A.07.24_W9127N17R00310001.pdf
PDF 97 KB Posted
- Attached to
- John Day SQ and SU Boards Replacement
- Solicitation number
- W9127N17R0031
About this file
W9127N17R0031 Amendment 0001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: JOHN DAY SQ AND SU BOARD REPLACEMENT
1. This Amendment is issued to update the technical specif ications.
2. Division 01 - General Requirements Section 01 10 10.00 25 Paragraph 1.16.4 has been deleted.
3. Division 01 - General Requirements Section 01 10 10.00 25 Paragraph 1.24 has been updated.
4. Division 26 - Electrical Section 26 05 00.00 26 Paragraph 2.15.3 has been updated.
5. Disvision 26 - Electrical Section 26 05 19.00 26 Paragraph 3.2.1.1 has been updated.
6. The proposal due date has been extended from 21 August 2017 to 4 September 2017 at 4:00 PM.
7. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N17R0031
X 9B. DATED (SEE ITEM 11)
20-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Aug-2017
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N17R0031
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 21-Aug-2017 04:00 PM to 04-Sep-2017 04:00 PM.
(End of Summary of Changes)
JOHN DAY SQ AND SU BOARD REPLACEMENT
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 22 00.00 25 MEASUREMENT AND PAYMENT
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 03 - CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND
EQUIPMENT FOUNDATIONS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 26 GENERAL ELECTRICAL WORK AND EQUIPMENT
26 05 13.00 26 MEDIUM-VOLTAGE CABLE
26 05 19.00 26 INSULATED WIRE AND CABLE
26 05 26.00 26 GROUNDING
26 08 01.00 26 SYSTEMS TESTING AND COMMISSIONING
26 12 16.00 26 DRY-TYPE TRANSFORMERS
26 22 00.10 26 480-VOLT STATION SERVICE SWITCHGEAR
26 24 19.00 26 MOTOR CONTROL CENTERS
DIVISION 27 - COMMUNICATIONS
27 21 10.00 26 FIBER OPTIC DATA TRANSMISSION SYSTEM
DIVISION 33 - UTILITIES
33 72 33.14 26 POWER SYSTEM RELAY PROTECTION AND METERING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 10.00 25
CONTRACTOR'S OPERATIONS AND REQUIREMENTS
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 PERMITS AND RESPONSIBILITIES
1.5 INCLEMENT WEATHER CONSTRUCTION
1.6 NOTIFICATION OF EQUIPMENT OUTAGE
1.7 UTILITY OUTAGE REQUEST
1.8 LINE OUTAGE REQUEST
1.9 WORK RESTRICTIONS
1.10 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK
1.11 WEEKLY COORDINATION MEETINGS
1.12 PROJECT WIDE COORDINATION MEETINGS
1.13 PARTNERING
1.14 CONTRACTOR EMPLOYEES
1.15 PAGERS
1.16 ACCESS AGREEMENTS AND WORK AREAS
1.16.1 Access Agreements
1.16.2 Work Areas
1.16.3 Employee Access and Parking
1.16.4 DELETED
1.17 SECURITY PROCEDURES
1.17.1 Project Security
1.17.2 Contractor's General Personnel
1.17.3 Identification of Employees
1.17.4 Non-US Citizen Employees
1.17.5 Identification of Contractor Vehicles
1.17.6 Use of Private Vehicles
1.18 SUPPLEMENTAL SECURITY REQUIREMENTS
1.18.1 Personnel Risk Assessment
1.18.2 Authorized Unescorted Access Requirements
1.18.3 Security Programs
1.18.3.1 Quarterly Security Awareness Program
1.18.3.2 Annual NERC Mandated Cyber Infrastructure Protection
Training Program
1.18.4 Safeguarding of Information
1.19 ANNUAL ANTITERRORISM AND OPERATIONS SECURITY TRAINING
1.20 DECK ACCESS RESTRICTIONS
1.21 CONSTRUCTION PROJECT IDENTIFICATION SIGN
1.22 UTILITIES
1.22.1 Sanitary Facilities
1.22.2 Electrical Power
1.22.2.1 General
1.22.2.2 Temporary Electrical Wiring
1.22.3 Telephone
1.22.4 Water
1.23 CONTRACTOR'S EQUIPMENT
SECTION 01 10 10.00 25 Page 1
1.23.1 Contractor's Planned Equipment Methods
1.23.2 Plant and Equipment List
1.23.3 Movement of Equipment by the Contractor
1.24 CONTRACTOR USE OF GOVERNMENT CRANES
1.25 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS
1.26 GAS, VAPOR, FUME, DUST, AND MIST CONTROL IN POWERHOUSE
1.26.1 General
1.26.2 Additional Provisions
1.27 NOISE CONTROL
1.27.1 General
1.27.2 Nighttime Noise Limitations
1.28 USE OF EXPLOSIVES
1.29 DISPOSITION OF MATERIALS
1.29.1 Daily Cleanup and Disposal
1.29.2 Disposal of Equipment and Miscellaneous Materials
1.30 PRESERVATION OF HISTORICAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES
1.31 PROTECTION OF MATERIAL AND WORK
1.32 PROTECTION OF EXISTING UTILITIES
1.33 PROTECTION AND RESTORATION OF EXISTING FACILITIES
1.34 RESTORATION OF PROJECT ROADS
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
-- End of Section Table of Contents --
SECTION 01 10 10.00 25 Page 2 surfaces.
