A.07.24_W9127N-17-R-0003_Amendment_0004.pdf

PDF 1000 KB Posted

Attached to
The Dalles Arc Flash Hazard Reduction
Solicitation number
W9127N-17-R-0003
Issued by

About this file

W9127N-17-R-0003 Amendment 0004

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: THE DALLES ARC FLASH HAZARD REDUCTION

SEE CONTINUATION PAGES

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-17-R-0003

X 9B. DATED (SEE ITEM 11)

10-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Sep-2017

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-17-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 25-Sep-2017 04:00 PM to 28-Sep-2017 04:00 PM.

The following have been added by full text:

AMENDMENT 0004

1. This Amendment is issued to update the plans and specifications.

2. Technical Specification Section 27 21 10.00 26 has been added.

3. Attachment A1, Submittal Register has been updated in its entirety.

4. Drawings E-801 and E-802 have been updated.

5. The proposal due date is extended from 25 September 2017 to 28 September 2017 at 4:00 PM local time.

6. All other terms and conditions remain unchanged.

(End of Summary of Changes)

The Dalles Arc Flash Hazard Reduction Project

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00.00 25 CONTRACT ADMINISTRATION DATA

01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS

01 11 00.00 25 SUMMARY OF WORK

01 22 00.00 25 MEASUREMENT AND PAYMENT

01 32 01.00 25 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 25 QUALITY CONTROL

01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 57 20.00 25 ENVIRONMENTAL PROTECTION

01 78 23.00 25 OPERATION AND MAINTENANCE DATA

01 78 39.00 25 PROJECT RECORD DOCUMENTS

DIVISION 02 - EXISTING CONDITIONS

02 82 14.00 25 ASBESTOS ABATEMENT WORK

02 83 13.00 20 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 60 00.00 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND

EQUIPMENT FOUNDATIONS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 00.00 26 ELECTRICAL EQUIPMENT AND WORK

26 05 19.00 26 INSULATED WIRE AND CABLE

26 05 26.00 26 GROUNDING

26 08 01.00 26 FIELD TESTING

26 13 13.00 26 METAL CLAD SWITCHGEAR

26 28 00.00 26 SWITCHBOARDS

DIVISION 27 - COMMUNICATIONS

27 21 10.00 26 FIBER OPTIC DATA TRANSMISSION SYSTEM

DIVISION 33 - UTILITIES

33 72 33.14 26 POWER SYSTEM RELAY PROTECTION AND METERING

33 75 10.00 26 MOTOR OPERATORS FOR HIGH VOLTAGE GROUND DISCONNECT SWITCH

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 27 - COMMUNICATIONS

SECTION 27 21 10.00 26

FIBER OPTIC DATA TRANSMISSION SYSTEM

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.1.1 General

1.2 REFERENCES

1.3 SUBMITTALS

1.4 QUALIFICATIONS

1.5 MANUFACTURER'S CATALOG DATA

1.6 MATERIAL AND EQUIPMENT LIST

1.7 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 GENERAL

2.2 FIBER OPTIC CABLE

2.2.1 General

2.2.2 Single-mode Fiber Optic Cable

2.2.3 Cable Construction

2.3 PATCH PANELS

2.3.1 General

PART 3 EXECUTION

3.1 FIBER OPTIC CABLE INSTALLATION

3.1.1 General

3.1.2 Installation Procedures

3.1.3 Cable Installation Plan

3.1.4 Service Loops

3.1.5 Splices

3.1.6 Identification and Labeling

3.2 FIBER TEST

3.2.1 General

3.2.2 Fiber Test Plan

3.2.3 Fiber Field Test

3.2.3.1 General

3.2.3.2 Optical Time Domain Reflectometer Tests

3.2.3.3 Power Attenuation Test

3.2.4 Fiber Test Report

3.3 OPERATIONS AND MAINTENANCE MANUAL

3.4 ACCEPTANCE

-- End of Section Table of Contents --

SECTION 27 21 10.00 26 Page 1

ADDED BY AMENDMENT AMD# 0004

SECTION 27 21 10.00 26

FIBER OPTIC DATA TRANSMISSION SYSTEM

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.1.1 General

This Section covers fiber optic cable installation and testing requirements.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the ASIC designation only.

ELECTRONIC INDUSTRIES ALLIANCE (EIA)

ANSI/TIA-455-80C (2003) FOTP-80 - IEC 60793-1-144 Optical fibres Part 1-44: Measurement Methods and Test Procedures - Cut-off Wavelength

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

TIA-455-104 (2016b) Standard for FOTP-104 Fiber Optic Cable Cyclic Flexing Test

TIA-455-13 (1996a; R 2012) FOTP-13 Visual and Mechanical Inspection of Fiber Optic Components, Devices, and Assemblies

TIA-455-177 (2003b) FOTP-177 IEC-60793-1-43:

Measurement Methods and Test Procedures - Numerical Aperture

TIA-455-78-B (2002) FOTP-78 Optical Fibres - Part 1-40: Measurement Methods and Test Procedures - Attenuation

TIA-455-91 (1986; R 1996) FOTP-91 Fiber Optic Cable Twist-Bend Test

TIA-606 (2012b; Add 1 2015) Administration Standard for the Telecommunications Infrastructure

TIA/EIA-455-171 (2001a) FOTP-171 - Attenuation by Substitution Measurement for Short-Length

SECTION 27 21 10.00 26 Page 2

Multimode Graded-Index and Single-Mode Optical Fiber Cable Assemblies

TIA/EIA-455-25 (2016d) FOTP-25 Impact Testing of Optical Fiber Cables

TIA/EIA-455-41 (1993a; R 2013) FOTP-41 Compressive Loading Resistance of Fiber Optic Cables

TIA/EIA-455-88 (2001) FOTP-88 Fiber Optic Cable Bend Test

UNDERWRITERS LABORATORIES (UL)

UL 1666 (2007; Reprint Jun 2012) Test for Flame Propagation Height of Electrical and Optical-Fiber Cables Installed Vertically in Shafts

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following must be submitted in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Cable Installation Plan; G, HDC Cable Installation plan must be submitted at least 30 calendar days prior to installation.

