AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project Number: 493308 Airport Restroom #2 Renovation Waco Lake Project Office, Waco, TX, The purpose of this amendment is to revise the Solicitation as outlined below . All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jun-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G22B0008

X 9B. DATED (SEE ITEM 11)

13-Jun-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jun-2022

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G22B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION SF30 - CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 11 00 - STANDARD FORM (SF) 1442 AND CLIN SCHEDULE

The required response date/time has changed from 13-Jul-2022 10:00 AM to 21-Jul-2022 10:00 AM.

The following have been added by full text:

AMENDMENT 0001

A. CONTRACT CHANGES: Statement of Work Additions. The Site Visit Sign-In Sheet and Minutes are added.

Bid Due Date Extended and Bid Opening Date and Time changed. Instructions to Offerors. Wage Determination Revised 06/17/2022.

B. TECHNICAL SPECIFICATION CHANGES: There are no specification changes with this amendment.

C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.

The following have been modified:

CLIN SCHEDULE

CESWF-OPR-A, Airport Park RR #2 Rehab

Waco, Texas

BID SCHEDULE

Unit price shall include all associated costs for each item.

Reference Summary of Work and attachments.

Item Description Quantity Unit U/Price Amount

BASE

0001 Renovation of Airport Park, Restroom 2: Job $____________

Includes all labor, tools, equipment and management necessary to provide renovations to restroom 2 at airport park to include but not limited to:

Replacing roof system, Electrical System, Plumbing System, Wall Panels, Interior and Exterior Carpentry Repairs and Re-staining Wood Surfaces.

Total $ __________ .

Base Period of Performance shall be 60 calendar days from issuance of notice to proceed.

Prices must be valid for 60 calendar days after submission of the proposal.

SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

CONTRACTOR INFORMATION SHEET

Contractor Information Sheet

**THIS MUST BE COMPLETED AND RETURNED WITH YOUR BID**

IN THE EVENT OF AWARD, ISSUE CONTRACT TO:

NAME

ADDRESS

(Number & Street) (City, State and Zip)

PHONE NUMBER MOBILE

(Area code and number) (Area code and number)

EMAIL ADDRESS________________________________________________________________

DUNS NUMBER

CAGE CODE NUMBER

TIN NUMBER ______________________________

UNIQUE ENTITY ID__________________________

INSTRUCTIONS TO OFFERORS

SEALED BID INSTRUCTIONS

PART I – GENERAL INFORMATION

A. OFFEROR’S QUESTIONS AND COMMENTS

OFFEROR'S QUESTIONS AND COMMENTS

All questions and/or comments are to be submitted via ProjNet.

Bidder Inquiry in ProjNet at http://www.projnet.org/projnet

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

From this page you may view all bidder inquiries or add inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is W9126G2200008 The Bidder Inquiry Key is: YCDAWE-V7XH2G

Last day to submit ProjNet questions is five (5) calendar days prior to bid due date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

*** Please Note: Offerors shall only submit one question per inquiry. Inquiries containing multiple questions may be rejected The call center operates weekdays from 8AM to 5PM U.S. Central Standard Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

B. INSTRUCTIONS TO OFFERORS

SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BID SUBMISSION (FAR 14.302 AND

14.304)

Electronic copies of bids and the Standard Form 24, Bid Bond, shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Bids submitted by mail or hand carried will not be evaluated. Bids sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Bidder to confirm receipt of bids. All Bids received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR).

There are 10 general steps a vendor must follow in order to use PIEE application modules. A complete list can be viewed at the following site:

https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml#step5

For instructions on how to post your Bid, please refer to the Posting Offer demo:

https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.

It is the Bidder’s responsibility to obtain written confirmation of receipt of all electronic bid files submitted by the Fort Worth District Contracting office. In the event that the Solicitation Module is down, the alternate method for bid submission is via email to: CIV-OPS.Proposals@usace.army.mil ONLY. The Bidder must obtain prior approval from the Contracting Officer/Contract Specialist (Jamauh.d.winston@usace.army.mil/

Nikisha.w.cook@usace.army.mil) to use the alternate submission method. Bidders are responsible for ensuring electronic files are virus-free and shall run an anti-virus scan before submission.

