AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: JOHN DAY SQ AND SU BOARD REPLACEMENT
1. This Amendment is issued to update the technical specifications.
2. Technical Specification Section 26 22 00.10 26 Paragraph 3.4 has been updated.
3. The proposal due date is extended from 4 September 2017 to 6 September 2017 at 4:00 PM.
4. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N17R0031
X 9B. DATED (SEE ITEM 11)
20-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Aug-2017
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N17R0031
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 04-Sep-2017 04:00 PM to 06-Sep-2017 04:00 PM.
(End of Summary of Changes)
JOHN DAY SQ AND SU BOARD REPLACEMENT
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 22 00.00 25 MEASUREMENT AND PAYMENT
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 03 - CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND
EQUIPMENT FOUNDATIONS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 26 GENERAL ELECTRICAL WORK AND EQUIPMENT
26 05 13.00 26 MEDIUM-VOLTAGE CABLE
26 05 19.00 26 INSULATED WIRE AND CABLE
26 05 26.00 26 GROUNDING
26 08 01.00 26 SYSTEMS TESTING AND COMMISSIONING
26 12 16.00 26 DRY-TYPE TRANSFORMERS
26 22 00.10 26 480-VOLT STATION SERVICE SWITCHGEAR
26 24 19.00 26 MOTOR CONTROL CENTERS
DIVISION 27 - COMMUNICATIONS
27 21 10.00 26 FIBER OPTIC DATA TRANSMISSION SYSTEM
DIVISION 33 - UTILITIES
33 72 33.14 26 POWER SYSTEM RELAY PROTECTION AND METERING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 22 00.10 26
480-VOLT STATION SERVICE SWITCHGEAR
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 ARRANGEMENT, ASSEMBLY, SHIPPING AND HANDLING
PART 2 PRODUCTS
2.1 NAMEPLATES
2.2 CONNECTIONS
2.3 480-VOLT STATION SERVICE SWITCHGEAR
2.3.1 General
2.3.2 Assembly And Detail Drawings
2.3.3 Outline Drawings
2.3.4 Schematic Diagrams And Connection Diagrams
2.3.5 Enclosure and Framework
2.3.5.1 Switchgear
2.3.5.2 Enclosure
2.3.5.3 Drawout Circuit Breaker
2.3.5.4 Ventilating Opening
2.3.5.5 Infra-red (IR) viewing windows
2.3.5.6 Foundations
2.3.6 Buses and Connections
2.3.7 Power Circuit Breakers
2.3.7.1 General
2.3.7.2 Power Supply, Bus Tie, and Tie Isolation Circuit Breakers
2.3.7.3 Feeder Air Circuit Breakers
2.3.7.4 Automatic Bus Transfer
2.3.8 Wiring
2.3.8.1 Control Panel and Power Wiring
2.3.8.2 Terminals and Installation
2.3.8.3 Terminal Blocks
2.3.9 Grounding
2.3.10 Molded Case Circuit Breakers
2.3.11 Instrument Transformers
2.3.11.1 General
2.3.11.2 Voltage Transformers
2.3.11.3 Current Transformers
2.3.12 Ground Detection Equipment
2.3.13 Relays
2.3.13.1 Protective Relays
2.3.13.2 Auxiliary relays
2.3.14 Control and Instrument Switches
2.3.14.1 General
2.3.14.2 Switch Features
2.3.15 Indicating Lamp Assemblies
2.3.16 Indicating Instruments
2.3.16.1 General
2.3.16.2 Rectangular Switchboard Instruments
SECTION 26 22 00.10 26 Page 1
2.3.16.3 AC Voltmeters
2.4 SECONDARY UNIT SUBSTATION
2.4.1 General
2.4.2 Incoming Sections
2.4.3 Transforming Sections
2.4.4 Transformer Bus Connections
2.4.5 Outgoing Section
2.4.6 NEUTRAL GROUNDING EQUIPMENT
2.5 REMOTE RACKING DEVICE
2.6 ACCESSORIES
2.7 SPARE PARTS
PART 3 EXECUTION
3.1 PAINTING
3.2 EQUIPMENT INSTALLATION
3.3 TEMPORARY POWER
3.4 DESIGN TESTS
3.5 FACTORY INSPECTION AND TESTS
3.5.1 General
3.5.2 Switchgear Assembly Tests
3.5.2.1 Assembled Equipment
3.5.2.2 Wiring
3.5.2.3 Switchgear Assembly
3.5.2.4 Circuit Breaker
3.5.3 Instrument Transformer Test