Fiber Test Plan; G, HDC Fiber test plan must be submitted at least 14 calendar days prior to the start of testing.

SD-03 Product Data

Manufacturer's Catalog Data; G, HDC Manufacturer catalog data must be submitted at least 30 calendar days prior to installation.

Material and Equipment List; G, HDC Material and Equipment List must be submitted 30 day after the award of the Contract.

SD-06 Test Reports

Fiber Test Report; G, HDC The final performance verification test report must be delivered 15 days after completion of testing.

SD-07 Certificates

Qualifications; G

SD-08 Manufacturer's Instructions

Installation Procedures; G, HDC

SECTION 27 21 10.00 26 Page 3

SD-10 Operation and Maintenance Data

Operations and Maintenance Manual; G, HDC The Operations and Maintenance Data must be delivered 30 days after installation and testing of all fiber optic equipment.

1.4 QUALIFICATIONS

a. Cable installation and termination work must be performed by construction personnel who have had at least 3-years experience in placing cables in conduit, cable trays, and underground duct systems.

b. Fiber optic cable splices, terminations, and testing must be made by journeymen cable splicers who have had a minimum of 1-year experience in splicing and terminating fiber optic cables. Personnel working pursuant to this Section, may at the Contracting Officer's option, be required to demonstrate technical competence by performing sample work and/or by displaying their state qualifications/certificates, at no additional cost to the Government.

1.5 MANUFACTURER'S CATALOG DATA

Manufacturer's Catalog Data composed of catalog cuts, brochures, circulars, specifications, product data, and printed information in sufficient detail and scope to verify compliance with the requirements of the Contract documents must be submitted prior to construction. Standard catalog data will not be acceptable unless irrelevant parts are marked out and relevant parts are clearly identified. Manufacturer's catalog data must be included in the required Operations and Maintenance Manual.

1.6 MATERIAL AND EQUIPMENT LIST

A complete itemized listing of equipment and materials proposed for incorporation into the work. Each entry must include an item number, the quantity of items proposed, and the name of the manufacturer complete with make and model of each item. Materials and equipment must conform to the respective publications and other requirements specified below and in the material and equipment list. Materials and equipment not listed below must be as specified elsewhere in this Section.

1.7 DELIVERY, STORAGE, AND HANDLING

The fiber optic cables must be furnished one length to a reel or coil.

Each length, and the outside of each reel or coil, must be plainly marked or tagged to indicate the cable length, cable type, number of fibers, and manufacturer's lot number and reel number. Reels shall remain the property of the Contractor.

PART 2 PRODUCTS

2.1 GENERAL

All fiber optic cable and associated equipment in this section must be provided by the Contractor and must conform to the requirements specified herein. Material and equipment characteristics, must be as indicated on the drawings, or as specified under the detailed requirements of these specifications for the particular construction or use, unless otherwise stated.

SECTION 27 21 10.00 26 Page 4

2.2 FIBER OPTIC CABLE

2.2.1 General

a. Optical fibers must be coated with a suitable material to preserve the intrinsic strength of the glass. The outside diameter of the glass-cladded fiber must be nominally 125 microns, and must be concentric with the fiber core. Optical fibers must meet TIA-455-78-B, and TIA-455-177.

b. Each fiber must be protected by a protective buffer tube. Cable and fiber protective covering must be free from holes, splits, blisters, and other imperfections. The covering must be flame retardant, moisture resistant, non-nutrient to fungus, ultraviolet light resistant as specified and nontoxic. Mechanical stress present in cable must not be transmitted to the optical fibers. Strength members must be non-metallic and must be an integral part of the cable construction.

The combined strength of all the strength members must be sufficient to support the stress of installation and to protect the cable in service. The cables must have a minimum storage temperature range of minus 40 to plus 158 degrees F. All cables furnished must meet the requirement of NFPA 70. Fire resistant characteristics of cables must conform to Article 770, Sections 49, 50, and 51. Cables must be from the same manufacturer, of the same cable type, and of the same size unless otherwise noted on the drawings or in this specification. Each fiber and protective coverings must be continuous with no factory splices. The manufacturer must certify fiber optic cable assemblies, including jacketing and fibers to have a minimum life of 30 years.

Ensure cables meet UL 1666. Certify fiber optic cable to meet the following: TIA-455-13, TIA/EIA-455-25, TIA/EIA-455-41, TIA-455-177, TIA-455-78-B, TIA/EIA-455-88, TIA-455-91, TIA-455-104, and

TIA/EIA-455-171.

c. Fiber optic cable must be rated for both indoor and outdoor applications. The cable must be rated to withstand temperatures of minus 40 to plus 185 degrees F. Equipment must be rated for continuous operation under the ambient environmental temperature, pressure, humidity, and vibration conditions specified or normally encountered for the installed location.

2.2.2 Single-mode Fiber Optic Cable

Use conductors that are single-mode, solid glass waveguides with a nominal core diameter of 8.3 microns. Ensure the fiber has transmission windows centered at 1310 and 1550 nanometer wavelengths with a numerical aperture minimum of 0.10. The attenuation for indoor/outdoor cable at 1310 and 1550 nanometers is 0.5 dB/Km or less. Certify the fibers to meet ANSI/TIA-455-80C. The number of fibers in each cable must be 12.