h. Damage to all roads caused by the Contractor's operations must be repaired to preexisting conditions at the expense of the Contractor.
1.16.2 Work Areas
a. Drawings showing the layout of the area proposed for use must be submitted for review and approval and comply with Contract Clause 52.236-10 OPERATIONS AND STORAGE AREAS. The drawing(s) must show the location of the principal components: offices, access roads, parking, storage facilities and disposal areas, which the Contractor proposes to construct within the designated limits.
b. Only Contractor and subcontractor parts trailers and lunch trailers may be allowed in the Contractor work areas and these must be subject to CO and Project approval. All Contractor and subcontractor trailers are required to be adequately and physically anchored to prevent overturning due to high winds. Electrical supply for Contractor trailers is 480V, 30Amp, 3 Phase, ungrounded delta. Contractor must provide transformer. No water supply is available at the trailer area.
c. Should additional working space or lands within the Government right-of-way be required for material yards, job offices, or other purposes obtain prior Government approval in writing. When directed at any time during the progress of the work when space is needed within the right-of-way for other purposes, any part of the grounds that have been in use must be promptly vacated and cleaned up. However, it is not the intent to require the Contractor's plant or material to be removed from an area while such plant, material, or area is still being actively used.
d. The Project staff will brief the Contractor on security procedures.
Any such procedures will not be the basis for claims for additional money or time. The Project areas off limits to Contractor personnel will also be designated.
e. Salespersons or personnel seeking employment will not be permitted inside the Project security fences without prior Government approval.
1.16.3 Employee Access and Parking
Contractor's employee private vehicle parking areas must be restricted to the area as agreed upon before construction or delivery. Keep the parking areas free of litter and debris. An adequate number and size of trash receptacles must be placed in the parking areas and emptied, as necessary to avoid overflowing. Trash receptacles must be adequately secured to provide protection from the wind and animals.
1.16.4 DELETED
1.17 SECURITY PROCEDURES
1.17.1 Project Security
a. The Project is not open to the public. After normal working hours the security gates are locked and unmanned. Submit a procedure for approval for identification and control of employees entering or leaving the Project during the hours of closure.
SECTION 01 10 10.00 25 Page 8
1.23.3 Movement of Equipment by the Contractor
a. Unless otherwise noted, any vehicle crossing a project bridge is limited to AASHTO LRFDUS, HL-93 vehicle and load requirements. Submit a loading diagram for approval showing wheel loads, wheel spacing, and travel speed a minimum of 14 days prior to operating any equipment or vehicles in excess of 72,000 pounds gross vehicle weight (GVW) and axle loads of 32,000 pounds. Prior coordination and approval for such loads must be obtained before proceeding. No exclusion trucks, multi-axle specialized hauling vehicles (SHV) or mobile cranes will be allowed on a bridge deck without prior review and approval. At a minimum, the loading diagram must include but not be limited to the following information:
(1) A typical section and plan view of the bridge, the position of the wheel loads and wheel spacing of the truck or crane.
(2) The GVW of the vehicle and all axle weights.
(3) For cranes, the location and weight of axles before and after counter weights are installed, all outrigger loads, required crane boom length, weight and location of center of gravity. This should also include the effects of guy lines, upper spreader and jib mast. If using a jib, show the length, weight, and location of the center of gravity.
b. Any SHV's authorized to drive on the bridge deck must have all lift axles lowered and fully engaged while the vehicle has any load. For cranes, all specialized boom trailers must be engaged until a final set up with the outriggers are made and approved.