Electronic copies of each Bid shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite 2016. Narrative portions of the proposal shall be in Adobe Acrobat portable document file (pdf) searchable text format. The Bidder shall not embed sound or video (e.g., MPEG) files into the proposal files. Electronic files shall be clearly identified for each volume, section, and item.

SENDING FILES. In an effort to reduce paperwork and reduce cost, all bids shall be submitted electronically.

All submissions should be in Adobe PDF format.

Title the file(s) in the following format:

W9126G22B0008_COMPANY NAME_ DESCRIPTION

Upload Completion & Deadline. Interested parties shall submit responses no later than the date specified on solicitation document. The time & date of bid receipt will be the upload completion / delivery time & date recorded.

1. Electronically submitted offers must include the completed SF 1442 (in accordance with FAR 52.214-18), Acknowledgement of all amendments, completed CLIN schedule and original Bid Bond.

2. . Offers received will be publicly opened at the following location:

US Army Corps of Engineers District, Fort Worth

819 Taylor St, Room 2A19Q

Fort Worth, TX 76102

DATE: 14 22 July 2022

TIME: 0900 1030 AM CDT

3. . Teleconference Dial-In Information for the public bid opening:

Phone: (844) 800-2712 Attendee Access: 43375062

Pin: 8286

4. Please note, oral explanations or instructions are not binding. Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

5. Original copies of the Bid Bond shall be submitted to the following point of contact two (2) business days after the bid due date

US Army Corps of Engineers District, Fort Worth

Attn: Stella Morales

819 Taylor Street, Room 2A17

Fort Worth, TX 76123-0300

6. DELIVERY of hard copies and/or CD-ROMs of offers, modifications thereto, or cancellations of offers will not be accepted.

7. OFFERS BY TELEGRAPH. Offers received by telegraph, modifications thereto, or cancellations of offers will not be accepted.

8. FACSIMILE OFFERS. Facsimile offers, modifications thereto, or cancellation of offers will not be accepted.

9. EMAIL. Follow the procedures in paragraph B titled “Instructions to Offerors/Special Instructions Pertaining to

Electronic Bid Submission (FAR 14.302 and FAR 14.304)

10. NOTICE REGARDING POTENTIAL EMPLOYMENT ON MILITARY INSTALLATION

If the work called for by this request for proposal is located on a military installation, offerors should check with post/base security to determine if potential employees will be allowed on the base/post to seek employment.

11. RESPONSIBILITY. Award will be made to the lowest, responsible bidder whose bid, conforming to the invitation for bids, will be the most advantageous to the Government. To be determined responsible, the apparent low bidder shall:

(1) Have adequate financial resources to perform the contract, or the ability to obtain them. The contractor will be required to provide the Name of the Financial Institution, POC, and phone number.

(2) Have a satisfactory performance record. The contractor shall have no performance annotated with an individual rating of less than SATISFACTORY on any Final Evaluation within five (5) years from the bid opening date.

(3) Have a satisfactory record of integrity and business ethics. Awardee will be required to provide at least three (3) references for like work, to include Business Name, Point of Contact, and telephone number.

(4) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor or subcontractor). Per FAR 9.104-3, acceptable evidence normally consists of a commitment or explicit arrangement that will be in existence at the time of the contract to acquire the needed equipment, facilities, other resources or personnel.

(5) Have the necessary production, construction and technical equipment and facilities, or the ability to obtain them; and

(6) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

12. NOTIFICATION OF UNSUCCESSFUL BIDDERS. All contract award information for this solicitation will be published electronically on www.sam.gov via the solicitation number. Written unsuccessful bidder letters will NOT be issued.

a. PREPROPOSAL CONFERENCE/SITE VISIT

SITE VISIT. See FAR clause 52.236-27 Site Visit (CONSTRUCTION) (FEB 1995) – ALTERNATE I IMPORTANT NOTES. (1) Remarks and explanations addressed during the conference shall not qualify or alter the terms and conditions of the solicitation. (2) The terms and conditions of the solicitation remain unchanged unless the solicitation is formally amended in writing.

