DATE

A

MANCHESTER, N.H.

CONTROL POWER SYSTEMS INC.

DR.

CHK.

ENG.

CUSTOMER

CONTRACT

GO. NO.

DWG. NO.

R-32529

REV.

CDR. CHK. ENG.

B 3/26/68

C 4/17/68

NO.

REV.

2/7/68

SCALE: ƒ"=1"

480 VOLT SUBSTATION

SQ4

CORPS OF ENGINEERS

DACW68-68-C-0023

12/1/67

MARKED PRINT 3/25/68

AS PER CUSTOMERS

MARKED PRINT

AS PER CUSTOMERS

ENGRAVING

SIZE

NAMEPLATE SCHEDULE

FIRST LINE SECOND LINE

1A BUS 1

2A TRANS BUS 1

3A POT TRANS RELAYS BUS 1

3C TRANS T4 COOLING FDR 1

3D BUS 1 SUPPLY BREAKER

4A SU13 480V CONTROL CENTER

4B SU14 480V CONTROL CENTER

4C SU15 480V CONTROL CENTER

4D SU16 480V CONTROL CENTER

M SQ4 480V SUBSTATION 3X5

5A CONTROL BREAKERS

5A-1 BUS 1 SUPPLY BREAKER 3X1

5A-2 BUS TIE BREAKER

5A-3 BUS 2 SUPPLY BREAKER

ALARM LIGHTS

5A-5 BUS TRANSFER RELAYS

5C HIGH BAY LIGHTS BAYS 17-20

5D BUS TIE BREAKER

6A SU13 480V CONTROL CENTER

6B SU14 480V CONTROL CENTER

6C SU15 480V CONTROL CENTER

6D SU16 480V CONTROL CENTER

7A POT TRANS RELAYS BUS 2

7C TRANS T4 COOLING FDR 2

7D BUS 2 SUPPLY BREAKER

8A TRANS BUS 2

9A BUS 2

8A-1 NONSTANDARD PHASING 3X5

NOTES:

1- SHIPPING WGT.=22,400#

2- REPRESENTS BILL OF MATERIAL ITEM NO

3- REFER TO DWG. R-32627 FOR ADDITIONAL

BUSSING DETAILS AND PANEL LAYOUTS.

CODUIT SPACE

AVAILABLE

DENOTES

* INSIDE OF COMPARTMENT

N

COMPT

O

APPROVED

CORPS OF ENGINEERS, U S ARMY

FOR CONSTRUCTION

NORTH PACIFIC DIVISION

DATE

BY

HYDRO-ELECTRIC DESIGN BRANCH

1969 JUL 2

ITEM

TO DOOR FOR COMP.5A

ADDEDD RELAY IT #29

4‚ X1

4‚ X1

4‚ X1

5A-4

I

4.16KV FDR

PLM

PLM

PLM

PLM

D 8/10/12

SMC

& QC

VECTOR CONVERSION

4.16KV FDR

PROJECT: JOHN DAY LOCK & DAM

CORPS OF ENGINEERS

WALLA WALLA DISTRICT

DEPARTMENT OF THE ARMY

CONTRACT NO. DACW68-68-C-0023

113844A

44A

AK-25

200AT

A

7D

AK-15

10 2

A 3

A

AK-25

6D5D4D3D

44A

AK-15

A

AK-25

A

38 90AT

AK-15

A

7C6C5C4C3C 44A

AK-15

A 3

A

AK-15

44A

3AK-15

A

A

AK-15 42

6B

A

AK-15

49 51

RG

44A 6A

A

AK-15

7A 8A 9A

50 51

2RG37

3A 4A 5A

44A21

AK-15

A

A

4B 44A21

3AK-15

M

VM

V.M.SW.

1 2 3 4 5

5A1 5A2 5A3 5A4 5A5

2A1A

1 2 3 44

KEY INTERLOCK

BUS CONNECTIONS SAME AS 1A & 2A

WINDOW

KEY INTERLOCK

END TRIM

EXISTING CABLE TRAYS

EXISTING CABLE TRAYS

CABLE TRAYS PLAN

FORMED FRONT PANELS OR DOORS

REMOVABLE FLAT PANELS

TOP OF BOARD & LOWER TRAY

MAXIMUM SPACE BETWEEN

EXTENDS TO 14ƒ BEYOND FRONT OF DOOR WHEN IN USE

BREAKER LIFTING DEVICE TELESCOPING TYPE

2X‚ CU.

2X‚ CU.

4X‚ CU.

4160-480V. 3

TRANSFORMER

500 K.V.A.

DOOR

COMPT. BEHIND

MOUNTED INSIDE

4160-480V 3

TRANSFORMER

500 K.V.A.

SWITCH

INTERUPTER

AIR

3P

225AF

3P

225AF

SWITCH

INTERUPTER

AIR

FLAT PANEL'S

ENDS & TOP REMOVABLE

END TRIM

1X‚ GND. BUS

3P

600A

3P

600A200AT

3P

225AF3P

600A

3P

225AF

200AT

3P

225AF

100AT

3P

225AF

200AT

3P

225AF

90AT

3P

225AF

200AT 200AT

3P

225AF

3P

225AF

200AT 200AT

3P

225AF

3„

4‚

47†

„ 3072‚202020202072‚ „

90„

6†

14ƒ

8•

3„

1‚

47†

T O

F L

O O

R

1551„36„10202020201036„51„

7• 2020 2020 7•

34‚

14 14

8•8•

46‚

17„

47†

Š-18 TAP (20)

CUB CUB CUB CUB CUB CUB CUB CUB CUB

TRANSFORMER (BOTH ENDS)

ON UNDERSIDE OF CHANNEL FOR MOUNTING

(4)‡ DIA HOLES WITH 3/4-10 STEEL NUTS WELDED

END TRIM

END TRIM

1•X1•X‚ ANGLE I 1" DIA.-18 GROUT HOLES

6 CHANNEL-8.2#

FOR ANCHOR BOLTS

† DIA-18 HOLES

OUTLINE OF ENCLOSURE

24‡

40‚

WINDOW

2" 3„3

8'-6‚" SHIPPING SECT. 8'-6‚" SHIPPING SECT8'-4" SHIPPING SECT.

1•

1•

1•

„ 15 „

6 6

2ƒ 2ƒ

2ƒ

3 3

3•

1• 3 3 1•

3•

3•

1•

1‚

„3•

5•

3„

6" 6"

2"

2"

24"

24"

30"

9"

22"

25'-4•"

9'-6„"

34‚

8'-6‚"8'-4"8'-6‚"

CONTRACT NO. DACW68-68-C-0023

DEPARTMENT OF THE ARMY

WALLA WALLA DISTRICT

CORPS OF ENGINEERS

PROJECT: JOHN DAY LOCK & DAM

DWG. NO.

GO. NO.

CONTRACT

CUSTOMER

REV.

CONTROL POWER SYSTEMS INC.

MANCHESTER. N.H.

CHK.

DR.

ENG.

SCALE:

R-32534

REV.

NO. DATE DR.

A

B

CHK. ENG.

VMG

J

D

480 VOLT CONTROL CENTER

PART OF CONTRACT ITEM 7

B 9/10/68

C

D 2/14/03

REPLACED EXCITER

AS BUILT

ADDED T.B. IN

DRL

THE CONNECTION WIRING DIAGRAM AS SHOW

FOR CONTROL CENTERS SU12, SU14 & SU16. THE

CONNECTIONS FOR SU11 ARE SIMILAR EXCEPT THE

MAIN BUS IN CUBICLE NO.2 SHALL BE CONNECTED

1.

NOTES:

CONTROL WIRE SHALL BE #14 AWG TYPE SIS.2.

POWER WIRING SHALL BE TYPE SIS AND OF THE3.

FOLLOWING SIZES:

(a)

(b)

SIZE 2 CONTACTOR #8 AWG

SIZE 3 CONTACTOR #4 AWG

(c) FEEDER BREAKERS 50A & BELOW #8 AWG

(d) FEEDER BREAKERS 70A #6 AWG

(e) FEEDER BREAKERS 90A #4 AWG

(F) FEEDER BREAKERS 100A #2 AWG

(g) FEEDER BREAKERS 125A (2) #6 AWG PER

RING TONGUE INDENTED TERMINALS SHALL BE4.

USED ON ALL CONTROL WIRING. (HOLLINGSWORTH TYPE NIT)

SYMMETRICAL AMPERE SHORT CIRCUIT CURRENT.

TERMINAL BLOCK FOR SU11 & SU12 SHALL BE CURTIS

TYPE "S" WITH (6) TREGO TYPE J5A & (3) J2A

LUGS. CONTROL CENTERS SU14 & SU16 SHALL HAVE

TERMINAL BOARDS WITH (6) TREGO TYPE J5A (410-350/KM)

TO BUS NO.1 INSTEAD OF BUS NO.2 AND THE D.C.

CONTACTOR SHALL BE CONNECTED TO PANEL BOARD

BREAKER NO.3 INSTEAD OF BREAKER NO.4.

5.

6.

& (3) J21 (#4-1) LUGS. TERMINAL BOARDS TO BE

SPECIAL FABRICATED BY CONTROL POWER SYSTEMS.

DIAGRAM SHOWN FOR CUBICLE 4B IS TYPICAL FOR EVEN7.

52-

72-

LEGEND

AC CONTACTOR OR STARTER

DC CONTACTOR

- SELECTOR SWITCH ON-OFF-AUTO1

OL- OVERLOAD RELAY CONTACTS

- INDICATING LIGHTS R-RED G-GREENR

MI- MECHANICAL INTERLOCK,

WALKING-BEAM TYPE.

ON AUTO

OFF MAINTAINED

CONTACTS

CONTACT

ON

X

OFF AUTO

X

R-32532-FRONT VIEW & SILL PLAN

BM-1308-7 SHEETS 1 & 2-EQUIPMENT SCHEDULE

REFERENCE DRAWINGS

8/19/80

SRB

FEEDER BKR. COMPH

VMG

SU11, SU12, SU14 & SU16

1/4/68

NUMBERED UNITS. DIAGRAM FOR UNIT 11 IS AS BELOW.

ADDED NOTE 7

JD-68-0023-20

APPROVED

FOR CONSTRUCTION

NORTH PACIFIC DIVISION

CORPS OF ENGINEERS, U.S. ARMY

HYDRO-ELECTRIC DESIGN BRANCH

DATE: 1969 JUL 2

BY: JOHN R. KLINE

BUS SHALL BE BRACED TO WITHSTAND 22,000 VMS

(3) J4A LUGS

(3/0), TREGO

A

B

C

‚ X1 COPPER ‚ X1 COPPER

M A I

N

B U

S

‚ X2 COPPER

A

B

C

M A

‚ X1 COPPER

(3) J4A LUGS

(3/0) -TREGO

A 1A

B C

A1B1 B C

T3T2T1

1B2

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#12

#6A1C1 B C

T3T2T1

1C2

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#6

#12A1D1 B C

T3T2T1

1D2

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#10

#12A1E1 B C

T3T2T1

1E2

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#12

#6

A B C

A B

C

T1

T2

T3

2A

#12

#12

T1

T2

T3

#12

A B C

L3L2L1

T1

T2

T3

5 L1 2 L2 L3 1 7

T1 3 T3

4 8

L2

L1

H

H

H

H

S-2

RG

6A

X

X

V A 4

ON

OFF

AUTO

#8

2B

2C A B C

L3L2L1

T1

T2

T3

#4

L1 L2

H1

H2 H3

H4

200VA

A

X1 X2

RG

T1 3 T2

S-3

5 L1 L2 L3 1 7

T2

OLOL

T3

A B C 3A

A3B1 B C

T3T2T1

3B2

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#12

#6

A3C1 B C

T3T2T1

3C2

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#10

#12

A3D1 B C

T3T2T1

3D2

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#6

#10

A3E B C2E A B C

1+

1N

1 (-)

SEE NOTE 6

2+

2N

2 (-)

SEE NOTE 6

3/0 (SU11 & SU12)

#2 AWG

(-)N+

1+

1N

1 (-)

(-)N+

2+

2N

2 (-)

NA

MI

4A2

#2 AWG

N+ (-)

W

G

4P

ELP

4N

ELN

G

1 2

72 4P

4N

ELP

ELN

250MCM (SU14

& SU16)

4A1

NA

4P

4N

4B

4D

* SEE NOTE 7

#12 AWG

#10

125V. EMERG. LTG

(STAIRS) IN SU16 ONLY

G R 52

OL

OL

52b

6 8

52a

G R 52

52b

6 8

52a

SCHEMATIC DIAGRAMS

N+

1 2

04P

4N

#12 AWG

‚ X2 COPPER

‚ X1 GROUND BUS

J3A LUG (2/0)

COMPARTMENT 2C COMPARTMENT 2B

CONTRACT NO. DACW68-68-C-0023

DEPARTMENT OF THE ARMY

WALLA WALLA DISTRICT

CORPS OF ENGINEERS

PROJECT: JOHN DAY LOCK & DAM

DWG. NO.

GO. NO.

CONTRACT

CUSTOMER

REV.

CONTROL POWER SYSTEMS INC.

MANCHESTER. N.H.

CHK.

DR.

ENG.

1/23/68

SCALE:

R-32535

REV.

NO. DATE DR.

A

C

CHK. ENG.

VMG

J

D

THE CONNECTION WIRING DIAGRAM FOR CONTROL

CENTERS SU13 & SU15 EXCEPT 1A & 3A SHALL

BE SPACES IN SU13 AND 3E SHALL BE A

SPACE IN CONTROL CENTER SU15

1.

