Final_Ft._Bliss_B1717-Att_B-Drawings_3aof4.pdf

PDF 9 MB Posted

Attached to
Buildings 1717 & 1735 renovation
Solicitation number
W9126G19B0010
Issued by

About this file

BLDG 1717 - ATT B Drawings 3a of 4. *These documents are being uploaded for downloading purposes. These documents replace the initial document (ATT B drawing 3 of 4) posted with the initial solicitation package.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLOW ARROW

CONNECT TO EXISTING

PIPE CAPPED

END OF DEMOLITION

AIRFLOW ARROW

DESCRIPTIONSYMBOL

MECHANICAL SYMBOLS LIST

NOTE: NOT ALL SYMBOLS MAY BE USED.

TEMPERATURE SENSOR

HUMIDITY SENSOR

PIPE UNION

REDUCED PRESSURE BACKFLOW PREVENTER

THREE-WAY CONTROL VALVE

TWO-WAY CONTROL VALVE

GENERAL SERVICE VALVE (SEE SPECIFICATIONS

FOR VALVE TYPE PER APPLICATION)

CHECK VALVE (ARROW INDICATES

DIRECTION OF FLOW)

AUTOMATIC BALANCING VALVE

AUTOMATIC AIR VENT

TEMPERATURE/PRESSURE TEST PLUG

(PETE'S PLUG)

DRAIN VALVE WITH THREADED

HOSE CONNECTION

THERMOMETER

STRAINER WITH BLOW DOWN VALVE

PRESSURE GAUGE WITH STOPCOCK

PITCH DOWN IN DIRECTION OF ARROW

FLEXIBLE PIPE CONNECTION

PIPE ANCHOR

MANUAL AIR VENT

PIPE GUIDES OR SLEEVES

FLOW METER

RELIEF VALVE

PRESSURE REDUCING VALVE

MANUAL BALANCING VALVEM

A

AV

MAV

TWO-WAY PRESSURE INDEPENDENT

CONTROL AND BALANCE VALVE

COCO CLEAN OUT

PICBV

THERMOSTAT WITH ADJUSTABLE CONTROLT

HUMIDISTAT WITH ADJUSTABLE CONTROLH

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

NITROGEN DIOXIDE SENSOR

CO2

CO

NO2

H

T

STEAM TRAP

STEAM PRESSURE REGULATING VALVE

OCCUPANCY SENSOR OS

PIPE DROP

PIPE RISE

PIPE TEE DOWN

PIPE REDUCER

DESCRIPTIONSYMBOL

MECHANICAL SYMBOLS LIST CONT.

NOTE: NOT ALL SYMBOLS MAY BE USED.

SUPPLY DIFFUSER WITH FLEXIBLE DUCT

SUPPLY DIFFUSER

RETURN/EXHAUST GRILLE

SIDEWALL SUPPLY REGISTER

SIDEWALL RETURN/EXHAUST REGISTER

DAMPERS/DUCT ACCESSORIES

BDD: BACKDRAFT DAMPER

FSD: FIRE/SMOKE DAMPER

FD: FIRE DAMPER

MD: MOTORIZED DAMPER

SD: SMOKE DAMPER

VD: VOLUME DAMPER

SB: SECURITY BARS

BDD

TAG -

AIRFLOW (CFM)

TAG

AIRFLOW (CFM)

TAG

AIRFLOW (CFM)

TAG

AIRFLOW (CFM)

TAG

AIRFLOW (CFM)

DSB

TAG EXAMPLE:

DSA

TAG EXAMPLE:

GRCA

TAG EXAMPLE:

RSA

TAG EXAMPLE:

GRSA

TAG EXAMPLE:

GECA

GESA

RECTANGULAR DUCT ELBOW UP

SUPPLY AND OUTDOOR AIR

OVAL DUCT ELBOW UP

ROUND DUCT ELBOW UP

RECTANGULAR DUCT ELBOW

UP

RETURN, RELIEF, AND EXHAUST AIR

OVAL DUCT ELBOW UP

ROUND DUCT ELBOW UP

NEW WORK DUCTWORK

EXISTING DUCTWORK

DEMOLITION DUCTWORK

NEW WORK PIPING

EXISTING PIPING

DEMOLISHED PIPING

NEW WORK MECHANICAL EQUIPMENT

(WITH CLEARANCE SHOWN)

