Final_Ft._Bliss_B1717-Att_B-Drawings_3aof4.pdf
PDF 9 MB Posted
- Attached to
- Buildings 1717 & 1735 renovation
- Solicitation number
- W9126G19B0010
About this file
BLDG 1717 - ATT B Drawings 3a of 4. *These documents are being uploaded for downloading purposes. These documents replace the initial document (ATT B drawing 3 of 4) posted with the initial solicitation package.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOW ARROW
CONNECT TO EXISTING
PIPE CAPPED
END OF DEMOLITION
AIRFLOW ARROW
DESCRIPTIONSYMBOL
MECHANICAL SYMBOLS LIST
NOTE: NOT ALL SYMBOLS MAY BE USED.
TEMPERATURE SENSOR
HUMIDITY SENSOR
PIPE UNION
REDUCED PRESSURE BACKFLOW PREVENTER
THREE-WAY CONTROL VALVE
TWO-WAY CONTROL VALVE
GENERAL SERVICE VALVE (SEE SPECIFICATIONS
FOR VALVE TYPE PER APPLICATION)
CHECK VALVE (ARROW INDICATES
DIRECTION OF FLOW)
AUTOMATIC BALANCING VALVE
AUTOMATIC AIR VENT
TEMPERATURE/PRESSURE TEST PLUG
(PETE'S PLUG)
DRAIN VALVE WITH THREADED
HOSE CONNECTION
THERMOMETER
STRAINER WITH BLOW DOWN VALVE
PRESSURE GAUGE WITH STOPCOCK
PITCH DOWN IN DIRECTION OF ARROW
FLEXIBLE PIPE CONNECTION
PIPE ANCHOR
MANUAL AIR VENT
PIPE GUIDES OR SLEEVES
FLOW METER
RELIEF VALVE
PRESSURE REDUCING VALVE
MANUAL BALANCING VALVEM
A
AV
MAV
TWO-WAY PRESSURE INDEPENDENT
CONTROL AND BALANCE VALVE
COCO CLEAN OUT
PICBV
THERMOSTAT WITH ADJUSTABLE CONTROLT
HUMIDISTAT WITH ADJUSTABLE CONTROLH
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
CO2
CO
NO2
H
T
STEAM TRAP
STEAM PRESSURE REGULATING VALVE
OCCUPANCY SENSOR OS
PIPE DROP
PIPE RISE
PIPE TEE DOWN
PIPE REDUCER
DESCRIPTIONSYMBOL
MECHANICAL SYMBOLS LIST CONT.
NOTE: NOT ALL SYMBOLS MAY BE USED.
SUPPLY DIFFUSER WITH FLEXIBLE DUCT
SUPPLY DIFFUSER
RETURN/EXHAUST GRILLE
SIDEWALL SUPPLY REGISTER
SIDEWALL RETURN/EXHAUST REGISTER
DAMPERS/DUCT ACCESSORIES
BDD: BACKDRAFT DAMPER
FSD: FIRE/SMOKE DAMPER
FD: FIRE DAMPER
MD: MOTORIZED DAMPER
SD: SMOKE DAMPER
VD: VOLUME DAMPER
SB: SECURITY BARS
BDD
TAG -
AIRFLOW (CFM)
TAG
AIRFLOW (CFM)
TAG
AIRFLOW (CFM)
TAG
AIRFLOW (CFM)
TAG
AIRFLOW (CFM)
DSB
TAG EXAMPLE:
DSA
TAG EXAMPLE:
GRCA
TAG EXAMPLE:
RSA
TAG EXAMPLE:
GRSA
TAG EXAMPLE:
GECA
GESA
RECTANGULAR DUCT ELBOW UP
SUPPLY AND OUTDOOR AIR
OVAL DUCT ELBOW UP
ROUND DUCT ELBOW UP
RECTANGULAR DUCT ELBOW
UP
RETURN, RELIEF, AND EXHAUST AIR
OVAL DUCT ELBOW UP
ROUND DUCT ELBOW UP
NEW WORK DUCTWORK
EXISTING DUCTWORK
DEMOLITION DUCTWORK
NEW WORK PIPING
EXISTING PIPING
DEMOLISHED PIPING
NEW WORK MECHANICAL EQUIPMENT
(WITH CLEARANCE SHOWN)
EXISTING MECHANICAL EQUIPMENT
DEMOLISHED MECHANICAL EQUIPMENT
VAV TERMINAL BOX (WITH REHEAT)
VAV TERMINAL BOX (NO REHEAT)
RECTANGULAR DUCT ELBOW DOWN
SUPPLY AND OUTDOOR AIR
OVAL DUCT ELBOW DOWN
ROUND DUCT ELBOW DOWN
RECTANGULAR DUCT ELBOW DOWN
RETURN, RELIEF, AND EXHAUST AIR
OVAL DUCT ELBOW DOWN
ROUND DUCT ELBOW DOWN
TERMINAL BOXES
ACCESS DOOR
GRSA = GRILLE - RETURN - SIDEWALL - TYPE A
GESA = GRILLE - EXHAUST - SIDEWALL - TYPE A
DSB = DIFFUSER - SUPPLY- TYPE B
DSA = DIFFUSER - SUPPLY- TYPE A
GRCA = GRILLE - RETURN - CEILING -TYPE A
GECA = GRILLE - EXHAUST - CEILING - TYPE A
RSA = REGISTER - SIDEWALL- TYPE A
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
W
G
-1
D -0
B
U
IL
D
IN
G
G
E N
E R
A L
I N
F O
H
V A
C
M001
07/24/19
MECHANICAL ABBREVIATIONS
NOTE: NOT ALL ABBREVIATIONS MAY BE USED.
ABBREVIATION DESCRIPTION
(D) EXISTING TO BE DEMOLISHED
(E) EXISTING TO REMAIN
(F) FUTURE
AFF ABOVE FINISHED FLOOR
AMB AMBIENT
APD AIR PRESSURE DROP
BAS BUILDING AUTOMATION SYSTEM
BFP BACKFLOW PREVENTOR
BHP BRAKE HORSEPOWER
BLDG BUILDING
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOS BOTTOM OF STRUCTURE
BTUH BRITISH TEHRMAL UNITS PER HOUR
CFM CUBIC FEET PER MINUTE
CL CENTER LINE
CO CLEAN OUT
COMPR COMPRESSOR
COP COEFFICIENT OF PERFORMANCE
CV CONSTANT VOLUME
DB DRY BULB
DIA DIAMETER
DN DOWN
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
EG ETHYLENE GLYCOL
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
FLA FULL LOAD AMPS
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
GAL GALLONS
GPM GALLONS PER MINUTE
HD HEAD
HP HORSEPOWER
ID INNER DIAMETER
IPLV INTEGRATED PART LOAD VALUE
KW KILOWATTS
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MBH THOUSAND BTUH
MCA MAXIMUM CURRENT AMPACITY
MFR MANUFACTURER
MOCP MAXIMUM OVERCURRENT PROTECTION
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOX NITROUS OXIDE
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
PD PRESSURE DROP
PG PROPYLENE GLYCOL
PPH POUNDS PER HOUR
PPM PARTS PER MILLION
PRV PRESSURE REDUCING VALVE
PSI PUNDS PER SQUARE INCH
REFRIG REFRIGERANT
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
SEER SEASONAL ENERGY EFFICIENCY RATIO
SP STATIC PRESSURE
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
W WATTS
WB WET BULB
WG WATER GAUGE
WPD WATER PRESSURE DROP
MECHANICAL SYSTEM TYPES AND ABBREVIATIONS
NOTE: NOT ALL ABBREVIATIONS MAY BE USED.
ABBREVIATION DESCRIPTION
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
COND CONDENSATE
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DRAIN
EA EXHAUST AIR
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
MW MAKEUP WATER - GENERIC
OA OUTDOOR AIR
PC PUMPED CONDENSATE
R REFRIGERANT
RA RETURN AIR
REL RELIEF AIR
SA SUPPLY AIR
MECHANICAL GENERAL NOTES
1. VISIT THE SITE OF THE WORK TO GAIN AN ACCEPTABLE KNOWLEDGE OF CONDITIONS
AFFECTING THE EXECUTION OF THE WORK. AFTER VISITING THE SITE, REQUEST SUCH
INFORMATION AND/OR CLARIFICATIONS AS NECESSARY TO FULLY UNDERSTAND THE
WORK REQUIRED AND TO PROPERLY ESTIMATE COSTS.
2. REVIEW ALL DRAWINGS TO VERIFY EXTENT AND SCHEDULING OF ALL DEMOLITION
ACTIVITIES PRIOR TO COMMENCING DEMOLITION WORK. FIELD VERIFY ALL SIZES AND
LOCATIONS OF EXISTING DUCTWORK AND PIPING TO REMAIN. NOTIFY
ARCHITECT/ENGINEER OF DEVIATIONS WHICH AFFECT RENOVATION WORK PRIOR TO
PROCEEDING WITH THE WORK.
3. ITEMS NOTED TO BE DEMOLISHED INCLUDES BUT IS NOT LIMITED TO ALL ASSOCIATED
COMPONENTS, CONTROL WIRING, PIPING, DUCTWORK, ELECTRICAL CONNECTIONS,
SUPPORTS, INSULATION, ETC. COORDINATE WITH OTHER TRADES AS REQUIRED.
