A.01.13_DDP1.111_E-101XXX.pdf
PDF 193 KB Posted
- Attached to
- Generator Step-up Transformer
- Solicitation number
- W9127N-15-R-0060
About this file
E-101XXX
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
G
H D
C S
D C
P -1 .1
-6 -0 /3
SEE NOTE 8
JOINT
CONTRACTION
SEE NOTE 8
EL 202.0
HOUSING FLANGE
EL 205.0
EL 185.0
RELIEF DEVICE
FOR PRESSURE
DISCHARGE PIPING
SEE NOTE 7
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
P O
R T
L A
N D D
IS
T R
IC
T
PORTLAND DISTRICT
S T
E V
E N R
M
IL
E S P .E
G
H D
C E
V H
A P
E S
O L
A
E-101
P O
W E
R H
O U
S E
C O
L U
M B
IA
R
IV
E R O
R A
N D W
A
A N
S I
D
SYSTEM (COPS) TANK
CONSTANT OIL PRESSURE
LOCATION
GROUND
LOCATION
GROUND
VALVE
3" DRAIN
EL 185.0
(TYP)
PENETRATION
PIPING DECK
OIL SUPPLY
RELIEF DEVICE
FOR PRESSURE
PIPING
DISCHARGE
PENETRATION
PIPING DECK
OIL DRAIN
DEVICE
RELIEF
PRESSURE
U P
S T
R E
A M
EMBEDDED CONDUITS
LOCATION OF EXISTING
DDP-1-6-1E/11 FOR
DDP-1.3-6-1E5/1 AND
SEE REF. DRAWINGS
SEE NOTE 2
18'-0"
FOR CLARITY
AS PHANTOM LINE
COPS TANK SHOWN
EL 203.0
7'-2"
VARIES
6'-6" 7'-7"
8'-3"
SEE NOTE 7
SEE NOTE 4
EMBEDDED IN DECK
UNDER TRANSFORMER
GROUND LOCATION
EMBEDDED IN DECK
UNDER TRANSFORMER
GROUND LOCATION
CABINET
CONTROL
CABINET
POWER
BOX
ENTRANCE
CONDUIT
HI
H0 X2 X1
11"
21"
31'-7"31'-7"
JOINT
CONTRACTION
MAIN DRAIN VALVE
VALVE
LOWER SERVERON
GAUGES
VALVE
FILL
UPPER
VALVE
SERVERON
UPPER
EL 190.0
RESERVED
AREA
VALVE
FILL
UPPER
RESERVED
AREA
RESERVED
AREA
VALVE
LOWER FILTER
VALVE
MAIN DRAIN
VALVE
FILTER
LOWER
CABINET
CONDUIT ENTRANCE
MIN
3'
MIN
3'
13'-0"
24"
14"
FOR SERVERON WIRING
CONDUIT CAPPED
1 1/2"
SEE NOTE 9
SEE NOTE 9
THE POWERHOUSE GROUNDING SYSTEM (BY OTHERS).
THE TANK GROUNDING PADS SHALL BE BONDED TO
STRAP CONNECTION TO THE TANK GROUNDING PADS.
10. TRANSFORMER BUSHINGS SHALL HAVE A GROUND
SUPPLIED AND INSTALLED BY OTHERS.
UNISTRUT TO WHICH GAS/OIL ANALYZER WILL BE
9. SUPPORT BEAMS FOR FASTENING 1 5/8" DEEP
PARAGRAPH 2.6.9.
SEE SPECIFICATIONS SECTION 48 19 23.01
BASE. TO BE SHIPPED PRIOR TO TRANSFORMER.
8. SUPPLY SEPARABLE STRUCTURAL STEEL SUPPORTING
CONNECTION TO EXISTING BUS WORK.
7. BUSHING LOCATIONS ARE FIXED TO FACILITATE
BOTTOM OF TRANSFORMER TANK.