1.24 CONTRACTOR USE OF GOVERNMENT CRANES
The Contractor will not be allowed to use Government cranes for any work or access. Use Contractor-furnished equipment to facilitate installation or handling of items and equipment for this Contract. The Contractor may use the facility freight elevator to move equipment and materials. The Contractor may request Government Crane Support for equipment or materials that are too large or heavy for the freight elevator. Government Crane Support is typically available during normal Project working hours. Provide at least 48 hours advance notice for Government Crane Support.
1.25 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS
Inform the CO immediately upon finding any damaged equipment or other abnormal conditions involving additional work in which the Contractor believes it has no responsibility. The failure or abnormality must not be disturbed until witnessed by the CO. Prior to proceeding further with work, the Contractor and the Government must agree in writing as to the responsibility for the damage or abnormality. Any damage or abnormal conditions not reported as specified above must also be corrected.
1.26 GAS, VAPOR, FUME, DUST, AND MIST CONTROL IN POWERHOUSE
1.26.1 General
Take all necessary measures to effect maximum control of gases, vapors, fumes, dusts, and mists created by Contractor operations under this Contract. To the maximum extent possible, dust and dirt must be removed by
SECTION 01 10 10.00 25 Page 15
DIVISION 26 - ELECTRICAL
SECTION 26 05 00.00 26
GENERAL ELECTRICAL WORK AND EQUIPMENT
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 GENERAL REQUIREMENTS
1.4.1 Materials, Equipment and Installation
1.4.2 Standard Products
1.4.3 Environmental Requirements
1.4.4 Storage and Handling
1.4.5 Corrosion Prevention
1.5 CONTRACT DRAWINGS
1.5.1 General
1.5.2 Departure From Drawings
1.6 WORKMANSHIP
1.7 FINAL APPROVED VERSIONS OF CONTRACTOR PREPARED DRAWINGS
PART 2 PRODUCTS
2.1 CONDUIT
2.1.1 Rigid Metal Conduit
2.1.2 Liquid Tight Flexible Steel Conduit
2.1.3 Non-Metallic Wiring Duct (Channel)
2.1.4 Rigid Metal Conduit Fittings
2.1.5 Conduit Hangers
2.2 WIRE AND CABLE
2.3 PANELBOARDS
2.4 BOXES, CABINETS, AND ENCLOSURES
2.4.1 General
2.4.2 Steel Cabinets and Boxes
2.4.3 Design of Conduit Pull Boxes
2.4.4 Doors, Covers, Cabinet Trim and Hardware
2.4.5 Paint
2.5 MOLDED-CASE CIRCUIT BREAKERS
2.6 TERMINAL BLOCKS
2.6.1 General
2.6.2 Control Signal Type
2.6.3 Short-Circuiting Type
2.6.4 Power Terminal Blocks
2.6.5 Rail Terminal Blocks
2.6.6 Marking
2.7 RELAYS (CONTROL & AUXILIARY)
2.7.1 General
2.7.2 Interposing Relays
2.8 ESCUTCHEONS AND NAMEPLATES
2.9 MIMIC BUS
SECTION 26 05 00.00 26 Page 1
2.10 TEST SWITCHES
2.11 SWITCHBOARD TERMINATIONS
2.12 MANUFACTURER'S NAMEPLATE
2.13 LOCK-OUT RELAYS
2.14 5 KV LOAD INTERRUPTER SWITCH
2.14.1 Electrical ratings
2.14.2 General Requirements
2.14.3 Operational and Maintenance Requirements
2.15 CONTROL PANEL PLC COMPONENTS
2.15.1 ControlLogix Chassis
2.15.2 ControlLogix DC Power Supplies
2.15.3 ControlLogix 5571 Controller
2.15.4 ControlLogix Fiber/IP Modules
2.15.5 ControlLogix Isolated Sequence of Events Input Modules
