JOHN DAY EMERGENCY GANTRY CRANE
Solicitation number
W9127N-16-R-0008
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
A_07_24_16R8-2.pdf PDF
A_07_20_Site_Visit_Attendees.pdf PDF
Offeror_Experience_Form.docx DOCX document
PPQ-0.doc DOC document
A_07_23_16R8_specs.pdf PDF
A_07_23_16R8_plans.pdf PDF
A.07.20_12JUL16PRE-SOLConference.pdf PDF
INQUIRIES.docx DOCX document
A072316R8BackcheckSet.pdf PDF
A0723JDReplacementE-CraneBCOEBackcheckContractDrawings05July16.pdf PDF
A0723JDBCOESBackcheckReferenceDrawings28June16.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W66QKZ60680224

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0001 makes the follow ing changes: Removes duplicate clause 52.236-13, corrects spelling error in Section L, clarifies insurance requirement, and updates site visit meeting location.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Oct-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0008

X 9B. DATED (SEE ITEM 11)

22-Sep-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Oct-2016

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-16-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION H - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

INSURANCE

INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1990 DEV)

a. The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance required by this Clause as follows:

TYPE AMOUNT

1) Workman's Compensation and Employer's Liability (including Federal Longshoremen . and Harbor Worker's Insurance)

As legally required by the State wherein the work is being performed.

2) Comprehensive General Liability Insurance Personal Injury Liability:

$1 million per person $1 million per occurrence

Property Damage (may be included in general aggregate limits or combined single unit coverage):

$1 million per occurrence

3) Automobile Liability Personal Injury Liability:

$1 million per person $1 million per occurrence

Property Damage (may be included in general aggregate limits or combined single unit coverage):

$1 million per occurrence

4) If single general aggregate limits or combined single unit coverage is obtained for General Liability and/or Automobile Liability coverage, minimum amounts shall be the sum of the personal injury and property damage coverage required above. Umbrella Form Excess Liability insurance coverage shall be added to general liability and automobile liability coverage to determine if minimum insurance limits are met.

b. Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

c. The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

d. "Government Installation" for this clause includes government vessels.

SECTION I - CONTRACT CLAUSES

The following have been deleted:

52.236-13 Accident Prevention NOV 1991

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

I. INTRODUCTION

Your firm is invited to submit a proposal in response to Request for Proposal (RFP) Number W9127N- 16-R-0008 for the project entitled “John Day Lock And Dam New 585 Ton Emergency Gantry Crane”.

The Government intends to procure this requirement on a competitive basis in accordance with the provisions set forth in FAR Part 15 Contracting by Negotiations, and within this Request For Proposal

(RFP).

The offeror’s proposal shall be submitted in hard copy, with accompanying digital copies, as set forth below. The RFP shall provide the Government address and receipt date for proposal submittal.

The offeror’s proposal shall consist of two (2) volumes. The Volumes are I – Technical Proposal and II – Price Proposal. The use of hyperlinks in proposals is prohibited.

Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

II. SITE VISIT

For site visit information see 52.236-27. To request participation, provide the names of attendees to Jeffrey S. Renner at jeff.s.renner@usace.army.mil no later than 96 hours before the visit.

III. SUBMITTING QUESTIONS

Questions and answers will be handled via a USACE bidder inquiry system, Projnet/DrChecks, found at https://www.projnet.org/projnet/binKornHome/index.cfm . An account has been created under the solicitation number W9127N-16-R-0008; the Public Access Key is 5ZVDG3 - X8CSUN. Use this website to submit technical questions about the project. The website will be monitored by USACE personnel who will post answers to submitted questions. All offerors are able to see the questions and answers from all submissions. This ensures that all have an equal opportunity to gain project insight from the questions submitted by other potential offerors.

