AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
As an amendment to the solicitation the follow ing changes are made:
1. Attachments A7, A9, A17 and A25 are revised. The revised attachments are included w ith this amendment and are incorporated in full and replace the previous versions in their entirety.
2. Survey data files CP_01_DES_20180206_OT_5x5_MB.gen; CP_01_DES_20180208_OT_5X5.gen; and CP_01_DES_20180206-08_OT_5x5R10.xyz associated w ith CLINs 0030, 0031, and 0032 are incorporated and are provided for dow nload on FBO.gov.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N18B0001
X 9B. DATED (SEE ITEM 11)
25-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Feb-2018
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N18B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
Attachment Replaced In It's Entirety From Original A7 - 1 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 2 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 3 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 4 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 5 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 6 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 7 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 8 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 9 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 10 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 11 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 12 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 13 Amendment 0001
Attachment Replaced In It's Entirety From Original A7 - 14 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 1 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 2 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 3 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 4 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 5 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 6 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 7 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 8 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 9 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 10 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 11 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 12 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 13 Amendment 0001
Attachment Replaced In It's Entirety From Original A9 - 14 Amendment 0001
General Decision Number: OR180002 01/05/2018 OR2
Superseded General Decision Number: OR20170002
State: Oregon
Construction Types: Heavy Dredging
Counties: Oregon Statewide.
STATEWIDE
SELF-PROPELLED HOPPER DREDGING
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018
SUOR1991-002 09/01/1991
STATEWIDE
Rates Fringes
Self-Propelled Hopper Dredge, Drag Tender............$ 8.78 4.23+a
FOOTNOTE: a. Nine paid holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Paul Hall's Birthday (August 20th), Veterans Day, Thanksgiving Day and Christmas Day.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
REPLACED IN ITS ENTIRETY
A17-1
AMD #0001
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
A17-2
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
A17-3 and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
A17-4
General Decision Number: OR180063 02/02/2018 OR63
Superseded General Decision Number: OR20170063
State: Oregon
Construction Type: Heavy
County: Clatsop County in Oregon.
HEAVY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 02/02/2018
CARP0001-037 06/01/2012
Rates Fringes
CARPENTER (Including Form Work)............................$ 32.61 14.44
MILLWRIGHT.......................$ 33.11 14.44
ELEC0048-018 01/01/2017
Rates Fringes
ELECTRICIAN......................$ 40.20 22.18
ELEC0125-002 02/01/2014
Rates Fringes
LINE CONSTRUCTION
LINEMAN.....................$ 46.87 4%+13.35
* ENGI0701-036 01/01/2018
A17-5
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 41.65 14.35
GROUP 1A....................$ 43.73 14.35
GROUP 1B....................$ 45.82 14.35
GROUP 2.....................$ 39.74 14.35
GROUP 3.....................$ 38.59 14.35
GROUP 4.....................$ 37.51 14.35
GROUP 5.....................$ 36.27 14.35
GROUP 6.....................$ 33.05 14.35
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments;
GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;
GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over
GROUP 2: CRANE: Cableway Operator, 25 tons and over;
HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);
TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:
Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); Rubber tired scraper with tandom scrapers; Loader 120,000 lbs and above; BLADE: Auto Grader; Blade Operator-Robotic; Bulldozer over 120,000 lbs and above;
GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);
LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units; Loader 60,000 lbs and less than 120,000 lbs; Bulldozer over 70,000 lbs up to and including 120,000 lbs;
GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;
LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/BACKHOE-ROBOTIC: track and wheel type, up to and including 20,0000 lbs. with any or all attachments; BLADE: Blade Operator; Tractor operator with boom attachment; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000
A17-6 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled; Loaders 25,000 lbs and less than 60,000 lbs;
Bulldozer over 20,000 lbs and more than 100 horse up to 70,000 lbs; Screed; Compactor with blade
GROUP 5: TRACKHOE/BACKHOE HYDRAULIC: Track type up to and including 20,000 lbs, Wheel type (Ford, John Deer, Case Type); Boom truck operator; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; Loaders, rubber tired type , less than 25,00 lbs; Forklift over 5 ton, Bulldozer 20,000 lbs or 100 horses or less; Roller; Compactor without blade
GROUP 6: LOADERS: (less than 1 cu yd.); Oiler; Grade Checker; Crane oiler;Forklift; Roller (non-asphalt)
Zone Differential (add to Zone 1 rates):
Zone 2 - $3.00 Zone 3 - $6.00
For the following metropolitan counties: MULTNOMAH;
CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA;
CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS
INDICATED:
All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt.