NOTES:

CONTROL WIRE SHALL BE #14 AWG TYPE SIS2.

POWER WIRING SHALL BE TYPE SIS AND OF THE3.

FOLLOWING SIZES:

(a)

(b)

SIZE 2 CONTACTOR #8 AWG

SIZE 3 CONTACTOR #4 AWG

(c) FEEDER BREAKERS 50A & BELOW #8 AWG

(d) FEEDER BREAKERS 70A #6 AWG

(e) FEEDER BREAKERS 90A #4 AWG

(F) FEEDER BREAKERS 100A #2 AWG

(g) FEEDER BREAKERS 125A (2) #6 AWG PER

RING TONGUE INDENTED TERMINALS SHALL BE4.

USED ON ALL CONTROL WIRING, (HOLLINGSWORTH TYPE NIT)

5.

SYMMETRICAL AMPERE SHORT CIRCUIT CURRENT.

6.

NO.4 SHALL HAVE (6) TREGO TYPE J5A LUGS

FOR 250 MCM CABLE AND (3) TREGO TYPE

J2A LUGS FOR #2 CABLE

AUX. CONTACTS IN COMPARTMENT 2C OF SU13 AND SU157.

& 3E OF SU13 SHALL BE N/O. AUX CONTACTS IN

COMPARTMENTS 1A & 3A OF SU15 SHALL BE N/C.

52_

72_

LEGEND

AC CONTACTOR OR STARTER

DC CONTACTOR

_ SELECTOR SWITCH ON-OFF-AUTO1

OL_ OVERLOAD RELAY CONTACTS

_ INDICATING LIGHTS R-RED, G-GREENR

MI_ MECHANICAL INTERLOCK,

WALKING-BEAM TYPE

ON AUTO

OFF MAINTAINED

CONTACTS

CONTACT

ON

X

OFF AUTO

X

R-32532-FRONT VIEW & SILL PLAN

BM-1308-7 SHEETS 1 & 2-EQUIPMENT SCHEDULE

REFERENCE DRAWINGS

480 VOLT CONTROL CENTER

SU13 & SU15

PART OF CONTRACT ITEM 7

B 9/10/68

C

D 2/14/03

1/7/69

REPLACED EXCITER

AS BUILT

ADDED T.B. IN

CORR. EXT. WIRE SIZES

BIL HEDB USCE

VMG

SRB

FEEDER BKR. COMPH

TERMINAL BLOCK FOR D.C. CABLES IN CUBICLE

JD-68-0023-21

VMG

APPROVED

FOR CONSTRUCTION

NORTH PACIFIC DIVISION

CORPS OF ENGINEERS, U.S. ARMY

HYDRO-ELECTRIC DESIGN BRANCH

DATE: 1969 JUL 2

BY: JOHN R. KLINE

BUS SHALL BE BRACED TO WITHSTAND 22,000 VMS

(3) J4A LUGS

(3/0) -TREGO

A

B

C

M A

‚ X1 COPPER

A 1A

B C

L1 L2

S-2

T1 3

T2

L3

T3

L3L2L1

1 4 7 8

(3) J4A LUGS

‚ X2 COPPER

A

B

C

‚ X1 COPPER

M A

G

R3

T1

T2

T3

L1 L2

100VA

A1B1 B C

T3T2T1

1B2

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#10

A

X1 X2

H4 H3H2

H1

#12

1C21C1 A B C

T3T2T1

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#6

#6

1D21D1 A B C

T3T2T1

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#12

1E21E1 A B C

T3T2T1

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#12

#12

#6

A B C

A B

C

T1

T2

T3

2A

#12

#12

T1

T2

T3

#12

2B A B C

L3L2L1

T1

T2

T3

5 L1 2 L2 L3 1 7

T1 3 T2 T3 4 8

L2

L1

H

H

H

H

S-2

RG

6A

X

X

V A 4

ON

OFF

AUTO

#82C A B C

L3L2L1

T1

T2

T3

#4

L1 L2

H1

H2 H3

H4

200VA

A

X1 X2

RG

T3T1 3 T2

S-3

5 L1 L2 L3 1 7

2E A B C

A 3A

B C

L1 L2

S-2

T1 3

T2

L3

T3

L3L2L1

1 4 7 8

G

R3

T1

T2

T3

L1 L2

100VA

#10

A

X1 X2

H4 H3H2

H1

A3B1 B C

T3T2T1

3B2

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#12

3C23C1 A B C

T3T2T1

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#6

#10

3D23D1 A B C

T3T2T1

T6T5T4

CBA

T1

T2

T3

T4

T5

T6

#6

#12

#10A 3E

B C

L1 L2

S-2

T1 3

T2

L3

T3

L3L2L1

1 4 7 8

G

R3

T1

T2

T3

L1 L2

100VA

#12

A

X1 X2

H4 H3H2

H1

1+

1N

1 (-)

SEE NOTE 6

2+

2N

2 (-)

SEE NOTE 6

#2 AWG

(-)N+

NA

1+

1N

1 (-)

(-)N+

2+

2N

2 (-)

NA

MI

4A1 4A2

#2 AWG

N+ (-)

3P

3N

#12 AWG

4B

4D

G

3P

ELP

3N

ELN

G

1 2

72 3P

3N

ELP

ELN

‚ X1 GROUND BUS

TREGO J3A LUG (2/0)

G R 52

OL

OL

52b

6 8

52a OR 52b

SEE NOTE 7

COMPARTMENTS 2C,

1A & 3A SU15

& 3E IN SU13

G R 52

52b

6 8

52a

1 21

SCHEMATIC DIAGRAMS

‚ X2 COPPER

‚ X1 COPPER

COMPARTMENT 2B

#10

(3/0)

250 MCM

43 TRANSFER CONTROL

X

X

X

X

X

X

X

X

X

X

CONTACTS

HANDLE END AUTO MAN

SPRING RETURN TO NORMAL

X

X

CLOSE NORMAL TRIP

152-3

152-2

152-1

BUS TIE BKR.

BUS 2 SUPPLY BKR.

BUS 1 SUPPLY BKR.

CONTACTS

HANDLE END

52-1

52-2

52-3

X

BA

Z

152-1

152-2

152-3

BUS 1 SUPPLY CIRCUIT BREAKER

BUS 2 SUPPLY CIRCUIT BREAKER

BUS TIE CIRCUIT BREAKER

UNDER VOLTAGE RELAY

AUXILIARY FOR UNDER VOLTAGE RELAY

BELL ALARM CONTACT

AUXILIARY FOR BELL ALARM CONTACT

CIRCUIT BREAKER CONTROL SWITCH, BUS 1 SUPPLY

CIRCUIT BREAKER CONTROL SWITCH, BUS 2 SUPPLY

CIRCUIT BREAKER CONTROL SWITCH, BUS TIE

GROUND RELAY

TRANSFER CONTROL SWITCH, AUTO-MANUAL

INDICATING LIGHT, R-RED, G-GREEN, A-AMBER

R-32529

R-32542

R-32543

R-32544

CONNECTION DIAGRAM, CUBICLES 1, 2 & 3

CONNECTION DIAGRAM, CUBICLES 4, 5 & 6

CONNECTION DIAGRAM, CUBICLES 7, 8 & 9 &

& E.O. AK-2-25 BREAKER CONNECTION DIAGRAM

& FEEDER BKRS CONNECTION DIAGRAM OF

BELL ALARM SWITCH.

RELAY & UNDER VOLTAGE RELAYS.

REFERENCE DRAWINGS

NOTES:

1.

BREAKER IS IN THE TEST OR DRAWOUT POSITION

"O" INDICATES THE SECONDARY DISCONNECT FINGERS

ARE CLOSED IN THE BREAKER OPERATING POSITION ONLY

"T" INDICATES THE SECONDARY DISCONNECT FINGERS

ARE CLOSED IN THE BREAKER TEST POSITION ONLY

2.

3.

CONTRACT NO. DACW68-68-C_0023

DEPARTMENT OF THE ARMY

WALLA WALLA DISTRICT

CORPS OF ENGINEERS

PROJECT: JOHN DAY LOCK & DAM

LIST OF ABBREVIATIONS

SECONDARY DISCONNECT

ANTI-PUMP, PERMISSIVE RELAY

BELL ALARM CONTACT MAN. RESET

CLOSING CONTACTOR

SHUNT TRIP COIL

CLOSING COIL

CLOSING SW. ON BKR.

(CPS TO DISCONNECT P.B)

CLOSED IN OPERATING POSITION ONLY

CLOSED IN TEST POSITION ONLY

CLOSED IN BOTH TEST & OPERATING POS.

F

G

BA.

X

M

N

P.

O

T

ELEMENTARY DIAGRAM FOR

BUS 1 & BUS 2 SUPPLY BREAKERS

AND BUS TIE BREAKER

DWG. NO.

GO. NO.

CONTRACT

CUSTOMER

REV.

CONTROL POWER SYSTEMS INC.

SCHEMATIC DIAGRAM FOR

MANCHESTER. N.H.

CHK.

DR.

ENG.

2/13/68

SCALE:

R-32541

REV.

NO. DATE DR.

A

A

CHK. ENG.

6/26/68

PER MARKED DWG.

DATED 4/22/68

VMG

ITEM #1

BUS SUPPLY & BUS TIE BKRS-

J

D

480 VOLT SUBSTATION SQ4

FRONT VIEW & SILL PLAN

(aa-bb) CUTOFF SW.

JD-68-0023-22

VMG

APPROVED

FOR CONSTRUCTION

NORTH PACIFIC DIVISION

CORPS OF ENGINEERS, U.S. ARMY

HYDRO-ELECTRIC DESIGN BRANCH

DATE: 1969 JUL 2

BY: JOHN R. KLINE

* INDICATES THE CONTACT IS CLOSED WHEN

SCHEMATIC DIAGRAM OF METERING, GROUND

G

1P

1C

MAN

1C

152-1

C

BUS 1 SUPPLY BREAKER (52-1)

A2A4

1N

A1 A3 D5

T

A5

O

52-1 b

B5

B4

52-1 CLOSING

CIRCUIT

PSQ

NSQ

52-2

52-2 b

B1

B2

52-3 b

B1

B2

52-3

2C

AUTO

A7

52-1 TRIP

CIRCUIT

27-1

X2

D6

O

A6

6 1

R

27-1

X1

2C

152-1

T B6

B7

52-1

BA

Z

52-1

G

3P

5C

MAN

1C

152-3

C

BUS TIE BREAKER (52-3)

A2A4

3N

A1 A3 D5

T

A5

O

52-3 b

B5

B4

52-3 CLOSING

CIRCUIT

52-1

52-1 b

C2

C3

52-2 b

C2

C3

52-2

C

AUTO

A7

52-3 TRIP

CIRCUIT

27-1

X1

D6

O

A6

R

2C

152-3

T B6

B7

52-3

BA

Z

52-3

27-2

X1

27-1

X2

C6

52-2 a

C7

X2

C6 a

C7

52-1

27-2

T

O

SEE NOTE 1

SEE NOTE 2

SEE NOTE 3

NSQ

G

2P

3C

MAN

1C

152-2

C

BUS 2 SUPPLY BREAKER (52-2)

A2A4

2N

A1 A3 D5

T

A5

O 52-2 b

B5

B4

52-2 CLOSING

CIRCUIT

52-1

52-1 b

B1

B2

52-3 b

C2

C3

52-3

4C

AUTO

A7

52-2 TRIP

CIRCUIT

27-2

X2

D6

O

A6

6 2

R

27-2

X1

2C

152-2

T B6

B7

52-2

BA

Z

52-2

PSQ

NSQ

A

PSQ

52-1

Z

PSQ

NSQ

52-1

D

A

52-2

Z

52-2

D

4N

4P

A

52-3

Z

52-3

D

A

TYPICAL

A

B4

FOR

FDR. BKR.

BELL ALARM

CONTRACT

FDR. BKR.

B5

ALARM LIGHTS

BUS TRANSFER RELAYS

5P

52-1Z

52-2Z

52-3Z

27-1

X1

27-1

27-2

X1

27-2

D3

D4

52-3 b

27-1

X2

27-1

D3

D4

52-1 b

5N

27-2

X2

27-2

D3

D4

52-2 b

27-1

27-2

AND

CLOSE WHEN VOLTAGE

DROPS TO 85% NORMAL

27-1

27-2

AND

CLOSE WHEN VOLTAGE

INCREASES TO 90% NORMAL

64-1

64-2 BA

B6

B7

D1

D2

D1

D2

52-1 b

A4

52-2 b

52-1Z

52-2Z

52-3Z

A L

A L

8C

AUTO

ANN1

A L

A L

A L

G N

D

F E

E D

E R

B R

E A

K E

R S

T R I

P

S U

P P

L Y

B R

E A

K E

R S

T R I

P

C O

N T

A C

T S

I

N

P A

R A

L L

E

R

A

D

R

K

R S

T

D5

O

A5 A3

K P

F aaGbb

3 2

F

K

F

A4

A1

A2

N

K

K

K

A6

A7

M

AUX

O D6

SW

a

B1

2C b

B2

AUX

SW.

3C

B4 a

B3 b

B5

C7

5C a

C6

C5

BA

C4

B6

BA

B7

C3

6C b

C2

AUX

SW.