EXISTING MECHANICAL EQUIPMENT

DEMOLISHED MECHANICAL EQUIPMENT

VAV TERMINAL BOX (WITH REHEAT)

VAV TERMINAL BOX (NO REHEAT)

RECTANGULAR DUCT ELBOW DOWN

SUPPLY AND OUTDOOR AIR

OVAL DUCT ELBOW DOWN

ROUND DUCT ELBOW DOWN

RECTANGULAR DUCT ELBOW DOWN

RETURN, RELIEF, AND EXHAUST AIR

OVAL DUCT ELBOW DOWN

ROUND DUCT ELBOW DOWN

TERMINAL BOXES

ACCESS DOOR

GRSA = GRILLE - RETURN - SIDEWALL - TYPE A

GESA = GRILLE - EXHAUST - SIDEWALL - TYPE A

DSB = DIFFUSER - SUPPLY- TYPE B

DSA = DIFFUSER - SUPPLY- TYPE A

GRCA = GRILLE - RETURN - CEILING -TYPE A

GECA = GRILLE - EXHAUST - CEILING - TYPE A

RSA = REGISTER - SIDEWALL- TYPE A

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

W

G

-1

D -0

B

U

IL

D

IN

G

G

E N

E R

A L

I N

F O

H

V A

C

M001

07/24/19

MECHANICAL ABBREVIATIONS

NOTE: NOT ALL ABBREVIATIONS MAY BE USED.

ABBREVIATION DESCRIPTION

(D) EXISTING TO BE DEMOLISHED

(E) EXISTING TO REMAIN

(F) FUTURE

AFF ABOVE FINISHED FLOOR

AMB AMBIENT

APD AIR PRESSURE DROP

BAS BUILDING AUTOMATION SYSTEM

BFP BACKFLOW PREVENTOR

BHP BRAKE HORSEPOWER

BLDG BUILDING

BOB BOTTOM OF BEAM

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BOS BOTTOM OF STRUCTURE

BTUH BRITISH TEHRMAL UNITS PER HOUR

CFM CUBIC FEET PER MINUTE

CL CENTER LINE

CO CLEAN OUT

COMPR COMPRESSOR

COP COEFFICIENT OF PERFORMANCE

CV CONSTANT VOLUME

DB DRY BULB

DIA DIAMETER

DN DOWN

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EFF EFFICIENCY

EG ETHYLENE GLYCOL

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

FLA FULL LOAD AMPS

FPI FINS PER INCH

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

GAL GALLONS

GPM GALLONS PER MINUTE

HD HEAD

HP HORSEPOWER

ID INNER DIAMETER

IPLV INTEGRATED PART LOAD VALUE

KW KILOWATTS

LAT LEAVING AIR TEMPERATURE

LWT LEAVING WATER TEMPERATURE

MBH THOUSAND BTUH

MCA MAXIMUM CURRENT AMPACITY

MFR MANUFACTURER

MOCP MAXIMUM OVERCURRENT PROTECTION

N/A NOT APPLICABLE

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOX NITROUS OXIDE

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

PD PRESSURE DROP

PG PROPYLENE GLYCOL

PPH POUNDS PER HOUR

PPM PARTS PER MILLION

PRV PRESSURE REDUCING VALVE

PSI PUNDS PER SQUARE INCH

REFRIG REFRIGERANT

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

SEER SEASONAL ENERGY EFFICIENCY RATIO

SP STATIC PRESSURE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VRF VARIABLE REFRIGERANT FLOW

W WATTS

WB WET BULB

WG WATER GAUGE

WPD WATER PRESSURE DROP

MECHANICAL SYSTEM TYPES AND ABBREVIATIONS

NOTE: NOT ALL ABBREVIATIONS MAY BE USED.