St. Helens "Blast Zone" shall receive Zone I pay for all classifications.
All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications.
All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications.
For the following cities: ALBANY; BEND; COOS BAY; EUGENE;
GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG
All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications.
All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all
A17-7 classifications.
All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications.
* ENGI0701-037 01/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR:
(PIPELINE)
GROUP 2.....................$ 39.74 14.35
GROUP 3.....................$ 38.59 14.35
GROUP 4.....................$ 37.51 14.35
GROUP 5.....................$ 36.27 14.35
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 2: Bulldozer over 120,000 lbs and above;
GROUP 3: Bulldozer over 70,000 lbs up to and including 120,000 lbs;
GROUP 4: TRACKHOE/BACKHOE-ROBOTIC: track and wheel type, up to and including 20,0000 lbs. with any or all attachments;
Bulldozer over 20,000 lbs and more than 100 horse up to 70,000 lbs
GROUP 5: TRACKHOE/BACKHOE HYDRAULIC: Track type up to and including 20,000 lbs, Wheel type (Ford, John Deer, Case Type); Bulldozer 20,000 lbs or 100 horses or less
Zone Differential (add to Zone 1 rates):
Zone 2 - $3.00 Zone 3 - $6.00
For the following metropolitan counties: MULTNOMAH;
CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA;
CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS
INDICATED:
All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt.
St. Helens "Blast Zone" shall receive Zone I pay for all classifications.
All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all
A17-8 classifications.
All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications.
For the following cities: ALBANY; BEND; COOS BAY; EUGENE;
GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG
All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications.
All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications.
All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications.
IRON0029-013 07/01/2015
Rates Fringes
IRONWORKER (Reinforcing and Structural)......................$ 34.12 23.04
LABO0737-031 06/01/2017
Rates Fringes
Laborers:
GROUP 1.....................$ 28.86 13.85
GROUP 2.....................$ 29.94 13.85
LABORER CLASSIFICATIONS
GROUP 1: Asphalt Spreader
GROUP 2: Grade Checker
PAIN0055-020 07/01/2013
Rates Fringes
Painters:
Brush, Roller and Spray.....$ 21.01 8.83
PLAS0555-006 06/01/2017
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.50 17.62
A17-9
TEAM0037-012 06/01/2017
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 27.94 14.37
GROUP 2.....................$ 28.06 14.37
GROUP 3.....................$ 28.19 14.37
GROUP 4.....................$ 28.46 14.37
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Water Truck up to 3,000 gallons
GROUP 2: Water Truck over 3,000 to 5,000 gallons
GROUP 3: Water Truck over 5,000 to 10,000 gallons
GROUP 4: Water Truck over 10,000 to 15,000 gallons
SUOR2009-061 11/23/2009
Rates Fringes
LABORER: Common or General......$ 20.31 7.26
LABORER: Flagger................$ 18.76 6.15
LABORER: Mason Tender - Cement/Concrete..................$ 21.27 5.35
LABORER: Pipelayer..............$ 20.77 6.51
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 22.77 7.90
OPERATOR: Broom/Sweeper.........$ 32.31 6.43
OPERATOR: Excavator.............$ 21.73 6.32
OPERATOR: Mechanic..............$ 20.64 5.58
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 27.59 2.96
TRUCK DRIVER: Dump Truck........$ 17.22 4.83
TRUCK DRIVER: Off the Road Truck............................$ 31.81 6.33
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
A17-10
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
A17-11
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial
A17-12 contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
A17-13
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
REGION IX
75 Hawthorne Street San Francisco, CA 94105
December 2018 Update
EPA Ocean Disposal Special Conditions for 2018, USACE Use of the
Humboldt Open Ocean Disposal Site (HOODS)
The following mandatory conditions for disposal operations at the HOODS are provided pursuant to
EPA’s authority under sections 102 and 103 of the Marine Protection, Research, and Sanctuaries Act
(MPRSA), and the ocean dumping regulations at 40 CFR Parts 220-228. Please note that these conditions and reporting requirements apply both to USACE using its owned and operated dredging equipment (e.g., the hopper dredge Essayons) as well as to any company contracted by USACE to perform dredging and ocean disposal with non-USACE owned and operated equipment (e.g., under
USACE’s West Coast Hopper Contract). These conditions also apply to any and all dredging episodes by or for USACE throughout calendar year 2018.