2.15.6 ControlLogix Digital Output Module
2.15.7 ControlLogix Removable Terminal Blocks
2.16 ANNUNCIATION PANEL SPEE PLC COMPONENTS
2.16.1 ControlLogix Chassis
2.16.2 ControlLogix DC Power Supplies
2.16.3 ControlLogix Ethernet/IP Modules
2.16.4 ControlLogix Digital Input Module
2.16.5 ControlLogix Removable Terminal Blocks
2.17 PLC COMPONENTS
2.17.1 ControlLogix Chassis
2.17.2 ControlLogix DC Power Supplies
2.17.3 ControlLogix 5561 Controller
2.17.4 ControlLogix EtherNet/IP Modules
2.17.5 ControlLogix Fiber/IP Modules
2.17.6 ControlLogix Time Synchronization Module
2.17.7 ControlLogix Isolated Sequence of Events Input Modules
2.17.8 ControlLogix Digital Output Module
2.17.9 ControlLogix Removable Terminal Blocks
2.17.10 ControlLogix Slot Filler Modules
2.17.11 FactoryTalk License
2.18 TRIP COIL MONITORS
PART 3 EXECUTION
3.1 PREPARATION
3.2 INSTALLATION
3.2.1 Conduits, Raceways And Fittings
3.2.1.1 Rigid Steel Conduit
3.2.1.2 Flexible Metallic Conduit
3.2.1.3 Wireway and Auxiliary Gutter
3.2.1.4 Surface Raceways and Assemblies
3.2.2 Wiring
3.2.3 Boxes and Fittings
3.2.4 Field Fabricated Nameplates
3.2.5 Nameplate Mounting
3.2.6 Identification Plates And Warnings
3.2.7 Posted Operating Instructions
3.2.8 Mimic Bus Mounting
3.3 FIELD QUALITY CONTROL
3.4 BRIDGE CRANE FEEDER
3.5 PLC COMPONENTS
3.6 SPARE PARTS
3.7 FIELD TRAINING
3.8 OPERATION AND MAINTENANCE DATA
SECTION 26 05 00.00 26 Page 2
2.15 CONTROL PANEL PLC COMPONENTS
Furnished Control Panel PLC Components integrated into the Local Control panels SQO1C and SQ2C. PLC Components numbers below are for a single control panel
2.15.1 ControlLogix Chassis
Provide one 7 slot Allen-Bradley ControlLogix Chassis. The 7 slot chassis must be 1756-A7.
2.15.2 ControlLogix DC Power Supplies
Furnish one Allen-Bradley ControlLogix DC power supplies. The power supplies must be catalog number 1756-PH75.
2.15.3 ControlLogix 5571 Controller
Furnish one Allen-Bradley Logix5571 controller with 2MB memory. The controller must be catalog number 1756-L71.
2.15.4 ControlLogix Fiber/IP Modules
Furnish one Allen-Bradley Fiber/IP modules. The modules must be catalog number 1756-EN2F.
2.15.5 ControlLogix Isolated Sequence of Events Input Modules
Furnish two Allen-Bradley isolated sequence of events input modules. The modules must be catalog number 1756-IH16ISOE.
2.15.6 ControlLogix Digital Output Module
Furnish two Allen-Bradley individually isolated digital output module. The module must be catalog number 1756-OH8I.
2.15.7 ControlLogix Removable Terminal Blocks
Furnish four Allen-Bradley removable terminal blocks. The blocks must be catalog number 1756-TBCH.
2.16 ANNUNCIATION PANEL SPEE PLC COMPONENTS
Furnished Annunciation panel SPEE PLC Components mounted in SPEE panel.
2.16.1 ControlLogix Chassis
Provide two 13 slot Allen-Bradley ControlLogix Chassis. The 13 slot chassis must be 1756-A13.
2.16.2 ControlLogix DC Power Supplies
Furnish two Allen-Bradley ControlLogix DC power supplies. The power supplies must be catalog number 1756-PH75.
2.16.3 ControlLogix Ethernet/IP Modules
Furnish two Allen-Bradley Ethernet/IP modules. The modules must be catalog number 1756-EN2T.