C1

7C a

D7

9C a

D4

8C b

D3

D2

10C b

D1

ANNUNCIATION

27-1

X1

27-2

X1

52-1TC 52-2TC

52-3CC

16 15 11 12

33 35 9 10

SPARE

7 8

SPARE

5 6

SPARE

3 4

SPARE

1 2

27-1

X2

52-1CC

52-3TC

13 15 11 12

36 35 9 10

SPARE

7 8

SPARE

5 6

SPARE

3 4

SPARE

1 2

52-3CC

26 25 11 12

33 35 9 10

SPARE

7 8

SPARE

5 6

SPARE

3 4

SPARE

1 2

27-2

X2

52-2CC

52-3TC

23 25 11 12

39 35 9 10

SPARE

7 8

SPARE

5 6

SPARE

3 4

SPARE

1 2

52-1Z, 52-2Z

& 52-3Z

ANNUNCIATION

ALARM LIGHTS

SPARE

TRANSFER RELAYS

SPARE

SPARE

11 12

9 10

7 8

5 6

3 4

1 2

DWG. NO.

GO. NO.

CONTRACT

CUSTOMER

REV.

CONTROL POWER SYSTEMS INC.

CONNECTION DIAGRAM FOR

MANCHESTER. N.H.

CHK.

DR.

ENG.

2/14/68

SCALE:

R-32542

REV.

NO. DATE

VMG

A

B

CHK. ENG.

PER MARKED DWG.

DATED 4/22/68

VMG

ITEM #1

J

D

7/1/68

VMG

B 7/12/68

MINOR

480 VOLT SUBSTATION SQ4

CUBICLES 1, 2 & 3

SPRING RETURN TO NORMAL

X

X

CLOSE NORMAL TRIP

152-1 BUS 1 SUPPLY BKR.

CONTACTS

HANDLE END

NOTES:

CONTROL WIRE SHALL BE #14 AWG TYPE SIS.

RING TONGUE INDENTED TERMINALS SHALL BE

USED ON ALL CONTROL WIRING

BUS SHALL BE BRACED TO WITHSTAND 22,000 VMS

SYMMETRICAL AMPERES SHORT CIRCUIT CURRENT

TERMINAL BLOCKS FOR CONTROL WIRING SHALL BE

GE TYPE EB-5

THE BREAKER IN COMPARTMENT 3D SHALL BE

NO.1 TO PREVENT THE OPERATION OF THE SWITCH

UNLESS THE BREAKER IS IN THE OPEN POSITION,

THE TEST OR DRAWOUT POSITION

52-1

POWER LUGS TO BE TREGO TYPE JA

1.

2.

3.

7.

CONTRACT NO. DACW68-68-C-0023

DEPARTMENT OF THE ARMY

WALLA WALLA DISTRICT

CORPS OF ENGINEERS

PROJECT: JOHN DAY LOCK & DAM

R-32529

R-32541

R-32543

R-32544

FRONT VIEW & SILL PLAN

SCHEMATIC DIAGRAM, BUS SUPPLY

CONNECTION DIAGRAM, CUBICLES 4, 5 & 6

CONNECTION DIAGRAM, CUBICLES 7, 8 & 9

& BUS TIE BREAKERS

& FEEDER BREAKERS CONNECTION DIAG.

OF BELL ALARM SWITCH

& SCHEMATIC DIAGRAM OF METERING,

GROUND RELAY & UNDER VOLTAGE RELAYS

REFERENCE DRAWINGS

NOTES:

C.P.S. TO DISCONNECT & INSULATE WIRE GOING

TO CLOSING SW. P.

DISCONNECT WIRE GOING TO 9C OF AUX. SW.

L FROM SEC. DISC. D5 AND CONNECT IT TO

SEC. DISC. A5.

DISCONNECT WIRE GOING TO 9 OF AUX. SW. L

FROM SEC. DISC. D6 AND CONNECT IT TO SEC.

DISC. A6

LIST OF ABREVIATIONS

ANTI-PUMP, PERMISSIVE RELAY

BELL ALARM MAN. RESET

CLOSING CONTACTOR

AUX. SW.

SHUNT TRIP

SOLENOID CLOSING COIL

(P.B.) CLOSING SW. ON BKR

POSITION ONLY

SEC. DISC CLOSED IN TEST

POSITION ONLY.

SECONDARY DISCONNECT

F

G

H

K

L

M

N

P

O

T

A, B, C & D

P2P2 N1

DR.

CONTACTS ARE CLOSED WHEN BREAKER IS IN

SEC. DISC. CLOSED IN OPERATING

1.

2.

3.

(aa-bb) CUT OFF SW.

JD-68-0023-23

APPROVED

FOR CONSTRUCTION

NORTH PACIFIC DIVISION

CORPS OF ENGINEERS, U.S. ARMY

HYDRO-ELECTRIC DESIGN BRANCH

DATE: 1969 JUL 2

BY: JOHN R. KLINE

KEY INTERLOCKED WITH THE SWITCH IN COMPARTMENT

(6) #J3A LUGS

(2) #1/0 PER PHASE

KI

NOTE

1A 2A

CUBICLE NO.1 FRONT VIEW CUBICLE NO.2 FRONT VIEW

H1 X1

H2 X2

H3 X3

A

B

C

4160-480 VOLTS

2/0

#J3A LUG

27-1

27-1

REAR VIEW OF DOOR COMPARTMENT 3A

P

P

5P

Z

4N

50 3D

AL5

1N

ANN1

64-1

27-1

X1

G

G

AL1

ANN1

G

R

1P

27-1

X2

1 2

152-1

HINGE WIRE

#14-41 STR.

1G11

1G12

1P11

1P2

3D

1P

5P

1N

4N

ANN1

AL1

AL5

1L11 G 1L12 1L13

1G1 1G2

CUBICLE NO 3 FRONT VIEW

3A

(3) 4/1 P.T'S.

11A 11B

1P1

11C

1P21P2 1P3

(2) 4/1 P.T'S.

A

L

L

A

L

L

A

L

L

A

A

A

A

B

B

A

C

C

C

L

C

L

P

P

V

P

P

G

G

G

G

V

C U

B I

C L

E

D W

G

C U

B I

C

D W

12, 13, 14, 15, 23, 24, 1P, 1N, 5P, 5N, 1P11, 1P2, 1P13, 30, 33, 34, 35, 52, 57, A4, AL1, AL4 & AL5

TO CUBICLE NO 5

DWG. NO. R325433C

A

4P 3C

4P 1

43C

54N

6AL3

7ANN1

B

SEE DRAWING

A-32543 FOR

CONTINUATION

OF MAIN BUS

NO.1

225AF.

90AT

(3) #J1A LUGS

1 #4/

1L1

1L2

1L3

1L1

1L2

1L3

1A

1B

1C

1A

1B

1C

1P 1

O

A

4P 3D A

1P

1N

23 1

61P

B

3D

600AF

600AT

2 33

C

3 58

2 A4

D

AL4

5N

1P2 G

52-1

33 34 23 24

KI

O

T

NOTE

CONNECTION DIAGRAM FOR

BUS 1 & BUS 2 SUPPLY BREAKERS

AND BUS TIE BREAKER

C

L5

L5C

H1

H2

L6

L6C

L7

F1

F5

G aa bb

2 3

F4

K9 K10

F

G2

G3

G1

K1

D

6O

L7C

A6

5T A5

L8

L8C

L10

L10C

A

K7

N2

K2

K10

D5

L1

D6

B

L2

L2C

L3

L3C

L4

H3

H4

O K1

M2

9 7

C

D

C

C

B

A

M

10 8

D

D

C

D

B

C

B

B

D

L

1 2 C5 C4

3 4

B6 B7

H

M

L1C A7

1 2

P2A3

P1 F1 A5

N1

2 4

5 7

A1

K

F3A4

F6

P 1 2

K1 K2 K4

‚ X2 COPPER

C

P P

E R

‚ X4 COPPER

‚ X1 COPPER

‚ X1 GROUND BUS (CONTINUOUS)‚ X1 GROUND BUS

500KVA

V

V

3 , 60 , 1 2

A N

N

P

CONTRACT

CUSTOMER

REV.

CONTROL POWER SYSTEMS INC.

CONNECTION DIAGRAM FOR

MANCHESTER. N.H.

CHK.

DR.

ENG.

2/16/68

SCALE:

R-32543

REV.

NO. DATE

VMG

A

A

CHK. ENG.

PER MARKED DWG.

DATED 4/22/68

VMG

ITEM #1

J

D

7/1/68

480 VOLT SUBSTATION SQ4

DR.

CUBICLES 4, 5 & 6

X X

X X

X

X

X

X X

XX

X

C

A

B

C

A

B

C

A

B

C

A

B

BUS 2 BUS 1

O F

F

O F

F

VM

CONTACTS

HANDLE END

VOLTMETER

BUS 1 BUS 2

OFF

C A

B

C

A B

OFF

C A

B

C

A B

SPRING RETURN TO NORMAL

X

X

CLOSE NORMAL TRIP

152-3 BUS TIE BKR.

CONTACTS

HANDLE END

43 TRANSFER CONTROL

X

X

X

X

X

X

X

X

X

X

CONTACTS

HANDLE END AUTO MAN

NOTES:

CONTROL WIRE SHALL BE #14 AWG TYPE SIS.

RING TONGUE INDENTED TERMINALS SHALL BE

USED ON ALL CONTROL WIRING

BUS SHALL BE BRACED TO WITHSTAND 22,000 VMS

SYMMETRICAL AMPERES SHORT CIRCUIT CURRENT

TERMINAL BLOCKS FOR CONTROL WIRING SHALL BE

GE TYPE EB-5 EXCEPT IN COMPARTMENT 5A

THE 60A. 2 POINT TERMINAL BLOCK FOR THE 125

V.D.C. CONTROL POWER SHALL BE A BODINE MFG.

CO. TYPE P201.

TEST OR DRAWOUT POSITION.

52-3

POWER LUGS TO BE TREGO TYPE JA.

1.

2.

3.

6.

R-32529

R-32541

R-32542

R-32544

FRONT VIEW & SILL PLAN

SCHEMATIC DIAGRAM, BUS SUPPLY

CONNECTION DIAGRAM, CUBICLES 1, 2 & 3

CONNECTION DIAGRAM, CUBICLES

& BUS TIE BREAKERS

& E.O. AK-2-25 BREAKER CONNECTION

DIAGRAM.

7, 8 & 9 AND SCHEMATIC DIAGRAM

OF METERING, GROUND RELAY &

REFERENCE DRAWINGS

UNDER VOLTAGE RELAYS

CONTRACT NO. DACW68-68-C-0023

DEPARTMENT OF THE ARMY

WALLA WALLA DISTRICT

CORPS OF ENGINEERS

PROJECT: JOHN DAY LOCK & DAM

CONTACTS ARE CLOSED WHEN BREAKER IS IN THE

VOLTMETER TRANSFER

JD-68-0023-24

APPROVED

FOR CONSTRUCTION

NORTH PACIFIC DIVISION

CORPS OF ENGINEERS, U.S. ARMY

HYDRO-ELECTRIC DESIGN BRANCH

DATE: 1969 JUL 2

BY: JOHN R. KLINE

A

4P 4A

225AF

200AT

(3) #J4A LUGS

1 #3/0 PER

4P 1

44A

54N

6AL3

7ANN1

B

4A

CUBICLE NO.4 FRONT VIEW CUBICLE NO 6 FRONT VIEW

4B

A

4P 4B

225AF

200AT

(3) #J4A LUGS

1 #3/0 PER

4P 1

44B

54N

6AL3

7ANN1

B

ANN1, AL3, 4P & 4N

FROM CUB. #5 & TO CUB #3

4C

A

4P 4C

225AF

200AT

(3) #J4A LUGS

1 #3/0 PER

4P 1

44C

54N

6AL3

7ANN1

B

1L1

1L2

1L3

SEE DRAWING

R-32542 FOR

CONTINUATION

OF MAIN BUS

NO 1

4D

A

4P 4D

225AF

200AT

(3) #J4A LUGS

1 #3/0 PER

4P 1

44D

54N

6AL3

7ANN1

B

BRANCH BUS

TYP.

A

4P 6A

225AF

200AT

(3) #J4A LUGS

1 #3/0 PER

4P 1

46A

54N

6AL3

7ANN1

B

6A

6B

A

4P 6B

225AF

200AT

(3) #J4A LUGS

1 #3/0 PER

4P 1

46B

54N

6AL3

7ANN1

B

ANN1, AL3, 4P & 4N

FROM CUB. #5 & TO CUB #7

6C

225AF

200AT

(3) #J4A LUGS

1 #3/0 PER

4P 1

46C

54N

6AL3

7ANN1

B

2L1

2L2

2L3

6D

225AF

200AT

(3) #J4A LUGS

1 #3/0 PER

4P 1

46D

54N

6AL3

7ANN1

B

A

4P 6C

A

4P 6D

SEE DRAWING

R-32544 FOR

CONTINUATION

OF MAIN BUS

NO.2

AL1

AL2

AL3

AL4

AL5

ANN1

ANN1

AL5

A4

1P2

1P13

2P11

2P2

2P13

1P

1N

3P

2N

3P

3N

3P 1

O

A

4P 5D A

3P

3N

13 1

63P

B

5D

600AF

600AT

2 23

C

3 57

D

5N

52-3

13 14 23 24

O

T

225AF

100AT

(3) #J2A LUGS

1 #2/

4P 1

45C

54N

6AL3

7ANN1

B

1L1

1L2

1L3

4P

5C

A

5C

V1 V2

VM

VM. SW.