IV. GENERAL PROPOSAL REQUIREMENTS

a. BINDING

Each volume shall be submitted in a separate three-ring binder, of standard letter (8 ½ x 11-inch) size and hardback construction. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated. Each binder shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 3) on both the cover and the spine.

b. ORGANIZATION – VOLUMES

The following volumes of material shall be submitted:

1. Volume 1: Technical Proposal

2. Volume 2: Price Proposal

c. QUANTITTY

The following quantities of copies shall be submitted:

1. Volume 1: Technical Proposal 1 original – clearly marked 3 copies 1 electronic (defined in paragraph e. of this Section)

2. Volume 2: Price Proposal 1 original – clearly marked 1 electronic (defined in paragraph e. of this Section)

d. CONTENT – GENERAL

The submission shall be clearly indexed and logically assembled. Proposals must set forth full, accurate, and complete information as required by this RFP. Absence of information will be deemed as if no support for that criterion was provided. Offerors submitting proposals should limit submission to data essential for evaluation of proposals so that a minimum of time and money is expended in preparing information required by the Request for Proposal (RFP). Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.

1. Table of Contents: A Table of Contents should be incorporated within Volume 1 and Volume 2.

2. Paper size: Proposals are to be on 8 ½ x 11-inch paper, to the maximum extent practicable. Drawings shall be 11x17-inch paper, folded to the same dimensions as the 8 ½ x 11-inch paper. Elaborate artwork, expensive paper and bindings, and expensive/ extensive visual and other presentation aids are not necessary. Each proposal should address the requests for information in the order identified in Section L.

3. Tabs: Contents of binders shall be tabbed and labeled to afford easy identification from the proposal Table of Contents. Tabs shall extend beyond the edge of the 8 ½ x 11-inch paper.

4. Page Numbering: All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer.

5. Page Limits: Volume I proposal shall not exceed 75 single sided pages; double sided pages are encouraged but any pages in excess of 75 will not be considered.

6. Signatures: Original signature from the offeror’s responsible party is required in box 15 of the SF33 submitted with the Price Proposal.

e. ELECTRONIC PROPOSAL SUBMITTAL REQUIREMENTS

1. File format

2. The electronic proposal shall be Portable Document Format, filename extension:

“.pdf” and suitable for viewing in Adobe Reader.

3. Number of files: The volume contents shall be combined and presented as a single .pdf file.

4. Method of submission

The electronic version of the proposals shall be submitted via Compact Disc (CD) suitably protected and submitted with the physical binders. CDs may be placed in the front pocket of the ORIGINAL copy only. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. USB thumb drives are not permitted.

REQUIRED TABS FOR VOLUME 1: TECHNICAL PROPOSAL

Table of Contents Factor 1 – Tab 01: Past Experience Factor 2 – Tab 02: Past Performance Factor 3 – Tab 03: Work Plan Factor 4 – Tab 04: Small Business Participation Plan

REQUIRED TABS FOR VOLUME 2: PRICE PROPOSAL

Table of Contents

Factor 5 – Price Proposal Tab 05: SF33, Solicitation, Offer, and Award Tab 06: Price Schedule Tab 07: Small Business Subcontracting Plan (Large Business ONLY) Tab 08: Representations and Certifications

V DETAILED CONTENT REQUIREMENTS FOR VOLUME 1: TECHNICAL PROPOSAL

Offerors shall submit the information noted below for each tab.

Factor 1 – TAB 01: Past Experience

This project will consist of designing, manufacturing/fabricating, factory testing, transporting, erecting, and field testing a new 585-ton gantry crane with three trolleys, each with a 195-ton main hoist, latching hoist, and maintenance hoist. The design, manufacture, and installation portion of the project are the three major project phases. The Offeror shall submit information for up to four (4) projects* that best demonstrates the offeror’s experience on projects that are similar in size, scope, and complexity to this project, as further described in the RFP specifications.

To be evaluated, each project must have been completed or must be substantially complete** by the Prime or the Prime’s major subcontractor*** within ten years of the date that proposals are due. In addition, each project must involve the design, manufacture, or installation of a new crane with a capacity of at least 100 tons. NOTE: Although each project submitted need not demonstrate experience in all three major project phases (design, manufacture, and installation), the Offeror’s Factor 1 proposal in its totality must demonstrate that the Offeror has experience in all three major project phases: design, manufacture, and installation.

For each project submitted, the Offeror shall provide an “Offeror Experience Form” using Attachment A (or document that addresses all of the information included in Attachment A). The offeror must address all items included on Attachment A. Offerors may include photographs or drawings for each project submission to provide a visual basis for the written description.

*A maximum of four projects will be evaluated. If an offeror disregards these instructions and submits more than four projects, only the first four projects will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess the projects against the evaluation criteria described in Section M of the RFP.