SECTION 26 05 00.00 26 Page 17
DIVISION 26 - ELECTRICAL
SECTION 26 05 19.00 26
INSULATED WIRE AND CABLE
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 General
1.3.2 Marking
1.4 INSPECTION AND TESTS
1.4.1 General
1.4.2 Flame Tests
1.4.3 Independent Tests
PART 2 PRODUCTS
2.1 INSULATED WIRE AND CABLE
2.1.1 General
2.1.2 Wire and Cable Schedule
2.1.3 Governing Standards
2.2 MATERIALS
2.2.1 Submittal Requirements
2.2.2 Rated Circuit Voltages
2.2.3 Conductors
2.2.3.1 Material for Conductors
2.2.3.2 Wire Size
2.2.3.3 Stranding
2.2.4 Insulation
2.2.4.1 Insulation Voltage Rating and Insulation Level
2.2.4.2 Insulation Material
2.2.4.3 Insulation Thickness
2.2.4.4 Insulation Shielding
2.2.5 Jackets
2.2.5.1 Jacket Material
2.2.5.2 Jacket Thickness
2.2.6 Cabling
2.2.7 Dimensional Tolerance
2.2.8 Color-Coding
2.3 SPECIAL WIRE AND CABLE
2.3.1 Control Panel Shop Wiring
2.3.2 Switchboard Wire
2.3.3 Annunciation, Control, and Signal Cable
2.3.4 Ground Conductors
PART 3 EXECUTION
3.1 INSTALLATION INSTRUCTIONS
3.1.1 General
SECTION 26 05 19.00 26 Page 1
3.1.2 External Wiring
3.1.3 Phasing
3.1.4 Cable Pulling Requirements
3.1.5 Installation in Conduit
3.1.6 Installation in Cable Trays
3.1.7 Bends
3.1.8 Cable Supports
3.1.8.1 Cable Clamps
3.1.8.2 Support Grips
3.1.9 Splices
3.1.10 Terminations
3.1.11 Wire Marking
3.1.12 Ground Conductors
3.2 FIELD ACCEPTANCE TESTING
3.2.1 Testing
3.2.1.1 Existing Conductor Testing
3.2.1.2 New Conductor Testing
3.2.2 Acceptance
-- End of Section Table of Contents --
SECTION 26 05 19.00 26 Page 2
3.1.11 Wire Marking
Mark All wires and cables as described in paragraph MARKING. All multiple conductor cables must be clearly identified with the cable designation by either embossed 1-inch diameter brass tags, by embossed aluminum band markers, or phenolic cable tags. Tags or band markers must be securely fastened to the cables at each termination, junction or pull box, where cables enter or leave cable trays, and as required at other points of access. Wires and individual conductors of control and power cables must be identified with non-metallic tube type markers at each termination.
Installed markers must be uniform in position on the wire and legends must be visible when wires are terminated on terminal blocks or at the equipment. Designations on markers must be as shown on the contract drawings or as otherwise shown on approved shop drawings.
3.1.12 Ground Conductors
A ground conductor must be run for all circuits. If not an integral part of a multiple conductor cable, a separate ground conductor must be provided. Ground conductors must be installed as continuous pieces of copper cable whenever possible. Exposed ground cable runs must be supported to follow conduit, equipment or concrete wall contours. Support clamps or clips must be of corrosion resistant metal and existing equipment bolts or screws must be used where possible for fastening. Drilling of equipment housings or frames will be permitted only when approved.
Concrete anchors must be used for wall fastening.
3.2 FIELD ACCEPTANCE TESTING
3.2.1 Testing
3.2.1.1 Existing Conductor Testing
All cables not directed to be replaced as a mandatory item are to be tested prior to equipment being removed and again before being placed back into service.
a. Submit Test Reports in accordance with referenced standards in this section.
b. Contractor must provide all necessary test equipment, labor, and personnel to perform the tests, as herein specified.
c. Suitable records must be kept of all tests, indicating the insulation-resistance tests, high voltage tests, continuity tests, and conductor identification markings. A duplicate record of all tests must be furnished to the Contracting Officer. Test reports must provide room for the Contracting Officer's signature. Each conductor must be tested as follows:
(1) Isolate completely all wire and cable from all extraneous electrical connections at cable terminations and joints.
Substation and switchboard feeder breakers, disconnects in combination motor starters, circuit breakers in panel boards, and other disconnecting devices must be used to isolate the circuits under test.
(2) Submit a Conductor Continuity Test Report performed on each wire and each individual conductor of a multiconductor cable to
SECTION 26 05 19.00 26 Page 12 ensure correct connections end-to-end.
(3) Submit a Shield Resistance Test Report performed on each cable shield. Shield resistance must be less than 10 ohms per 1000 feet of cable if applicable.
(4) Submit an Insulation Resistance Test Report performed on each field-installed conductor with respect to ground and adjacent conductors. Applied potential must be 1000 volts DC. Take readings after 1 minute and until the reading is constant for 15 seconds. Minimum insulation-resistance values must not be less than 100 Megohms.
(5) Tests must be witnessed by the Contracting Officer and the wire and cable installation test reports must be submitted in accordance with Section 01 33 00, SUBMITTAL PROCEDURES.