1 2 1P11 2P11

3 4 1P2 2P2

5 6 1P13 2P13

7 8

V2

V1

52-3Z

51 5D

AL5

3N

ANN1

52 4N

CONNECTION DIAGRAM FOR AK-2-15 BKRS

WITH BELL ALARM SWITCH.

B

H2

H1

H3

H4

1 2 B5 B4

3 4 B6 B7

BA

BELL ALARM SW.

MANUAL RESET

ANN1, AL3, 4P & 4N

TO CUBICLES 4 & 6

22, 23, 24, 25, 13. 14, 2P, 2N, 2P11, 2P2, 2P13, 30, 33, 34, 35, 5N, 51, 52, 57, A4, AL2, AL4, & AL5 TO CUBICLE

NO.7 DWG. #R-32544

12, 13, 14, 15, 23, 24, 1P, 1N, 5P, 5N, 1P11, 1P2, 1P13, 30, 33, 34, 35, 52, 57, A4, AL1, AL4, & AL5 TO CUBICLE

NO.3 DWG #R-32542

G

PSQ

NSQ

5A

CUBICLE NO 5 FRONT VIEW

125V. DC

2c-19/25

60A TB

1P11

4P

4N

5N

5P

5D

1P

PSQ

NA

1N

NSQ

3P

NA

3N 2P

NA

2N 4P

NA

4N 5P

NA

5N

HINGE WIRE

12 15 1 2

22 25 3 4

32 35 5 6

ANN1

7 8

9 10

1P

2P

3P

A4

152-3

1 2

3P

R

G

‚ X1 GROUND BUS

P P

E R

‚ X1 COPPER

‚ X1 COPPER

‚ X4 COPPER

‚ X4 COPPER

P P

E R

‚ X1 GROUND BUS

‚ X4 COPPER

#8 AWG

#14-4/STR.

H

BA

H

REAR VIEW OF DOOR COMPARTMENT 5A

CONTRACT

CUSTOMER

REV.

CONTROL POWER SYSTEMS INC.

CONNECTION DIAGRAM FOR

MANCHESTER. N.H.

CHK.

DR.

ENG.

2/19/68

SCALE:

R-32544

REV.

NO. DATE

VMG

A

B

CHK. ENG.

PER MARKED DWG.

DATED 4/22/68

VMG

ITEM #1

J

D

7/1/68

480 VOLT SUBSTATION SQ4

DR.

SPRING RETURN TO NORMAL

X

X

CLOSE NORMAL TRIP

152-2 BUS 2 SUPPLY BKR.

CONTACTS

HANDLE END

NOTES:

CONTROL WIRE SHALL BE #14 AWG TYPE SIS.

RING TONGUE INDENTED TERMINALS SHALL BE USED

ON ALL CONTROL WIRING

SYMMETRICAL AMPERES SHORT CIRCUIT CURRENT

TERMINAL BLOCKS FOR CONTROL WIRING SHALL

BE GE TYPE EB-5

THE BREAKER IN COMPARTMENT 7D SHALL BE KEY

INTERLOCKED WITH THE SWITCH IN COMPARTMENT

NO 9 TO PREVENT THE OPERATION OF THE SWITCH

UNLESS THE BREAKER IS IN THE OPEN POSITION.

52-2

POWER LUGS TO BE TREGO TYPE JA.

1.

2.

3.

4.

5.

6.

7.

R-32529

R-32541

R-32542

R-32543

FRONT VIEW & SILL PLAN

SCHEMATIC DIAGRAM, BUS SUPPLY

CONNECTION DIAGRAM CUBICLES 1, 2 & 3

CONNECTION DIAGRAM CUBICLES 4, 5 & 6

& BUS TIE BREAKERS

AND E.O. AK-2-25 BREAKER CONNECTION

DIAGRAM

AND FEEDER BREAKER CONNECTION DIAG.

OF BELL ALARM SWITCH

REFERENCE DRAWINGS

CONTRACT NO. DACW68-68-C-0023

DEPARTMENT OF THE ARMY

WALLA WALLA DISTRICT

CORPS OF ENGINEERS

PROJECT: JOHN DAY LOCK & DAM

B 9/12/68

CUBICLES 7, 8 & 9

VMG

MINOR

TEST OR DRAWOUT POSITION

CONTACTS ARE CLOSED WHEN BREAKER IS IN THE

JD-68-0023-25

APPROVED

FOR CONSTRUCTION

NORTH PACIFIC DIVISION

CORPS OF ENGINEERS, U.S. ARMY

HYDRO-ELECTRIC DESIGN BRANCH

DATE: 1969 JUL 2

BY: JOHN R. KLINE

BUS SHALL BE BRACED TO WITHSTAND 22,000 VMS

R G

2G11

2G12

2P11

2P2

7D

2P

2N

4N

ANN1

AL2

AL5

A

A

A

A

A

A

3 3 3 3

3 3 3

3 3

3 3 3

3 3

3 3

RES

A

A

27-2

PEAR VIEW OF DOOR COMPARTMENT 7A

7A

27-2

P

P

64-2

Z

287D AL5

2N

4N ANN1

G

G

AL2

ANN1

27-2

X1

33 26 55

27 21

2P

1 2

152-2

27-2

X2

39 23

HINGE WIRE

#14-41 STR.

CUBICLE NO 7 FRONT VIEW

2L11 2L132L12G

2G22G1

21A 21B 21C

2P1 2P2 2P32P2

7C

L

L

L

A

B

C

V

C

L

V

C

L

L

L

L

A

B

C

V

V

P

P

G

G

P

P

G

G

4P 7C

225AF

90AT

4P

7C

4N

AL3

ANN1

B

L

L

L

2L1

2L2

2L3

(3) #J1A LUGS

P P

E R

‚ X4 COPPER

7D

A

2P

2N

2P

2P

B

O

4P 7D

600AF

600AT

G 2P2

2A

2B

2C

52-2

KI

NOTE

O

T

C

D

13 14 33 34

5N

A4

AL4

CUBICLE NO 8 FRONT VIEW

X1 H1

X2 H2

X3 H3

500KVA

4160-480 VOLTS

‚ X4 COPPER

A

B

C

‚ X1 GROUND BUS (CONTINUOUS)

CUBICLE NO 9 FRONT VIEW

(6) #J3A LUGS

(2) #1/0 PER PHASE

NOTE

KI22, 23, 24, 25, 13, 14, 2P, 2N,

2P11, 2P2, 2P13, 30, 33, 34, 35

5N, 51, 52, 57, A4, AL3, AL4

& AL5 TO CUBICLE NO.

5 DWG #R-32543

ANN1, AL3, 4P & 4N

TO CUB. #6 DWG #R.-32543

#3 DWG #R-32542

SCHEMATIC FOR UNDERVOLTAGE RELAYS

& VOLTMETER

BUS NO.1

1A

1B

1C

11A

11B

11C

1P1

1P3

P

6 5

16 15

P

1P11

6 5

27-1

27-1

1P2

1P13

P

600V

CL. FUSES

480/120

P.T.

250V.

FUSES

1 2

3 4

5 6

7 8

VM. SW.

2P11

2P2

2P13

VM

V

V

BUS NO.3

2A

2B

2C

21A

21B

21C

2P1 2P3

P

6 5

16 15

P

6 5

27-2

27-2

P

CL. FUSES

480/120

P.T.

250V

FUSES

2L1

2L2

2L3

2L11 2L12 2L13

600V

CL. FUSES

G

2G1

2G11

64-2

2G12

2G2

250V.

FUSES

SCHEMATIC SHOWN

FOR BUS NO 2

BUS NO.1 SIMILAR

FOR PER FIX

SUCH AS 1L1,

1L11, ETC. AND

64-2 BECOMES

64-1

2/0

* J3A LUG

‚ X2 COPPER

(2) 4/1 PTS.

1 #41

3 60

EXCEPT USE 1.

600V.

SCHEMATIC FOR GROUND RELAY

36, 39 & 50 TO CUB.

(3) 4/1 PTS.

CORPS OF ENGINEERS

DATEREVISION DESCRIPTION

DESIGNED BY JRK

U.S. ARMY ENGINEERS DIVISION, N.P.

SCALE AS SHOWN

BY

SUBMITTED:

DATE

HEAD, ELECTRICAL SECTION

PREPARED:

DRAWN BY REF

CHIEF, HYDRO-ELECTRIC DESIGN BRANCH

APPROVED: FOR DIV. ENGINEER

WHR

CHIEF, ENGINEERING DIVISION

SPEC. NO.

POWERHOUSE

SHEET 1

U.S. ARMY

27-1

27-1 27-1

X2

27-1

X1

52-1

E

64-1

3A

A

RG

3C

21 4A

A

4B

4C

4D

A

5A

A

5B

5C

5D

RG

52-1 52-3

M

V

6A

VS

A

A

7A

A

7B

7C

7D

A

A

8A

A

8B

8C

8D

G R

52-2

AA

A A

A A A

27-2

27-2 27-2

X2

27-2

X1

52-2

Z

64-2

#2/O #2/O

750KVA-3

4.16KV-480 VOLT

BUS 1

CONTINUOUS

GROUND BUS

750KVA-3

4.16KV-480 VOLT

BUS 2

6C 9C

9A 10

52-3

Z

2P NON-AUTO

CIRCUIT BKR

(SEE NOTE 3)

EMBEDDED 3" CONDUIT SLEEVES

SEE NOTE 2

FINISHED FLOOR

CHANNEL SILL

AUTO TRIP

INDICATOR

27-1

X1

52-3

B

27-1

X2

52-1

B

27-1

27-1

27-2

X1

27-2

27-2

X2

52-2

B

27-2

Z

Z

Z

S

N T

R

H E

M A

T I

C

52-1

A

52-1

Z

52-2

A

52-2

Z

52-3

A

52-3

Z

TYPICAL

A

BELL

ALARM

FOR

FDR BKR

CONTACT

TC

A

TC

A

CQO1

FDR

BKRS

REMOTE

CONTACT

NFO1

V

N

A U

T O

IN ACCORDANCE WITH ASA STANDARDS C37.2-1962 AND

Y322-1962 EXCEPT AS NOTED:

ELECTRICALLY OPERATED DRAWOUT TYPE AIR CIRCUIT

BREAKER

DISCONNECT DEVICE; CLOSED IN BOTH TEST AND OPERATING

POSITION UNLESS MARKED AS FOLLOWS:

O-CLOSED IN OPERATING POSITION ONLY.

T-CLOSED IN TEST POSITION ONLY

SHUNT TRIP ATTACHMENT

INDICATING LIGHTS (LETTER INDICATES COLOR)

MASTER NAMEPLATE (SEE EQUIPMENT SCHEDULE)

R

M

VS

CIRCUIT OR COMPARTMENT NO. (SEE EQUIPMENT SCHEDULE)

VOLTMETER SWITCH

NOTES

VARIATIONS IN EQUIPMENT ARRANGEMENT AND BREAKER

CONTROL WILL BE ALLOWED TO FIT MANUFACTURERS STANDARD

CONSTRUCTION SUBJECT TO THE APPROVAL OF THE

CONTRACTING OFFICER.

1.

THE SUBSTATION SHALL BE CONSTRUCTED SO THAT ONE OF

THE EMBEDDED CONDUIT SLEEVES WILL ENTER THE PRIMARY

SUPPLY ENTRANCE COMPARTMENT.

2.

PROVIDE NAMEPLATES LABELED AS INDICATED BY SCHEMATIC

DIAGRAMS.

3.

ALL DRAWOUT TYPE AIR CIRCUIT BREAKERS SHALL BE 22,000

RMS SYMMETRICAL AMPERES MINIMUM INTERRUPTING

CAPACITY. FEEDER BREAKERS WITH TRIP RATINGS OF 350

4.

AMPERES OR MORE SHALL BE OF 600 AMPERE MINIMUM

FRAME SIZE.