3.5.4 Station Service Transformer Test
3.5.5 Grounding Resistor
3.5.6 Multi-Function Relay
3.6 FIELD INSPECTION, TESTING AND COMMISSIONING
3.6.1 General
3.6.2 Low Voltage Breakers
3.6.3 Commissioning
3.7 QUALIFICATIONS OF FIELD ENGINEERING SERVICE PERSONNEL
3.8 CONTRACTOR FURNISHED TRAINING OF GOVERNMENT PERSONNEL
-- End of Section Table of Contents --
SECTION 26 22 00.10 26 Page 2
3.4 DESIGN TESTS
Design tests must have been performed on circuit breakers identical to those furnished under this Contract. Certified Design Test Reports must be submitted. Proof of adequacy of design must be by certified reports of previously performed tests, or of tests, which will be performed. The Contractor's certified report must identify all design tests which were performed to certify the design and the Contractor must permit review of design test data, oscillograph tracings, and other information by the Contracting Officer. The costs of performing design tests not previously performed must be borne by the Contractor and must be included in the prices bid for the items of equipment. If any design tests are performed on circuit breakers or components to be furnished under this Contract, the affected items must be inspected after testing to ensure that no damage or wear has occurred. Any items, which may have had the lifetime and reliability, expected of new and unused equipment degraded by the tests must be replaced, or if approved, repaired. Applicable production tests must be performed on the circuit breaker or components after they have been subjected to design tests, and needed replacements or repairs have been made.
Certifications of Switchgear and Breakers must be submitted. A certified statement must be provided by the manufacturer of the circuit breakers and switchgear that design tests in accordance with IEEE C37.20.1 have been previously made on power circuit breakers and switchgear used together of the same design, construction, and ratings as those furnished under this Contract and that the results of the tests prove the adequacy of the design of the circuit breakers to operate satisfactorily under normal and short-circuit conditions when applied within their ratings.
3.5 FACTORY INSPECTION AND TESTS
3.5.1 General
Each item of equipment supplied under this contract must be given the manufacturer's routine factory tests and also other tests, as specified below, to insure successful operation of all parts of the assemblies. All tests required must be witnessed by the Contracting Officer, unless waived in writing, and no equipment must be shipped until it has been approved for shipment. Notify the Contracting Officer sufficiently in advance of the test date, so that the Contracting Officer can make arrangements to be present. Factory Test Procedure must be submitted prior to factory testing. The factory test equipment and test methods used must conform to the applicable requirements of ANSI, IEEE and NEMA standards, and are subject to approval. The witnessing representatives of the Contractor and the Contracting Officer must sign all test reports. Factory Inspection and Test Reports must be submitted after completion of the tests. The factory test equipment and test methods used must conform to the applicable requirements of ANSI, IEEE and NEMA standards, and are subject to approval. The witnessing representatives of the Contractor and the Contracting Officer must sign all test reports.
