Solicitation-Amendment0002.pdf
PDF 90 KB Posted
- Attached to
- THE DALLES BAY 15 ELEVATOR REHABILITATION
- Solicitation number
- W9127N-16-B-0008
About this file
Solicitation Amendment 0002
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
NAME OF PROJECT: THE DALLES BAY 15 ELEVATOR REHABILITATION
SEE CONTINUATION PAGE FOR AMENDMENT DETAILS
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-B-0008
X 9B. DATED (SEE ITEM 11)
09-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2016
CODE
PORTLAND DISTRICT, CORPS OF ENGINEERS
333 SW 1ST AVE
PORTLAND OR 97204
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-16-B-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS
The following have been added by full text:
AMENDMENT NO. 0002
Amendment No. 0002 makes the following changes to Solicitation No. W9127N-16-R-0050:
1) Updated Specs Section 1 45 00.00 25 section 3.4.2 to reflect "The CQC System Manager must have a minimum of five years experience in a verifiable CQC role on jobs similar to this contract."
2) Updated clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK to include hard completion dates.
All other terms and conditions remain unchanged.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I
a. The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than:
(1) FINAL CONSTRUCTION PHYSICAL COMPLETION: May 12, 2017
(2) CONTRACT END DATE: July 11, 2017
b. Work Activities for the construction completion date milestones references above are described under paragraph, SUMMARY OF WORK paragraph INTERIM CONSTRUCTION COMPLETION DATE.
c. The time stated for FINAL CONSTRUCTION PHYSICAL COMPLETION includes physical completion of all site work, site cleanup, and demobilization.
d. The time stated for CONTRACT END DATE includes submission and approval of all final remaining work documents. (See Sections 01 33 00 SUBMITTAL PROCEDURES, paragraphs OPERATIONS AND MAINTENANCE DATA, and PROJECT RECORD DOCUMENTS for final work document requirements.)
(End of clause)
(End of Summary of Changes)
The Dalles Dam Bay 15 Elevator Rehab
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 45 00.00 25
QUALITY CONTROL
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 LABORATORY VALIDATION
1.4 PAYMENT
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Quality Control System
3.1.2 Project Superintendent
3.2 CONTRACTOR QUALITY CONTROL PLAN
3.2.1 Content of the CQC Plan
3.2.2 Acceptance of CQC Plan
3.2.3 Notification of Changes
3.3 COORDINATION MEETING
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
3.4.2 CQC System Manager Qualifications
3.4.3 CQC Specialized Personnel
3.4.4 Construction Quality Management for Contractors
3.4.5 Organizational Changes
3.5 SUBMITTALS AND DELIVERABLES
3.6 QUALITY CONTROL
3.6.1 Preparatory Phase
3.6.2 Initial Phase
3.6.3 Follow-up Phase
3.6.4 Additional Preparatory and Initial Phases
3.7 TESTS
3.7.1 Testing Procedure
3.7.2 Testing Laboratories
3.7.3 Onsite Laboratory
3.7.4 Furnishing or Transportation of Samples for Testing
3.8 COMPLETION INSPECTION
3.8.1 Punch-Out Inspection
3.8.2 Pre-Final Inspection
3.8.3 Final Acceptance Inspection
3.9 DOCUMENTATION
3.10 NOTIFICATION OF NONCOMPLIANCE
-- End of Section Table of Contents --
SECTION 01 45 00.00 25 Page 1
SECTION 01 45 00.00 25
QUALITY CONTROL
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C1077 (2014) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation
ASTM C1093 (2009) Standard Practice for Accreditation of Testing Agencies for Masonry
ASTM D3666 (2013) Standard Specification for Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials
ASTM D3740 (2012a) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction
ASTM E329 (2014) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following must be submitted in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Contractor Quality Control Plan; G
Construction Quality Management for Contractors
Furnish documentation that the Contractor Quality Control System Manager has completed the Corps of Engineers course titled "Construction Quality Management for Contractors."
SD-06 Test Reports
Daily CQC Report
SECTION 01 45 00.00 25 Page 2
1.3 LABORATORY VALIDATION
For tests performed under this Contract, use a testing laboratory validated by the Corps of Engineers Material Testing Center (MTC). See paragraph entitled TESTS.