NO

3A

3C

4A

4B

4C

4D

5A

5B

5C

5D

M

6C

7A

7B

7C

7D

8A

8B

8C

8D

9A

6A

9C

FIRST LINE

NAMEPLATE LETTERING

SECOND LINE

TRIP

RATING

(AMP)

CABLE

SIZE

TRANS

POT TRANS

BUS 1

NONE

FREIGHT

SQO1 480V

CONTROL

BUS TIE

NONE

CQO7 480V

??? 480V

POT TRANS

BUS 2

TRANS

CQO5 480V

CQO4 480V

CQO3 480V

CQO2 480V

CQO1 480V

CQO3 480V

CQO2 480V

CQO1 480V

???? 480V

???? 480V

RELAYS BUS 1

SUPPLY BREAKER

ELEVATOR

SUBSTATION

BREAKERS

BREAKER

RELAYS BUS 2

SUPPLY BREAKER

BUS 2

BUS 2

PANELBOARD

CONTROL CENTER

PANELBOARD

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

PANELBOARD

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

BUS

BUS

2/O

500MCM

2/O

4/O

350MCM

350MCM

BUS

500MCM

2/O

2/O

350MCM

350MCM

BUS

BUS

52-1TC

52-3CC

SPARE

SPARE

27-1X1

52-1CC

52-3TC

SPARE

SPARE

27-1X2

52-2TC

52-3CC

SPARE

SPARE

27-2X1

52-2CC

52-3TC

SPARE

SPARE

27-2X227-227-1

AND

CLOSES WHEN VOLTAGE

DROPS TO 85% NORMAL

27-227-1

AND

CLOSES WHEN VOLTAGE

INCREASES TO 90%

52-2

B

G

V

N

A U

T O

52-1

Z

52-2

52-3

B

C

MAN

52-3

52-1

B

NSO1

PSO1

CLOSE

T

R

27-1

X2 T2

TRIP

52-1

A

27-1

X1

52-1

B

G

V

N

A U

T O

52-3

Z

52-1

52-2

B

C

MAN

52-2

52-3

B

CLOSE

T

R

27-1

X1

1 52-3

T

TRIP

52-3

A

27-1

X2

27-2

X1

AUTO

27-2

X2

52-2

A

52-1

A

52-1

BA

52-3

BA

52-1

B

G

V

N

A U

T O

52-2

Z

52-1

52-3

B

1 52-2

C

MAN

52-3

52-2

B

CLOSE

T

R

27-2

X2 T

TRIP

52-2

A

27-2

X1

52-2

BA

AUTO 4

AUTO

TRANSFER RELAYS

ANN

INDICATING LIGHTS

SPARE

52-1Z, 52-2Z, 52-3Z

PFO1

V

N

A U

T O

B

A N

S F

L A

Y S

S

H E

M A

T I

C

FRONT VIEW AND ONE LINE DIAGRAM

ELECTRICAL BKR CONTROL-SCHEMATIC DIAGRAM

BUS TRANSFER RELAYS

SCHEMATIC DIAGRAM

ALARM LIGHTS & SHUNT TRIP

SCHEMATIC DIAGRAM

52-1

B

52-2

B

AUTO

Z

Z

Z6

G N

D

F

A R

M

C O

N T

A C

T S

R A

L L

E L

F

I

P

S U

P P

Y

R

T R I

P

ANNUNCIATION WIRING

CONTACT MAN AUTO

1 X

X2

X

X

SPARE

SPARE

X

X

X

SPARE

AUTO

MAN

43 TRANSFER CONTROL

CONTACT CLOSE TRIP

1 X

X2

NEUTRAL

TRIP

1 52-1 BUS 1 SUPPLY BKR

1 52-2 BUS 2 SUPPLY BKR

1 52-3 BUS TIE BKR

CLOSE

MAINTAINED

CONTACTS

NEUTRAL

SPRING RETURN

TO NEUTRAL

LEGEND

EQUIPMENT SCHEDULE

a

J

D P

A

31 JULY 64

CHECKED BY:

JDP-1-6-1A8/1

C 65-6

?? ??? 64

SQO1

JOHN DAY LOCK AND DAM

480-VOLT SUBSTATION

REVISED BKR CONTROL ????????, ???? NOTE 4

SHIPPING SECTIONS

13"

BUS 2 SUPPLY BKR (52-2)BUS TIE BKR (52-3)BUS 1 SUPPLY BKR (52-1)

2 6

* CONTACT CLOSED WHEN BKR IS IN TEST OR DRAWOUT POSITION

COLUMBIA RIVER, WASHINGTON AND OREGON

BUS 1

BUS 1

16KV FDR

4.16KV FDR

PORTLAND, OREGON

O O

O O

O O

O O

OO

O O O

O O

O O

O

52-1152-1

52-3 1 52-21

DESIGNED BY JRK

U.S. ARMY ENGINEERS DIVISION, N.P.

SCALE AS SHOWN

BY

SUBMITTED:

DATE

HEAD, ELECTRICAL SECTION

PREPARED:

DRAWN BY REF

CHIEF, HYDRO-ELECTRIC DESIGN BRANCH

APPROVED: FOR DIV. ENGINEER

CHIEF, ENGINEERING DIVISION

SPEC. NO.

POWERHOUSE

SHEET 3

U.S. ARMY

27-1

27-1 27-1

X2

27-1

X1

52-1

Z

64-1

3A

RG

4B

52-1

M

A

500KVA-3

4.16KV-480 VOLT

BUS 1

500KVA-3

4.16KV-480 VOLT

Z

2P NON-AUTO

CIRCUIT BKRS

FRONT VIEW AND ONE LINE DIAGRAM

4A

A

3C

A

3D

A

VS

V

52-3

RG

4C

A

4D

A

5C

5D

A

52-3

6B

A

6A

A

RG

6C

A

6D

A

7C

A

7D

A

52-2

7A

5A

27-2

X1

64-2

27-2 52-2

Z

27-2

X2 27-2

8 9

C

AUTO TRIP

INDICATOR

KEY INTERLOCK

BUS 2

#2/O

TO #2/O CONNECTOR

CONTINUOUS

GROUND BUS

CHANNEL SILL

FINISHED FLOOR

(SEE NOTE 5)

KEY INTERLOCK

PSQ

125V DC

NON-AUTO

NSQ

B

P P

R

B

R

B

P P

R

A L

A

M

G H

T S

B

A N

S F

L A

Y S

CONTROL SOURCE DISTRIBUTION

NOTES

FOR LEGEND SEE DWG JDP-1-?-1A?/11.

FOR SCHEMATIC DIAGRAMS OF ELECTRICAL BREAKER2.

CONTROL, AUTOMATIC BUS TRANSFER AND BREAKER

ALARM LIGHTS, AND WIRING OF ANNUNCIATION

CONTACTS SEE DWG JDP-1-?-1A?/1

VARIATIONS IN EQUIPMENT ARRANGEMENT AND3.

BREAKER CONTROL WILL BE ALLOWED TO FIT MANUFAC-

TURERS STANDARD CONSTRUCTION SUBJECT TO THE

APPROVAL OF THE CONTRACTING OFFICER.

PROVIDE NAMEPLATES LABELED AS INDICATE BY CONTROL5.

SOURCE DISTRIBUTION DIAGRAM.

4.

ACCOMMODATE FUTURE ??????.

3A

4A

4B

4C

4D

M

5A

7C

7D

FIRST LINE

NAMEPLATE LETTERING SQ1

SECOND LINE

TRIP

RATING

(AMP)

CABLE

SIZE

4.16KV FDR

TRANS

POT TRANS

SU1 480V

SQ1 480 VOLT

CONTROL

SU2 480V

TRANS T1

SU1 480V

BUS TIE

NONE (SEE NOTE 4)

RELAYS BUS 1

CONTROL CENTER

BREAKERS

COOLING FDR 2

CONTROL CENTER

CONTROL CENTER

BREAKER

CONTROL CENTER

BUS 2

2-#1/O

BUS

3C

3D

6D

7A

TRANS T1

BUS 1

COOLING FDR 1

SUPPLY BREAKER

SU2 480V

SU3 480V

SU4 480V

POT TRANS

BUS 2

TRANS

4.16KV FDR

CONTROL CENTER

SUBSTATION

RELAYS BUS 2

BUS 2

#3/O

#3/O

#3/O

#3/O

BUS

#4

5C

5D

6A

6B

6C

SU4 480V

SU3 480V

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

SUPPLY BREAKER

FIRST LINE

NAMEPLATE LETTERING SQ2

SECOND LINE

SU5 480V

SQ2 480 VOLT

TRANS T2

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

TRANS T2 COOLING FDR 1

SU6 480V

SU7 480V

SU8 480V CONTROL CENTER

SUBSTATION

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

FIRST LINE

NAMEPLATE LETTERING SQ3

SECOND LINE

SU9 480V

SQ3 480 VOLT

TRANS T3

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

TRANS T3 COOLING FDR 1

NONE (SEE NOTE 4)

SUBSTATION

CONTROL CENTER

SU5 48OV

SU6 48OV

SU7 48OV

SU8 48OV

SU9 480V

NONE (SEE NOTE 4)

200 #3/O

#3/O

#3/O

#3/O

BUS

BUS

#4

2 #1/O

EQUIPMENT SCHEDULE

NAMEPLATE LETTERING SAME FOR EACH SQ SUBSTATION EXCEPT AS NOTED

NONE (SEE NOTE 4)

a

J

D P

A

JDP-1-6-1A8/3

C 65-6

10 MAR 64

JOHN DAY LOCK AND DAM

480 VOLT SUBSTATIONS

SQ1, SQ2, & SQ3

CHECKED BY:

SHIPPING SECTIONS

NO.

COLUMBIA RIVER, WASHINGTON AND OREGON

BUS 1

BUS 1

SU10 480V

COOLING FDR 2COOLING FDR 2

SU10 480V

SU11 480V

COMPARTMENTS SHALL BE ???????? TO

PORTLAND, OREGON

DESCRIPTIONREVISION DATE

SCALE AS SHOWN

DATE

SUBMITTED:

SPEC. NO.

DESIGNED BY

CHECKED BY

PREPARED:

HEAD, ELECTRICAL SECTION

CHIEF, HYDRO-ELECTRIC DESIGN BRANCH

BY

DRAWN BY

SHEET

CORPS OF ENGINEERS U.S. ARMY

POWERHOUSE

JDP-1-6-1A8/6

APPROVED:FOR DIV. ENGINEER

CHIEF, ENGINEERING DIVISION

JOHN DAY LOCK AND DAM

COLUMBIA RIVER, WASHINGTON AND OREGON

480-VOLT CONTROL CENTERS

SU1 THRU SU10

U.S. ARMY ENGINEER DIVISION. N.P.

PORTLAND, OREGON

C-65-6

10 MAR 64

JRK

PJL-REF

JY

FRONT VIEW

ONE LINE DIAGRAM

COMPARTMENTS 2B & 2C

TYPICAL SCHEMATIC DIAGRAM CONTROL CONNECTIONS

DETAIL A

FIRST LINENO.

SU1 480VM1

1A

1B1

1B2

1C1

1C2

1D1

1D2

1E1

1E2

2A

2B

2C

2E

SECOND LINE

CONTROL CENTER*

NONE (SEE NOTE 3)

BLANK

GEN BKR

HEAD COVER

480 VOLT

AC TURBINE

LIGHT TRANS

LIGHT TRANS

GENERATOR

GENERATOR

GOVERNOR OIL

NONE (SEE NOTE 3)

PUMP NO.1

OUTLETS

BRG OIL PUMP

BUS 1

HEATERS

PUMP NO.3

FIRST LINENO.

M1

3A

3B1

3B2

3C1

3C2

3D1

3D2

3E2

4A1

4A2

4B

4C

4D

SECOND LINE

CONTROL CENTER

NONE (SEE NOTE 3)

BLANK

GEN BKR

HEAD COVER

HIGH BAY

BLANK

125-250V DC

125-250V DC

125-250V DC

EMERG LTG

COOLER NO.2

PUMP NO.2

LIGHTS

OIL PUMP

OUTLETS

SUPPLY NO.1

SUPPLY NO.2

PANEL

CONTACTOR

NAMEPLATE SCHEDULE

M1 REPLACE SU1 WITH SU2, SU3, ETC.

REPLACE TR12 WITH TR22 IN SU2, TR32 IN SU3, ETC.1D2

REPLACE TR111 WITH TR21 IN SU2, TR31 IN SU3, ETC.1E1*

EXCITATION

3E1

PREF AC

480 VOLT

THRUST BRG

PREF AC BUS 2

TRANSFER SW

FOR OTHER BOARDS EXCEPT AS NOTED BELOW:

NAMEPLATES ARE SHOWN FOR SU1 AND ARE SAME

SCHEDULE

DIRECTORY

SEE

X

ON OFF AUTO

X

CONTACT

AUTOON

OFF

BKR NO.

DC TURBINE BRG OIL PUMP

125V EMERG LTG

"125V EMERG LTG" IN EVEN NUMBERED BOARDS (SU2, SU4, ETC)

CONTACTS

MAINTAINED

DIRECTORY SCHEDULE

COMPARTMENT 4B

2.

3.

4.

1.

EACH CONTROL CENTER SHALL BE SHIPPED IN ONE PIECE.5.

6.

AND BE CONSTRUCTED TO ACCOMMODATE FUTURE OPERATING UNITS.

ALL EMPTY COMPARTMENTS SHALL HAVE BLANK COVERS

NOTES

COOLER NO.1

TR12

TR11

SU1 480V

PREF AC

BLANK IN EVEN NUMBERED BOARDS EXCEPT "125V EMERG LTG STAIRS" IN SU8

OF THE CONTRACTING OFFICER.

STANDARD CONSTRUCTION SUBJECT TO APPROVAL

WILL BE ALLOWED TO FIT MANUFACTURERS

OTHERWISE, VARIATIONS IN EQUIPMENT ARRANGEMENT

THE NUMBER OF VERTICAL SECTIONS SHALL BE AS SHOWN

AND NAMEPLATES AS INDICATED.

SU1 THRU SU1O WITH VARIATIONS IN BUS CONNECTIONS

THIS DRAWING IS REPRESENTATIVE OF CONTROL CENTERS

IN COMPARTMENTS 2B 4C AND 4D.

NO OVERLOAD DEVICES ARE REQUIRED ??? ???