13. Submittals:

Complete and return provisions 52.204-24 Complete and return Contract Clause 52.219-28 Complete SF 1442 blocks 14, 15, 19, (Acknowledge all amendments), 20a, 20b, 20c of the SF 1442 and return with the completed Contract Line Item Schedule.

Offerors must insert a price on all numbered items of the Clin Schedule. Failure to do so may Result in the bid being unacceptable.

14. National Institute of Standards and Technology (NIST)

Please NOTE this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) prior to responding to this solicitation. The NIST score is a responsiveness item. Bids/offers from contractors with a NIST score in SPRS will be considered responsive and evaluated/considered. Those without a NIST score in SPRS prior to award will be deemed NON-RESPONSIVE and thus not evaluated/considered for award. * If the apparent awardee does not correct the omission by refusing to enter its NIST score within 14 days after the allotted time then it can be safely deemed “not responsible”.

Reference: 252.204-2019 - Notice of NIST SP 800-171 DoD Assessment Requirements Reference: 252.204-2020 - NIST SP 800-171 DoD Assessment Requirements See the Attached Quick Entry Guide to assist with entering NIST Assessment.

Contact Help Desk at (866)618-5988 for additional assistance.

SECTION 00 73 46 - WAGE DETERMINATION SCHEDULE

WAGE DETERMINATION

"General Decision Number: TX20220260 02/25/2022

Superseded General Decision Number: TX20210260

State: Texas

Construction Type: Building

County: McLennan County in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.

Modification Number Publication Date 0 01/07/2022 1 02/25/2022

BOIL0074-003 01/01/2021

Rates Fringes

BOILERMAKER......................$ 29.47 24.10

ELEC0072-002 12/01/2021

Rates Fringes

ELECTRICIAN......................$ 28.05 3%+8.83

ENGI0178-005 06/01/2020

Rates Fringes

POWER EQUIPMENT OPERATOR

(1) Tower Crane.............$ 32.85 13.10

(2) Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above.....$ 28.75 10.60

(3) Hydraulic cranes 59 Tons and under..............$ 32.35 13.10

IRON0084-011 06/01/2021

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 26.01 7.56

PLUM0286-011 06/07/2021

Rates Fringes

PIPEFITTER (Excludes HVAC Pipe Installation)...............$ 32.05 14.92

PLUM0529-002 10/04/2021

Rates Fringes

Plumber........................$ 29.24 11.84

* SUTX2014-036 07/21/2014

Rates Fringes

BRICKLAYER.......................$ 18.00 0.00

CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation.....................$ 14.76 ** 0.00

CEMENT MASON/CONCRETE FINISHER...$ 13.13 ** 0.00

DRYWALL HANGER AND METAL STUD

INSTALLER........................$ 14.27 ** 0.00

GLAZIER..........................$ 20.00 0.00

HVAC MECHANIC (Installation of HVAC Unit Only)...............$ 15.00 1.56

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical System Insulation)...............$ 19.77 7.13

IRONWORKER, REINFORCING..........$ 13.35 ** 0.00

IRONWORKER, STRUCTURAL...........$ 20.50 5.15

LABORER: Common or General......$ 11.10 ** 0.00

LABORER: Mason Tender - Brick...$ 8.00 ** 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 9.93 ** 0.00

LABORER: Pipelayer..............$ 12.49 ** 2.13

LABORER: Roof Tearoff...........$ 11.28 ** 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 13.59 ** 1.60