1.4 PAYMENT
Separate payment will not be made for providing and maintaining an effective Quality Control system, and all associated costs will be included in the applicable unit prices or lump-sum prices contained in the Price Schedule.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Quality Control System
Establish and maintain an effective quality control (QC) system in compliance with Contract Clause 52.246-12, INSPECTION OF CONSTRUCTION. The quality control system must consist of plans, procedures, and organization necessary to produce an end product which complies with the Contract requirements. The QC system must cover all construction operations, both onsite and offsite, and be keyed to the proposed construction sequence.
3.1.2 Project Superintendent
Identify an individual, within the onsite work organization, as Project Superintendent. The Project Superintendent must be a Journeyman with a minimum of five years experience in a verifiable Project Superintendent role on jobs similar to this Contracts. The designated Project Superintendent must be acceptable to the CO. The Project Superintendent must be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer (CO) for non-compliance with the quality requirements specified in the Contract. In this context the highest level manager responsible for the overall construction activities at the site, including quality and production is the Project Superintendent. The Project Superintendent must maintain a physical presence at the site at all times, except as otherwise acceptable to the CO, and must be responsible for all construction and construction related activities at the site. The Project Superintendent must have no other duties; they may not perform the duties of an equipment operator, flagger, laborer, or any other position. Identify an alternate for the Project Superintendent to serve in the event of the Project Superintendent's absence and/or to cover work performed on additional shift. The requirements for the alternate are the same as the designated Project Superintendent.
3.2 CONTRACTOR QUALITY CONTROL PLAN
Submit no later than 21 calendar days days after receipt of Notice to Proceed, the Contractor Quality Control (CQC) Plan proposed to implement the requirements of Contract Clause 52.246-12, INSPECTION OF CONSTRUCTION.
The Government will consider an interim plan for the first 10 days of operation. Construction will be permitted to begin only after acceptance
SECTION 01 45 00.00 25 Page 3 of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the features of work included in an accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional features of work.
3.2.1 Content of the CQC Plan
Include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:
a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff must implement the three phase control system for all aspects of the work specified. Include in the staff a CQC System Manager.
b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function; see paragraph entitled QUALITY CONTROL ORGANIZATION.
c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the Contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities must be issued by the CQC System Manager. Copies of these letters must be furnished to the Government.
d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures must be in accordance with Section 01 33 00, SUBMITTAL PROCEDURES.
e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Use laboratory facilities approved by the CO.)
f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.
g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.
h. Reporting procedures, including proposed reporting formats.
i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each Section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular
SECTION 01 45 00.00 25 Page 4 section. This list will be agreed upon during the coordination meeting.
3.2.2 Acceptance of CQC Plan
Acceptance of the CQC plan is required prior to the start of construction.
Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in the CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.
3.2.3 Notification of Changes
After acceptance of the CQC Plan, notify the CO in writing of any proposed change. Proposed changes are subject to acceptance by the CO.
3.3 COORDINATION MEETING
After the Preconstruction Conference, before start of construction and prior to acceptance by the Government of the CQC Plan, the Contractor shall meet with the CO and discuss the Contractor's quality control system.
Submit the CQC Plan for review a minimum of 5 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management, and control with the Government's Quality Assurance. Minutes of the meeting will be prepared by the Government and signed by both the Contractor and the CO and will become a part of the Contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure Contract compliance. The Safety and Health Manager must receive direction and authority from the CQC System Manager and serve as a member of the CQC staff. Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly must be included as part of the CQC organization. The Contractor's CQC staff must maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure Contract compliance. All CQC staff members must be subject to acceptance by the CO. Promptly complete and furnish all letters, material submittals, shop drawing submittals, schedules, and all other project documentation to the CQC organization. The CQC organization must maintain these documents and records at the site at all times, except as otherwise acceptable to the CO.
3.4.2 CQC System Manager Qualifications
Identify an individual, within the onsite work organization, as CQC System Manager who shall be responsible for writing and executing a complete CQC plan, overall management of CQC, and have the authority to act in all CQC
SECTION 01 45 00.00 25 Page 5 matters for the Contractor. The CQC System Manager must have a minimum of five years experience in a verifiable CQC role on jobs similar to this Contract. This CQC System Manager must be on the site at all times during construction and be employed by the prime Contractor. The CQC System Manager shall be assigned no other duties. Identify in the plan an alternate for the CQC System Manager to serve in the event of the CQC System Manager's absence and/or to cover work performed on additional shifts. The requirements for the alternate are the same as the designated CQC System Manager.