FOR LEGEND SEE DWG JDP-??-1A8/4

G R 52

OL

OL

9 10 11

AT 2C ONLY

5 7

6 8

#6

20 20

#12 #10

20 30

#12 #6

20 50

#6 #12

50 20

#8

#2

#6

#10

#10 #6

30 50

#12 #10

20 30

#6 #12

50 20

#3/0 #3/0

B U

S

B U

S

WITH BA

SEE DETAIL A

20 20

20 20

125/250V-3P #19/25

125V-2P #12

#19/25 125/250V-3P

#12 125V-2P

TO DC BKR 3 OR 4

722P

125V DC

2 #12

#2/0

GROUND BUS

C

C

C

C

WITH BA

A B

A B

#19/25

1E 3E 4C 2B & 2C

2 2

1 2

1 1

CONNECT TO BUS 2 IN EVEN NUMBERED SU BOARDS

CONNECT TO BUS 1 IN ODD NUMBERED SU BOARDS (AS SHOWN)

EQUIPMENT

4A1 THRU 4C

100A MAINS

3-WIRE UNGROUNDED

125/250V DC

2 #12

120V AC

NON-AUTO

3P, 100A FRAME

480-120V

1-PHASE

1 KVA

1E2

BA

3E2

BA

BKR4

BA

1 1 1 1

CHANNEL SILL

M1

FLOOR

FINISHED

1A 2A 3A 4A1 4A2

1B1 1B2 2B 3B1 3B2 4B

1C1 1C2 2C 3C1 3C2 4C

1D1 1D2 3D1 3D2 4D

1E1 1E2 2E 3E1 3E2

30"

CORPS OF ENGINEERS U.S. ARMY

SPEC. NO.

CHIEF, HYDRO-ELECTRIC DESIGN BRANCH

RTO

PREPARED:

APPROVED:

SUBMITTED:

DATEREVISION BYDESCRIPTION

CHIEF, ENGINEERING DIVISION

DATE

HEAD, ELECTRICAL SECTION

NRR

DESIGNED BY

SHEET

DRAWN BY

JDP-1-6-1A8/12

U.S. ARMY ENGINEER DIVISION, N.P.

27-1

27-1 27-1

X2

27-1

X1

52-1

Z

64-1

3A

RG

4B

52-1

M

A

500KVA-3

4.16KV-480 VOLT

BUS 1

500KVA-3

4.16KV-480 VOLT

Z

2P NON-AUTO

CIRCUIT BKRS

27-1

X1

52-3

B

27-1

X2

52-1

B

27-1

27-1

27-2

X1

27-2

27-2

X2

52-2

B

27-2

Z

Z

Z

S

N T

R

H E

M A

T I

C

52-1

A

52-1

Z

52-2

A

52-2

Z

TYPICAL

A

BELL

ALARM

FOR

FDR BKR

CONTACT

IN ACCORDANCE WITH ASA STANDARDS C37.2-1962 AND

ELECTRICALLY OPERATED DRAWOUT TYPE AIR CIRCUIT

BREAKER.

DISCONNECT DEVICE; CLOSED IN BOTH TEST AND

INDICATING LIGHTS (LETTER INDICATES COLOR)

MASTER NAMEPLATE (SEE EQUIPMENT SCHEDULE)

R

M

VS

CIRCUIT OR COMPARTMENT NO. (SEE EQUIPMENT

VOLTMETER SWITCH

NOTES

VARIATIONS IN EQUIPMENT ARRANGEMENT AND BREAKER

CONTROL WILL BE ALLOWED TO FIT MANUFACTURER'S

STANDARD CONSTRUCTION SUBJECT TO THE APPROVAL

OF THE CONTRACTING OFFICER.

1.

MINIMUM INTERRUPTING CAPACITY SHALL BE 22,000 RMS

SUPPLY AND BUS TIE BREAKERS AND 14,000 RMS

2.

3A

4A

4B

4C

4D

M

5A

6A

6B

6C

6D

7A

7C

7D

FIRST LINE

NAMEPLATE LETTERING SQ4

SECOND LINE

TRIP

RATING

(AMP)

CABLE

SIZE

4.16KV FDR

TRANS

POT TRANS

SQ4 480V

CONTROL

ALARM LIGHTS

BUS TRANSFER

SU13 480V

POT TRANS

TRANS

4.16KV FDR

BUS 2

TRANS T4

BUS 2

BUS TIE

BUS 1

RELAYS BUS 1

CONTROL CENTER

BREAKERS

RELAYS

CONTROL CENTER

CONTROL CENTER

CONTROL CENTER

SUPPLY BREAKER

CONTROL CENTER

BREAKER

SUPPLY BREAKER

CONTROL CENTER

SUPPLY BREAKER

BUS 2

BUS 2

NON-AUTO

2-#1/O

BUS

#3/O

BUS

2-#1/O

52-1TC

52-3CC

SPARE

SPARE

52-1CC

52-3TC

SPARE

SPARE

52-2TC

52-3CC

SPARE

SPARE

52-2CC

52-3TC

SPARE

SPARE

27-227-1

AND

CLOSES WHEN VOLTAGE

DROPS TO 85% NORMAL

27-227-1

AND

CLOSES WHEN VOLTAGE

INCREASES TO 90%

NORMAL

52-2

B

G

N

A U

T O

Z

52-2

52-3

B

1 52-1

C

MAN

52-3

52-1

B

NSQ

PSQ

CLOSE

T

R

27-1

X2 T

TRIP

52-1

A

27-1

X1

52-1

B

G

N

A U

T O

52-1

Z

52-1

52-2

B

C1

MAN

52-2

52-3

B

CLOSE

T

R

27-1

X1 T2

TRIP

52-3

A

27-1

X2

27-2

X1

AUTO

27-2

X2

52-2

A

52-1

A

52-1

BA

52-3

BA

52-1

B

G

N

A U

T O

Z

52-1

52-3

B

C

MAN

52-3

52-2

B

CLOSE

T

R

27-2

X2 T2

TRIP

52-2

A

27-2

X1

52-2

BA

AUTO 4

AUTO

TRANSFER RELAYS

ANN.

SPARE

52-1Z, 52-2Z, 52-3Z

N

A U

T O

FRONT VIEW AND ONE LINE DIAGRAM

ELECTRICAL BKR CONTROL SCHEMATIC DIAGRAM

BUS TRANSFER RELAYS

SCHEMATIC DIAGRAM

ALARM LIGHTS

SCHEMATIC DIAGRAM

52-1

B

52-2

B

AUTO

Z

Z

Z

52-3

A

52-3

Z

T R I

P

S U

P P

R

G N

D

F

I

P

F

A R

M

C O

N T

A C

T S

R A

L L

E L

S

N T

R

H E

M A

T I

C

ANNUNCIATION WIRING

N

A U

T O

52-1

4A

A

3C

A

3D

A

VS

V

52-3

RG

4C

A

4D

A

5C

A

5D

A

52-3

6B

A

6A

A

RG

6C

A

6D

A

7C

A

7D

A

52-2

7A5A

27-2

X1

64-2

27-2 52-2

Z

27-2

X2 27-2

8 9

SYMMETRICAL AMPERES FOR ALL DRAWOUT TYPE FEEDER

BREAKERS.

SCHEDULE)

OPERATING POSITION UNLESS MARKED AS FOLLOWS:

O-CLOSED IN OPERATING POSITION ONLY

T-CLOSED IN TEST POSITION ONLY

LEGEND

CONTACT MAN AUTO

TRANSFER CONTROL43

AUTO

MAN

MAINTAINED

CONTACTS

X

X

X

SPARE

SPARE

X

X

X

X

SPARE

BUS TIE BKR

CONTACT

TRIP

X

NEUTRAL CLOSE

X

BUS 2 SUPPLY BKR

BUS 1 SUPPLY BKR

1 52-3

1 52-2

1 52-1

NEUTRAL

TRIP CLOSE SPRING RETURN

TO NEUTRAL

3C

3D

5C

5D

TRANS T4

BUS 1

COOLING FDR 1

SUPPLY BREAKER

HIGH BAY LIGHTS

BUS TIE

SU14 480V

SU15 480V

SU16 480V

CONTROL CENTER

SUBSTATION

BAY 17-20

BREAKER

CONTROL CENTER

RELAYS BUS 2

COOLING FDR 2

NON-AUTO

NON-AUTO

NON-AUTO

NON-AUTO

#4

#3/O

#3/O

#3/O

BUS

#2

#3/O

#3/O

#3/O

#3/O

BUS

#4

EQUIPMENT SCHEDULE

C

AUTO TRIP

INDICATOR

KEY INTERLOCK

BUS 2

#2/O

#2/O

TO #2/O CONNECTOR

#2/O

CONTINUOUS

GROUND BUS

CHANNEL

SILL

FINISHED

FLOOR

2 6

52-2

KEY INTERLOCK

SHIPPING SCTIONS

BUS 2 SUPPLY BKR (52-2)BUS TIE BKR (52-3)BUS 1 SUPPLY BKR (52-1)

A L

A

G H

T S

S

H E

M A

T I

C

B

A N

S F

L A

Y S

S

H E

M A

T I

C a

J

D P

A

YY

SCALE AS SHOWN 67-B-58

SQ4

480 VOLT SUBSTATION

POWERHOUSE

COLUMBIA RIVER, WASHINGTON AND OREGON

JOHN DAY LOCK AND DAM

FOR DIV. ENGINEER 7 DEC 66

SYMMETRICAL AMPERES FOR THE DRAWOUT TYPE BUS

O O

O O

O O

O O

O O

OO

O O

O O O

O

ALARM LIGHTS

BUS 1

BUS 1

* CONTACT CLOSED WHEN BKR IS IN TEST OR DRAWOUT POSITION

27-1 X1 27-1 X2 27-2 X1 27-2 X2

PORTLAND, OREGON

1 52-1

Y32.2-1962 EXCEPT AS NOTED:

1 52-2 1 52-21 52-3

1 52-3

NO.

SU13 480V

SU14 480V

SU15 480V

SU16 480V

CHECKED BY

DESCRIPTIONREVISION DATE

SCALE AS SHOWN

DATE

SUBMITTED:

SPEC. NO.

DESIGNED BY

CHECKED BY

PREPARED:

HEAD, ELECTRICAL SECTION

CHIEF, HYDRO-ELECTRIC DESIGN BRANCH

BY

DRAWN BY

SHEET

NRR

CORPS OF ENGINEERS U.S. ARMY

POWERHOUSE

RTO

JDP-1-6-1A8/13

67-B-58

7 DEC 66APPROVED:FOR DIV. ENGINEER

CHIEF, ENGINEERING DIVISION

JOHN DAY LOCK AND DAM

COLUMBIA RIVER, WASHINGTON AND OREGON

480-VOLT CONTROL CENTERS

SU11 THRU SU16

U.S. ARMY ENGINEER DIVISION. N.P.

PORTLAND, OREGON

FRONT VIEW

DETAIL A

ONE LINE DIAGRAM

COMPARTMENTS 2B & 2C; AND 3E (SU13)

TYPICAL SCHEMATIC DIAGRAM

COMPARTMENTS 1A AND 3A IN SU15

FIRST LINENO.

SU11 480VM1

1A

1B1

1B2

1C1

1C2

1D1

1D2

1E1

1E2

2A

2B

2C

2E

SECOND LINE

CONTROL CENTER*

FIRST LINENO.

SU11 480VM1

3A

3B1

3B2

3C1

3C2

3D1

3D2

3E

4A1

4A2

4B

4C

4D

SECOND LINE

CONTROL CENTER

NAMEPLATE SCHEDULE

M1 REPLACE SU11 WITH SU12, SU13, ETC.

ID2

1E1

SEWAGE PUMP NO.4 IN SU13.3E

TEMPORARY LTG EL 168.5 GALLERY IN SU16.1B1

MG6 MOTOR SUPPLY IN SU151A

MG7 MOTOR SUPPLY IN SU153A

BLANK IN SU12, SU14, AND SU16.1B2

BLANK IN SU11, SU13, AND SU15.3B2

FOR OTHER BOARDS EXCEPT AS NOTED BELOW:

NAMEPLATES ARE SHOWN FOR SU11 AND ARE SAME

SU13, ETC.

REPLACE TR112 WITH TR122 IN SU12, TR132 IN

SU13, ETC.

REPLACE TR111 WITH TR121 IN SU12, TR131 IN

SCHEDULE

DIRECTORY

SEE

OUTGOING CABLE; NUMBER INDICATES WIRE SIZE.

OVERLOAD RELAY CONTACT.

SELECTOR SWITCH. SEE DEVELOPMENT.

AC CONTACTOR OPERATING COIL.

DC CONTACTOR OPERATING COIL.

MASTER NAMEPLATE.

TERMINAL BLOCK POINT FOR EXTERNAL CONNECTION.

LEGEND

OL

1A

M1

R

#12

AND Y32.2-1962 EXCEPT AS NOTED:

IN ACCORDANCE WITH ASA STANDARDS C37.2-1962

NUMBER INDICATES TRIP RATING.

MAGNETIC OVERLOAD DEVICES EXCEPT AS NOTED;

AIR CIRCUIT BREAKER; 3 POLE WITH THERMAL AND

RELAYS EXCEPT AS NOTED; NUMBER INDICATES NEMA SIZE.

CONTACTOR; 3 POLE, WITH MANUAL RESET OVERLOAD

SCHEDULE.

CIRCUIT OR COMPARTMENT NUMBER; SEE NAMEPLATE

X

ON OFF AUTO

X

CONTACT

AUTOON

OFF

BKR NO.

DC TURBINE BRG OIL PUMP

125V EMERG LTG

CONTACTS

MAINTAINED

DIRECTORY SCHEDULE

COMPARTMENT 4B

"125V EMERG LTG-STAIRS" IN SU16

BLANK IN EVEN NUMBERED BOARDS EXCEPT

SU12, SU14 & SU16

"125V EMERG LTG" IN

NOTES

1.

2.

3.

EACH CONTROL CENTER SHALL BE SHIPPED IN ONE PIECE.4.

OPERATING UNITS.