**Substantially complete is defined as being 50% complete by the date that proposals are due. If an offeror submits a project that it represents is “substantially complete,” the offeror must reasonably explain why the project is considered at least 50% complete. If an offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 50% complete, the Government reserves the right to reject the project.

***Instructions on the use of major subcontractors to fulfill major project phases of work (design, manufacture, and installation): Offerors may use the past experience of major subcontractors to demonstrate experience, however, if the Offeror is not assuming all roles in this contract, then the Offeror must clearly demonstrate through its Factor 1 proposal that the major subcontractor it proposes to use has the technical experience for that major project phase. Further, a letter of commitment is required for the use of any major subcontractors. The letter of commitment must be a signed letter of commitment from the subcontractor who is proposed to perform the work. The commitment letter must be submitted even if the firm is in some way related to a joint venture partner (for example, the subcontractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). If a letter of commitment is not submitted, the experience will not be considered.

Factor 2 – TAB 02: Past Performance

The Offeror shall provide past performance information for each project listed by the Offeror under Factor 1: Past Experience. Recent and relevant projects are those projects completed or substantially completed* in the past ten (10) years that are comparable in size, scope, and complexity with this project.

*Substantially complete is defined as being 50% complete by the date that proposals are due.

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal. If there is not a completed CPARS evaluation, the standard Past Performance Questionnaire (PPQ) for USACE is Form PPQ-0 (9/30/11) and it is provided as an attachment to this solicitation. PPQ-0 is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal under Factor 1, Past Experience, and for which a completed CPARS evaluation is not available. (Ensure correct phone numbers and email addresses are provided for the client point of contact.) Do not submit a PPQ when a completed CPARS evaluation is available.

Completed PPQs should be submitted with your proposal if a CPARS evaluation is unavailable. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow- up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Jeffrey S. Renner, via email at jeff.s.renner@usace.army.mil, prior to proposal closing date. The Offerors shall instruct the clients to refer to the solicitation number in the subject line. The PPQs are Source Selection materials. All successfully submitted PPQs will receive an e-mail confirmation upon receipt. If the Offeror does not receive the confirmation, it is their responsibility to follow up to ensure the Government has received the information.

Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the Offeror.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS, including CPARS, using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), telephone interviews with organizations familiar with the Offeror’s performance, Government personnel with personal knowledge of the Offeror’s performance capability, and any other known sources not provided by the Offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the Offeror.

Factor 3 – TAB 03: Work Plan

The Offeror shall submit a work plan consisting of a detailed schedule and a project management plan.

Schedule – The detailed schedule for this project shall include a Gantt chart showing all critical tasks needed to complete the project, duration for each work task, and work task sequencing. The detailed schedule must include no more than 50 tasks. The schedule shall meet the stated schedule requirements specified in the Contract Clause 52.211-10, Commencement, Prosecution, and Completion of Work.

Project Management Plan – The project management plan for this project shall include the following:

A supporting discussion of the schedule and a detailed narrative for each major project phase (design, manufacture, and installation).

The risks and risk management for potential issues and unforeseen delays. For example, identify the risk associated with the manufacture and delivery of long lead items, and describe the offeror’s plan to mitigate the risk.

If major subcontractors will be used to perform the design, manufacturing, or installation portion of the work, identify the subcontractors proposed to be used and the offeror’s plan for managing those subcontractors.

Factor 4 – TAB 04: SMALL BUSINESS PARTICIPATION PLAN

The purpose of this criterion is to evaluate the amount of work to be performed by Small Businesses as prime or subcontractors in relation to the total value of the project, as well as the types of work small businesses will be performing, and the Offeror’s past performance complying with contract requirements contained in clauses FAR 52.219-8, Utilization of Small Business Concerns and FAR.52.219-9, Small Business Subcontracting Plan.

SUBMISSION REQUIREMENTS for SMALL BUSINESS PARTICIPATION PLAN:

1. All Offerors (both large and small businesses) shall submit a Small Business Participation Plan (SBPP) (sample provided), to identify the extent to which small businesses will participate in the performance of the proposed acquisition.

Large businesses primes may achieve the small business participation goals through subcontracting to small businesses.

Small business primes may achieve small business participation goals through their own performance/participation as a prime and also through subcontracting to other small businesses.