3.2.1.2 New Conductor Testing
Testing must be per NETA ATS recommended procedures.
a. Submit Test Reports in accordance with referenced standards in this section.
b. After completion of the installation and prior to energizing the conductors, perform wire and cable continuity and insulation tests as herein specified before the conductors are energized.
c. Contractor must provide all necessary test equipment, labor, and personnel to perform the tests, as herein specified.
d. Field Acceptance Testing and submittals must be performed as described herein. Any damages to existing or new electrical equipment resulting from contractor mis-wiring will be repaired and re-verified at contractor's expense. All repairs must be approved by the CO prior to acceptance of the repair.
e. Isolate completely all wire and cable from all extraneous electrical connections at cable terminations and joints. Substation and switchboard feeder breakers, disconnects in combination motor starters, circuit breakers in panel boards, and other disconnecting devices must be used to isolate the circuits under test.
f. Suitable records must be kept of all tests, indicating the insulation-resistance tests, high voltage tests, continuity tests, and conductor identification markings. A duplicate record of all tests must be furnished to the Contracting Officer. Prior to testing, the wire and cable test record form must be submitted for approval. Test reports must provide room for the Contracting Officer's signature.
After installation, but just prior to terminal connection, each conductor must be tested as follows:
(1) Submit a Conductor Continuity Test report performed on each wire and each individual conductor of a multiconductor cable to insure correct connections end-to-end.
(2) Submit a Shield Continuity Test report performed on each cable shield to insure correct connections end-to-end if applicable.
SECTION 26 05 19.00 26 Page 13
| Technical_Sections.pdf |
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS |
| 01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 PERMITS AND RESPONSIBILITIES |
| 1.5 INCLEMENT WEATHER CONSTRUCTION |
| 1.6 NOTIFICATION OF EQUIPMENT OUTAGE |
| 1.7 UTILITY OUTAGE REQUEST |
| 1.8 LINE OUTAGE REQUEST |
| 1.9 WORK RESTRICTIONS |
| 1.10 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK |
| 1.11 WEEKLY COORDINATION MEETINGS |
| 1.12 PROJECT WIDE COORDINATION MEETINGS |
| 1.13 PARTNERING |
| 1.14 CONTRACTOR EMPLOYEES |
| 1.15 PAGERS |
| 1.16 ACCESS AGREEMENTS AND WORK AREAS |
| 1.16.1 Access Agreements |
| 1.16.2 Work Areas |
| 1.16.3 Employee Access and Parking |
| 1.16.4 DELETED |
| 1.17 SECURITY PROCEDURES |
| 1.17.1 Project Security |
| 1.17.2 Contractor's General Personnel |
| 1.17.3 Identification of Employees |
| 1.17.4 Non-US Citizen Employees |
| 1.17.5 Identification of Contractor Vehicles |
| 1.17.6 Use of Private Vehicles |
| 1.18 SUPPLEMENTAL SECURITY REQUIREMENTS |
| 1.18.1 Personnel Risk Assessment |
| 1.18.2 Authorized Unescorted Access Requirements |
| 1.18.3 Security Programs |
| 1.18.3.1 Quarterly Security Awareness Program |
| 1.18.3.2 Annual NERC Mandated Cyber Infrastructure Protection Training |
1.18.4 Safeguarding of Information