4. ALL WORK IS TO BE PHASED AS INDICATED ON THE ARCHITECTURAL DRAWINGS.
COORDINATE PHASING OF ALL DEMOLITION, RENOVATION, AND NEW WORK WITH
OTHER TRADES. CLOSELY COORDINATE PHASING OF WORK WITHIN CORRIDORS WITH
THE OWNER. CORRIDORS CANNOT BE COMPLETELY CLOSED OFF TO PEDESTRIAN
TRAFFIC. TO ACCOMMODATE PHASING, CORRIDOR ACCESS WORK MAY NEED TO BE
PERFORMED DURING OFF PEAK PERIODS. PRIOR TO MOVING ON TO THE NEXT PHASE,
ALL WORK IN PREVIOUSLY PHASED AREAS MUST BE COMPLETE AND OPERATIONAL.
5. ENSURE THAT THE WORK WILL NOT INTERFERE OR INTERRUPT SERVICES TO AREAS
OUTSIDE OF THE DESIGNATED CONTRACT AREAS. SCHEDULE ALL WORK AS TO CAUSE
MINIMAL SERVICE INTERRUPTIONS FOR THE OWNER. UNAVOIDABLE INTERRUPTIONS
ARE TO BE SCHEDULED WITH THE OWNER NO LESS THAN TWO WEEKS PRIOR TO
THEIR EXPECTED COMMENCEMENT. WORK SHALL BE PERFORMED AT SUCH TIMES AS
DIRECTED BY THE OWNER AND, IF POSSIBLE, ARE TO OCCUR DURING OFF PEAK
PERIODS.
6. THE CONTRACTOR IS TO VERIFY THE EXACT SERVICE OF ANY EXISTING PIPING OR
DUCTWORK PRIOR TO INSTALLING ANY NEW CONNECTIONS. ANY DISCREPANCIES
BETWEEN THE CONSTRUCTION DOCUMENTS OR THE DESIGN INTENT AND ACTUAL
CONDITIONS ARE TO BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER
IMMEDIATELY, PRIOR TO FABRICATION OR INSTALLATION.
8. EACH TRADE SHALL PAY THE GENERAL CONTRACTOR TO PATCH FLOOR SLAB AND
WALL PENETRATIONS TO MATCH EXISTING WHERE THEIR PIPING, DUCT OR
EQUIPMENT IS BEING REMOVED OR INSTALLED.
9. ALL ROOFING MODIFICATIONS SHALL BE DONE BY OWNER’S ROOFING VENDOR TO
MAINTAIN ANY AND ALL WARRANTIES. COST TO BE INCLUDED IN THIS CONTRACT
UNLESS SPECIFICALLY INCLUDED IN GENERAL TRADES CONTRACTOR’S SCOPE OF
WORK.
10. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED
AND/OR REMOVED IN THE PERFORMANCE OF WORK FOR THIS PROJECT.
13. CONTRACT DOCUMENTS FOR MECHANICAL WORK ARE SCHEMATIC IN NATURE AND
ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
14. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE SYSTEMS AS INDICATED ON THE DRAWINGS AND
SPECIFICATIONS. INCLUDE ALL NECESSARY AND APPLICABLE APPURTENANCES,
WHETHER INDICATED OR NOT.
15. ANY DEVIATIONS FROM THE BASIS OF DESIGN THAT REQUIRE ADDITIONAL
PROVISIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
16. COORDINATE THE EXACT REQUIREMENTS AND LOCATION OF WORK WITH THE WORK
OF OTHER TRADES PRIOR TO FABRICATION AND INSTALLATION. PROVIDE ADDITIONAL
OFFSETS AND SECTIONS IN DUCTWORK AND/OR PIPING REQUIRED TO MEET THE
APPLICABLE JOB CONDITION REQUIREMENTS. VERIFY JOB SITE ELEVATIONS,
DIMENSIONS, AND CONDITIONS, PRIOR TO FABRICATION OR INSTALLATION OF THE
WORK. COORDINATE EXACT ROUTING OF DUCTWORK AND PIPING WITH OTHER
TRADES SO THAT NO CONFLICTS OCCUR WITH DUCTWORK, PIPING, LIGHTS,
STRUCTURE, ETC. PROVIDE ALL PERTINENT DATA CONCERNING THE LOCATION,
DIMENSIONS, ETC., OF THE MECHANICAL EQUIPMENT THAT REQUIRES BASES, CURBS
AND SUPPORTS TO THE APPROPRIATE TRADES.
18. ALL RATED WALL AND FLOOR PENETRATIONS ARE TO BE SEALED WATER TIGHT AND
PACKED WITH FIRE STOP MATERIAL.
19. ALL ITEMS THAT REQUIRE MAINTENANCE OR ADJUSTMENT MUST BE INSTALLED IN
ACCESSIBLE LOCATIONS. PROVIDE AN APPROPRIATELY SIZED ACCESS DOOR AS
REQUIRED.
22. INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH THE
MANUFACTURER’S RECOMMENDATIONS AND DIRECTION. PROVIDE STRAIGHT INLET
AND OUTLET DUCTS/PIPES BASED ON MANUFACTURER’S RECOMMENDATIONS. IF IN
CONFLICT WITH THE DESIGN INDICATED HEREIN, ADVISE THE ENGINEERS PRIOR TO
INSTALLATION FOR CLARIFICATION.
23. COORDINATE THE EXACT LOCATIONS OF DIFFUSERS, GRILLES AND REGISTERS WITH
ARCHITECTURAL REFLECTED CEILING PLANS, AREA SMOKE DETECTORS, SPRINKLERS,
LIGHTS AND ELECTRICAL DEVICES. AIR DEVICES SHALL NOT BE WITHIN 3 FEET OF AN
AREA SMOKE DETECTOR.
25. AIR DEVICES PROVIDED WITH INTEGRAL BALANCE DAMPERS DO NOT REQUIRE
ADDITIONAL BALANCING DAMPER AT AIR DEVICE BRANCH TAKEOFF.
26. PROVIDE ROOM TEMPERATURE THERMOSTATS FOR ALL EQUIPMENT THAT MAINTAINS
SPACE TEMPERATURE. PREFERRED LOCATIONS ARE SHOWN ON THE PLANS.
THERMOSTATS SHALL BE MOUNTED AT 48" ABOVE FINISHED FLOOR, UNLESS NOTED
OTHERWISE. COORDINATE THE EXACT LOCATIONS OF THERMOSTATS WITH
MARKERBOARDS, SWITCHES, AND ANY OTHER WALL MOUNTED FIXTURES PRIOR TO
ROUGH IN.
27. UNLESS NOTED OTHERWISE, MINIMUM PIPE SIZE TO TERMINAL EQUIPMENT SHALL BE
3/4 INCH AND MINIMUM FLOW SHALL BE 0.5 GPM.
28. PROVIDE SHUT-OFF VALVES WITHIN ALL SUPPLY PIPING BRANCH TAKEOFFS FROM
MAINS. PROVIDE A MANUAL BALANCE VALVE AND A SEPARATE SHUT-OFF VALVE
WITHIN ALL RETURN PIPING BRANCH TAKE-OFFS FROM MAINS. LOCATE VALVES IN
ACCESSIBLE LOCATIONS.
29. INSTALL ALL PIPING IN LOCATIONS AND ELEVATIONS SUCH THAT COILS, TUBES, AND
FILTERS CAN BE REMOVED AND REPLACED WITHOUT MAJOR PIPING REMOVAL.
LOCATE VALVES IN APPROPRIATE PLACES TO ACCOMMODATE MAINTENANCE. FOR
GRAVITY FLOW PIPING, ADEQUATE SLOPE SHALL BE PROVIDED.
30. INSTALL TWO-WAY CONTROL VALVES ON ALL EQUIPMENT UNLESS NOTED OTHERWISE.
31. AT TIME OF ROUGH INSTALLATION, DURING STORAGE ON THE CONSTRUCTION SITE,
AND UNTIL FINAL STARTUP OF THE HEATING AND COOLING EQUIPMENT, ALL DUCT AND
OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH
TAPE, PLASTIC, SHEET METAL OR OTHER METHODS ACCEPTABLE FOR PROTECTION
TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST OR DEBRIS WHICH
MAY COLLECT IN THE SYSTEM(S).
32. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED AREAS
OF THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT
PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8 PRIOR TO
OCCUPANCY. FILTERS SHALL BE CHANGED PRIOR TO AIR BALANCE AND
COMMISSIONING, AND AGAIN AT THE COMPLETION OF CONSTRUCTION JUST PRIOR TO
OCCUPANCY OF THE BUILDING WITH FINAL FILTERS PER SPECIFICATIONS.
MAINTENANCE RECOMMENDATIONS FOR FILTERS OF THE SAME VALUE SHALL BE
INCLUDED IN THE OPERATION AND MAINTENANCE MANUAL.
34. ALL SUPPORTS FOR EQUIPMENT, DUCTWORK AND PIPING SYSTEMS, DEVICES SHALL
BE FROM THE BUILDING STRUCTURE. SUPPORT FROM STRUCTURAL BRIDGING IS
UNACCEPTABLE.
35. INSTALL NO PIPING, CONDUIT, DUCTWORK, ETC., IN A LOCATION OR IN A MANNER THAT
WILL ALLOW FREEZING AND/OR THE COLLECTION OF CONDENSATION.
36. CONTRACTOR IS RESPONSIBLE FOR DRAINING, FLUSHING, PURGING, AND FILLING ALL
PIPING SYSTEMS AS REQUIRED. THESE SYSTEMS INCLUDE (BUT MAY NOT BE LIMITED
TO): HEATING HOT WATER SYSTEMS, CHILLED WATER SYSTEMS, BUILDING STEAM
SYSTEMS, ALL REQUIRED CHEMICAL TREATMENT SYSTEMS, CONDENSER WATER
SYSTEMS (AND COOLING TOWER SUMPS), WATER-SOURCE HEAT PUMP LOOP
SYSTEMS, GROUND-SOURCE HEAT PUMP LOOP SYSTEMS, AND MAKE-UP WATER
CONNECTIONS.