Definitions:
1. “Permit” and “permittee” as used here mean USACE ocean dumping permits issued to others under Section 103 of the MPRSA, and to USACE itself and its contracts or other authorizations for USACE dredging projects (see MPRSA section 103(e) and 40 CFR Part 220.2).
2. “Towing vessel” is any self-propelled tug or other marine vessel used to transport (tow or push) the “disposal vessel” (see #3 following) for any portion of the transit to G-DODS.
3. “Disposal vessel” is any barge, scow, or self-propelled vessel (such as a hopper dredge) that carries dredged material during transit and from which the dredged material is discharged, typically by opening doors in the bottom of the hull or by splitting the hull.
4. “Transit” or “transport” to the disposal site begins as soon as dredged material loading into the disposal vessel is completed and a towing vessel begins moving the disposal vessel to the disposal site.
5. “Buffer cells” are the outermost cells of the overall disposal site, adjacent to the site boundaries.
NO DISPOSAL is allowed in the buffer cells unless specified by EPA on a project-by-project basis.
6. “Closed cells” are specified (smaller) cells in the interior of the overall disposal site; disposal site that EPA has identified as having mounded to a degree that DISPOSAL IS NO LONGER
ALLOWED.
7. “Allowable Disposal Cells” are specified (smaller) cells in the interior of the overall disposal site within which the disposal vessel must discharge all of the dredged material.
Attachment Replaced In It's Entirety From Orignal A25 - 1 Amendment 0001
EPA Conditions for use of the Humboldt Open Ocean Disposal Site (HOODS):
1. All disposal operations at the HOODS shall be conducted in accordance with the most recent update of the Site Management and Monitoring Plan (SMMP)
(https://www.epa.gov/sites/production/files/2015-10/documents/r9_hoods_smmp_2006.pdf), as well as these specific conditions. (In the event of any contradictions, these conditions prevail.)
2. Dredged material shall not be leaked or spilled from disposal vessels during transit to the
HOODS. Transportation of dredged material to the HOODS shall only be allowed when weather and sea state conditions will not interfere with safe transportation and will not create risk of spillage, leak or other loss of dredged material in transit to the HOODS. No disposal vessel trips shall be initiated when the National Weather Service has issued a gale warning for local waters during the time period necessary to complete dumping operations, or when wave heights are 16 feet or greater.
3. No more than one disposal vessel may be present within the HOODS at any time.
4. NO DISPOSAL in buffer cells or closed cells: Disposal in 2018 may only occur in certain interior cells of the HOODS (refer to attached schematic of the HOODS and Condition 5, below).
No disposal shall occur in buffer cells A1, A2, A3, A4, A6, A6, B6, C6, D6, E6, F6, or F1.