2.2.3 Cable Construction

Fiber optic cables installed must be low-smoke zero-halogen, loose tube, indoor/outdoor rated, single-mode (fiber category OS2), and have a flame-retardant jacket. Polyvinyl chloride (PVC) is not acceptable as a jacket material. Corning part number 012EUZ-T4101D2N_NAFTA_AEN or approved equal.

SECTION 27 21 10.00 26 Page 5

2.3 PATCH PANELS

2.3.1 General

Terminate fiber optic cables to existing patch panels in the warehouse building and the SCADA Rack in the 7th floor cable spreading room, station service bay. Ensure the integrity of the housing, terminations, splice storage, routing, radius limiting, cable fastening, storage, and cross-connection is maintained as a complete system.

PART 3 EXECUTION

3.1 FIBER OPTIC CABLE INSTALLATION

3.1.1 General

a. The Contractor must obtain from the manufacturer an installation manual or set of instructions which addresses such aspects as cable construction, insulation type, cable diameter, bending radius, cable temperature, lubricants, coefficient of friction, conduit cleaning, storage procedures, moisture seals, testing for and purging moisture, etc.

b. Cable installation and applications must meet the requirements of NFPA 70, Article 770, Sections 52 and 53. Cables not installed in conduits must be properly secured and neat in appearance, and if installed in plenums or other spaces used for environmental air, must comply with NFPA 70 requirements for this type of installation. The cable must not be forced around sharp corners, or tugged during installation. The cable must not be kinked or crushed and the maximum pulling tension and minimum bend radius of the cable must not be exceeded at any time during installation. The minimum bend radius must be as specified by the cable manufacturer, or 20 times the cable's outside diameter if not specified. If a cable lubricant is required, it must be compatible with the cable sheathing material. Pulling fixtures must be attached to the cable strength members. If the cable is pulled out of a junction or pull box the cable must be protected from dirt and moisture by laying the cable on a ground covering in a figure-eight configuration such that the cable's minimum bend radius is not exceeded. In such a case, the cable must be protected from vehicular and public traffic. The completed cable installation must provide protection from abrasion and sharp edges.

c. Cable must be installed strictly in accordance with the cable manufacturer's recommendations. Each circuit must be identified by means of a fiber, laminated plastic, or non-ferrous metal tags, or approved equal, in each cable vault, handhole, junction box, and each termination. Each tag must contain the following information: cable type, circuit number and cable destination.

d. Cable Inspection. The cable reel must be inspected for correct storage positions, signs of physical damage, and broken end seals. If end seal is broken, moisture must be removed from cable in accordance with the cable manufacturer's recommendations.

3.1.2 Installation Procedures

a. Where installation procedures or part of the installation procedures are required to be in accordance with manufacturer's instructions, SECTION 27 21 10.00 26 Page 6 submit printed copies of those instructions prior to installation.

Installation of the item must not proceed until manufacturer's instructions are received. Failure to submit manufacturer's instructions shall be cause for rejection of the equipment or material.

b. System components and appurtenances must be installed in accordance with the manufacturer's instructions and as shown. Interconnections, services, and adjustments required for a complete and operable data transmission system must be provided. The installation and testing of fiber optic cable and associated components must be accomplished by an installer who has documented training and experience in the installation and testing of this equipment. See the qualifications section within this specification for installer expertise requirements. Documentation must be furnished for review and approval prior to start of fiber optic equipment installations.

3.1.3 Cable Installation Plan

Contractor must prepare and submit a cable installation plan for all fiber optic cable pulls prior to construction. The Fiber Optic Cable installation plan must include at a minimum:

a. Site layout cable installation drawing with pulls identified in numeric order of expected pulling sequence and direction of cable pull.

b. List of cable installation equipment.

c. Lubricant manufacturer's application instructions.

d. Procedure for resealing cable ends to prevent moisture from entering cable.

e. Cable pulling tension calculations of all cable pulls.

f. Cable minimum bend radius and minimum diameter of pulling wheels used.

g. Maximum allowable pulling tension on the cable.

h. Maximum allowable pulling tension on pulling device.

3.1.4 Service Loops

Each fiber optic cable over 100ft. must have 15-foot service loops at each end unless indicated otherwise on the contract drawings. In addition, a minimum of 3 feet of contingency slack must be provided in each pull or junction box.

3.1.5 Splices

No splices will be permitted. Contractor shall be responsible for furnishing and installing new cable should any be damaged during installation or fail required testing.

3.1.6 Identification and Labeling

Identification tags or labels must be provided for each cable and/or fiber. Markers, tags and labels must use indelible ink or etching which

SECTION 27 21 10.00 26 Page 7 will not fade in sunlight, or in buried or underground applications.

Markers, tags, and labels must not become brittle or deteriorate for a period of 20 years. Label all termination blocks and panels with cable number or pair identifier for cables in accordance with TIA-606 and as specified. The labeling format must be as indicated on the drawings and a complete record must be provided to the Government with the final documentation. Each cable must be identified with type of signal being carried and termination points.

3.2 FIBER TEST

3.2.1 General

Fiber testing must be performed in the presence of the Government Quality Assurance Representative in accordance with the fiber test plan. The Contractor must notify the Government Quality Assurance Representative (GQAR) seven days prior to conducting tests. The Contractor must furnish all materials, labor, and equipment necessary to conduct tests. The Contractor must perform all tests including on-site tests and inspection recommended by the manufacturer unless specifically waived by the Government Quality Assurance Representative. The Contractor must maintain a written record of all tests that includes date, test performed, personnel involved, devices tested, serial number and name of test equipment, and test results for test reports and installation test reports. All test reports will be signed and dated by the Contractor.

3.2.2 Fiber Test Plan

Contractor must prepare and submit a fiber test plan that includes, at a minimum, a schedule of when tests will be performed relative to installation milestones, specific test procedure that will be used, a list of test equipment that will be used including manufacturer, model number, range, resolution accuracy, certificate of calibration and must conform to the specified requirements. The plan must be submitted prior to installation.