AND BE CONSTRUCTED TO ACCOMMODATE FUTURE

ALL EMPTY COMPARTMENTS SHALL HAVE BLANK COVERS

NONE (SEE NOTE 2)

BLANK

GEN BKR

HEAD COVER

480 VOLT

AC TURBINE

LIGHT TRANS

LIGHT TRANS

BLANK

GENERATOR

GENERATOR

GOVERNOR OIL

NONE (SEE NOTE 2)

PUMP NO.1

OUTLETS

BRG OIL PUMP

HEATERS

PUMP NO.1

EXCITATION

NONE (SEE NOTO 2)

BLANK

GEN BKR

HEAD COVER

HIGH BAY

125-250V DC

125-250V DC

125-250V DC

EMERG LTG

480 VOLT

THRUST BRG

PUMP NO.2

LIGHTS

OIL PUMP

OUTLETS

SUPPLY NO.1

SUPPLY NO.2

PANEL

CONTACTOR

COOLER

TR112

TR111

COOLER

NONE

NONE (SEE NOTE 2)

INDICATING LIGHTS; R-RED, G-GREEN.

TION SUBJECT TO APPROVAL OF THE CONTRACTING OFFICER.

BE ALLOWED TO FIT MANUFACTURER'S STANDARD CONSTRUC-

OTHERWIISE, VARIATIONS IN EQUIPMENT ARRANGEMENT WILL

THE NUMBER OF VERTICAL SECTIONS SHALL BE AS SHOWN;

AND NAMEPLATES AS INDICATED.

SU11 THROUGH SU16 WITH VARIATIONS IN BUS CONNECTIONS

THIS DRAWING IS REPRESENTATIVE OF CONTROL CENTERS

SU15 ONLY SU15 ONLY

SU13 ONLY

CHANNEL SILL

M1

FLOOR

FINISHED

1A 2A 3A 4A1 4A2

1B1 1B2 2B 3B1 3B2 4B

1C1 1C2 3C1 3C2 4C

1D1 1D2 3D1 3D2 4D

1E1 1E2 2E 3E

2C

30"60"

G R 52

3 9

1 2

OL

OL

9 10 11

SWITCH AT 2B ONLY

AT 2C & 3E (SU13) ONLY

5 7

6 8

G R 52

OL

OL

9 10 11

5 7

6 8

#6 #12

70 20

#12 #10

20 30

#12 #6

20 50

#6 #12

50 20

#8

#2

#4

#12

#10 #6

50 50

#12 #10

20 30

#6 #12

50 20

#10

SU15 ONLY

#3/0 #3/0

B U

S

B U

S

SU15 ONLY

SU13 ONLY

SEE DETAIL A

20 20

20 20

125/250V-3P #19/25

125V-2P #12

#19/25 125/250V-3P

#12 125V-2P

TO DC BKR 3 OR 4

722P

125V DC

2 #12

#2/0

GROUND BUS

C

M C

M

C

M C

M

C

C

S U

C

C

S U

S U

C

M C

M

C

M C

M S

U

AS REQUIRED

ADD'L TERMINALS

AS REQUIRED

ADD'L TERMINALS

CONNECT TO BUS 2 IN EVEN NUMBERED SU BOARDS

CONNECT TO BUS 1 IN ODD NUMBERED SU BOARDS (AS SHOWN)

4B EQUIPMENT

4A1 THROUGH

100A MAINS

3-WIRE UNGROUNDED

125/250V DC

2 #12

120V AC

NON-AUTO

3P, 100A FRAME

#10

SP20-p2-DSQ1

SP19-p1-DSQ1

SEE NOTE 3

S T

A

SP19-p1-DSQ2 SP20-p2-DSQ2

BAY 2O

CABLE TAP BOXES

480V SUBSTA SQ2

S Q p

C P

480V SUBSTA SQ1

C P p

S Q

S Q p

C P

C P p

S Q

C P p

S Q

C P p

C P

C P p

S Q

C P p

C P

S Q p

C P

C P p

C P

S Q p

C P

C P p

C P

C P p

C P

C P p

C P

C P p

C P

S P p

C P

C P p

C P

S P p

C P

C P p

C P

C P p

C P

C P p

C P

S Q p

C P

C P p

C P

S Q p

C P

C P p

S Q

C P p

C P

C P p

S Q

C P p

C P

C P p

C P

C P p

C P

C P p

C P

S Q p

C P

C P p

C P

S Q p

C P

C P p

S Q

C P p

C P

C P p

S Q

C P p

C P

C P p

C P

S P p

C P

C P p

C P

S P p

C P

C P p

C P

C P p

C P

C P p

C P

S Q p

C P

C P p

C P

S Q p

C P

C p p

S Q

C P p

C p

C p p

S Q

C P p

C p

C P p

C P

S P p

C P

C P p

C P

S P p

C P

C P p

C P

S P p

C P

C P p

C P

S P p

C P

S Q p

C P

C P p

S Q

S Q p

C P

C P

P

S Q

S Q p

C P

C P p

S Q

S Q p

C P

C P p

S Q

S P p

D S

Q

S P p

D S

Q

C P p

S Q

S Q p

C P

C P p

S Q

S Q p

C P

CABLE SHAFT

SEE UPPER TRAY P1

FOR CONTINUATION

S P p

D S

Q

S P p

D S

Q

S

T E

S

G

J

F

N T

IN

U A

T

IO

N S

P p

S Q

S P p

S Q

CP8 CP7 CP6 CP5 CP4 CP3 CP2

CP1

BAY 8BAY 9 BAY 7 BAY 6 BAY 5 BAY 4 BAY 3 BAY 2 BAY 1

SP11

SP13

SP15

SP17

SP19

SP21

SP23

SP25

SP31

SP27

SP29

SP12

SP14

SP16

SP18

SP20

SP22

SP24

SP26

SP32

SP28

SP30

480V SUBSTA SQ4 480V SUBSTA SQ3

SEE LOWER TRAY P2

FOR CONTINUATION

CP16

BAY 16

CP15

BAY 15

CP14

BAY 14

CP13

BAY 13

CP12

BAY 12

CP11

BAY 11

CP10

BAY 10

CP9

BAY 9

SP11

SP13

SP15

SP17

SP19

SP21

SP23

SP25

SP31

SP27

SP29

SP12

SP14

SP16

SP18

SP20

SP22

SP24

SP26

SP32

SP28

SP30

BUS 1

4160V SWGR SP

BUS 2

4160V SWGR SP

SP17-p1-SQ02

SP25-p1-CP1

SP27-p1-CP5

SP18-p1-SQ02

SP26-p2-CP1

SP28-p2-CP5

SP19-p1-DSQ1

SP29-p1-CP9

SP31-p1-CP13

SP20-p2-SQ01

SP30-p2-CP9

SP32-p2-CP13

JDP-1.1-6-1A11/1

JDP-1.1-6-1A11/9

JDP-1.1-6-1J11/1

DWG NO. SHEET NO.

REFERENCE DRAWINGS

1. ALL CABLES SHOWN ON THIS DRAWING ARE ARMORED.

IN EXISTING TRAYS IN THE ADJACENT STRUCTURE. SEE DWG 1A11/9.

3. CABLES EXTENDING BEYOND THE POWERHOUSE ARE TO BE INSTALLED

ING OF CABLES.

TO ALLOW SPACE FOR FUTURE CABLES AND TO MINIMIZE CROSS-

4. ROUTING SHOWN SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE

NOTES:

REVISION DATE DESCRIPTION BY

DESIGNED BY RGM

DRAWN BY RPG

CHECKED BY JRK

PREPARED:

HEAD, ELECTRICAL SECTION

SUBMITTED:

CHIEF, HYDRO-ELECTRIC DESIGN BRANCH

INV. NO.-CIVENG 45-164-66-28

U.S. ARMY ENGINEER DIVISION, N.P.

APPROVED:FOR DIV. ENGINEER DATE

CHIEF, ENGINEERING DIVISION

SHEET 114

5 JAN 66

SCALE AS SHOWN SPEC. NO.

JDP-1.1-6-1A11/8

CORPS OF ENGINEERS U.S. ARMY

PORTLAND, OREGON

AS CONSTRUCTED

HYDRO ELECTRIC DESIGN BRANCH, NPD

DATE BY

TRAY P1

(UPPER LEVEL)

4.16KV POWER CABLES

CABLE ARRANGEMENT

COLUMBIA RIVER, WASHINGTON AND OREGON

JOHN DAY LOCK AND DAM

POWERHOUSE

SWITCHGEAR AS SHOWN ON THE APPLICABLE CONTRACT DRAWINGS.

EXPOSED TO BAY 10, EL 251 AND TERMINATED IN SQ02

2. CABLES LEAVING TRAY P2 IN BAY 9 ARE TO BE ROUTED

137 138

TRAY P2

(UPPER LEVEL)

TRAY IG2

(LOWER TRAY)

DESCRIPTION BYREVISION DATE

SHEET

DATE

SUBMITTED:

AS SHOWN

CHECKED BY

DRAWN BY

DESIGNED BY

HEAD, ELECTRICAL SECTION

SCALE

JJC

RGM

U.S. ARMYCORPS OF ENGINEERS

PORTLAND, OREGON

U.S. ARMY ENGINEER DIVISION, N.P.

DATE BY

HYDRO ELECTRIC DESIGN BRANCH, NPD

AS CONSTRUCTED

COLUMBIA RIVER, WASHINGTON AND OREGON

RCM

JOHN DAY LOCK AND DAM

POWERHOUSE

INV. NO. -CIVENG 45-164-66-28

15 OCT 75

J

D P

D

JDP-1.1-6-1D11/4

PREPARED

EL 168.5

CHIEF, HYDRO-ELECTRIC DESIGN BRANCH

APPROVED:

CHIEF, ENGINEERING DIVISION

SPEC. NO.

DWG NO.

REFERENCE DRAWINGS

JDP-1.1-6-1A11/2

SHEET NO.

JDP-1.1-6-1A11/5

JDP-1.1-6-1D11/5

JDP-1.1-6-1D11/11

JDP-1.1-6-1E11/1

JDP-1.1-6-1E11/2

7. FOR EQUIPMENT INSTALLATION DETAILS OF ELEC. SHOP SEE 1D1/3 & 2D1/5.

6. SUPPORT CONDUIT FROM CEILING WITH HANGERS AS SHOWN

IN DETAIL A, DWG 1D11/11. INSTALL 5'-0" O.Z. PBW 300 PULL

BOX NEAR CONNECTION TO EMBEDDED CONDUIT.

5. SURFACE MOUNT 52151 WITH BLANK COVER OVER CONDUIT

CONDUCTOR WIRE. SUPPORT CABLE WITH CGB TYPE CONNECTOR.

4. SECURE 72171 OVER CONDUIT CRO2-s6, 1" AND SPLICE

CONDUIT TO TRAY AS SHOWN.

3.

LOCKWASHERS AND HEX NUTS.

2. FIELD DRILL AND TAP CHIMNEY STRUCTURAL MEMBERS 10-24

1.

SCREWS, SHAKEPROOF LOOK WASHERS.

NOTES

SECTION F-F

SCALE 1"=1'-0"

SECTION G-G

SCALE 1"=1'-0"

1 MK 1-16

1 MK 2-1

3 MK 1-17

3 MK 2-2

3 MK 1-16

3 MK 2-1

3 MK 1-16

3 MK 2-1

3 MK 1-16

1 MK 2-1

2 MK 2-5

1 MK 2-31

NO SCALE

DETAIL A

NO SCALE

PLAN EL. 168.5

SECTION J-J

SCALE 1"=1'-0"

SECTION H-H

SCALE 1"=1'-0"

81 88 90 91 146 151 152 161 163 164

INCL

AS REQ'D

1"=1'-0"

4' 0 4' 8'

1' 0 1' 2'

GRAPHIC SCALES

SCALE ‚"=1'-0"

‚"=1'-0"

4 #10 WIRES TO 4c #19/22 CABLE IN BOX. EXTEND 1‚"

RC-uc3, ƒ" & SPLICE CODE CALL 2 CONDUCTOR CABLE TO SINGLE

FIELD DRILL FSC TOP PANELS TO MATCH ‹" DIA HOLES IN

TO MATCH EXISTING ‚" DIA. HOLES IN THE COVER PLATES

AND FASTEN PLATES WITH 10-24X•" R.H. MACHINE

MK 3-1 AND FASTEN WITH …-16 H.H. MACHINE SCREWS,

JY-MFB EQUIPMENT INSTALLATION

STATION SERVICE & ASSEMBLY BAYS

DRL2 21 JAN 87

ADDED SECT. K-K., RELOCATED D.C. TEST STATION

A-A (1) B-B (3) C-C (2) D-D (14) E-E (5)

FOR TRAY SYSTEM GENERAL NOTES SEE DWG. 1A11/2.

ADDED CONDUIT RUNS RC-uc-4.4; SU1-f3, & TB3-tt4.4

5 JAN 66

FOR DIV. ENGINEER

SECTION K-K

C

EDGE OF 18"

TRAY BELOW

C

B

B

A

A

B

B

H

D D

H

D

D11

D

D11

B

D11

E

D11

A

D11

C

D11

B

D11

E

D11

A

D11

C

D11

D D

K

K

E

E

FF

161161

(EXPOSED ON CEILIING BELOW0

FRONT

RC-uc-4.4, ƒ"

SU1-f3, ƒ" &

SEE NOTE 7

72171

SEE NOTE 4

FOR CONTINUATION

SEE DWG 1D11/5

F

N T I

N U

A T I

O N

S

G

E

E

SP16-p1-SQO1, 3"

(EXPOSED ON CEILING BELOW)

SP BUS 2

CROSS TRAY

@ EL 177.50

SP21-p1, 3"

(SEE NOTE 6)

D.C. TEST STATION. MOUNT TO

COLUMN WITH BACK FIELD DRILLED

TO SUIT FOR CONDUIT ENTRANCE

D.C. TEST STATION REMOUNT

W/ CONCRETE ANCHORS

CENTERED ON COLUMN.