3.4.3 CQC Specialized Personnel
In addition to CQC personnel specified elsewhere in the Contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical, mechanical, if the CQC manager is not qualified to cover these areas. These individuals may be employees of the prime or subcontractor; must be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; and meet the same experience/education qualifications in their own discipline as for the CQC Manager. These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan. A single person may cover more than one area provided that they are qualified to perform QC activities in each designated and that workload allows.
3.4.4 Construction Quality Management for Contractors
In addition to the above experience and education requirements, the CQC System Manager and Alternate CQC System Manager must have successfully completed the course entitled "Construction Quality Management For Contractors." This course is periodically offered by the Associated Builders and Constructors, Inc., or Associated General Contractor, Inc. and must be retaken every five years. The course has been coordinated with the Navy and certificates from the Navy will be accepted. For further information regarding courses in the Portland area contact: Associated General Contractors, Oregon-Columbia Chapter at (503) 682-3363 or http://www.agc-oregon.org/education-and-training/army-corps-of-engineers/.
3.4.5 Organizational Changes
Maintain the CQC staff at full strength at all times. When it is necessary to make changes to the CQC staff, revise the CQC Plan to reflect the changes and submit the changes to the CO for acceptance.
3.5 SUBMITTALS AND DELIVERABLES
Submittals, if needed, must comply with the requirements in Section 01 33 00, SUBMITTAL PROCEDURES. The CQC organization must be responsible for certifying that all submittals and deliverables are in compliance with Contract requirements.
3.6 QUALITY CONTROL
Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the Contract. At least three phases (Preparatory, Initial, and Follow-up) of control must be conducted by the CQC System Manager for each definable feature of the construction work as
SECTION 01 45 00.00 25 Page 6 follows:
3.6.1 Preparatory Phase
This phase must be performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:
a. Review each paragraph of applicable specifications, reference codes, and standards. Make available during the preparatory inspection a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field. Maintain and make available in the field for use by Government personnel until final acceptance of the work.
b. Review of the Contract drawings.
c. Check to assure that all materials and/or equipment have been tested, submitted, and approved.
d. Review of provisions that have been made to provide required control inspection and testing.
e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the Contract.
f. Physical examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.
g. Review of the appropriate activity hazard analysis to assure safety requirements are met.
h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.
i. Check to ensure that the portion of the plan for the work to be performed has been accepted by the CO.
j. Discussion of the initial control phase.
k. Notify the Government at least 24 hours in advance of beginning the preparatory control phase. Include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. The CQC System Manager must prepare and document the results of the preparatory phase actions by separate minutes, and attach to the daily CQC report. Instruct applicable workers as to the acceptable level of workmanship required in order to meet Contract specifications.
3.6.2 Initial Phase
This phase must be accomplished at the beginning of a definable feature of work. Accomplish the following:
a. Check work to ensure that it is in full compliance with Contract requirements. Review minutes of the preparatory meeting.
SECTION 01 45 00.00 25 Page 7
b. Verify adequacy of controls to ensure full Contract compliance.
Verify required control inspection and testing.
c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.
d. Resolve all differences.
e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.
f. Notify the Government at least 24 hours in advance of beginning the initial phase. Document separate minutes of this phase, prepared by the CQC System Manager, and attach to the daily CQC report. Indicate exact location of initial phase for future reference and comparison with follow-up phases.
g. Repeat the initial phase for each new crew to work onsite, or any time acceptable specified quality standards are not being met.
3.6.3 Follow-up Phase
Perform daily checks to assure control activities, including control testing, are providing continued compliance with Contract requirements, until completion of the particular feature of work. Record the daily checks in the CQC documentation. Conduct final follow-up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work.
3.6.4 Additional Preparatory and Initial Phases
Conduct additional preparatory and initial phases on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision, or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.
3.7 TESTS
3.7.1 Testing Procedure
Perform specified or required tests to verify that control measures are adequate to provide a product that conforms to Contract requirements.
Report all test results using industry standard forms at the frequency specified in the Contract. Upon request, furnish to the Government duplicate samples of test specimens for QA verification testing by the Government. Procure the services of a Corps of Engineers approved testing laboratory, as described in subparagraph entitled Testing Laboratories, or establish an approved testing laboratory at the project site. Perform the following activities and record and provide the following data:
a. Verify that testing procedures comply with Contract requirements.
b. Verify that facilities and testing equipment are available and comply with testing standards.