3.2.3 Fiber Field Test

3.2.3.1 General

The Contractor must verify the complete operation of the data transmission system prior to formal acceptance testing and recorded in the Fiber Test Report. These tests must be performed on each link and repeated from the opposite end of each link (bi-directional). Tests must be performed at both wavelengths (1310nm and 1550nm)unless indicated otherwise.

3.2.3.2 Optical Time Domain Reflectometer Tests

Optical time domain reflectometer (OTDR) tests must be performed using the FO test procedures of TIA-455-78-B. An optical time domain reflectometer test must be performed on all fibers of the FO cable on the reel prior to installation. The optical time domain reflectometer must be calibrated to show anomalies of 0.2 dB as minimum. Photographs of the traces must be furnished to the Government. An optical time domain reflectometer test must be performed on all fibers of the FO cable after it is installed. The optical time domain reflectometer must be calibrated to show anomalies of

0.2 dB as a minimum. If the optical time domain reflectometer test results show attenuation characteristics greater than those published by the cable manufacturer, the FO cable segment is unacceptable to the Government. The

SECTION 27 21 10.00 26 Page 8 unsatisfactory segments of cable must be replaced with a new segment of cable. The new segment of cable must then be tested to demonstrate acceptability. Photographs of the traces must be furnished to the Government for each link. The Contractor must use a "100 meter fiber launch cable" to eliminate the "dead zone" for the tests.

3.2.3.3 Power Attenuation Test

Power attenuation tests must be performed at the light wavelength of the transmitter to be used on the circuit being tested. The flux must be measured at the FO receiver end and must be compared to the flux injected at the transmitter end. There must be a jumper added at each end of the circuit under test so that end connector loss shall be validated.

Rotational optimization of the connectors will not be permitted. If the circuit loss exceeds the calculated circuit loss by more than 1 dB, the circuit is unsatisfactory and must be examined to determine the problem.

The Government must be notified of the problem and what procedures the Contractor proposes to eliminate the problem. The Contractor must prepare and submit a report documenting the results of the test. If the GQAR judges the losses to be excessive, the GQAR reserves the option to instruct the Contractor to re-terminate selected connectors and splices and/or to replace the cable as necessary.

3.2.4 Fiber Test Report

The Contractor's written records of testing must be submitted in the form of a formal shop test reports. Reports must identify each cable according to designations shown on the contract drawings. If no designation is shown, one will be provided by the Government. Test report must be submitted 15 days after completion of field testing.

3.3 OPERATIONS AND MAINTENANCE MANUAL

The following information must be included in the Operations and Maintenance Manual:

a. Manufacturer's operating and maintenance manuals for each item provided.

b. Manufacturer's catalog data for each item provided.

c. Recommended spare parts stocking list.

3.4 ACCEPTANCE

Final acceptance will depend upon the successful performance of the fiber optic cable and equipment under test. The final test reports must be reviewed and approved by the Contracting Officer.

-- End of Section --

SECTION 27 21 10.00 26 Page 9

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 11 PAGES

01 10 10.00 25 SD-01 Preconstruction Submittals

1.4 GSchedule for Construction

1.9Line Outage Request

1.14 GAccess Agreements and Work

Areas

1.15 GSecurity Procedures

1.16.1 GPersonnel Risk Assessment

1.16.3.1 GQuarterly Security Awareness

Program

1.16.3.2 GAnnual NERC Mandated Cyber

Infrastructure Protection Training Program

1.17 GAnnual Antiterrorism and

Operations Security Training

1.20.2.2 GTemporary Electrical Wiring Plan

1.21.1 GContractor's Planned Equipment

Methods

1.21.2 GPlant and Equipment List

1.21.3 GLoading Diagram

1.23.1 GLifting Diagram

1.23.3 GLoading Plan for Cranes and

Heavy Equipment

1.25.1 GGas, Vapor, Fume, Dust, and

Mist Control Program

1.28 GDisposal Plan

01 22 00.00 25 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

REPLACED IN ITS ENTIRETY

A1-1

AMD# 0004

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 11 PAGES

01 22 00.00 25 1.5.1 GSchedule of Mobilization and Demobilization Costs

01 32 01.00 25 SD-01 Preconstruction Submittals

1.7.1 GECCCPreliminary Schedule

1.7.2 GECCCInitial Schedule

01 33 00 SD-01 Preconstruction Submittals

1.5 GSubmittal Register

SD-07 Certificates 1.10.2Authorized Shop Drawing

Approvers 01 35 26.00 25 SD-01 Preconstruction Submittals

1.6.1.3 GCrane Operators

1.7.3 GTraining Plan

1.7.4 GHazardous Energy Control Plan

and HEC Procedures Training Certification

1.8 GAccident Prevention Plan (APP)

1.9 GActivity Hazard Analysis (AHA)

3.5.2 GArc Flash Hazard (AFH) Program

1.7.6 GArc Flash Hazard (AFH) Training

Certification

1.8.2 GFatigue Management Plan (FMP)

SD-06 Test Reports 1.4Regulatory Citations, Violations, and Corrective Action

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 11 PAGES

01 35 26.00 25 1.5Drug and Alcohol Use Prevention Program

1.14.2Accident or Mishap Reports SD-07 Certificates

1.10Confined Space Entry Permit 1.10Hot Work Permit

01 45 00.00 25 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control Plan

3.4.4Construction Quality

Management for Contractors SD-06 Test Reports

3.9Daily CQC Report 01 57 20.00 25 SD-01 Preconstruction Submittals

1.10 GECDGEnvironmental Protection Plan

01 78 23.00 25 SD-01 Preconstruction Submittals

1.2 GO&M Manual Execution Plan

SD-10 Operation and Maintenance Data

1.3 GOperation and Maintenance

Manual

01 78 39.00 25 SD-01 Preconstruction Submittals

1.4 GRecord Drawings Execution Plan

1.5Working As-Built Drawings

SD-11 Closeout Submittals

1.7 GPreliminary Record Drawings

1.7.2.2 GFinal Working As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 11 PAGES

01 78 39.00 25 1.8 GFinal Record Drawings 02 82 14.00 25 SD-01 Preconstruction Submittals