DEMO EXISTING MULTIZONE
DUCTWORK IN THIS AREA
DEMO DUCT AND AIR DEVICES
EXISTING RTU-1 TO BE REMOVED EX RTU-2 TO BE REMOVED
EX RTU-3 TO BE REMOVED
REMOVE AND CAP EXISTING DUCT
REMOVE EXISTING
HORIZONTAL AHU
EXISTING CHILLED/HEATING WATER
FAN COIL UNIT TO REMAIN - REBALANCE
DEMO UNITS ON SECOND
FLOOR LEVEL
DEMO CHILLED AND
HEATING WATER PIPING
TO SECOND LEVEL UNITS
REMOVE DUCTWORK AND AIR DEVICES
REMOVE CHILLED AND
HEATING WATER PIPING
EXISTING CHILLED AND HEATING
PIPING TO BE REMOVED
DEMO DUCTWORK
x
A1 M401
REMOVE CHILLER-1 - CHILLER -2 WILL REMAIN UNTIL THE NEW
CHILLER 1 IS INSTALLED AND CHANGEOVER PIPING TO EXISTING IS COMPLETE.
AFTER CHANGEOVER IS COMPLETED THE EXISTING CHILLER WILL BE REPLACED
WITH NEW CHILLER -2
EX CHILLER 1
EX CHILLER 2
EXISTING CIF AREA
HVAC SYSTEMS TO REMAIN IN
OPERATION
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S
T F
L O
O R
P L
A N
D
E M
O
MD101
07/24/19
A B C
F E D
Scale: 3/64" = 1'-0" A1
BUILDING 1717 FIRST FLOOR DEMO
PLAN DEMOLITION NOTE:
CONTRACTOR SHALL REMOVE EQUIPMENT AND PRIDE
WILL PICK UP THE EQUIPMENT FROM LAYDOWN AREA.
1 3
A
2 4 5 6 7 8
B
D1
E1
1 32 4 5 6 7 8
F1
G1
H
K
4.1 5.1
L
M
A
B
D1
E1
F1
G1
H
K
1 32
A
B
D1
E1
F1
G1
H
K
1 32
20x14
DEMO DUCT AND AIR DEVICES
EXISTING RTU-1 TO BE REMOVED
EX RTU-2 TO BE REMOVED
REMOVE EXISTING
HORIZONTAL AHU UNITS,
DUCTWORK AND PIPING
DEMO CHILLED AND
HEATING WATER PIPING
TO UNIT
REMOVE DUCTWORK AND AIR DEVICES
REMOVE CHILLED
AND HEATING
WATER PIPING
EXISTING CHILLED AND HEATING
PIPING TO BE REMOVED
DEMO EXISTING MULTIZONE (CHW & HW)
SERVING FIRST AND SECOND LEVELS IN
THIS AREA
EXISTING VENTILATION FAN AND
DUCTWORK TO BE REMOVED
UNIT HEATERS TO BE REMOVED
DEMO DUCTWORK TO FIRST AND SECOND
LEVELS
DEMO AHU AND DUCTWORK
DEMO ALL DUCTWORK SERVING
THIS AREA
EXISTING LOUVER
- BLANK OFF
DEMO HEATING UNIT
DEMO HEATING UNIT
DEMO DUCTWORK
DEMO VRF WALL UNITS
FCU (9)TO REMAIN UNTIL NEW CHILLED WATER
SYSTEM IS OPERATING TO SERVE THE CIF -
MAINTAIN CHILLED WATER FLOW INTO
EXISTING REVERSE RETURN WATER LOOP (P7)
DEMO RA FAN
DEMO ROOF INTAKE HOOD
SECOND FLOOR FIRST FLOOR
REMOVE GAS FIRED UNIT
HEATERS AND FLUES
EX LOUVER TO BE USED
FOR NEW WORK
DEMO UNIT HEATERS - TYP
REMOVE CHILLED
AND HEATING
WATER PIPING
DEMO HEATING WATER PIPING
DEMO DUCT AND AIR DEVICES
DEMO 2 1/2" HWRDEMO 2 1/2" HWS
DEMO 2" CWR AFTER
NEW CHILLED WATER IS
OPERATING TO SERVE THE
CIF AREA
(AC1)
DEMO HEATING WATER PIPING
AND REFRIGERANT PIPING UP
TO AIR COOLED CONDENSING
UNIT ON ROOF
SEE SECOND
FLOOR
DEMO PLAN FOR
CONTINUATION
3/4" CHS
3/4" CHR
2" CHR
/4
C
H S
C H
R
(AC2)
FCU(3) TO REMAIN UNTIL NEW CHILLED WATER
SYSTEM IS OPERATING TO SERVE THE CIF -
MAINTAIN CHILLED WATER FLOW OF 2 GPM INTO
EXISTING REVERSE RETURN WATER LOOP (P7)
A1 M402
A5 M402
1 1
B
E
A
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S
T F
L O
O R
P L
A N
N O
R T
H
D E
M O
MD102
07/24/19
Scale: 1/16" = 1'-0" A1
BUILDING 1717 FIRST /SECOND
FLOOR DEMO PLAN - NORTH
A B C
F E DKEYNOTES
1 BLANK OFF EXISTING LOUVER
1610 11 12 13 14 15
1610 11 12 13 14 15
EX RTU-3 TO BE REMOVED
REMOVE AND CAP EXISTING DUCT
EXISTING CHILLED/HEATING WATER
FAN COIL UNIT (AHU1)TO REMAIN - 14 GPM -
3235 CFM, 815 CFM OA
DEMO DUCTWORK
x
A1 M401
EX FAN COIL (FC-1) TO REMAIN IN OPERATION
CHILLED WATER - 2 GPM, HEATING WATER 1 GPM
C H
S
EX FAN COIL (FC7) TO REMAIN
IN OPERATION - DEMO AFTER NEW
WORK IN RESTROOMS IS COMPLETE
HEATING ONLY - 2 GPM
EXHAUST FAN TO BE REPLACED
EXISTING UNIT HEATERS
TO REMAIN
EX
UH-6
EX
UH-7
EX
UH-8
EX
UH-9
EX
-UH-10
EX
UH-12
EX
UH-11
EX
UH-13
EX
UH-14
EX
UH-15
EX
UH-16
EX
UH-18
EX
UH-17
EX
UH-19
EX
UH-20
(E)1 1/2" HWS
1" HWR
4" HWS
H W
R
H W
S
EXISTING HYDRONIC HEATING
WATER PIPING TO REMAIN -
REVERSE RETURN LOOP (LOOP P4
@ 110 GPM AT 35' HEAD)
(E)4" HWR
EX
CHILLER
EX
CHILLER
SEE ENLARGED DEMO PLAN
PLAN 2 DRAWING M106
HEATING/VENTILATION
UNIT TO BE REMOVED
3/4" CHR
1 1/4" CHS
1 1/2" CHR
4" HWR
EX HWR
EX
430 CFM
EX 425 CFM
EX
425 CFM
2" CHS
EXISTING TO REMAIN-
DEMO AFTER NEW PIPING
IS OPERATING
E1 M402
B
E
A
(E)1" HWS
(E)1" HWR
(D)2"
(D)2"
(E)1 1/2" CHR
(E)1 1/4" CHS
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S
T F
L O
O R
P L
A N
S O
U T
H
D E
M O
MD103
07/24/19
Scale: 1/16" = 1'-0" A1
BUILDING 1717 FIRST FLOOR DEMO
PLAN - SOUTH
A B C
F E D
KEYNOTES
1 DEMO EXHAUST FAN - NEW FAN TO USE EXISTING
OPENING
2 EXISTING PIPING TO REMAIN OPERATIONAL UNTIL
NEW SYSTEM IS INSTALLED.
3 CONNECT TO EXISTING PIPING AFTER NEW SYSTEM
IS OPERATING TO KEEP CIF OPERATING.
4 DEMO EXISTING CHILLED WATER PIPING.
5 DEMO EXISTING HEATING WATER PIPING
6 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS
SPLIT SYSTEM. THE UNITS SHALL REMAIN IN
OPERATION UNTIL NEW COOLING SYSTEMS ARE
OPERATIONAL.
A1 M401
C
D
F1
G1
H
K
L
M
F
2 3 4 5 6 8 9 11 12 13 14 15 16
G
H1
EXISTING RTU-1
TO BE REMOVED EX RTU-2 TO
BE REMOVED
EX RTU-3 TO BE REMOVED
DEMO
RTU
EXISTING
FANS TO BE
REMOVED
EXISTING GAS
PIPING TO BE
REMOVED
EXISTING
ROOF HATCH
TO REMAIN
EXISTING GAS
PIPING TO BE
REMOVED
EXISTING
EXHAUST FANS
TO BE REMOVED
EXISTING
EXHAUST FANS
TO BE REMOVED
DEMO VENTILATING UNIT
DEMO ROOF HOODS
EXISTING
FANS TO BE
REMOVED
DEMO ROOF HOOD
DEMO EXHAUST FAN
DEMO FLUESDEMO ACCU
B
E
A
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
D
E M
O R
O O
F P
L A
N
MD104
07/24/19
Scale: 1" = 20'-0" A1
BUILDING 1717 ROOF PLAN DEMO
DEMOLITION NOTE:
CONTRACTOR SHALL REMOVE EQUIPMENT AND PRIDE
WILL PICK UP THE EQUIPMENT FROM LAYDOWN AREA.