ABBREVIATION DESCRIPTION

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

COND CONDENSATE

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DRAIN

EA EXHAUST AIR

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

MW MAKEUP WATER - GENERIC

OA OUTDOOR AIR

PC PUMPED CONDENSATE

R REFRIGERANT

RA RETURN AIR

REL RELIEF AIR

SA SUPPLY AIR

MECHANICAL GENERAL NOTES

1. VISIT THE SITE OF THE WORK TO GAIN AN ACCEPTABLE KNOWLEDGE OF CONDITIONS

AFFECTING THE EXECUTION OF THE WORK. AFTER VISITING THE SITE, REQUEST SUCH

INFORMATION AND/OR CLARIFICATIONS AS NECESSARY TO FULLY UNDERSTAND THE

WORK REQUIRED AND TO PROPERLY ESTIMATE COSTS.

2. REVIEW ALL DRAWINGS TO VERIFY EXTENT AND SCHEDULING OF ALL DEMOLITION

ACTIVITIES PRIOR TO COMMENCING DEMOLITION WORK. FIELD VERIFY ALL SIZES AND

LOCATIONS OF EXISTING DUCTWORK AND PIPING TO REMAIN. NOTIFY

ARCHITECT/ENGINEER OF DEVIATIONS WHICH AFFECT RENOVATION WORK PRIOR TO

PROCEEDING WITH THE WORK.

3. ITEMS NOTED TO BE DEMOLISHED INCLUDES BUT IS NOT LIMITED TO ALL ASSOCIATED

COMPONENTS, CONTROL WIRING, PIPING, DUCTWORK, ELECTRICAL CONNECTIONS,

SUPPORTS, INSULATION, ETC. COORDINATE WITH OTHER TRADES AS REQUIRED.

4. ALL WORK IS TO BE PHASED AS INDICATED ON THE ARCHITECTURAL DRAWINGS.

COORDINATE PHASING OF ALL DEMOLITION, RENOVATION, AND NEW WORK WITH

OTHER TRADES. CLOSELY COORDINATE PHASING OF WORK WITHIN CORRIDORS WITH

THE OWNER. CORRIDORS CANNOT BE COMPLETELY CLOSED OFF TO PEDESTRIAN

TRAFFIC. TO ACCOMMODATE PHASING, CORRIDOR ACCESS WORK MAY NEED TO BE

PERFORMED DURING OFF PEAK PERIODS. PRIOR TO MOVING ON TO THE NEXT PHASE,

ALL WORK IN PREVIOUSLY PHASED AREAS MUST BE COMPLETE AND OPERATIONAL.

5. ENSURE THAT THE WORK WILL NOT INTERFERE OR INTERRUPT SERVICES TO AREAS

OUTSIDE OF THE DESIGNATED CONTRACT AREAS. SCHEDULE ALL WORK AS TO CAUSE

MINIMAL SERVICE INTERRUPTIONS FOR THE OWNER. UNAVOIDABLE INTERRUPTIONS

ARE TO BE SCHEDULED WITH THE OWNER NO LESS THAN TWO WEEKS PRIOR TO

THEIR EXPECTED COMMENCEMENT. WORK SHALL BE PERFORMED AT SUCH TIMES AS

DIRECTED BY THE OWNER AND, IF POSSIBLE, ARE TO OCCUR DURING OFF PEAK

PERIODS.

6. THE CONTRACTOR IS TO VERIFY THE EXACT SERVICE OF ANY EXISTING PIPING OR

DUCTWORK PRIOR TO INSTALLING ANY NEW CONNECTIONS. ANY DISCREPANCIES

BETWEEN THE CONSTRUCTION DOCUMENTS OR THE DESIGN INTENT AND ACTUAL

CONDITIONS ARE TO BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER

IMMEDIATELY, PRIOR TO FABRICATION OR INSTALLATION.

8. EACH TRADE SHALL PAY THE GENERAL CONTRACTOR TO PATCH FLOOR SLAB AND

WALL PENETRATIONS TO MATCH EXISTING WHERE THEIR PIPING, DUCT OR

EQUIPMENT IS BEING REMOVED OR INSTALLED.

9. ALL ROOFING MODIFICATIONS SHALL BE DONE BY OWNER’S ROOFING VENDOR TO

MAINTAIN ANY AND ALL WARRANTIES. COST TO BE INCLUDED IN THIS CONTRACT

UNLESS SPECIFICALLY INCLUDED IN GENERAL TRADES CONTRACTOR’S SCOPE OF

WORK.

10. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED

AND/OR REMOVED IN THE PERFORMANCE OF WORK FOR THIS PROJECT.

13. CONTRACT DOCUMENTS FOR MECHANICAL WORK ARE SCHEMATIC IN NATURE AND

ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

14. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO

INSTALL COMPLETE AND OPERABLE SYSTEMS AS INDICATED ON THE DRAWINGS AND

SPECIFICATIONS. INCLUDE ALL NECESSARY AND APPLICABLE APPURTENANCES,

WHETHER INDICATED OR NOT.

15. ANY DEVIATIONS FROM THE BASIS OF DESIGN THAT REQUIRE ADDITIONAL

PROVISIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

16. COORDINATE THE EXACT REQUIREMENTS AND LOCATION OF WORK WITH THE WORK

OF OTHER TRADES PRIOR TO FABRICATION AND INSTALLATION. PROVIDE ADDITIONAL

OFFSETS AND SECTIONS IN DUCTWORK AND/OR PIPING REQUIRED TO MEET THE

APPLICABLE JOB CONDITION REQUIREMENTS. VERIFY JOB SITE ELEVATIONS,

DIMENSIONS, AND CONDITIONS, PRIOR TO FABRICATION OR INSTALLATION OF THE

WORK. COORDINATE EXACT ROUTING OF DUCTWORK AND PIPING WITH OTHER

TRADES SO THAT NO CONFLICTS OCCUR WITH DUCTWORK, PIPING, LIGHTS,

STRUCTURE, ETC. PROVIDE ALL PERTINENT DATA CONCERNING THE LOCATION,

DIMENSIONS, ETC., OF THE MECHANICAL EQUIPMENT THAT REQUIRES BASES, CURBS

AND SUPPORTS TO THE APPROPRIATE TRADES.

18. ALL RATED WALL AND FLOOR PENETRATIONS ARE TO BE SEALED WATER TIGHT AND

PACKED WITH FIRE STOP MATERIAL.

19. ALL ITEMS THAT REQUIRE MAINTENANCE OR ADJUSTMENT MUST BE INSTALLED IN

ACCESSIBLE LOCATIONS. PROVIDE AN APPROPRIATELY SIZED ACCESS DOOR AS

REQUIRED.

22. INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH THE

MANUFACTURER’S RECOMMENDATIONS AND DIRECTION. PROVIDE STRAIGHT INLET

AND OUTLET DUCTS/PIPES BASED ON MANUFACTURER’S RECOMMENDATIONS. IF IN

CONFLICT WITH THE DESIGN INDICATED HEREIN, ADVISE THE ENGINEERS PRIOR TO

INSTALLATION FOR CLARIFICATION.

23. COORDINATE THE EXACT LOCATIONS OF DIFFUSERS, GRILLES AND REGISTERS WITH

ARCHITECTURAL REFLECTED CEILING PLANS, AREA SMOKE DETECTORS, SPRINKLERS,

LIGHTS AND ELECTRICAL DEVICES. AIR DEVICES SHALL NOT BE WITHIN 3 FEET OF AN

AREA SMOKE DETECTOR.

25. AIR DEVICES PROVIDED WITH INTEGRAL BALANCE DAMPERS DO NOT REQUIRE

ADDITIONAL BALANCING DAMPER AT AIR DEVICE BRANCH TAKEOFF.

26. PROVIDE ROOM TEMPERATURE THERMOSTATS FOR ALL EQUIPMENT THAT MAINTAINS

SPACE TEMPERATURE. PREFERRED LOCATIONS ARE SHOWN ON THE PLANS.

THERMOSTATS SHALL BE MOUNTED AT 48" ABOVE FINISHED FLOOR, UNLESS NOTED

OTHERWISE. COORDINATE THE EXACT LOCATIONS OF THERMOSTATS WITH

MARKERBOARDS, SWITCHES, AND ANY OTHER WALL MOUNTED FIXTURES PRIOR TO

ROUGH IN.

27. UNLESS NOTED OTHERWISE, MINIMUM PIPE SIZE TO TERMINAL EQUIPMENT SHALL BE

3/4 INCH AND MINIMUM FLOW SHALL BE 0.5 GPM.