A mandatory minimum Total Small Business Participation goal of 10% of the total contract value (through small business participation from small-, small disadvantaged-, HUB Zone-, Service Disabled Vet-, Vet-, or Woman-owned small businesses) is required based on the nature of the work for this project. The offeror should articulate how small businesses will participate through performance as either a small business prime or as a subcontractor, as well as demonstrating their past performance in complying with requirements of the clauses at FAR 52.219-8, Utilization of Small Business Concerns and 52.219-9, Small Business Subcontracting Plan.

2. Offeror’s are required to submit information that can be verified on at least three projects that demonstrate the degree (both by dollar and by percent of total contract value) to which the contractor utilized small business firms in performing the project. For small business Offeror’s, consideration will be given to self-performance if a small business for that project, as well as for providing subcontracting opportunities to small businesses - as is the policy of the government. For large business Offeror’s, in addition to the information for the three required projects, consideration may also include review of ISR’s (Individual Subcontract Reports) and SSR’s (Summary Subcontract Report) from the eSRS (Electronic Subcontracting Reporting System). The project information submitted for the small business participation plan evaluation does not have to be the same as those listed in the Past Performance factor.

Volume II – Price:

The offeror shall submit their price proposal in a separate binder consisting of the SF33, bid schedule, Small business Subcontracting Plan (if applicable) and reps and certs. The offeror must provide a complete bid schedule and acknowledge all amendments on the signed SF33.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

DATE: 12 OCTOBER 2016

TIME: 10:00 AM PDT

(c) Participants will meet at- JOHN DAY LOCK AND DAM. AFTER ATTENDEES CLEAR THE PROJECT

GATE THEY WILL GATHER TO BE ESCORTED TO THE 4TH FLOOR MEZZANINE CONFERENCE

ROOM

REQUIREMENTS: INTERESTED SITE VISIT ATTENDEES ARE REQUIRED TO RSVP YOUR

PLANNED ATTENDANCE WITH THE FOLLOWING INFORMATION TO Jeffrey S. Renner VIA EMAIL: jeff.s.renner@usace.army.mil;

NAME

COMPANY NAME

PHONE

EMAIL

DATE OF BIRTH

PLACE OF BIRTH

U. S. CITIZEN (Y/N)

DUE TO SECURITY REQUIRMENTS AT THE POWERHOUSE, YOU MUST RSVP IN ADVANCE TO

ATTEND. HARD HATS, STURDY CLOSED-TOED WORK BOOTS OR SAFETY SHOES, AND PHOTO ID

WILL BE REQUIRED.

PLEASE DO NOT HESITATE TO CONTACT Jeffrey S. Renner, 503-808-4630, SHOULD YOU HAVE ANY QUESTIONS IN ADVANCE OF THE SITE VISIT. INDIVIDUAL SITE VISITS CAN NOT BE

ARRANGED, SO PLEASE MAKE EVERY EFFORT TO ATTEND THIS ONLY OPPORTUNITY TO

VIEW THE SITE OF THE WORK.

IN ADDITION, THE OFFEROR SHALL SUBMIT IN WRITING ANY FOREIGN NATIONALS WHO PLAN

TO

BE IN ATTENDANCE AT THE SITE VISIT A MINIMUM OF TWO (2) WEEKS PRIOR TO SITE VISIT.

THE CONTRACTOR SHALL SUBMIT A PHOTOCOPY OF GREEN CARD WORK PERMIT AND/OR

COPY OF PASSPORT FOR ALL CONTRACTOR EMPLOYEES WHO ARE FOREIGN BORN AND

HAVE NON-CITIZEN STATUS.

THESE PHOTOCOPIES SHALL BE SUBMITTED AT LEAST TWO (2) WEEKS IN ADVANCE OF THE SITE VISIT. THIS ALLOWS THE CORPS SECURITY OFFICE SUFFICIENT TIME TO RUN A SECURITY CHECK

ON THESE EFFECTED PERSONNEL.

CONTRACTOR PERSONNEL WHO FIT THE ABOVE DESCRIPTION OF NON-CITIZENSHIP SHALL

NOT BE PERMITTED TO ACCESS THE PROJECT UNTIL THEY PASS THIS SECURITY CHECK.

(End of provision)