1.7 GECDGWritten Qualifications and

Organization Report

1.8 GECDGAsbestos Hazard Abatement

Plan

SD-06 Test Reports 1.14.1Daily Narrative Log 3.6Personnel and Area Air

Monitoring SD-07 Certificates

1.13Permits and Notifications 1.13Permits and Notifications 1.11Local Exhaust System 1.12Medical Surveillance

Requirements

3.9 GECDGWaste Shipment Record (WSR)

02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.2 G ECDGLead Compliance Plan

1.5.1.1 G ECDGCompetent Person

1.5.1.2 G ECDGTraining Certification

1.5.2.8 G ECDGlead waste management plan

1.5.2.4 G ECDGMedical Examinations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 11 PAGES

02 83 13.00 20 1.5.2.3 G ECDGsampling results

1.5.2.3 G ECDGOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.3 G ECDGTesting laboratory

1.5.1.4 G ECDGThird party consultant

qualifications

3.5.1.1 G ECDGClearance Certification

03 60 00.00 26 SD-01 Preconstruction Submittals

3.4.1 G HDCConcrete Removal and Disposal

Plan

3.4.3 G HDCSaw Cutting Procedure

3.4.4 G HDCCore Drilling Procedure

3.4.8 G HDCConcrete Imaging Report

3.4.12 G HDCRepair Procedure of Concrete

Surfaces

2.5 G HDCFirestopping Materials

13 48 00.00 26 SD-02 Shop Drawings

1.5 G HDCDetail Drawings

1.6 G HDCDetail Drawings

SD-03 Product Data

3.4 G HDCConcrete Anchors

1.4.4 G HDCSeismic Equipment Certification

SD-05 Design Data

1.5 G HDCStructural Design Calculations for

Seismic Restraints

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-5

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 11 PAGES

13 48 00.00 26 1.6 G HDCStructural Design Calculations for Seismic Restraints

SD-06 Test Reports

3.5.2.1 G HDCConcrete Anchor Test Reports

3.5.1 G HDCContractor Qualification Testing

26 05 00.00 26 SD-01 Preconstruction Submittals

3.1 G HDCEquipment Replacement and

Cutover Plan SD-02 Shop Drawings

1.6.1 G HDCDrawing Index

1.6.2 G HDCBill of Materials

1.6.3 G HDCInterconnecting Diagrams

1.6.4 G HDCConduit and Cable Schedule

1.6.5 G HDCConduit Routing Drawings

1.6.9 G HDCWiring Schematics

2.2.2 G HDCGround Conductors

2.5 G HDCFabricated Nameplates

2.6 G HDCMolded Case Circuit Breakers

1.6.6 G HDCAs-Built Drawings

SD-03 Product Data

2.1.1 G HDCConduit and Fittings

2.1.2 G HDCJunction Boxes

2.3 G HDCTerminal Blocks

2.4 G HDCBoxes, Cabinets, and Enclosures

2.13 G HDCControl Switches

26 05 19.00 26 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 11 PAGES

26 05 19.00 26 2.1 G HDCInsulated Wire and Cable

2.4 G HDCSpecial Wire And Cable

SD-06 Test Reports

3.2.1 G HDCContinuity Tests

3.2.1 G HDCContinuity Tests

3.2.1 G HDCInsulation-Resistance Test

3.2.1 G HDCPhase-Rotation Tests

26 08 01.00 26 SD-05 Design Data

1.4.2 G HDCField Testing Plan

SD-06 Test Reports

1.5.2 G HDCField Test Reports

1.5.2 G HDCCircuit Functionality Test Report

1.5.2 G HDCContinuity Tests

26 13 13.00 26 SD-01 Preconstruction Submittals

3.5 G HDCQualifications of Field

Engineering Service Personnel

3.6 G HDCContractor Furnished Training of

Government Personnel

3.4 G HDCRemoval and Installation Plan

3.4 G HDCConstruction Progress Schedule

3.4 G HDCTemporary Power Plan for the

warehouse/security building SD-02 Shop Drawings

2.2.1.1 G HDCOutline Drawings

2.2.8.1 G HDCFoundation Details

2.2.1.2 G HDCAssembly and Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-7

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 11 PAGES

26 13 13.00 26 2.2.1 G HDCSchematic Diagrams and Connection Diagrams

2.2.1.3 G HDCSchematic Diagrams and

Connection Diagrams

1.4.4 G HDCAs-Built Drawings

SD-03 Product Data

2.1.1 G HDCList of Proposed Products

2.3 G HDCCircuit Breaker

2.7 G HDCInstrument Transformers

3.3.2.3 G HDCSwitchgear cubicles

2.2.6.4 G HDCInsulation

2.7.2.3 G HDCCurrent Transformer Calculations

2.7.1 G HDCSaturation Curves for Instrument

Transformers

2.9 G HDCAccessories

2.10 G HDCSpare Parts

SD-07 Certificates 3.3.1.1Certifications of Switchgear and

Breakers 3.1Certifications of Seismic

Requirements SD-09 Manufacturer’s Field Reports

3.3.1.2 G HDCDesign Test Reports

3.3.2.2 G HDCTest Record Forms

3.3.2.1 G HDCFactory Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-8

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 11 PAGES

26 13 13.00 26 3.3.3.1 G HDCfield test procedure

2.7.2.4 G HDCField Test Reports

3.3.3.1 G HDCField Test Reports

SD-10 Operation and Maintenance Data

1.4.2 G HDCSwitchgear

26 28 00.00 26 SD-02 Shop Drawings

2.1.5 G HDCArrangement Drawings

SD-03 Product Data

2.1.2.2 G HDCSwitchboard

2.2 G HDCMolded Case Circuit Breakers

2.1.4 G HDCBus Insulation and Barriers

SD-05 Design Data

3.3.4 G HDCField Acceptance Testing

3.3.4 G HDCField Test Reports

SD-07 Certificates

2.4 G HDCFactory Tests

SD-10 Operation and Maintenance Data

3.5 G HDCOperation and Maintenance

Manuals

27 21 10.00 26 SD-01 Preconstruction Submittals

3.1.3 G HDCCable Installation Plan

3.2.2 G HDCFiber Test Plan

SD-03 Product Data

1.5 G HDCManufacturer's Catalog Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-9

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 11 PAGES

27 21 10.00 26 1.5 G HDCManufacturer's Catalog Data

1.6 G HDCMaterial and Equipment List

1.6 G HDCMaterial and Equipment List

SD-06 Test Reports

3.2.4 G HDCFiber Test Report

SD-07 Certificates

1.4 GQualifications

3.1.2 GQualifications

SD-08 Manufacturer’s Instructions

3.1.2 G HDCInstallation Procedures

SD-10 Operation and Maintenance Data

1.5 G HDCOperations and Maintenance

Manual

3.3 G HDCOperations and Maintenance

Manual

33 72 33.14 26 SD-03 Product Data

2.1 G HDCPROTECTIVE RELAYS

SD-05 Design Data

3.2 G HDCInstallation;

SD-06 Test Reports

3.3 G HDCField Testing;

3.3.3 G HDCManufacturer's Test Reports

SD-07 Certificates

1.6 G HDCDevices and Equipment

33 75 10.00 26 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-10

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 11 PAGES

33 75 10.00 26 1.5.1 G HDCBill of Materials

1.5.2 G HDCOutline Drawings

1.5.2 G HDCMounting Details

1.5.2 G HDCSchematic Diagrams

1.5.2 G HDCManufacturer's Nameplate

SD-03 Product Data

2.1 G HDCground switch motor operator

2.2.5 G HDCInterlocking

SD-06 Test Reports

3.1.1 G HDCFactory Tests

SD-10 Operation and Maintenance Data

3.3 G HDCOperation and Maintenance

Manual

3.4Contractor-Furnished Training of Government Personnel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-11

NOTES:

CONDUIT

NUMBER SIZE LENGTH NO. CONDNUMBER SIZE

CABLE

INSUL. LGTH.(FEET) OPR. VOLT FUNCTION FROM

DISCRIPTIONS

TO ROUTING

REMARKS

SUA-c1-XPSRA/CTC

SUA-c2-XPSRA/CTC

SRA-c1-XPSRA/CTC

SP3-c1-SH1/CTC

SP3-c1-SH2/CTC

SR11-c1-XPSR1/CTC

SU1-c1-XPSR1/CTC

SU1-c2-XPSR1/CTC

SU2-c1-XPSR2/CTC

SU2-c2-XPSR2/CTC

SOR3-c1-SR42

SR31-c1-XPSR3/CTC

SU3-c1-XPSR3/CTC

SU3-c2-XPSR3/CTC

SP5-c1-SH3/CTC

SR41-c1-XPSR4/CTC

SU4-c1-XPSR4/CTC

SU4-c2-XPSR4/CTC

SR11-c1-SR12

SR22-c1-SR21

SR32-c1-SR31

SR22-c1-XPSR2/CTC

SR42-c1-SR52

ROC1-c1-SB1C

ROC2-c1-ROC1

BE1-e1-SB1C

BE2-f1-SB1C

BE3-e1-SB1C

SB1C-e1-SB1E

SB1C-f1-SB2B

SB1C-e1-SB3E

SOR3-c1-DQ3/CTC

DP1-p1-DQ5

DP1-p1-DQ6

DP1-c1-DQ5

DP1-c1-DP1ROC

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

SUA-c2-XPSRA/CTC

SRA-c1-XPSRA/CTC

SRA-c2-XPSRA/CTC

SOR1-c1-XPSRA/CTC

SOR4-c1-XPSRA/CTC

SP3-c1-SH1/CTC

SP3-c1-SH2/CTC

SR11-c1-XPSR1/CTC

SR11-c2-XPSR1/CTC

SU1-c1-XPSR1/CTC

SU1-c2-XPSR1/CTC

SOR1-c1-XPSR1/CTC

SOR4-c1-XPSR1/CTC

SOR2-c1-XPSR2/CTC

SOR4-c2-XPSR2/CTC

SU2-c1-XPSR2/CTC

SU2-c2-XPSR2/CTC

SOR3-c1-SR42

SOR2-c1-XPSR3/CTC

SOR9-c1-XPSR3/CTC

SOR2-c1-XPSR4/CTC

SOR9-c1-XPSR4/CTC

SR31-c1-XPSR3/CTX

SR31-c2-XPSR3/CTX

SU3-c1-XPSR3/CTC

SU3-c2-XPSR3/CTC

SP5-c1-SH3/CTC

SR41-c1-XPSR4/CTC

SR41-c2-XPSR4/CTC

SU4-c1-XPSR4/CTC

SU4-c2-XPSR4/CTC

SR11-c1-SR12

SR11-c1-SR12

SR22-c1-SR21

SR22-c1-SR21

SR32-c1-SR31

SR32-c2-SR31

SR22-c1-XPSR2/CTC

SR22-c2-XPSR2/CTC

SR42-c1-SR52

ROC1-c1-SB1C

ROC2-c1-ROC1

BE1-e1-SB1C

BE1-e2-SB1C

BE2-f1-SB1C

BE2-f2-SB1C

BE2-f3-SB1C

BE3-e1-SB1C

BE3-e2-SB1C

SB1C-e1-SB1E

SB1C-e2-SB1E

SB1C-f1-SB2B

SB1C-f2-SB2B

SB1C-f3-SB2B

SB1C-e1-SB3E

SB1C-e2-SB3E

DP1-p1-DQ5

DP1-c1-DQ5

DP1-c1-DP1ROC

1-1/2

1-1/2

1-1/2

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-4/C

1-15/C

1-15/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

2-1/C

3-1/C

3-1/C

1-4/C

1-20/C

4/0

4/0

4/0

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

600V

5000V

5000V

5000V

600V

600V

600V

600V

600V

600V

600V

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

DC BREAKER CONTROL PANEL

DC BREAKER CONTROL PANEL

POWER TO DC SWITCHBOARD

POWER TO DC SWITCHBOARD

POWER TO DC SWITCHBOARD