A B C
F E D
C
D
F1
G1
H
K
L
M
F
2 3 4 5 6
G
H1
EXISTING RTU-1
TO BE REMOVED
EX RTU-2 TO
BE REMOVED
EXISTING FAN
TO BE REMOVED
EXISTING AC
CONDENSING UNIT
TO BE REMOVED
EXISTING INTAKE
HOOD TO BE
REMOVED
EXISTING INTAKE
HOOD TO BE
REMOVED
EXISTING COOLER
CONDENSING UNITS
TO BE REMOVED
EXISTING
ROOF HATCH
ROOF VENTILATION UNIT
AND DUCTWORK TO
ROOF PENETRATION TO
BE REMOVED - REPAIR
ROOF
EXISTING FANS
TO BE REMOVED
EXISTING
GOOSENECK
EXHAUST VENT
TO BE REMOVED
EXISTING
GOOSENECK
EXHAUST VENT
TO BE REMOVED
EXISTING MINI SPLIT
CONDENSER TO BE
REMOVED
EXISTING FREEZER
CONDENSING UNITS
TO BE REMOVED
EXISTING SMALL
CONDENSING UNITS
TO BE REMOVED
EXISTING
FANS TO BE
REMOVED
EXISTING GAS
PIPING TO BE
REMOVED
CAPPED ROOF CURB
OPENINGS WHERE ROOF
VENTS ONCE WERE
CAPPED ROOF CURB
OPENINGS WHERE ROOF
VENTS ONCE WERE
CURB CAP WHERE ROOFTOP
UNIT WAS REMOVED. TO BE
REUSED THIS AREA FOR AHU
IN NEXT PHASE.
EXISTING
EXHAUST FAN
TO BE REMOVED
EXISTING
MUSHROOM
HOOD TO BE
REMOVED
EXISTING
EXHAUST FANS
TO BE REMOVED
EXISTING FLUES
TO BE REMOVED
EXISTING
EXHAUST FANS
TO BE REMOVEDEXISTING FREEZER
COMPRESSOR /
CONDENSING UNITS TO
BE REMOVED (TYP 3)
EXISTING COOLER
CONDENSING UNITS
TO BE REMOVED
EXISTING
ROOF HATCH
TO REMAIN
EXISTING VRF
CONDENSING UNITS
TO BE REMOVED
EXISTING
EXHAUST FANS
TO BE REMOVED
B
E
A
EXISTING
FANS TO BE
REMOVED
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
D
E M
O R
O O
F P
L A
N
N O
R T
H
MD105
07/24/19
A B C
F E D
Scale: 1/16" = 1'-0" A1
BUILDING 1717 ROOF PLAN DEMO -
NORTH
KEYNOTES
1 EXISTING UNIT TO BE DEMOLISHED WITH
ASSOCIATED DUCTWORK AND CONTROLS.
M401
C
D
F1
G1
H
K
L
M
F
8 9 11 12 13 14 15 16
G
H1
EX RTU-3 TO BE REMOVED
DEMO
RTU
EXISTING GAS
PIPING TO BE
REMOVED
EXISTING
EXHAUST FANS
TO BE REMOVED
E1 M402
A5 M402
B
E
A
DEMO VENTILATION HOOD
EXISTING CIF AREA
HEATING AND VENTILATING EQUIPMENT IN
THIS AREA OF ROOF IS TO REMAIN-
SYSTEMS TO REMAIN IN OPERATION
DEMO EXHAUST FAN
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
D
E M
O R
O O
F P
L A
N
S O
U T
H
MD106
07/24/19
A B C
F E D
Scale: 1/16" = 1'-0" A1
BUILDING 1717 ROOF PLAN DEMO -
SOUTH
KEYNOTES
1 EXISTING TO REMAIN (TYP).
2 EXISTING FAN TO REMAIN
3 DEMO EXHAUST FAN - NEW FAN TO USE EXISTING
OPENING
4 DEMO EXHAUST FAN
LAB
IMMUNIZATIONS
RISER RM
ELEC
OFFICE
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
WOMEN
MEN
ELEC
OFFICE
VITALS
LOCKER RM
OFFICE
OFFICE
EXAM
SCREENING
EXAM
SCREENING
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
CORR
ROOM
ROOM
TR
ADA-M
ADA-W
ROOM
ROOM
ROOM
VEST
VEST
CONF
STOR
WRK RM
TR
ANAM WAITING
STOR
ANAM TESTING
STOR
PROVIDERS
BRK RM
MED PROS CHECK-IN
MED PROS
LOADING DOCK
WOMEN
TR
BEHAVIORAL HEALTH
SECURE
BRK RM
MEDICAL RECORDS
WAITING
ELECRICAL
WRK RM
STOR
MEDICAL SCREENING
VITALS
LOD / NLC
JAN
TR
WAITING
STOR
DENTAL
LOCKER RM
WRK RM
TR
WORK / SUPPLY
STOR
LOADING DOCK
WOMEN
MEN
WAITING
WAITING
OFFICE
AUDIOLOGY
TR
EXAM
ELEC
STOR
CHECK-IN
BRK RM
WRK RM
VISION / OPTOMETRY
EXAM
EXAM
EXAM
DIST / Rx
STOR
SMALL POX
WAITING
ELEC
BIOHZD
WRK RM
AG RECORDS
STOR
COMPUTER LAB
WAITING
NCM
BRFG-A
BRFG-B
BRFG-C
MEDICAL FINAL OUT
VAULT
ELEC
CS / FINANCE
AG
STOR
MEN
S1
SITE MGR
CORR
SRRC OIC
SRRC XD
CMD STE
SRRC 1SGT
WOMEN
JAN
BRK RM
SRPC SCHED
MED OPS
STOR
SRPC MaD
STOR
TR
FINAL OUT
CONF
SECUR
LEGAL
EXAM
SHPE
SHPE WAITING
VEST
MAIN ENTRY
NEW EGRESS DOOR(S)
A1 M401
C C
D D
F1
G1
H
K K
L L
M M
F F
2 3 4 5 6 8 9 11 12 13 14 15 16
G
H1
CH-2(R)
CH-1(R)
B B
E E
A A
EXISTING CIF AREA - NOT IN
SCOPE OF WORK
VAV-2-2
FCU-15
FCU-5
VAV-2-6
VAV-2-5
VAV-2-4
VAV-2-1
VAV-1-5
FCU-12
FCU-10
VAV-2-8
FPVAV-3-2
FCU-13
FPVAV-3-1
FPVAV-3-3
FPVAV-3-5
FPVAV-3-4
VAV-2-7
VAV-4-7
VAV-4-8
FCU-17
FCU-3
VAV-4-6FCU-4
VAV-4-2
VAV-4-10
VAV-4-4
VAV-4-3
FPVAV-4-2
VAV-4-12
VAV-4-13 VAV-4-14
VAV-4-15
FPVAV-4-1
FPVAV-5-6
FPVAV-5-5 FPVAV-5-7
FPVAV-5-8
FPVAV-5-4
FPVAV-5-3
FCU-9
FPVAV-6-3FPVAV-6-2
FPVAV-6-1
VAV-6-3 VAV-6-1
FCU-6
FPVAV-7-3
FPVAV-7-4
VAV-6-5
FCU-16
VAV-6-6
FCU-8
VAV-1-3
VAV-1-4
FPVAV-7-1
VAV-1-6
VAV-1-7
FPVAV-1-1
VAV-1-9
VAV-1-11
VAV-1-1VAV-1-10
FCU-11FCU-1
VAV-6-7
VAV-2-9 VAV-2-3
VAV-2-10
FCU-2
B-2(R)
B-1(R)
VAV-1-2
FCU-8
FPVAV-7-2
FPVAV-6-3
FPVAV-6-4
FPVAV-5-2
VAV-6-2
VAV-1-8
VAV-4-16
VAV-4-1
FCU-14
VAV-4-5
VAV-4-11
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S T
F L
O O
R O
V E
R A
L L
P L
A N
M101
07/24/19
Scale: 3/64" = 1'-0" A1
BUILDING 1717 FIRST FLOOR PLAN
A B C
ROUND DUCT
CONNECTION TO
TOP OF TESTING BOOTH
- 220 CFM (TYP.).
VAV-1-5
VAV-1-10
VAV-1-6
C
D
2 3 4
VAV-1-2
VAV-1-3
FPVAV-7-1
FCU-1
VAV-1-9
VAV-1-7
FPVAV-1-1
VAV-1-8
VAV-1-4
48x20ø 30x20ø 20ø x x x ø
VAV-1-1
VAV-1-11
x
A6 M401
14x1210x10
FCU-11
DSA
DSA
DSA
DSA
DSB
DSB
70 DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
14x12 16x14 ø x
10x8
6ø 12x12 ø ø
8ø ø
12x12 8x8
8ø x x
10x10
8ø
8ø x 28ø
8ø
10x8
DSA
ø
DSA
DSA
DSA
ø x
12x12 x
8ø
DSA
DSA
DSA
DSA
DSA
x
8ø
DSA
DSA
DSA
DSA
DSA
DSA
16x14 12x12 x
12x12 ø ø
16x1612x12
10x10 14x10 x ø ø ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
x
12x12 ø ø
14x14 12x12 16x16
DSA
DSA
DSA
DSA
6x8 x x
6ø
DSA
DSA
DSA
DSA
DSA
DSA
10x10 x ø ø ø ø DSA
DSA
DSA
DSA
DSA
DSA
GRSB
RSB
FCU-12
12x12
14x10 x
FCU-8
10x12
RSA
GRSB
GRSA
RSA
10x10
10x8
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
T
VAV-1-6
T
VAV-1-7
T
FPVAV-1-1
T
VAV-1-9
T
VAV-1-11
T
VAV-1-5
T
VAV-1-2
T
VAV-1-3
T
VAV-1-4
T
VAV-1-8
T
VAV-1-10
T
FPVAV-7-1
T
FCU-8
T
FCU-12
T
FCU-1
T
FCU-11
PRIMARY AIR SUPPLY
DUCT TO AHU-1 CONTINUED ON
SECOND LEVEL PLAN - DRAWING
M102A
GRCB GRCB
8"X8" OA DUCT.