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 13.93 ** 0.00

OPERATOR: Bulldozer.............$ 18.29 1.31

OPERATOR: Drill.................$ 16.22 0.34

OPERATOR: Forklift..............$ 15.00 0.00

OPERATOR: Grader/Blade..........$ 14.34 ** 1.68

OPERATOR: Loader................$ 14.01 ** 0.44

OPERATOR: Mechanic..............$ 17.52 3.33

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 0.00

OPERATOR: Roller................$ 13.11 ** 0.00

PAINTER (Brush, Roller, and Spray)...........................$ 13.00 ** 0.00

ROOFER...........................$ 13.75 ** 0.00

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 19.00 5.73

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 14.62 ** 0.00

TILE FINISHER....................$ 11.22 ** 0.00

TILE SETTER......................$ 14.74 ** 0.00

TRUCK DRIVER: Dump Truck........$ 12.24 ** 1.62

TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57

TRUCK DRIVER: Semi-Trailer Truck............................$ 12.50 ** 0.00

TRUCK DRIVER: Water Truck.......$ 12.00 ** 4.11

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

"General Decision Number: TX20220260 06/17/2022

Superseded General Decision Number: TX20210260

State: Texas

Construction Type: Building

County: McLennan County in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.

Modification Number Publication Date

0 01/07/2022 1 02/25/2022 2 06/17/2022

BOIL0074-003 01/01/2021

Rates Fringes

BOILERMAKER......................$ 29.47 24.10

* ELEC0072-002 06/01/2022

Rates Fringes

ELECTRICIAN......................$ 29.05 3%+8.83

ENGI0178-005 06/01/2020

Rates Fringes

POWER EQUIPMENT OPERATOR

(1) Tower Crane.............$ 32.85 13.10

(2) Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above.....$ 28.75 10.60

(3) Hydraulic cranes 59 Tons and under..............$ 32.35 13.10

IRON0084-011 06/01/2021

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 26.01 7.56

* PLUM0286-011 06/06/2022

Rates Fringes

PIPEFITTER (Excludes HVAC Pipe Installation)...............$ 33.15 15.37

PLUM0529-002 10/04/2021

Rates Fringes

Plumber........................$ 29.24 11.84

* SUTX2014-036 07/21/2014

Rates Fringes

BRICKLAYER.......................$ 18.00 0.00

CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation.....................$ 14.76 ** 0.00

CEMENT MASON/CONCRETE FINISHER...$ 13.13 ** 0.00

DRYWALL HANGER AND METAL STUD

INSTALLER........................$ 14.27 ** 0.00

GLAZIER..........................$ 20.00 0.00

HVAC MECHANIC (Installation of HVAC Unit Only)...............$ 15.00 1.56

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical System Insulation)...............$ 19.77 7.13

IRONWORKER, REINFORCING..........$ 13.35 ** 0.00

IRONWORKER, STRUCTURAL...........$ 20.50 5.15

LABORER: Common or General......$ 11.10 ** 0.00

LABORER: Mason Tender - Brick...$ 8.00 ** 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 9.93 ** 0.00

LABORER: Pipelayer..............$ 12.49 ** 2.13

LABORER: Roof Tearoff...........$ 11.28 ** 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 13.59 ** 1.60

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 13.93 ** 0.00

OPERATOR: Bulldozer.............$ 18.29 1.31

OPERATOR: Drill.................$ 16.22 0.34

OPERATOR: Forklift..............$ 15.00 0.00

OPERATOR: Grader/Blade..........$ 14.34 ** 1.68

OPERATOR: Loader................$ 14.01 ** 0.44

OPERATOR: Mechanic..............$ 17.52 3.33

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 0.00

OPERATOR: Roller................$ 13.11 ** 0.00

PAINTER (Brush, Roller, and Spray)...........................$ 13.00 ** 0.00

ROOFER...........................$ 13.75 ** 0.00

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 19.00 5.73

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 14.62 ** 0.00

TILE FINISHER....................$ 11.22 ** 0.00

TILE SETTER......................$ 14.74 ** 0.00

TRUCK DRIVER: Dump Truck........$ 12.24 ** 1.62

TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57

TRUCK DRIVER: Semi-Trailer Truck............................$ 12.50 ** 0.00

TRUCK DRIVER: Water Truck.......$ 12.00 ** 4.11

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

(End of Summary of Changes)