ASSEMBLY BAY

EL. 168.5

CABLE TRAY

S T

SLOPE SLOPE

BOX ON CEILING

(SEE NOTE 5)

CONNECT TO EMBEDDED

3" CONDUIT EL 181.5

FOR CONTINUATION

SEE DWG 1A11/5

FSC

S T

A

3"

3"

3"

22'-3"9'-6"

6'-1" 6'-1"

3'-0"8'-3"3'-0"

31'-6"

SP BUS 1

5'-6"

8'-0"3'-2"3'-0"

TB3-tt4.4, ƒ"

TB3-tt4.4, ƒ"

54"

EL 168.5

SP15-p1-SQO1, 3"

EL 177.5

J

J

G

G

MOUNTED ON

JUNCTION BOX

COVER. SEE

DETAIL A FOR

JUNCTION BOX.

MK2-9

EMBEDDED

INSERT

USE RIGHT ANGLE TYPE

CONDUIT CLAMP

SEE NOTE 4

EMBEDDED

INSERT

MK1-8

MK1-6

4160V 3 CONDUCTOR

ARMORED CABLE

EL. 177.50

EL. 178.25

EL. 179.00

WALL OPENING

MK1-8

1"

EL. 177.50

EL. 178.25

EL. 179.00

OPENING TO BE CUT

IN FIELD TO SUIT

MK8-3

(BOTH SIDES)

SEE DETAIL B

DWG 1A11/2

EL. 177.50

FSC SWBD

MK8-1

MK3-1

B.E.

MK3-1

MK8-2

FSC SWBD

SEE NOTE 2

MK8-1

SEE NOTE 2

APPROX EL. 176.

SEE NOTE 3

RC-uc-4.4, ƒ"

SU1-f3, ƒ"

TB3-tt4.4, ƒ"

CRO2-r6, 1‚"

12"

21"12" 3"

CODE CALL BELL-

MK8-43

MK2-26

CEILING EL. 182.0

EL. 179.0

EL. 178.25

EL. 177.50

EL. 180.50

EL. 179.75

EL. 179.00

EL. 179.00

EL. 178.25

EL. 177.50 EL. 177.50

(24" TRAY)

(24" TRAY)

(18" TRAY)

1" CND, FIELD DRILL

AS REQ'D

4" SQUARE OPENING

IN BACK

8"X10"X4" DEEP

TERMINAL BLOCK

2"

JUNCTION BOX

C O

L U

M B

IA

R

IV

E R

O R

E G

O N W

A S

H

IN

G T

O N

P O

R T

L A

N D D

IS

T R

IC

T

P O

R T

L A

N D

O R

E G

O N

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

PORTLAND DISTRICT

J

H N D

A Y L

O C

K A

N D D

W E

R H

O U

M U

N R

O E

A N

S I D

A L

JDP-1.1-6-1D21/1

D

P 1.

1-

1D

1/

J D

P 1.

1-

1D

1_

1.

d g n

F

E B

J

U N

J

A N

C

A D

D

E D

E

Q

O 1-a

C Q

O

S T

A T

IO

R V

IC

N T

R A

C T

A N

N U

N C

IA

T

IO

V

IS

IO

N

R E

D R

A W

U P

D A

T

IE

R

IF

A

IC

A T

IO

N J

G M

D R

L

H O

K

D Q

S Q

O

O N

E L

IN

E D

IA

G R

A M

S Q S

W

IT

C H

G E

A R R

E P

L A

C E

M E

N T

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

SHEET OF

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

C Q

O

C Q

O

S O

U

O R

E

C Q

O

S Q

O q

C Q

O

C Q

O

27X27X

VS

V

52-3 Z

52-2 Z

52-1 Z

S Q c

C Y

O

C

C Q

O

I

P

A N

N U

N C I

A T I

O N

S B e

S Q

O

C Q

O

C Q

O

C Q

O

C Q

O

S Q

O q

C Q

O

C Q

O

BKR BELL ALARM

CONTACTS

INDICATING

LAMPS

BELL ALARM

52-3

52-2

BUS 2BUS 1

175400175 350 400250

2P NON-AUTO

BKRS

750KVA, 4.16KV-480V

S P p

S Q

O

27X27X

52-1

S Q

O q

C Q

O

S Q

O q

C Q

O

S Q

O q

C Q

O

S Q

O q

C Q

O

S Q

O q

C Q

O

S Q

O q

C Q

O

S Q

O q

D Q

S Q

O q

C Q

O

S P p

S Q

O

S Q

O u

S P

C C

M

M

M

M

F R

E I

G H

T

E L

E V

A T

O R

S Q

O q

S Q

O q

C Q

O

C Q

O

M

C Q

O

S Q

O q

C Q

O

S Q

O q

D Q

M S

O U

O R

E

S Q

O q

C Q

O

M C

Q O

S P

A R

E

C Q

O

S Q

O q

C Q

O

C Q

O

S Q

O q

C Q

O

M

D E S

IG

IL

E c p w w o r k p w n w p g h d c c l g d m s J

D P

D d g n

SHEET NAME: Standard_SheetBY USERNAME: g2hdcclg Chuck GierekDATE AND TIME PLOTTED: 8/19/2016 12:01:42 PM

Contact Drafting staff for plan status

AS-BUILT PLAN

INTERIM

UNAPPROVED,

DATE

SUBMITTED:

AS SHOWN

CHECKED BY

DRAWN BY

DESIGNED BY

HEAD, ELECTRICAL SECTION

SCALE

JWC

EMS

JRK

U.S. ARMYCORPS OF ENGINEERS

PORTLAND, OREGON

U.S. ARMY ENGINEER DIVISION, N.P.

DATE BY

HYDRO ELECTRIC DESIGN BRANCH, NPD

AS CONSTRUCTED

COLUMBIA RIVER, WASHINGTON AND OREGON

5 JAN 1966

RCM

JOHN DAY LOCK AND DAM

POWERHOUSE

INV. NO. -CIVENG 45-164-66-28

15 OCT 75

J

D P

D

JDP-1.1-6-1D24/2

STATION SERVICE AUXILIARIES

CONTROL DIAGRAMS

PREPARED

SEPTIC TANK EFFLUENT PUMPS

CQO2

STA. SERVICE

FOR GENERAL NOTES AND LEGEND SEE DWG JDP-1.1-6-1A0/11.

NOTES

DRAWING NO.

REFERENCE DRAWINGS

JDP-1-3-8/42

SHEET NO.

JDP-1.1-3-9/67

JDP-1.1-3-9/85

JDP-1.1-3-9/86

MAINTAINED

CONTACT

1 X

X

X

X

X

X

X

X

CONTACTS

NO 2

LEAD

NO 1

LEAD

STA AIR COMP43HA

MAINTAINED

ONCONTACT

1 X

CONTACTS

AUTOON

1UW1

OFF

OFF AUTO

X

1UW2

1EP4

1EP2

1EP1

HYPOCHLORINATOR1HY

SEWAGE PUMP NO 4

MAINTAINED

HANDCONTACT

CONTACTS

AUTOHAND

1PA2

OFF

OFF AUTO

X

1PA1

4 X

X

UNWATER PUMP43UW

SEWAGE PUMP43EP

TIMING RELAY FOR COMPRESSOR NO.3 TO BE SET FOR2.

30 MINUTES.

60B VOL. IV, CONT. 64-20

1 X

CONT. NO.1 NO.2

1 X

X

NO.1

LEAD

NO.2

LEAD

43FA S/S AIR COMPS.

X

X

X

X

X

X

X

X

X

X

CONT. HAND AUTO

1 X

X

HAND AUTO

X

X

PA1 S/S AIR COMP. NO.1

PA2 S/S AIR COMP. NO.2

OFF

OFF

SEWAGE TANK HYPOCHLORINATOR

SEPTIC TANK SEWAGE PUMP

SU13

BAY 13

SEPTIC TANK SLUDGE PUMP

CQO2

START-STOP PUSHBUTTON STATION,PB2

MOMENTARY CONTACT WITH STOP LOCKOUT

START-STOP PUSHBUTTON STATION,PB3

MOMENTARY CONTACT WITH RED

INDICATING LIGHT.

LEAD PRESSURE SWITCHPS1-

CLOSE 100 PSI OPEN 110 PSI

LA6 PRESSURE SWITCHPS2-

CLOSE 98 PSI OPEN 108 PSI

LOADS AND UNLOADS NO.1 COMPRESSOR IN HAND OPERATIONPS3-

CLOSES 100 PSI OPENS 110 PSI

LOADS AND UNLOADS NO.2 COMPRESSOR IN HAND OPERATIONPS4-

CLOSE 100 PSI OPENS 110 PSI

52C-COMPRESSOR STARTERS

G-GREEN LIGHT

R-RED LIGHT

2-SHUT DOWN TIMER 0-30 MINUTES

20-UNLOADER PILOT VALVE

LWP-LOW WATER PRESSURE SWITCH

HA-HIGH AIR TEMPERATURE SWITCH

RT-RUN TIMER

PS-PRESSURE SWITCHES

WIRE NOS. WITH NO.1.

PREFIX ARE ASSIGNED

NOTE:

TO WIRES WHICH ARE

COMMON TO BOTH

CONTROL CIRCUITS.

TEST RESET PUSHBUTTON

STATION WITH MAINTAINED CONTACTS

PB4-

UNWATERING PUMPS

CPO

SHEET 2

CHIEF, HYDRO-ELECTRIC DESIGN BRANCH

APPROVED:

CHIEF, ENGINEERING DIVISION

SPEC. NO.

3 26 JUN 81

4 23 MAR 82

DRL

6 20 APR 83

DRL

DRL

REVISED AS CONSTRUCTED., REVISED SCHEMATICS

RB

RB

4 FEB 83

4 MAY 81 ADDED TIME METERS

MINOR REVISION

ADDED TIME METER

ADDED NEW STA AIR COMP SCHEMATIC

STA. AIR COMP. WIRING CHANGE

6-13-85

DRL

DRL

DRL

RAM

TLS

4-8-91

2-1-89

1-26-89

2-9-88

REVISED AS CONSTRUCTED

REVISED AS CONSTRUCTED PER M.O. 55422

WIRING CHANGE REVISION, X3 & X4

RAM

1-7-87

5-29-85

5-22-85

ADDED 43DT RELAY

WIRING MOD. S.S. AIR COMP.

WIRING MOD. S.S. AIR COMP.

WIRING CHANGE S.S. AIR COMP.

DRL

FOR DIV. ENGINEER

STATION SERVICE AIR COMPRESSOR PER M.O. 55424

EFFLUENT PUMP NO 1

EFFLUENT PUMP NO 2

UNWATER PUMP NO 1

UNWATER PUMP NO 2

STA AIR COMP NO 1

STA AIR COMP NO 2

NO 2 LEADNO 1 LEAD

43DT DRAFT TUBE CUSHION

CUSHION

DRAFT TUBE

(HIGH) (LOW)

SUMP

NORMAL

MAINTAINED CONTACTS

CONTACTS LOWHIGH

X

X

X

X

X

X

X

X

X

X

11 X

12 X

3. THIS DRAWING INCLUDES INFO FROM SUPERSEDED DRAWING JDP-3-6-9A24/2

15 9-28-12 INCORPORATED CONTROLS FROM JDP-3-6-9A24/2, & REVISIONS BY D.Q.

UNWATERING PUMPS 1 & 2

63M

LOW SUMP (NORMAL)

LAG (P7) ON 44' OFF 37'

LEAD (P6) ON 42' OFF 37'

HIGH SUMP

LAG P18B ON 64' OFF 61'

LEAD P18A ON 63' OFF 60'

63MA

(P6) 46.5'

ALARM

HIGH LEVEL

(P7) 70.3'

L.T. FISHER

R.C. SCHUKNECHT

GORDON H. FERNALD, JR.

E.M. SKURDAHL

CAR

EP2

OL2

EP1

OL1OL1

OL1

OL1

1EP1

1 2

EP1

G

EP1

R TM

M A

6 7

8 9

5 6

EP2

GRTM

EP2

A 2 1 M

1EP2

1 1

OL2

EP1

EP2

43EP

3 4

CR3 CR4

7 8

OL2

OL2

EP3

OL3OL3

EP3

G R

PB2

(PUMP)

R

PB3

(TAILRACE DECK)

EP3

EP3

EP3

UN1

4160-120V

UW1

EP4

OL

OL

EP4

G X

R

EP4

EP4

TM

X1

TM

PS2

PS1 X2

1EP4

BU

PS3

ANN

T11A

APS17

LEVEL SEQUENCE

OF PS OPERATION,

SEE DWG 9/67

FOR PRESSURE

SWITCH SETTINGS

OPENS CLOSES

PS3

PS1

PS2

OL1OL1

4.16KV

X1

UW1

X1

R G

X1

OL1

X1

OL1

UW1

RES.

5 11 12 5

OL2

OL2

2 1

8 8

RG 52

UW2

RES.

X2 X2

DOOR INTERLOCK

1UW1 1UW2

43UW

X2

UW2

X2

OL2 OL2

UW2

UW2

4160-120V

4.16KV

SEE DWG…