POWER TO DC SWITCHBOARD

POWER TO DC SWITCHBOARD

POWER TO DC SWITCHBOARD

POWER TO DC SWITCHBOARD

POWER FROM DC SWITCHBOARD

POWER FROM DC SWITCHBOARD

POWER FROM DC SWITCHBOARD

POWER FROM DC SWITCHBOARD

POWER FROM DC SWITCHBOARD

POWER FROM DC SWITCHBOARD

POWER FROM DC SWITCHBOARD

MAITENANCE SWITCH/INDICATING LIGHT

MAITENANCE SWITCH/INDICATING LIGHT

BREAKER OPEN/CLOSE

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

SUA BUS 1 CONTROL CABINET

SUA BUS 2 CONTROL CABINET

SRA BUS 1 MAIN

SRA BUS 2 MAIN

SOR1

SOR4

SP3-7

SP3-8

SR11 MAIN

SR11 MAIN

SU1 BUS 1 CONTROL CABINET

SU1 BUS 2 CONTROL CABINET

SOR1

SOR4

SOR2

SOR4

SU3 BUS 1 CONTROL CABINET

SU3 BUS 2 CONTROL CABINET

SOR2

SOR2

SOR3

SOR9

SOR9

SOR9

SOR10

SOR2

SOR9

SOR2

SOR4

SR31 MAIN

SR31 MAIN

SU2 BUS 1 CONTROL CABINET

SU2 BUS 2 CONTROL CABINET

SP5-4

SR41 MAIN

SR41 MAIN

SU4 BUS 1 CONTROL CABINET

SU4 BUS 2 CONTROL CABINET

SR11 MAIN

SR11 MAIN

SR22 MAIN

SR22 MAIN

SR32 MAIN

SR32 MAIN

SR22 MAIN

SR22 MAIN

SR42 MAIN

ROC1

ROC2

BE1

BE1

BE2

BE2

BE2

BE3

BE3

SB1C-XE1

SB1C-XE1

SB1C-XF1

SB1C-XF1

SB1C-XF1

SB1C-XE2

SB1C-XE2

SOR3

DP1

DP1

DP1-XPD22

DP1

ZWT1

XPSRA/CTC

XPSRA/CTC

XPSRA/CTC

XPSRA/CTC

XPSRA/CTC

XPSRA/CTC

SH1/CTC

SH2/CTC

XPSR1/CTC

XPSR1/CTC

XPSR1/CTC

XPSR1/CTC

XPSR1/CTC

XPSR1/CTC

XPSR2/CTC

XPSR2/CTC

XPSR2/CTC

XPSR2/CTC

SQ0/5A

SQ0/5A

SR42 MAIN

SQ1/6A

SQ1/6A

SQ2/6A

SQ2/6A

XPSR3/CTC

XPSR3/CTC

XPSR4/CTC

XPSR4/CTC

XPSR3/CTC

XPSR3/CTC

XPSR3/CTC

XPSR3/CTC

SH3/CTC

XPSR4/CTC

XPSR4/CTC

XPSR4/CTC

XPSR4/CTC

SR12 MAIN

SR12 MAIN

SR21 MAIN

SR21 MAIN

SR31 MAIN

SR31 MAIN

XPSR2/CTC

XPSR2/CTC

SR52 MAIN

SB1C

ROC1

SB1C-XE1

SB1C-XE1

SB1C-XF1

SB1C-XF1

SB1C-XF1

SB1X-XE2

SB1X-XE2

SB1E

SB1E

SB2B

SB2B

SB2B

SB3E

SB3E

DQ3/CTC

DP1

DQ5

DQ6

DQ5 MS

DP1-ROC

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT AND EXISTING CABLE TRAY

NEW CONDUIT AND EXISTING CABLE DUCT

NEW CONDUIT AND EXISTING CABLE DUCT

NEW CONDUIT AND EXISTING CABLE DUCT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

350KCMIL CABLES ROUTED IN PARALLEL

CABLE AND CONDUIT SCHEDULE

(NOTE 2)

(NOTE 2)

(NOTE 2)

(NOTE 2)

(NOTE 2)

(NOTE 2)

REFERENCE DRAWINGS:

DDP-6-5/25

DDP-6-5/24

DDP-6-5/23

DDP-6-5/22

SUA-c1-XPSRA/CTC

DP1 FEEDER

DQ5 FEEDER

DQ6 FEEDER

600V14

1-3/C

1-3/C

1-3/C

1-3/C

1-3/C

1-3/C

SOR-c1-SQ1

SOR9-c1-SQ2

SQ0/5A-c1

XPSRA/CTC-c1

XPSR1/CTC-c1

XPSR2/CTC-c1

XPSR3/CTC-c1

XPSR4/CTC-c1

SOR2-c1-SQ0

SOR4-c1-SQ0

SOR9-c1-SQ1

SOR9-c2-SQ1

SOR9-c1-SQ2

SOR10-c1-SQ2

RCS-ZWT1

RCS-ZWT2

RCS-ZMT3

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

1-1/2

3/4

1-1/2

1-1/2

3-1/2

3-1/2

600V

600V

600V

600V

600V

600V

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

REMOTE OPEN AND CLOSE

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

NEW CONDUIT

RCS-ZMT5

RCS-ZMT7

ZWT2

NEW CONDUIT

ZMT3

ZMT5

ZMT7

ZMT10 RCS-ZMT10

SB1C-c1-SB1E

10SB1C-c1-SB3E 3/4

3/4 10 SB1C-c1-SB1E

SB1C-c1-SB2A

SB1C-c1-SB2B

SB1C-c1-SB1E

SB1C-c1-SB2B 3/4 10

1-2/C

1-2/C

1-2/C

1-2/C

600V

600V

600V

600V

ANNUNCIATION

ANNUNCIATION

ANNUNCIATION

ANNUNCIATION

SB1E NEW CONDUIT AND EXISTING TRAY

SB2A NEW CONDUIT AND EXISTING TRAY

SB2B NEW CONDUIT AND EXISTING TRAY

SB3E NEW CONDUIT AND EXISTING TRAY

SB1CXE1

SB1CXF1

SB1CXF1

SB1CXE2

SOR3-c1-DQ3/CTC 1-8/C

PBZWT2-c2-PBZMT3

PBZMT3-c2-PBZMT4

PBZMT4-c2-PLCZ

1-1/2

2-1/2

1-9/C 14 600V 790 CONTROL PBZWT1 PLCZ NEW CONDUIT

(NOTE 3)

3.DUPLICATE NEW CONDUIT NOT BOLDED.

2.CABLE IS ROUTED THROUGH VARIOUS CONDUITS.

1.CABLE AND CONDUIT SCHEDULES

1-9/C 14 600V 610 CONTROL ZWT2 PLCZ NEW CONDUIT

2-1/2

2-1/2

1-9/C 14 600V 430 CONTROL ZMT3 PLCZ NEW CONDUIT

1-1/2

2-1/2

2-1/2

2-1/2

2-1/2

ZMT10G-c1-PLCZ 1-9/C 14 600V 1210 CONTROL ZMT10 PLCZ NEW CONDUIT

1-9/C 14 600V 510 CONTROL ZMT7 PLCZ NEW CONDUIT

1-9/C 14 600V 150 CONTROL ZMT5 PLCZ NEW CONDUIT

3/4

3/4

3/4

3/4

3/4

3/4

ZWT1-c1-ZWT1G

ZWT2-c1-ZWT2G

ZMT3-c1-ZMT3G

ZMT5-c1-ZMT5G

ZMT7-c1-ZMT7G

ZMT10-c1-ZMT10G

3/4

3/4

3/4

3/4

3/4

3/4 10

10 ZWT1-c1-ZWT1G

ZWT2-c1-ZWT2G

ZMT3-c1-ZMT3G

ZMT5-c1-ZMT5G

ZMT7-c1-ZMT7G

ZMT10-c1-ZMT10G 1-2/C

1-2/C

1-2/C

1-2/C

1-2/C

1-2/C 10

ZWT2

ZMT3

ZMT5

ZMT7

ZMT10 ZMT10G

ZWT1G

ZWT2G

ZMT3G

ZMT5G

ZMT7G

PBZMT7-c2-PBZMT6

PBZMT10-c2-PBZMT9

PBZMT9-c2-PBZMT8

ZWT1

ZWT1G-c1-Z1RCS

ZWT2G-c1-Z2RCS

ZMT3G-c1-Z3RCS

ZMT5G-c1-Z5RCS

ZMT7G-c1-Z7RCS

ZMT10G-c1-Z10RCS

ZWT1G-c1-Z1RCS

ZWT2G-c1-Z2RCS

ZMT3G-c1-Z3RCS

ZMT5G-c1-Z5RCS

ZMT7G-c1-Z7RCS

ZMT10G-c1-Z10RCS

XPWH-p1-DP1 XPWH-p1-DP1 XPWH NEW CONDUIT AND EXISTING CABLE DUCT485 2225

PBZWT2-c1-PBZMT3 180

PBZMT3-c1-PBZMT4 180

PBZMT4-c1-PLCZ 190

180PBZMT3-c1-PBZMT4

PBZMT4-c1-PLCZ 190

PBZMT6-c2-PBZMT5 180

90PBZMT5-c2-PLCZ

PBZMT5-c2-PLCZ 90

ZMT5G-c1-PBZMT5

ZWT1G-c1-PLCZ

ZWT2G-c1-PBZWT2

ZWT1G-c1-PBZWT1

DP1-p1-DQ6

ZMT3G-c1-PBZMT3

ZWT2G-c1-PLCZ

ZMT3G-c1-PLCZ

ZMT10G-c1-PBZMT10

PBZMT8-c2-PBZMT7

PBZMT7-c2-PBZMT6

PBZMT6-c2-PBZMT5

PBZMT5-c2-PLCZ

ZMT7G-c1-PBZMT7

ZMT7G-c1-PLCZ

PBZWT1-c2-PBZWT2, 3"

ZMT5G-c1-PLCZ

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

120VAC

4160VAC

4160VAC

4160VAC

4160VAC

125VDC

125VDC

125VDC

250VDC

250VDC

250VDC

125VDC

125VDC

125VDC

125VDC

250VDC

250VDC

250VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125VDC

125…