THE BASE OF THE TRANSFORMER AT EXTREME
THE MAIN DRAIN VALVE IS LOCATED 16" ABOVE
AND SHALL BE SIZED SUCH THAT THE CENTER OF
CLOSER THAN 8" TO THE CONTRACTION JOINT,
OVERLAP CONTRACTION JOINT, SHALL BE NO
6. TRANSFORMER STRUCTURAL STEEL BASE SHALL NOT
AND CONDITIONS.
5. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS
4. VERTICAL DRAFT LOW NOISE FANS AS REQUIRED.
AND DDP-1-6-1E/1)
POWERHOUSE. (SEE DRAWINGS E-402, E-405
CIRCUITS FROM THE CABINET INTO THE
ROUTING TRANSFORMER CONTROL AND RELAYING
CONDUIT BLOCK OUT SHOWN CAN BE USED FOR
CABINET SO THAT THE EXISTING EMBEDDED
SHALL INCLUDE CONDUIT TO A CONDUIT ENTRANCE
3. THE TRANSFORMER CONTROL CABINET LOCATION
VOLTAGE BUS.
DDP-1-6-1A5/5 FOR EXISTING TRANSFORMER LOW
2. SEE REFERENCE DRAWING DDP-56-162-16 AND
F. VAULT OPENINGS
CABINET
E. CONTROL CABINET AND CONDUIT ENTRANCE
D. OIL DRAIN VALVE
C. HIGH-VOLTAGE NEUTRAL BUSHING
B. LOW-VOLTAGE BUSHINGS
A. HIGH-VOLTAGE BUSHING
TRANSFORMER INSTALLATION.
ALLOW FOR PROPER INTERCONNECTION DURING
TRANSFORMER APPURTENANCES, AS INDICATED, TO
GIVEN TO THE DESIGN AND PLACEMENT OF THE
MAINTENANCE. PARTICULAR ATTENTION SHOULD BE
TO ASSURE ADEQUATE SPACE FOR FUTURE
AND THE VAULT STRUCTURE HAVE BEEN INDICATED
LIMITING DIMENSIONS BETWEEN THE TRANSFORMER
INTERCONNECTION TO THE EXISTING POWERPLANT.
DESIGNING THE TRANSFORMER FOR PROPER
PROVIDED FOR THE MANUFACTURER'S USE IN
INDICATED ON THIS DRAWING HAVE BEEN
1. THE TRANSFORMER LAYOUT AND DIMENSIONS AS
EMBEDDED IN DECK
UNDER TRANSFORMER
GROUND LOCATION DETAIL ON SHEET E-301)
GROUNDING COVER (SEE
CORE AND CORE FRAME
SEE NOTE 9
ITEMS
FOR FUTURE
RESERVED
SPACE
X2 H0
X1
HI
X2 H0
X1
HI
D
IM
E N
S
IO
N S
T
R A
N F
O R
M E
R B
A N
K T I
L A
Y O
U T A
N D L
IM
IT
IN
G D
D P .1
E -1
X X
X .d g n
/0
/2
G S
U T
R A
N S
F O
R M
E R S
U P
P L
Y
T H
E D
A L L E
S L
O C
K A
N D D
A M
W
N -1
-R -0
-1
-2
C H
G E -4
E -4
W
E R
E E -0
E -0
B J B
B
A
VIEW A-A TRANSFORMER BANK T1 EL 185.00
SCALE: 3/16" = 1'-0'
SCALE: 3/16" = 1'-0'
ELEVATION TRANSFORMER BANK T1 - EL 185.0
B
SCALE: 3/16" = 1'-0"
SECTION
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
D R
A W
IN
G N
U M
B E
R of Engineers
US Army Corps
P L
O T D
A T
E
54321
D
C
B
A
/1
/2 n w d \n w p \E
T D
S \C
A D
D -W o rk s p a c e s \N
W P \W o rk
S p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
BORDER VERSION UPDATE [09-2012]
E-101SHEET NAME:g2hdcjpr BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 10/16/2015 3:38:51 PM
D R
A W
N B
Y
C H
E C
K E
D B
Y
File details come from the government source that posted it. Updated .