| 1.19 ANNUAL ANTITERRORISM AND OPERATIONS SECURITY TRAINING |
| 1.20 DECK ACCESS RESTRICTIONS |
| 1.21 CONSTRUCTION PROJECT IDENTIFICATION SIGN |
| 1.22 UTILITIES |
| 1.22.1 Sanitary Facilities |
| 1.22.2 Electrical Power |
| 1.22.2.1 General |
| 1.22.2.2 Temporary Electrical Wiring |
| 1.22.3 Telephone |
| 1.22.4 Water |
| 1.23 CONTRACTOR'S EQUIPMENT |
| 1.23.1 Contractor's Planned Equipment Methods |
| 1.23.2 Plant and Equipment List |
| 1.23.3 Movement of Equipment by the Contractor |
| 1.24 CONTRACTOR USE OF GOVERNMENT CRANES |
| 1.25 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS |
| 1.26 GAS, VAPOR, FUME, DUST, AND MIST CONTROL IN POWERHOUSE |
| 1.26.1 General |
| 1.26.2 Additional Provisions |
| 1.27 NOISE CONTROL |
| 1.27.1 General |
| 1.27.2 Nighttime Noise Limitations |
| 1.28 USE OF EXPLOSIVES |
| 1.29 DISPOSITION OF MATERIALS |
| 1.29.1 Daily Cleanup and Disposal |
| 1.29.2 Disposal of Equipment and Miscellaneous Materials |
| 1.30 PRESERVATION OF HISTORICAL, ARCHEOLOGICAL, AND CULTURAL |
| 1.31 PROTECTION OF MATERIAL AND WORK |
| 1.32 PROTECTION OF EXISTING UTILITIES |
| 1.33 PROTECTION AND RESTORATION OF EXISTING FACILITIES |
| 1.34 RESTORATION OF PROJECT ROADS |
| PART 2 PRODUCTS - NOT USED |
| PART 3 EXECUTION - NOT USED |
| DIVISION 26 - ELECTRICAL |
| 26 05 00.00 26 - GENERAL ELECTRICAL WORK AND EQUIPMENT |
| 26 05 00.00 26 - GENERAL ELECTRICAL WORK AND EQUIPMENT |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.3 SUBMITTALS |
| 1.4 GENERAL REQUIREMENTS |
| 1.4.1 Materials, Equipment and Installation |
| 1.4.2 Standard Products |
| 1.4.3 Environmental Requirements |
| 1.4.4 Storage and Handling |
| 1.4.5 Corrosion Prevention |
| 1.5 CONTRACT DRAWINGS |
| 1.5.1 General |
| 1.5.2 Departure From Drawings |
| 1.6 WORKMANSHIP |
| 1.7 FINAL APPROVED VERSIONS OF CONTRACTOR PREPARED DRAWINGS |
| PART 2 PRODUCTS |
| 2.1 CONDUIT |
| 2.1.1 Rigid Metal Conduit |
| 2.1.2 Liquid Tight Flexible Steel Conduit |
| 2.1.3 Non-Metallic Wiring Duct Channel |
| 2.1.4 Rigid Metal Conduit Fittings |
| 2.1.5 Conduit Hangers |
| 2.2 WIRE AND CABLE |
| 2.3 PANELBOARDS |
| 2.4 BOXES, CABINETS, AND ENCLOSURES |
| 2.4.1 General |
| 2.4.2 Steel Cabinets and Boxes |
| 2.4.3 Design of Conduit Pull Boxes |
| 2.4.4 Doors, Covers, Cabinet Trim and Hardware |
| 2.4.5 Paint |
| 2.5 MOLDED-CASE CIRCUIT BREAKERS |
| 2.6 TERMINAL BLOCKS |
| 2.6.1 General |
| 2.6.2 Control Signal Type |
| 2.6.3 Short-Circuiting Type |
| 2.6.4 Power Terminal Blocks |
| 2.6.5 Rail Terminal Blocks |
| 2.6.6 Marking |
| 2.7 RELAYS CONTROL & AUXILIARY |
| 2.7.1 General |
| 2.7.2 Interposing Relays |
| 2.8 ESCUTCHEONS AND NAMEPLATES |
| 2.9 MIMIC BUS |
| 2.10 TEST SWITCHES |
| 2.11 SWITCHBOARD TERMINATIONS |
| 2.12 MANUFACTURER'S NAMEPLATE |
| 2.13 LOCK-OUT RELAYS |
| 2.14 5 KV LOAD INTERRUPTER SWITCH |
| 2.14.1 Electrical ratings |
| 2.14.2 General Requirements |
| 2.14.3 Operational and Maintenance Requirements |
| 2.15 CONTROL PANEL PLC COMPONENTS |
| 2.15.1 ControlLogix Chassis |
| 2.15.2 ControlLogix DC Power Supplies |
| 2.15.3 ControlLogix 5571 Controller |
| 2.15.4 ControlLogix Fiber/IP Modules |
| 2.15.5 ControlLogix Isolated Sequence of Events Input Modules |
| 2.15.6 ControlLogix Digital Output Module |