CONNECT TO EXISTING
LOUVER
DSA
100 DSA
DSA
x
GRCA GRCA
12x12
RSA
RSA
E6 M401 x x ø
B
A
6ø 8x10 10x10
DSA
DSA
30x20
24x24
24x24 x
10x8
4 4
5 5
5 5
GRCA
GRCA
M101A
M101F
M101A
M101F
M101B
M101E
M E
24x24
16ø
10ø
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S T
F L
O O
R P
L A
N A
R E
A A
M101A
07/24/19
Scale: 1/8" = 1'-0" A1
BUILDING 1717 FIRST FLOOR PLAN -
AREA A
A B C
F E D
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
KEYNOTES
1 CEILING RETURN GRILLE WITH 18" X 18" SOUND
BOOT. SEE DETAIL A1/M605.
2 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR
RETURN AIR PATH THROUGH WALL TO DECK.
3 SOUND TRAP ON RETURN AIR THROUGH WALL TO
DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.
4 BLANK OFF EXISTING LOUVER
5 OPPOSED BLADE MANUAL BALANCING DAMPER.
6 OUTSIDE AIR DUCT.
7 FIRE RATED WALLS TO DECK - 2 HR - INSTALL FIRE
DAMPERS.SEE DETAIL A6/M605.
8 EXISTING LOUVER TO HAVE PLENUM BOX
CONNECTED AND NEW OA DUCT ROUTED TO FAN
COIL UNIT
VAV-1-5
VAV-2-10
C
D
5 6 8 9
A6 M106
A1 M106 x
20ø x
VAV-1-1
FPVAV-3-5
FPVAV-3-4
FPVAV-3-1
ø ø
10ø
10x12
12ø
14x12
16x16
VAV-2-7
VAV-2-9
VAV-2-8
VAV-2-4
VAV-2-6
VAV-2-5
VAV-2-2
VAV-2-1
x
18x14
A6 M401
EGA
300 EGA
10x10 1 x
14/12 UP TO EF-2
ON ROOF
FCU-2
DSA
DSA
x 28ø
8ø
10x8
DSA
x
DSA
DSA
DSA
x ø
12x12 16x16
DSA
DSA
DSA
12x12 ø ø ø x x
8ø
DSA
12x12 ø
10ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
8x8 x x
10ø ø
DSA
DSA
DSA
DSA
DSA
ø x
DSA
DSA
DSA
DSA
DSA
DSA
DSA
10x10 12x10 x x ø
8ø ø ø ø x
10x10 ø ø x
8ø
DSB
DSB
DSB
DSA
DSA
DSB
DSA
DSA
DSA
DSA
DSA
x x
6ø
8ø x
8x8
6ø ø
12x101 ø
16x12 ø ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
ø 8 ø 8 ø
12x10 8x8 x
DSA
DSA
DSA
DSA
DSA
x
16x14 12x12 ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
ø ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
12x12 ø x x
DSA
DSA
20x1816x1612x12 ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
EGB
FCU-10
16x12
14x12
16x16
RSC
GRSC
RSA
GRSA
18ø24x20ø ø
14x12
6ø
FPVAV-3-2
VAV-2-3
8ø ø
FCU-13
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
DSA
RSA
10x12
EXISTING 120X48" LOUVER TO REMAIN
INSTALL PLENUM SECTION OF DUCTWORK - 120 X 48".
INSTALL 4 - 36 X 24 MOTORIZED DAMPER(S) FOR BUILDING
PRESSURE RELIEF DURING ECONOMIZER
MODE OF OPERATIONS.
DSA
S
SOUND TRAP
CH-1(R) CH-2(R)
T
VAV-1-5
T
VAV-1-1
T
VAV-2-1
T
VAV-2-2
T
VAV-2-5
T
VAV-2-6
T
VAV-2-9
T
VAV-2-8
T
VAV-2-4
T
VAV-2-3
T
VAV-2-7
T
VAV-2-10
T
FPVAV-3-2
T
FPVAV-3-1
T
FPVAV-3-4
T
FPVAV-3-5
T
FCU-12 T
FCU-2
T
FCU-10
T
FCU-13
x
GRCA
DSA
GRCA
GRCA
GRCA
E1 M402 x x
B
E
A
DSA
DSA
52x20ø 24x18ø ø ø
16ø
42x20ø 32x20ø
DN TO CL 12'-0"
EF-9
OUTINE OF RTAHU-2
ON ROOF ABOVE
DSA
DSB
EGA
30x20
10x10
8x10 ø x x
6 6
12x12
12x12
10x10
12x12 x
6ø
M101A
M101F
M101B
M101E
4' - 6 1/2"
30x20 x
24x36
EXHAUST DUCT UP
TO EF-6 ON ROOF
16ø
10ø
6x6
8x6
DSB
EGC
60 EGC
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S T
F L
O O
R P
L A
N A
R E
A B
M101B
07/24/19
Scale: 1/8" = 1'-0" A1
BUILDING 1717 FIRST FLOOR PLAN -
AREA B
A B C
F E D
NEW ROOF MOUNTED
EXHAUST 600 CFM
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
KEYNOTES
7 OPPOSED BLADE MANUAL BALANCING DAMPER.
8 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS
SPLIT SYSTEM. THE UNITS SHALL REMAIN IN
OPERATION UNTIL NEW COOLING SYSTEMS ARE
OPERATIONAL.
9 FIRE RATED WALLS TO DECK - 2 HR - INSTALL FIRE
DAMPERS.SEE DETAIL A6/M605.
10 EXISTING LOUVER TO HAVE PLENUM BOX
CONNECTED AND NEW OA DUCT ROUTED TO FAN
COIL UNIT
KEYNOTES
1 CEILING RETURN GRILLE WITH 18" X 18" SOUND
BOOT. SEE DETAIL A1/M605.
2 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR
RETURN AIR PATH THROUGH WALL TO DECK.
3 SOUND TRAP ON RETURN AIR THROUGH WALL TO
DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.
4 EXHAUST UP TO EXHAUST FAN ON ROOF
5 MOTORIZED DAMPER (TYP).
6 BLANK OFF EXISTING LOUVER
D
11 12 13 14 15 16
EX
UH-13
EX
UH-8
EX
UH-7
EX
UH-6
EX
UH-9
EX
-UH-10
EX
UH-12
EX
UH-11
EX FAN COIL TO REMAIN IN OPERATION
CHILLED AND HEATING
EX FAN COIL SERVING CIF TO REMAIN IN OPERATION
HEATING ONLY
10ø
FPVAV-3-3
18x14 x x
EGA
EGA
14x14
DSA
DSA
DSA
DSA
DSA
DSA
12x12 10x10 ø ø x x
6ø ø
DSA
DSB
DSA
DSA
DSB
DSB
10ø
8x81 x
DSA
DSA
DSA
DSA
DSA
DSA
12x12 ø ø
10ø
DSA
DSA
DSA
x x
DSA
DSA
DSA
GRCA
GRCA
GRCA
GRCA
T
FPVAV-3-3
DSA
GRCA GRCA GRCA
GRCA
DSA
10ø
DSA
B
E
A
24x24 x ø
8ø
M101C
M101D
M101B
M101E
M101C
M101D
6x6
12X14 UP TO EF-4
(R) ON ROOF
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S
T F
L O
O R
P L
A N
A
R E
A C
M101C
07/24/19
Scale: 1/8" = 1'-0" A1
BUILDING 1717 FIRST FLOOR PLAN -
AREA C
A B C
F E D
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
KEYNOTES
1 CEILING RETURN GRILLE WITH 18" X 18" SOUND
BOOT. SEE DETAIL A1/M605.
2 SOUND TRAP ON RETURN AIR THROUGH WALL TO
DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.
3 EXHAUST UP TO EXHAUST FAN ON ROOF
F1
G1
H
K
L
M
F
11 12 13 14 15 16
EX
UH-17
EX
UH-16
EX
UH-18
EX
UH-19
EX
UH-20
EX
UH-14
EX
UH-15
EXISTING ROOF MOUNTED SUPPLY VENTILATOR
EX FAN COIL TO REMAIN IN OPERATION
G
H1
16ø ø
18ø28x18ø ø
10x10
12ø ø
14ø x
28x18ø x
10ø
VAV-4-15
VAV-4-13
VAV-4-10
VAV-4-11VAV-4-9
VAV-4-5
VAV-4-6
VAV-4-8
VAV-4-2
VAV-4-3
VAV-4-4
8x81 x
6ø
6ø
DSA
DSA
DSA
DSA
DSA
40 DSA
x
7ø
DSA
DSA
6ø x x
DSA
DSA
DSA
DSA
DSA
ø ø ø ø
12x12
8ø10x10 x
8ø
DSA
DSA
DSA
6ø
VAV-4-14
DSA
DSA
DSA
DSA
x x
8ø
8ø
14x12 12x10 8x10
DSC
DSC
DSC
DSC
DSC
DSC
DSB
DSC
DSC
DSC
DSA
DSA
12x10 10x8 ø ø 6 ø
12ø
12x10 6ø ø ø
6ø
DSC
DSC
DSB
DSA
DSA
DSA
DSA
12x12 10ø
6ø
DSA
DSA
DSA
8ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
x
6ø
6ø
DSA
x x
DSA
DSA
DSA
x
6ø
DSA
10x10
10x8
FCU-17
GRSA
RSA
FCU-3 GRSB
RSA
12x12 x
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCB
GRCA
GRCA
GRCA
GRCA
GRCA
VAV-4-16
T
VAV-4-8
T
VAV-4-16
T
VAV-4-6
T
VAV-4-5
T
VAV-4-9
T
VAV-4-11
T
VAV-4-15
T
VAV-4-14
T
VAV-4-13
T
VAV-4-12
T
VAV-4-10
T
VAV-4-4
T
VAV-4-2
T
FCU-17
T
FCU-3
DSA
EGB
GRCA
GRCB
GRCB GRCB GRCB GRCB
GRCBGRCB
GRCB GRCB GRCB GRCB GRCB GRCB
DSC
GRCA
16x16
30x20
M101C
M101D
M101B
M101E
M101C
M101D
LOCATION OF HVAC
EMERGENCY SHUT-OFF
SWITCH
6x6
M101D x
12X14 UP TO EF-4
(R) ON ROOF
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S
T F
L O
O R
P L
A N
A
R E
A D
M101D
07/24/19
Scale: 1/8" = 1'-0" A1
BUILDING 1717 FIRST FLOOR PLAN -
AREA D
A B C
F E D
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
KEYNOTES
1 CEILING RETURN GRILLE WITH 18" X 18" SOUND
BOOT. SEE DETAIL A1/M605.
