AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

As an amendment to the solicitation the follow ing changes are made:

1. Division 01 -- General Requirements: Section 01 22 00.00 82 Paragraph 3.1.17 a. is revised. The attached revised paragraph is incorporated in full and replaces the previous version in its entirety.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N18B0001

X 9B. DATED (SEE ITEM 11)

25-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Feb-2018

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N18B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

West Coast Hopper Maintenance Dredging 2018

b. Quantity measurement: Reference paragraph 3.1.2 CLINs 0002 and 0003 subitem (b).

c. Non-Payable Material: Reference paragraph 3.1.2 CLINs 0002 and 0003 (c).

d. Placement sites SWS and NJS will be provided for all material dredged from MCR for the above referenced CLINs.

3.1.16 MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement, Base and Optional Line Items, CLINs 0027, 0028, and 0029

a. Measurement and payment for the bid items stated above will be considered complete and full compensation for the effort and cost to place the material listed above in paragraph 3.1.15, in the DWS instead of the SWS or NJS.

b. Payment will be an incremental cost per cubic yard in addition to the price per cubic yard for CLINs 0024, 0025, and 0026.

c. Quantity measurement: Reference paragraph 3.1.2 CLINs 0002 and 0003 subitem (b).

d. Non-Payable Material: Reference paragraph 3.1.2 CLINs 0002 and 0003 subitem (c).

3.1.17 ESI, Incremental Mobilization and Demobilization for Pumpashore Operations, Optional Line Items, CLIN 0030

a. Payment will be considered complete and full compensation for the additional effort and cost, including related administrative costs, to transport to and from the job site all necessary Contractor plant, equipment, fuel, supplies, and personnel required for the Placement of material from the Mouth of the Columbia River to the East Sand Island erosion repair placement sites. Payment will be made in the amount of the contract lump sum price for this item. Plant subject to pre-work safety inspection requirements will not be considered "mobilized" until such equipment is determined to be in compliance as determined by the Government during the joint equipment walk-through. Price for this item shall also include:

(1) Complete preparation of the site, including setup of pumpout equipment, pipe, and any necessary land work equipment.

(2) Final site cleanup, finshing, and restoration as prescribed in Sections 31 00 00.00 25 and 32 90 00.00 25.

b. 60 percent will be paid to the Contractor upon mobilization of all equipment needed to commence dredging and pumpashore material placement operations. The remaining 40 percent will be paid to the Contractor upon final completion and acceptance of all pumpashore work.

c. The Government may require the Contractor to furnish cost data to justify this portion of the bid in the event the Government considers the amount in this item, sixty percent of which covers mobilization and forty percent of which represents demobilization, does not bear a reasonable relation to the cost of the work in this Contract. Failure to justify such price satisfactorily will result in payment of actual

SECTION 01 22 00.00 82 Page 10

West Coast Hopper Maintenance Dredging 2018 mobilization and demobilization costs as determined by the Government after each activity is completed and payment of the remainder of this item in the final payment under this Contract. The determination of actual costs by the Government is not subject to appeal.

3.1.18 ESI, Bin Measure, Increment for Operations and Maintenance, Shoreline Placement, East Sand Island Erosion Repair, Optional Line Item, CLIN 0031

a. Payment will be considered complete and full compensation for the additional costs over and above the costs for either the MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement or the LCR, Bin Measure, FL Placement, to place the dredged material in the East Sand Island Erosion Repair site in accordance with SECTION 35 20 23.00 82, DREDGING AND CHANNEL CLEARING, and will be paid for at the contract unit price (cubic yards of dredged material) for this item. Dredging sites associated with this CLIN will be located between CR RM -2-10-00 and RM 12+00+00. CLIN 0022 does not apply to this work.

b. Measurement shall be made by taking hopper bin measurements as stated in paragraph 3.1.2 b. above, and making any adjustments necessary for material remaining in the hopper bin after pumpout. The total measured quantity will be subject to deductions for material removed from outside the dimensions of the dredging pay area, for material which is improperly transported, or material not placed within the designated material placement areas (misplaced material).

3.1.19 ESI, Piling Removal and Rock Removal and Relocation, Optional Line Item, CLIN 0032

Measurement and payment for the bid items stated above will be considered complete and full compensation for the effort and cost to remove pilings, spreaders, and rock within the specified area in accordance with Section 31 62 19.00 25, TIMBER PILE REMOVAL, including disposal of the removed timbers and relocation of the removed rock to the prescribed location on East Sand Island.

3.2 PAYMENT METHODS

3.2.1 Bin Measure

In Bin measure work areas, the Government will provide a required quantity for the Contractor to dredge and a maximum dredging pay depth. The dredging pay prism is formed by the maximum pay depth, the 1-vertical to 3-horizontal side slopes, and the horizontal channel limits or maximum pay width. The required dredging quantity will be a maximum of 85 percent of the estimated quantity available as determined by single-beam or multi-beam Government hydrographic surveys, unless mutually agreed upon by the Contractor and the Government. A work area will be accepted when the total quantity dredged is within a single hopper load quantity of the total required dredging quantity. Survey the entire dredging area every 72 hours minimum unless there has been no dredging in the work area during that period.

3.2.2 Bin Measure to Required Depth

In Bin measure to Required Depth work areas, the Government will provide a required channel depth, with a maximum pay depth of 1- to 2-feet beyond the required channel depth(2 feet in HUM, and 1 foot in MSC and LCR), and a