SECTION 01 45 00.00 25 Page 8
c. Check test instrument calibration data against certified standards.
d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.
e. Record results of all tests taken, both passing and failing, on the CQC report for the date taken. Include Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test. If approved by the CO, actual test reports may be submitted later with a reference to the test number and date taken. Provide an information copy of tests performed by an offsite or commercial test facility directly to the CO. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for this Contract.
3.7.2 Testing Laboratories
The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the Contract specifications and to check the laboratory technician's testing procedures and techniques.
a. Validation. The validation of a testing laboratory is site-specific and cannot be transferred to a facility at a different location. Costs for validation by the Corps of Engineers MTC must be borne by the laboratory and/or the Contractor. Validation is granted only for the specific testing procedures requested to be validated. The laboratory may select the testing procedures to be validated, except for the Quality Assurance requirements of the applicable ASTM standards listed in this paragraph.
b. Validation Procedures. Validation of a testing laboratory consists of either an inspection or audit, as defined below:
(1) Inspection must be performed by the MTC to verify compliance with the applicable provisions of ASTM C1077, ASTM C1093, ASTM D3666, ASTM D3740, and ASTM E329.
(2) An audit would be performed by the MTC in lieu of an inspection for laboratories holding a current AASHTO accreditation. Inspection by the MTC may be required after auditing if critical testing procedures required in the Contract were not included in the applicable CCRL or AMRL inspections.
c. Validation Schedule. For aggregate, concrete, bituminous materials, soil, rock, riprap, and metal components, the frequency of validation inspections or audits is once every two years. For water quality and sediment testing the validation schedule is every 18 months. When conditions change substantially from the time of the last validation, laboratories must be re-validated.
d. Validation Process. For information on the validation process and costs contact the MTC at (601) 634-2496 or fax at (601) 634-3242.
Procedures for validation, including forms requesting validation may be obtained from the MTC web site at:
www.erdc.usace.army.mil/Media/FactSheets/FactSheetArticleView/tabid/
SECTION 01 45 00.00 25 Page 9
9254/Article/6289/materials-testing-center.aspx.
The Contractor is cautioned that the validation process is lengthy and that it requires immediate action. Keep the CO informed about the validation process as it proceeds in a timely manner.
3.7.3 Onsite Laboratory
The Government reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests, and to check the Contractor's testing procedures, techniques, and test results at no additional cost to the Government.
3.7.4 Furnishing or Transportation of Samples for Testing
Costs incidental to the transportation of samples or materials must be borne by the Contractor. Samples of materials for test verification and acceptance testing by the Government must be delivered to the Portland District contract commercial Laboratory in the District area. Coordination for each specific test, exact delivery location, and dates must be made through the Portland District Resident Office.
3.8 COMPLETION INSPECTION
3.8.1 Punch-Out Inspection
The CQC Manager must conduct an inspection of the work near the end of the work, or any increment of the work established by a time stated in the specifications, or the Contract Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. As required by paragraph DOCUMENTATION, prepare and include in the CQC documentation a punch list of items which do not conform to the approved drawings and specifications.
Include within the list of deficiencies the estimated date by which the deficiencies will be corrected. The CQC System Manager or staff must make a second inspection to ascertain that all deficiencies have been corrected. Once this is accomplished, notify the Government that the facility is ready for the Government Pre-Final inspection.
3.8.2 Pre-Final Inspection
The Government will perform the pre-final inspection to verify that the work is complete. A Government Pre-Final Punch List may be developed as a result of this inspection. The Contractor's CQC System Manager must ensure that all items on this list have been corrected before notifying the Government, so that a Final inspection with the customer can be scheduled.
Correct any items noted on the Pre-Final inspection in a timely manner.
These inspections and any deficiency corrections required by this paragraph must be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate completion dates.
3.8.3 Final Acceptance Inspection
The Contractor's Quality Control Inspection personnel, plus the superintendent or other primary management person, and the CO must be in attendance at the final acceptance inspection. Additional Government personnel including, but not limited to, those from Base/Post Civil Facility Engineer user groups and major commands may also be in attendance. The final acceptance inspection will be formally scheduled by the CO based upon results of the Pre-Final inspection. Notify the CO at
SECTION 01 45 00.00 25 Page 10 least 14 days prior to the final acceptance inspection and include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the Contract, will be complete and acceptable by the date scheduled for the final acceptance inspection. Failure of the Contractor to have all Contract work acceptably complete for this inspection will be cause for the CO to bill the Contractor for the Government's additional inspection cost in accordance with Contract Clause 52.246-12, INSPECTION OF CONSTRUCTION.