2 SOUND TRAP ON RETURN AIR THROUGH WALL TO
DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.
3 EXISTING UNIT HEATER TO REMAIN
4 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS
SPLIT SYSTEM. THE UNITS SHALL REMAIN IN
OPERATION UNTIL NEW COOLING SYSTEMS ARE
OPERATIONAL.
5 FIRE RATED WALLS TO DECK - 2 HR - INSTALL FIRE
DAMPERS.SEE DETAIL A6/M605.
6 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR
RETURN AIR PATH THROUGH WALL TO DECK.
SA DN FROM RTAHU-4
M401
F1
G1
H
K
M
F
5 6 8 9
10ø
G
H1
18ø30x18ø40x18ø
10ø x x x x
40x18ø 28x18ø x
10ø x x
FPVAV-4-1
FPVAV-4-2
FPVAV-5-1
FPVAV-5-2
FPVAV-5-4 FPVAV-5-5
FPVAV-5-6
FPVAV-5-7
FPVAV-5-8
FPVAV-6-2
FPVAV-6-3
FPVAV-6-4
VAV-6-2
VAV-6-1
VAV-4-1
VAV-4-2
VAV-4-7
EGA
EGA
12x10 x x x x
DSA
DSA
DSA
DSA
x
8x8
6ø
12x101 ø
DSA
DSA
DSA
12x12 ø ø
12x10
DSA
DSA
DSA
DSA
DSA
DSA
8ø
10x1216x10
DSA
DSA
DSA
DSA
DSA
DSA
DSA
x
8ø x
DSA
DSA
DSA
DSA
10ø
10ø1 x x x x
10ø
DSA
DSA
DSA
DSA
x
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
10ø
10ø x x
FPVAV-5-3
DSA
DSA
10ø
10ø 10ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
ø x
10x10 14x12
DSA
DSA
x ø8 x
EGA
EGA
DSA
DSA
DSA
DSA
DSA
DSA
x
6ø
6ø x x
8ø
DSA
DSA
x
12x10 ø ø
DSA
DSA
80DSA
DSA
DSB
DSA
DSA
x x
6ø
6ø
DSA
DSA
DSA
DSA
DSA
DSA
DSB
DSB
DSB
DSB
DSA
10x10 8ø
8ø10x10 x x
6øDSA
DSA
DSA
DSA
x
6ø
DSA
DSA
DSA
DSA
DSA
8ø ø x x x
10ø
10ø
10ø
DSA
DSA
DSA
DSA
DSA
ø
10x10
DSA
DSA
DSA
x x
FCU-15
RSA
GRSA
GRSB
FCU-5
RSA
10x12
12x12 x x
FCU-14
RSA
GRSA
12x12
FCU-4
GRSB
RSA
x
GRSC
FCU-9
DSA
NEW CABINET
EXHAUST FAN,
TERMINATE DUCT AT
ROOF WITH
GOOSENECK
EF-7
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
48x30
T
VAV-4-7
T
VAV-4-1
T
VAV-4-3
T
FPVAV-4-2
T
FPVAV-4-1
T
FPVAV-5-8
T
FPVAV-5-7
T
FPVAV-5-5
T
FPVAV-5-6
T
FPVAV-5-4
T
FPVAV-5-3
T
FPVAV-5-1
T
FPVAV-5-2
T
FPVAV-6-3
T
FPVAV-6-4
T
VAV-6-2
T
FPVAV-6-2
T
FCU-14
T
FCU-5
T
FCU-15
T
FCU-9
T
FCU-4
GRCA
GRCA
GRCA
GRCA1
ø x
10ø
EGA
EGA
GRCA
DSA
DSA
DSB
DSA
A5 M402
EXISTING GYP CEILING AT 13'-4" AFF
RSB
400 GRSB
10'
CEILING
LAY-IN CEILING AT 9' AFF
EXISTING GYP CEILING AT 13'-4" AFF
EXISTING LAY-IN
CEILING AT 9' AFF
GRCA
OUTLINE OF RTAHU-4
ON ROOF ABOVEOUTLINE OF RTAHU-5
ON ROOF ABOVE
x
1 1
30x20
30x20
24x24
30x20
14x12
10x10
14x14
RSC
M101A
M101F
M101B
M101E
M E
M E
M F
14ø
30x20
30x20
30x20
16X16 UP TO EF-3
ON ROOF
UP TO EF-5(R)
ON ROOF
66X66 RELIEF DUCT UP
TO RH-1 ON ROOF
66x42
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S
T F
L O
O R
P L
A N
A
R E
A E
M101E
07/24/19
Scale: 1/8" = 1'-0" A1
BUILDING 1717 FIRST FLOOR PLAN -
AREA E
A B C
F E D
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
KEYNOTES
1 CEILING RETURN GRILLE WITH 18" X 18" SOUND
BOOT. SEE DETAIL A1/M605.
2 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR
RETURN AIR PATH THROUGH WALL TO DECK.
3 SOUND TRAP ON RETURN AIR THROUGH WALL TO
DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.
4 12" X 12" OPENING IN WALL IN PLENUM ABOVE FOR
RETURN AIR PATH THROUGH WALL TO DECK.
5 FIRE RATED WALLS TO DECK - 2 HR - INSTALL FIRE
DAMPERS.SEE DETAIL A6/M605.
6 EXHAUST UP TO EXHAUST FAN ON ROOF
F1
G1
H
K
L
M
F
2 3 4
26x18ø ø
12ø
10ø
16x1410x12
10ø12ø16ø
G
H1
FPVAV-6-1
14x14
VAV-6-5
VAV-6-4
VAV-6-7
VAV-6-6
FPVAV-7-4
VAV-6-3 VAV-6-1
x x x x ø x ø
FPVAV-7-2
EGA
14x1210x10
NEW EXHAUST
FAN ON ROOF
600 CFM
12x12
DSA
DSA
DSA
DSA
DSA
x
8ø
DSA
DSA
ø x x
6ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
6ø x x x
10ø
10ø
10ø
10ø
DSA
DSA
DSA
DSA
DSA
DSA
ø
12x12
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
6ø x
DSA
DSA
DSA
DSA
DSA
DSA
DSA
8ø
8ø ø ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
10x10
20x18 16x12 ø ø
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
DSA
8ø 1 ø ø
8ø ø x
DSB
150 DSB
DSA
DSA
DSA
DSA
RSB
FCU-6
12x12
18x10
GRSB
10x8
10x10
FCU-16
RSA
GRSA
x ø ø
14ø ø
28x18ø
FPVAV-7-3
ø ø
8ø x
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
GRCA
T
FPVAV-6-1
T
FPVAV-6-2
T
VAV-6-1
T
VAV-6-3
T
VAV-6-6
T
VAV-6-7
T
VAV-6-4
T
VAV-6-5
T
FPVAV-7-3
T
FPVAV-7-4
T
FPVAV-7-2
T
FCU-6
T
FCU-16
T
FCU-7
GRCA
36x18ø 24x16ø 14ø ø x ø
8x8 x
DSA
DSA
x x
DUCT FROM AHU-7
RE: M102
DSA
x
EGA
GRCA
GRCA
GRCAGRCA
DSA
DSA
E1 M401
E6 M401
A1 M402
20x10
6ø 8x10 10x10
OUTLINE OF RTAHU-6
ON ROOF ABOVE
x
24x24
M101A
M101F
DSB
M E
M E
M F
30x20
30x20
30x20 x
84X42 RELIEF UP TO
RH-2 ON ROOF
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S
T F
L O
O R
P L
A N
A
R E
A F
M101F
07/24/19
Scale: 1/8" = 1'-0" A1
BUILDING 1717 FIRST FLOOR PLAN -
AREA F
A B C
F E D
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
KEYNOTES
1 CEILING RETURN GRILLE WITH 18" X 18" SOUND
BOOT. SEE DETAIL A1/M605.
2 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR
RETURN AIR PATH THROUGH WALL TO DECK.
3 SOUND TRAP ON RETURN AIR THROUGH WALL TO
DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.
4 OA DUCT DOWN FROM GRAVITY INTAKE HOOD ON
ROOF.
5 12" X 12" OPENING IN WALL IN PLENUM ABOVE FOR
RETURN AIR PATH THROUGH WALL TO DECK.
