of Materials: Astoria Turning Basin

0017 10,000 Cubic

OPTION Astoria Basin Dredging and Placement

Dredging and Placement of Materials: Astoria Turning Basin

File details come from the government source that posted it.