| 2.15.7 ControlLogix Removable Terminal Blocks |
| 2.16 ANNUNCIATION PANEL SPEE PLC COMPONENTS |
| 2.16.1 ControlLogix Chassis |
| 2.16.2 ControlLogix DC Power Supplies |
| 2.16.3 ControlLogix Ethernet/IP Modules |
| 2.16.4 ControlLogix Digital Input Module |
| 2.16.5 ControlLogix Removable Terminal Blocks |
| 2.17 PLC COMPONENTS |
| 2.17.1 ControlLogix Chassis |
| 2.17.2 ControlLogix DC Power Supplies |
| 2.17.3 ControlLogix 5561 Controller |
| 2.17.4 ControlLogix EtherNet/IP Modules |
| 2.17.5 ControlLogix Fiber/IP Modules |
| 2.17.6 ControlLogix Time Synchronization Module |
| 2.17.7 ControlLogix Isolated Sequence of Events Input Modules |
| 2.17.8 ControlLogix Digital Output Module |
| 2.17.9 ControlLogix Removable Terminal Blocks |
| 2.17.10 ControlLogix Slot Filler Modules |
| 2.17.11 FactoryTalk License |
2.18 TRIP COIL MONITORS
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.2 INSTALLATION |
| 3.2.1 Conduits, Raceways And Fittings |
| 3.2.1.1 Rigid Steel Conduit |
| 3.2.1.2 Flexible Metallic Conduit |
| 3.2.1.3 Wireway and Auxiliary Gutter |
| 3.2.1.4 Surface Raceways and Assemblies |
| 3.2.2 Wiring |
| 3.2.3 Boxes and Fittings |
| 3.2.4 Field Fabricated Nameplates |
| 3.2.5 Nameplate Mounting |
| 3.2.6 Identification Plates And Warnings |
| 3.2.7 Posted Operating Instructions |
| 3.2.8 Mimic Bus Mounting |
| 3.3 FIELD QUALITY CONTROL |
| 3.4 BRIDGE CRANE FEEDER |
| 3.5 PLC COMPONENTS |
| 3.6 SPARE PARTS |
| 3.7 FIELD TRAINING |
| 3.8 OPERATION AND MAINTENANCE DATA |
| 26 05 19.00 26 - INSULATED WIRE AND CABLE |
| 26 05 19.00 26 - INSULATED WIRE AND CABLE |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.3.1 General |
| 1.3.2 Marking |
| 1.4 INSPECTION AND TESTS |
| 1.4.1 General |
| 1.4.2 Flame Tests |
| 1.4.3 Independent Tests |
| PART 2 PRODUCTS |
| 2.1 INSULATED WIRE AND CABLE |
| 2.1.1 General |
| 2.1.2 Wire and Cable Schedule |
| 2.1.3 Governing Standards |
| 2.2 MATERIALS |
| 2.2.1 Submittal Requirements |
| 2.2.2 Rated Circuit Voltages |
| 2.2.3 Conductors |
| 2.2.3.1 Material for Conductors |
| 2.2.3.2 Wire Size |
| 2.2.3.3 Stranding |
| 2.2.4 Insulation |
| 2.2.4.1 Insulation Voltage Rating and Insulation Level |
| 2.2.4.2 Insulation Material |
| 2.2.4.3 Insulation Thickness |
| 2.2.4.4 Insulation Shielding |
| 2.2.5 Jackets |
| 2.2.5.1 Jacket Material |
| 2.2.5.2 Jacket Thickness |
| 2.2.6 Cabling |
| 2.2.7 Dimensional Tolerance |
| 2.2.8 Color-Coding |
| 2.3 SPECIAL WIRE AND CABLE |
| 2.3.1 Control Panel Shop Wiring |
| 2.3.2 Switchboard Wire |
| 2.3.3 Annunciation, Control, and Signal Cable |
| 2.3.4 Ground Conductors |
| PART 3 EXECUTION |
| 3.1 INSTALLATION INSTRUCTIONS |
| 3.1.1 General |
| 3.1.2 External Wiring |
| 3.1.3 Phasing |
| 3.1.4 Cable Pulling Requirements |
| 3.1.5 Installation in Conduit |
| 3.1.6 Installation in Cable Trays |
| 3.1.7 Bends |
| 3.1.8 Cable Supports |
| 3.1.8.1 Cable Clamps |
| 3.1.8.2 Support Grips |
| 3.1.9 Splices |
| 3.1.10 Terminations |
| 3.1.11 Wire Marking |
| 3.1.12 Ground Conductors |
| 3.2 FIELD ACCEPTANCE TESTING |
| 3.2.1 Testing |
| 3.2.1.1 Existing Conductor Testing |
| 3.2.1.2 New Conductor Testing |
3.2.2 Acceptance
| [1]: [1] |
| Amd0001: AMD #0001 |
File details come from the government source that posted it. Updated .