Similarly, no disposal shall occur in the outer half of buffer cells B1, C1, D1, E1, F2, F3, F4, and
F5. Finally, no disposal shall occur in the outer half of cell C2, the western quadrant of cell E2, or the outer half of cells E3 or E4.
5. Allowable disposal cells: To minimize further mounding throughout the HOODS, disposal events for this project shall occur only over the northeast and northwest slopes of the existing mound where depths currently exceed 130 feet MLLW. Compared to the most recent dredging and disposal episodes, four additional previously-used cells are now closed. Specifically, as shown on the attached schematic, all disposal events must occur within the NW half of cells B2, D2, and E2;
the SE half of cells B1, C1, D1, and E1; the NE half of cell E5; and the SW half of cells F2, F3, F4, and F5. (Coordinates for the corners of these allowable disposal cells are provided in the attached table.) Dredged material from sequential trips shall not be disposed in the same cell; rather, to the maximum extent practicable consistent with safe vessel operation, disposal events shall progress to all allowable disposal cells before returning to a previously used cell. (Note, this does not mean disposal must happen in order from one cell to the next. Nor does it mean that single disposal events cannot cross a cell's boundary and discharge material in multiple authorized cells.)
6. The disposal vessel must have a disposal tracking system, and the system must be operational before any individual disposal trip to HOODS is initiated. Throughout transit to the disposal site, during disposal, and for at least 10 minutes after disposal is complete, the disposal tracking system must automatically indicate and record the position, speed and draft of the disposal vessel, and the load level within the bin. These data must be generated at a maximum
1-minute interval while en route to the HOODS, and at a maximum 15-second interval while within 1/4 mile of and inside the HOODS boundary. The tracking system must also indicate and record the time and location of the beginning and end of each disposal event (e.g., opening and closing of scow hull or hopper doors).
7. “E-mail alerts” regarding any degree of apparent dumping outside the HOODS boundary, and regarding any apparent substantial leakage/spillage or other loss of material en route to the
HOODS must be sent within 24 hours of USACE becoming aware of the apparent issue, to
Attachment Replaced In It's Entirety From Orignal A25 - 2 Amendment 0001 https://www.epa.gov/sites/production/files/2015-10/documents/r9_hoods_smmp_2006.pdf
Brian Ross (ross.brian@epa.gov) and Allan Ota (ota.allan@epa.gov) at EPA Region IX, the
San Francisco District USACE project manager, and Mark Delaplaine at the California Coastal
Commission (mdelaplaine@coastal.ca.gov). Substantial leakage/spillage or other loss shall be defined as an apparent loss of draft of one foot or more between the time that the disposal vessel begins transport to the HOODS and the time of actual disposal.
8. In addition to any alerts pursuant to Condition 7 above, data recorded from the disposal tracking system must be provided to EPA Region IX, the San Francisco District USACE, and the California Coastal Commission at a minimum on a weekly basis during disposal operations. For each disposal trip the records must include disposal trip number and date, estimated bin volume of material disposed, and a visual display of the beginning and ending locations of the disposal event relative to the HOODS boundaries and internal cells. The reports shall include a cover letter describing any problems complying with these Ocean
Disposal Special Conditions, the cause(s) of the problems, any steps taken to rectify the problems, and whether the problems occurred on subsequent disposal trips.
9. A post-disposal bathymetric survey of the HOODS, extending at least 500 feet outside the site boundaries in all directions, shall be conducted within 60 days of completion of disposal operations, and provided to EPA Region IX within 30 days of completion.
ALSO SEE ATTACHED FIGURE AND COORDINATE TABLE
-end-
Attachment Replaced In It's Entirety From Orignal A25 - 3 Amendment 0001 mailto:ross.brian@epa.gov mailto:ota.allan@epa.gov mailto:mdelaplaine@coastal.ca.gov
Attachment Replaced In It's Entirety From Orignal A25 - 4 Amendment 0001
Attachment Replaced In It's Entirety From Orignal A25 - 5 Amendment 0001