3.5.2 Switchgear Assembly Tests
Each low-voltage air circuit breaker switchgear assembly must be subjected to the "Production Tests" described in IEEE C37.20.1, except as modified or supplemented below:
SECTION 26 22 00.10 26 Page 21
| Technical_Sections.pdf |
| PROJECT TABLE OF CONTENTS |
| DIVISION 26 - ELECTRICAL |
| 26 22 00.10 26 - 480-VOLT STATION SERVICE SWITCHGEAR |
| 26 22 00.10 26 - 480-VOLT STATION SERVICE SWITCHGEAR |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 ARRANGEMENT, ASSEMBLY, SHIPPING AND HANDLING |
| PART 2 PRODUCTS |
| 2.1 NAMEPLATES |
| 2.2 CONNECTIONS |
| 2.3 480-VOLT STATION SERVICE SWITCHGEAR |
| 2.3.1 General |
| 2.3.2 Assembly And Detail Drawings |
| 2.3.3 Outline Drawings |
| 2.3.4 Schematic Diagrams And Connection Diagrams |
| 2.3.5 Enclosure and Framework |
| 2.3.5.1 Switchgear |
| 2.3.5.2 Enclosure |
| 2.3.5.3 Drawout Circuit Breaker |
| 2.3.5.4 Ventilating Opening |
| 2.3.5.5 Infra-red IR viewing windows |
| 2.3.5.6 Foundations |
| 2.3.6 Buses and Connections |
| 2.3.7 Power Circuit Breakers |
| 2.3.7.1 General |
| 2.3.7.2 Power Supply, Bus Tie, and Tie Isolation Circuit Breakers |
| 2.3.7.3 Feeder Air Circuit Breakers |
| 2.3.7.4 Automatic Bus Transfer |
| 2.3.8 Wiring |
| 2.3.8.1 Control Panel and Power Wiring |
| 2.3.8.2 Terminals and Installation |
| 2.3.8.3 Terminal Blocks |
| 2.3.9 Grounding |
| 2.3.10 Molded Case Circuit Breakers |
| 2.3.11 Instrument Transformers |
| 2.3.11.1 General |
| 2.3.11.2 Voltage Transformers |
| 2.3.11.3 Current Transformers |
| 2.3.12 Ground Detection Equipment |
| 2.3.13 Relays |
| 2.3.13.1 Protective Relays |
| 2.3.13.2 Auxiliary relays |
| 2.3.14 Control and Instrument Switches |
| 2.3.14.1 General |
| 2.3.14.2 Switch Features |
| 2.3.15 Indicating Lamp Assemblies |
| 2.3.16 Indicating Instruments |
| 2.3.16.1 General |
| 2.3.16.2 Rectangular Switchboard Instruments |
| 2.3.16.3 AC Voltmeters |
| 2.4 SECONDARY UNIT SUBSTATION |
| 2.4.1 General |
| 2.4.2 Incoming Sections |
| 2.4.3 Transforming Sections |
| 2.4.4 Transformer Bus Connections |
| 2.4.5 Outgoing Section |
| 2.4.6 NEUTRAL GROUNDING EQUIPMENT |
| 2.5 REMOTE RACKING DEVICE |
| 2.6 ACCESSORIES |
| 2.7 SPARE PARTS |
| PART 3 EXECUTION |
| 3.1 PAINTING |
| 3.2 EQUIPMENT INSTALLATION |
| 3.3 TEMPORARY POWER |
| 3.4 DESIGN TESTS |
| 3.5 FACTORY INSPECTION AND TESTS |
| 3.5.1 General |
| 3.5.2 Switchgear Assembly Tests |
| 3.5.2.1 Assembled Equipment |
| 3.5.2.2 Wiring |
| 3.5.2.3 Switchgear Assembly |
| 3.5.2.4 Circuit Breaker |
| 3.5.3 Instrument Transformer Test |
| 3.5.4 Station Service Transformer Test |
| 3.5.5 Grounding Resistor |
| 3.5.6 Multi-Function Relay |
| 3.6 FIELD INSPECTION, TESTING AND COMMISSIONING |
| 3.6.1 General |
| 3.6.2 Low Voltage Breakers |
| 3.6.3 Commissioning |
| 3.7 QUALIFICATIONS OF FIELD ENGINEERING SERVICE PERSONNEL |
| 3.8 CONTRACTOR FURNISHED TRAINING OF GOVERNMENT PERSONNEL |