3.9 DOCUMENTATION
Daily CQC Report:
a. Maintain current records providing factual evidence that required quality control activities and/or tests have been performed. Include in these records the work of subcontractors and suppliers on an acceptable form that includes, as a minimum, the following information:
(1) Contractor/subcontractor and their area of responsibility.
(2) Operating plant/equipment with hours worked, idle, or down for repair.
(3) Work performed each day, giving location, description, and by whom. When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.
(4) Test and/or control activities performed with results and references to specifications/drawings requirements. Identify the control phase (Preparatory, Initial, or Follow-up). List of deficiencies noted, along with corrective action.
(5) Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications/drawings requirements.
(6) Submittals and deliverables reviewed, with Contract reference, by whom, and action taken.
(7) Offsite surveillance activities, including actions taken.
(8) Job safety evaluations stating what was checked, results, and instructions or corrective actions.
(9) Instructions given/received and conflicts in plans and/or specifications.
(10) Contractor's verification statement.
(11) Deficiency Tracking System. Maintain a cumulative list of deficiencies identified for the duration of the project.
Deficiencies to be listed include those failures, Government oral observations, and Notifications of Noncompliance. Maintain the list at the project site. Submit copies of updated listings to the Government at least every 30 days.
b. Indicate a description of trades working on the project; the number of personnel working; weather conditions encountered; and any delays encountered. Cover both conforming and deficient features and include
SECTION 01 45 00.00 25 Page 11 a statement that equipment and materials incorporated in the work and workmanship comply with the Contract. Electronically submit daily reports and a signed, printed copy of these records to the Government within 24 hours after the date covered by the report, except that reports need not be submitted for days on which no work is performed.
As a minimum, prepare and submit one report for every seven days of no work and on the last day of a no work period. All calendar days must be accounted for throughout the life of the Contract. The first report following a day of no work must be for that day only. Reports must be signed and dated by the CQC System Manager. Include copies of test reports and copies of reports prepared by all subordinate quality control personnel within the Daily CQC Report.
3.10 NOTIFICATION OF NONCOMPLIANCE
The CO will notify the Contractor of any detected noncompliance with the foregoing requirements. Take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, must be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the CO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor must make no part of the time lost due to such stop orders the subject of claim for extension of time or for excess costs or damages.
-- End of Section --
SECTION 01 45 00.00 25 Page 12
| A.07.24_Amendment0002_16B0008 |
| PUBLISH |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 45 00.00 25 - QUALITY CONTROL |
| 01 45 00.00 25 - QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 LABORATORY VALIDATION |
| 1.4 PAYMENT |
| PART 2 PRODUCTS - NOT USED |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.1.1 Quality Control System |
| 3.1.2 Project Superintendent |
| 3.2 CONTRACTOR QUALITY CONTROL PLAN |
| 3.2.1 Content of the CQC Plan |
| 3.2.2 Acceptance of CQC Plan |
| 3.2.3 Notification of Changes |
| 3.3 COORDINATION MEETING |
| 3.4 QUALITY CONTROL ORGANIZATION |
| 3.4.1 Personnel Requirements |
| 3.4.2 CQC System Manager Qualifications |
| 3.4.3 CQC Specialized Personnel |
| 3.4.4 Construction Quality Management for Contractors |
| 3.4.5 Organizational Changes |
| 3.5 SUBMITTALS AND DELIVERABLES |
| 3.6 QUALITY CONTROL |
| 3.6.1 Preparatory Phase |
| 3.6.2 Initial Phase |
| 3.6.3 Follow-up Phase |
| 3.6.4 Additional Preparatory and Initial Phases |
| 3.7 TESTS |
| 3.7.1 Testing Procedure |
| 3.7.2 Testing Laboratories |
| 3.7.3 Onsite Laboratory |
| 3.7.4 Furnishing or Transportation of Samples for Testing |
| 3.8 COMPLETION INSPECTION |
| 3.8.1 Punch-Out Inspection |
| 3.8.2 Pre-Final Inspection |
| 3.8.3 Final Acceptance Inspection |
| 3.9 DOCUMENTATION |
| 3.10 NOTIFICATION OF NONCOMPLIANCE |
| [2]: [2] |
| Amd0002: AMD #0002 |
File details come from the government source that posted it. Updated .