6 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS
SPLIT SYSTEM. THE UNITS SHALL REMAIN IN
OPERATION UNTIL NEW COOLING SYSTEMS ARE
7 EXHAUST UP TO EXHAUST FAN ON ROOF
D
F1
F
VAV-1-6
x
48x20ø ø ø
20x16ø
28x18ø x ø
1 1/4" HWS
1 1/4" HWR
C H
S
C H
R
3" CHS
3" CHR
2" HWR
2" HWS
E1 M401
36x66
E6 M401
FPVAV-7-1
VAV-1-3
VAV-1-4
x ø
60x30
B
FCU-7
14x1410x12
1" HWS
1" HWR
1" CHR
1" CHS
/4
H
W R
/4
H
W S x
60x20
14x14
DN UNDER
BEAM
DN UNDER BEAM
SECOND LEVEL
FLOOR SLAB AT 12'-2" AFF
2 1/2" CHS
1 1/2" HWR
DN UNDER BEAM
VAV-1-2
AHU-7
AHU-1
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
S
E C
O N
D F
L O
O R
P L
A N
M102
07/24/19
Scale: 1/8" = 1'-0" A5
BUILDING 1717 SECOND FLOOR
PLAN AREA F
A B C
F E D
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
KEYNOTES
1 OPEN END RA DUCT.
2 3/4" HWS & R TO VAV TERMINAL HEATING COIL
3 BLANK OFF EXISTING LOUVER
4 EXHAUST UP TO EXHAUST FAN ON ROOF
5 UP TO INTAKE HOOD ON ROOF.
6 ROUTE CONDENSATE DRAIN TO NEAREST FLOOR
DRAIN OR TAILPIECE OF NEAREST SINK (TYP).
REFER TO SHEET M101A
2 4 5 6 7 8 9
B
D1
E1
1 32 4 5 6 8 9
F1
G1
H
K
1610 11 12 13 14 15
1610 11 12 13 14 154.1 5.1
A1 M401
RTAHU-4
EF-1
EF-2
EF-3
EF-5(R)
EF-4(R)
EF-6
RTAHU-2
RTAHU-6 RTAHU-5
B
E
A
RTAHU-3
OAI-1
OAI-2
RH-2
RH-1
EX ROOF HATCH
EX ROOF HATCH
NEW BOILER FLUE
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
R
O O
F P
L A
N
O V
E R
A L
L
M103
07/24/19 Scale: 1" = 20'-0"
A1
BUILDING 1717 ROOF PLAN
A B C
0' 10' 20' 40' 80'
2 4 5 6 7 8 9
B
D1
E1
1 32 4 5 6 8 9
F1
G1
H
K
4.1 5.1
RTAHU-2
RTAHU-6
RTAHU-5
OA INTAKE HOOD
AHU-7
CL OF ROOF JOISTS BELOW - 4' O.C.
EF-6
EF-2
EF-3
EF-5(R)
EF-1
OA INTAKE HOOD
AHU-1
CL OF ROOF JOISTS
BELOW - 4' O.C.
PIPING ENCLOSURE
RETURN AIR
SA DNSA DN
RA UP PIPING ENCLOSURE
OAI-1
OAI-2
1" CONDENSATE DRAIN
TO ROOF DRAIN
1 1/4" CONDENSATE DRAIN
TO ROOF DRAIN
A1 M402
A5 M402
EDGE OF ROOF
AT 22' T.O.S
B
E
A
DEMO VRF CONDENSING UNIT
ALONG WITH ALL PIPING AND WIRING
EXISTING ROOF HATCH
SERVING MECHANICAL
MEZZANINE BELOW
1" CONDENSATE DRAIN
TO ROOF DRAIN
PIPING ENCLOSURE
RH-2
ROOF HATCH
OAI-3
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
R
O O
F P
L A
N
N O
R T
H
M104
07/24/19
Scale: 1/16" = 1'-0" A1
BUILDING 1717 ROOF PLAN - NORTH
A B C
F E D
0 4' 8' 16' 32' 48'
SCALE: 1/16" = 1'-0"
KEYNOTES
1 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS
SPLIT SYSTEM. THE UNITS SHALL REMAIN IN
8 9
8 9
1610 11 12 13 14 15
1610 11 12 13 14 15
A1 M401
RTAHU-4
EXISTING ROOF MOUNTED
VENTILATION UNIT - TYP 6
EXISTING ROOF MOUNTED
EXHAUST FANS TYP 6
NEW FLUE STACK
EF-4(R)
EF-5(R)
CL OF ROOF JOISTS BELOW - 6' O.C.
CL OF ROOF JOISTS BELOW - 6' O.C.
1" CONDENSATE
DRAIN TO ROOF DRAIN
1" CONDENSATE
DRAIN TO ROOF DRAIN
E1 M402
EDGE OF ROOF AT 24' 6" T.O.S.
HIGH POINT
LOW POINT OF ROOF AT
23'-6" T.O.S. , 23'-10" APPROX T.O. ROOF -
EXISTING JOISTS ARE 24" DEPTH AT 6' O.C.
B
E
A
RH-1
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
R
O O
F P
L A
N
S O
U T
H
M105
07/24/19
A B C
F E D
Scale: 1/16" = 1'-0" A1
BUILDING 1717 ROOF PLAN - SOUTH
0 4' 8' 16' 32' 48'
SCALE: 1/16" = 1'-0"
KEYNOTES
1 DEMO EXHAUST FAN - NEW FAN TO USE EXISTING
OPENING
2 EXISTING VENTILATING UNIT TO REMAIN
3 EXISTING FAN TO REMAIN
4 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS
SPLIT SYSTEM. THE UNITS SHALL REMAIN IN
NEW EGRESS DOOR(S) NEW EGRESS DOOR(S)
EXISTING TO REMAIN UNTIL NEW
CHIILERS ARE ON LINE
EXISTING TO REMAIN TO KEEP CIF
IN OPERATION UNTIL NEW BOILERS
ARE IN OPERATION - DEMO
3"
3"
4" HWS
4" HWS
BOILER FLUE TO BE REMOVED
EX
CHWP-1
EX
HWP-1
EX
HWP-2(DEMO)
EX
CHWP-2
EX
CHWP-3
EX
CHWP-4
EX
HWP-3
EX
CHILLER
EX
CHILLER
3"
4" HWR
H W
R
2" CHS
4" HWS
DEMO PIPING
DEMO PUMP
DEMO PIPING
DEMO PUMP
EXISTING TO REMAIN UNTIL NEW
CHIILERS ARE ON LINE - DEMO
AFTER COMPLETION OF NEW
E7 M402
A
EXISTING PUMPS MODEL AND CAPACITIES
HWP-3 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP
CHWP-4 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP
CHWP-3 ARMSTRONG 4280, 1.5 X 1 X 8, 26 GPM , 43 FT HEAD, 1.5 HP
CHWP-2 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP
HWP-2 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP
HWP-1 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP
CHWP-1 - ARMSTRONG 4280, 1.5 X 1 X 8, 26 GPM , 43 FT HEAD, 1.5 HP
4" CHR
4" CHR
1 1/2" CHS
C H
S
C H
R
DEMO BOILERS
DEMO AND REPLACE WITH
NEW SF-1
H W
R
4"
CAP EXISTING TO ALLOW
USE OF EXISTING SYSTEM UNTIL NEW
EQUIPMENT IS IN OPERATION - TYP
4" CHS
WAREHOUSE - CIF
HEATING WATER RETURN TO
REMAIN UNTIL NEW SYSTEM IS
OPERATING
WAREHOUSE - CIF
HEATING WATER SUPPLY
LOOP TO REMAIN UNTIL NEW
SYSTEM IS OPERATING
4" HWS
4" HWR
4" HWR
NEW 20" FLUE UP
TO ROOF CAP
4" CHS
4" CHR
4" CHS
4" CHR
C H
S
C H
R
H W
S
H W
R
CH-1(R)
CH-2(R)
CHILLED WATER SUPPLY
TO CIF TO REMAIN IN OPERATION
2" CHS
H W
R
4" HWS
6" HWS
4" HWS
4" HWS
6" HWS
HWP-2(R)
NEW HWP-1(R)
EX
HWP-2(DEMO)
CONNECT TO EXISTING
INSTALL NEW VALVE
CHILLER PUMP TO REMAIN IN OPERATION
UNTIL NEW CHILLER IS OPERATIONAL
EXISTING CHILLED WATER PIPING TO
REMAIN FOR OPERATION OF CIF UNITS UNTIL
NEW IS IN OPERATION
6" FLUES FROM
WATER HEATERS UP TO
ROOF CAPS
B-2(R)
B-1(R)
E7 M402
A
4" HWR
6" HWR
2" CHS
6" CHR
6" CHS
CONNECT TO EXISTING
CONNECT TO EXISTING
DEMO EXISTING CHILLER AFTER
CHILLED WATER FROM CH-2 IS
IN OPERATION
CHEMICAL
FEEDER
HYDRONIC SYSTEM
EXPANSION TANK
CHILLED WATER CHEMICAL
FEED TANK
DEMO PIPING
DOMESTIC WATER HEATERS
RE: PLUMBING DWGS
AIR SEPARATOR FOR CHILLED WATER
