AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: THE DALLES ARC FLASH HAZARD REDUCTION PROGRAM

1. This Amendment is issued to update the draw ings.

2. Draw ing Sheet EF201 has been updated.

3. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-17-R-0003

X 9B. DATED (SEE ITEM 11)

10-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Sep-2017

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-17-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

350A

NOTES:

LEGEND:

350A

DP1-1A

DP1-c1-DQ5,3/4"

XPWH SWITCH (POWERHOUSE)

350 AMPS

DP1 MAIN BREAKER

350 AMPS

DP1 FEEDER BREAKER

DQ6 PRIMARY BUS

SECONDARY BUS 2

DQ6

SECONDARY BUS 1

DQ6

PRIMARY BUS

DQ6.1

DQ5 SWITCHGEAR

DQ6A SWITCHGEAR

DP1-p1-DQ5, 3"

DP1-p1-DQ6, 3"

UPS

RELAY AC POWER SUPPLY

DP1-1B DP1-1C

DP1-2B DP1-2CDP1-2A

CABINET INTERIOR

DP1 SWITCHGEAR

G R

MAIN BREAKER

STATUS LEDs

BREAKER

EQUIVALENT

SEL 751A OR

TEST SWITCHES

MOMENTARY

THROW WITH OFF,

SWITCH, DOUBLE

FEEDER 1 BREAKER

G R

G R

G R

G R

G R

MAIN BREAKER

FEEDER 1

SPARE

SPARE

SPARE

STATUS LEDs

BREAKER

G R

18161412108642

1715139

A E G I JH

F

B C D

18161412108642

1715139

A E G I JH

F

B C D

C1 C2 C3 CNSPARESPOWER

STATUS

BREAKER

LIGHT

MODE

MAINT.

SWITCH

MODE

MAINT.

TRIP

BREAKER SPARES

(FRONT VIEW)

RELAY TEST SWITCH LAYOUT

TSA TSB

DQ6

LAYOUT

LOCAL PANEL

DP1 SWITCHGEAR

REFERENCE DRAWINGS:

SWITCH

BREAKER CONTROL

DP1 ONELINE

100 101

DP1-c1-DP1ROC,1"

MICRO-FARAD CAPACITOR

SURGE ARRESTOR WITH 0.25

SEE NOTE 84160V/120V PT

0.25uF

0.25uF

0.25uF 0.25uF

PREPARED SPACE PREPARED SPACE PREPARED SPACE PREPARED SPACE

PREPARED SPACE

PREPARED SPACE

24" 24" 24"

XPWH-p1-DP1, 3"

4'

N.T.S.

REMOTE PANEL LAYOUT

DP1-ROC SWITCHGEAR

DDG-10-7-10/12 D

DDG-9-6-9A21/1

1200 AMPS

4160V BUS

1200 AMPS

DP1 SWITCHGEAR

8.DOUBLE FEED TO DQ5 & DQ6.

SELECTION OF UPS.

BREAKERS, FOR AT LEAST ONE HOUR. CONTRACTOR TO VERIFY PROPER

SIZE BATTERY TO SUPPLY FULL LOAD, INCLUDING FUTURE FEEDER

INPUT/OUTPUT VOLTAGE OF 120V, A POWER RATING OF AT LEAST 500VA.

7.UPS TO SUPPLY POWER TO BREAKER RELAYS. UPS WILL HAVE AN

6.INCLUDE GROUNDING POINTS ON THE BUSES.

DESIGN.

ILLUMINATE INTENT. THE CONTRACTOR CAN SUBMIT A DIFFERENT

5.THIS SWITCHGEAR SHOWS A SUGGESTIVE DESIGN AND ROUTING TO

AND MULTIFUNCTION RELAY.

4.NON EMPTY CUBICLE WILL INCLUDE 350A BREAKER

3.NOT USED.

2.DEPTH OF SWITCHGEAR SHALL NOT EXCEED 90".

1.BOLD INDICATES ITEMS TO BE INSTALLED.

S T

E V

E N R

M

IL

E S P .E

/0

/2

G

H D

C G J

D

G

H D

C G J

D

D

D

IN

H

W

N -1

-R -0

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

T

A N

S I F

A R

C F

L A

S H H

A Z

A R

D R

E D

U C

T

IO

N

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E R

IN

S

T A

L L

EF201

D

Q S

W

IT

C H

G E

A R

T H

E D

A L L E

S L

O C

K A

N D D

A M

D D

P .1

E

F

X X

X .D

G N .d g n

E L E

V A

T

IO

N S

B S

F R

E L

O C

A T

E D F

E E

D E

R B

R A

K E

R /0

/1

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

EF201SHEET NAME:G2hdcrlk BY USERNAME:DATE AND TIME PLOTTED: 9/7/2017 2:32:06 PM

PORTLAND DISTRICT

File details come from the government source that posted it. Updated .