CHILLED WATER EXPANSION TANK
HW-B-2(R)
HW-B-1(R)
HEATING WATER PUMP TO REMAIN IN OPERATION
UNTIL NEW BOILER IS OPERATIONAL
SF-1(R)
PIPE SUPPORT - TYP
CARBON MONOXIDE DETECTOR
CONTROL PANEL
CARBON MONOXIDE
SYSTEM ALARM/STROBE
EXISTING LOUVERS - 6' H X 4' W
ONE LOW AND ONE HIGH
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
M
E C
H A
N
IC
A L
R O
O M
P L
A N
S
M106
07/24/19
Scale: 1/4" = 1'-0" A1
BUILDING 1717 ENLARGED MECH
RM PLAN - DEMO
0 4' 8' 12'2'1'
SCALE: 1/4" = 1'-0"
Scale: 1/4" = 1'-0" A6
BUILDING 1717 ENLARGED MECH
RM PLAN - NEW WORK
IMMUNIZATIONS
RISER RM
ELEC
OFFICE
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
CORR
WOMEN
MEN
ELEC
OFFICE
VITALS
LOCKER RM
OFFICE
OFFICE
EXAM
SCREENING
EXAM
SCREENING
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
CORR
ROOM
ROOM
TR
ADA-M
ADA-W
ROOM
ROOM
ROOM
VEST
VEST
CONF
STOR
WRK RM
TR
ANAM WAITING
STOR
ANAM TESTING
STOR
PROVIDERS
BRK RM
MED PROS CHECK-IN
MED PROS
LOADING DOCK
WOMEN
TR
BEHAVIORAL HEALTH
SECURE
BRK RM
MEDICAL RECORDS
WAITING
ELECRICAL
WRK RM
STOR
MEDICAL SCREENING
VITALS
LOD / NLC
JAN
TR
WAITING
STOR
DENTAL
LOCKER RM
WRK RM
TR
WORK / SUPPLY
STOR
LOADING DOCK
WOMEN
MEN
WAITING
WAITING
OFFICE
AUDIOLOGY
TR
EXAM
ELEC
STOR
CHECK-IN
BRK RM
WRK RM
VISION / OPTOMETRY
EXAM
EXAM
EXAM
DIST / Rx
STOR
SMALL POX
WAITING
ELEC
BIOHZD
WRK RM
AG RECORDS
STOR
COMPUTER LAB
WAITING
NCM
BRFG-A
BRFG-B
BRFG-C
MEDICAL FINAL OUT
VAULT
ELEC
CS / FINANCE
AG
STOR
MEN
S1
SITE MGR
CORR
SRRC OIC
SRRC XD
CMD STE
SRRC 1SGT
WOMEN
JAN
BRK RM
SRPC SCHED
MED OPS
STOR
SRPC MaD
STOR
TR
FINAL OUT
CONF
SECUR
LEGAL
EXAM
SHPE
SHPE WAITING
VEST
MAIN ENTRY
NEW EGRESS DOOR(S)
A1 M401
C
D
F1
G1
H
K
L
M
F
2 3 4 5 6 8 9 11 12 13 14 15 16
CH-2(R)
CH-1(R)
B
E
A
VAV-1-9
VAV-1-10
VAV-1-11
VAV-1-6
FPVAV-7-1
VAV-1-8
FCU-11
FCU-1
FPVAV-1-1
VAV-1-7
FCU-12
VAV-1-1
VAV-1-5
VAV-2-1
VAV-2-2
VAV-2-5
VAV-2-6
VAV-2-4 FPVAV-3-2 VAV-2-8
VAV-2-9
FCU-2
FCU-13
VAV-2-10
VAV-2-3
FPVAV-3-1
FPVAV-3-5
FPVAV-3-4
VAV-2-7
FPVAV-3-3
FCU-17
VAV-4-16
VAV-4-8
FCU-3
VAV-4-7
FCU-14
VAV-4-6
VAV-4-11
VAV-4-10
VAV-4-9
VAV-4-5
VAV-4-2
VAV-4-3 VAV-4-4
VAV-4-1
FCU-4
FPVAV-4-2
VAV-4-12
VAV-4-14
VAV-4-15
FPVAV-4-1
FCU-9
FPVAV-6-4
FPVAV-5-8
FPVAV-5-7
FCU-5
FCU-15
FPVAV-5-4
FPVAV-5-3
FPVAV-5-2
FPVAV-5-1
VAV-6-2
FPVAV-6-4
FPVAV-6-3
FPVAV-6-2FPVAV-6-1
VAV-6-3 VAV-6-1
FCU-6
FPVAV-7-4
FPVAV-7-3 VAV-6-6
VAV-6-7
VAV-6-4
VAV-6-5FCU-7
FPVAV-7-2
FCU-8
VAV-1-4
VAV-1-3
VAV-1-2
FCU-16
FCU-10
FPVAV-5-6
FPVAV-5-5
VAV-4-13
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S T
F L
O O
R O
V E
R A
L L
P
IP
IN
G
P L
A N
M311
07/24/19
A B C
F E D
Scale: 3/64" = 1'-0" A1
BUILDING 1717 FIRST FLOOR PIPING
PLAN
RISER RM
CORR
CORR
CORR
OFFICE
TR
SECURE
BRK RM
MEDICAL RECORDS
MEDICAL SCREENING
WORK / SUPPLY
STOR
LOADING DOCK
WAITING
WAITING
OFFICE
AUDIOLOGY
TR
EXAM
ELEC
STOR
CHECK-IN
BRK RM
WRK RM
VISION / OPTOMETRY
EXAM
EXAM
C
D
2 3 4 5
A6 M401
VAV-1-5
VAV-1-10
VAV-1-6
VAV-1-2
VAV-1-3
FPVAV-7-1
FCU-1
VAV-1-9
VAV-1-7
FPVAV-1-1
VAV-1-8
VAV-1-4
VAV-1-1
VAV-1-11
3" HWS
1" HWR
C H
S
H W
R
H W
S
/2
H W
R
/2
H W
S
2" HWR
FCU-11
FCU-12
FCU-8
/4
H
W R
/4
H
W S
/4
H
W R
/4
H
W S
1" HWS
1" HWR
3/4" CHS
3/4" CHR
3/4" HWS
3/4" HWR
2" HWS
2" HWR
/4
H
W S
/4
H
W R
3/4" CHS
3/4" CHR
C H
S
C H
R
H W
R
/4
H
W S
/4
H
W R
/4
H
W S
C H
R
PIPING UP TO
MECHANICAL LEVEL
SEE M102 FOR CONTINUATION
PIPE ANCHORS
E6 M401
B
A
2" CHREX
6" CHS
C H
S
3" CHS
3" CHR
/4
C
H S
C H
R
/2
C H
R
/2
C H
S
1" CHR2 1/2" CHR
2" HWR
H W
S
4" HWS
/2
C H
R
PIPING UP TO
RTAHU-2
M312
M317
M313
M316
CORRECTED FINAL SUBMITTAL 24 JULY 2019
US Army Corps of Engineers
A N
S I_
D
IC
E
-D E
C J
V
W G
-1 -B
-0
/2
/2
T B
D
J V
-0
F O
R T
B L
IS
S T
E X
A S
M A
R K
D A
T E
D
E S
C R
IP
T
IO
N
D E
S
IG
N B
Y
SHEET ID
D R
A W
N B
Y
C H
E C
K E
D B
Y
S
IZ
E
IS
S
U E
D A
T E
F
IL
E N
A M
E :S
O L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F O
R T
W O
R T
H D
IS
T
R
IC
T T
A Y
L O
R S
T R
E E
T R
O O
M
A
F O
R T
W O
R T
H T
X
S U
B M
IT
T
E D
B Y
A
E C
O M
K
A T
Y F
R E
E W
A Y
S U
IT
E
H O
U S
T O
N T
X
B1717
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
PLAN
NORTH
W
G
-1
D -0
B
U
IL
D
IN
G
F
IR
S T
F L
O O
R P
IP
IN
G P
L A
N
A R
E A
A
M312
07/24/19
Scale: 1/8" = 1'-0" A1
BUILDING 1717 FIRST FLOOR PIPING
PLAN - AREA A
A B C
F E D
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
KEYNOTES
1 EXISTING PIPING TO REMAIN OPERATIONAL UNTIL
NEW SYSTEM IS INSTALLED.
2 EXISTING FAN COIL UNIT TO REMAIN IN OPERATION
UNTIL NEW SYSTEM IS OPERATIONAL TO MAINTAIN
MINIMUM SYSTEM VOLUME FOR THE CHILLER TO
MAINTAIN COOLING IN THE CIF AREA. DEMO AFTER
NEW STSEM IS OPERATING.
3 3/4" HWS & R TO VAV TERMINAL HEATING COIL
4 3/4" CHILLED WATER SUPPLY AND RETURN TO FAN
COIL UNIT
5 3/4" CHWS&R AND 3/4" HWS&R TO FAN COIL UNIT.
6 ROUTE CONDENSATE DRAIN TO NEAREST FLOOR
IMMUNIZATIONS
CORR
CORR
CORR
CORR
VITALS
LOCKER RM
STOR
DENTAL
LOCKER RM
WRK RM
TR
WORK / SUPPLY
WOMEN
MEN
EXAM
EXAM
EXAM
DIST / Rx
STOR 190
SMALL POX
WAITING
ELEC
BIOHZD
WRK RM
AG RECORDS
STOR
WAITING
NCM
CS / FINANCE
NEW EGRESS DOOR(S)
C
D
5 6 8 9 11
A6 M401
VAV-1-5 VAV-2-10
VAV-1-1
3" HWS
1" HWR 1" HWR
4" HWS
6" CHS
4" HWS
C H
S
C H
R
H W
S
H W
R
4" HWS
1" HWR
/2
C H
S
C H
R1
/2
H W
S
H W
R
FPVAV-3-5
FPVAV-3-4
FPVAV-3-1
VAV-2-7
VAV-2-9
VAV-2-8
VAV-2-4
VAV-2-6
VAV-2-5
VAV-2-2
VAV-2-1
/2
H W
R
/2
H W
S
FCU-2
FCU-10
FPVAV-3-2
VAV-2-3
FCU-13
/4
H
W S
/4
H
W R
/4
H
W S
/4
H
W R
H W
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.