28. PROVIDE SHUT-OFF VALVES WITHIN ALL SUPPLY PIPING BRANCH TAKEOFFS FROM

MAINS. PROVIDE A MANUAL BALANCE VALVE AND A SEPARATE SHUT-OFF VALVE

WITHIN ALL RETURN PIPING BRANCH TAKE-OFFS FROM MAINS. LOCATE VALVES IN

ACCESSIBLE LOCATIONS.

29. INSTALL ALL PIPING IN LOCATIONS AND ELEVATIONS SUCH THAT COILS, TUBES, AND

FILTERS CAN BE REMOVED AND REPLACED WITHOUT MAJOR PIPING REMOVAL.

LOCATE VALVES IN APPROPRIATE PLACES TO ACCOMMODATE MAINTENANCE. FOR

GRAVITY FLOW PIPING, ADEQUATE SLOPE SHALL BE PROVIDED.

30. INSTALL TWO-WAY CONTROL VALVES ON ALL EQUIPMENT UNLESS NOTED OTHERWISE.

31. AT TIME OF ROUGH INSTALLATION, DURING STORAGE ON THE CONSTRUCTION SITE,

AND UNTIL FINAL STARTUP OF THE HEATING AND COOLING EQUIPMENT, ALL DUCT AND

OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH

TAPE, PLASTIC, SHEET METAL OR OTHER METHODS ACCEPTABLE FOR PROTECTION

TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST OR DEBRIS WHICH

MAY COLLECT IN THE SYSTEM(S).

32. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED AREAS

OF THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT

PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8 PRIOR TO

OCCUPANCY. FILTERS SHALL BE CHANGED PRIOR TO AIR BALANCE AND

COMMISSIONING, AND AGAIN AT THE COMPLETION OF CONSTRUCTION JUST PRIOR TO

OCCUPANCY OF THE BUILDING WITH FINAL FILTERS PER SPECIFICATIONS.

MAINTENANCE RECOMMENDATIONS FOR FILTERS OF THE SAME VALUE SHALL BE

INCLUDED IN THE OPERATION AND MAINTENANCE MANUAL.

34. ALL SUPPORTS FOR EQUIPMENT, DUCTWORK AND PIPING SYSTEMS, DEVICES SHALL

BE FROM THE BUILDING STRUCTURE. SUPPORT FROM STRUCTURAL BRIDGING IS

UNACCEPTABLE.

35. INSTALL NO PIPING, CONDUIT, DUCTWORK, ETC., IN A LOCATION OR IN A MANNER THAT

WILL ALLOW FREEZING AND/OR THE COLLECTION OF CONDENSATION.

36. CONTRACTOR IS RESPONSIBLE FOR DRAINING, FLUSHING, PURGING, AND FILLING ALL

PIPING SYSTEMS AS REQUIRED. THESE SYSTEMS INCLUDE (BUT MAY NOT BE LIMITED

TO): HEATING HOT WATER SYSTEMS, CHILLED WATER SYSTEMS, BUILDING STEAM

SYSTEMS, ALL REQUIRED CHEMICAL TREATMENT SYSTEMS, CONDENSER WATER

SYSTEMS (AND COOLING TOWER SUMPS), WATER-SOURCE HEAT PUMP LOOP

SYSTEMS, GROUND-SOURCE HEAT PUMP LOOP SYSTEMS, AND MAKE-UP WATER

CONNECTIONS.

DEMO EXISTING MULTIZONE

DUCTWORK IN THIS AREA

DEMO DUCT AND AIR DEVICES

EXISTING RTU-1 TO BE REMOVED EX RTU-2 TO BE REMOVED

EX RTU-3 TO BE REMOVED

REMOVE AND CAP EXISTING DUCT

REMOVE EXISTING

HORIZONTAL AHU

EXISTING CHILLED/HEATING WATER

FAN COIL UNIT TO REMAIN - REBALANCE

DEMO UNITS ON SECOND

FLOOR LEVEL

DEMO CHILLED AND

HEATING WATER PIPING

TO SECOND LEVEL UNITS

REMOVE DUCTWORK AND AIR DEVICES

REMOVE CHILLED AND

HEATING WATER PIPING

EXISTING CHILLED AND HEATING

PIPING TO BE REMOVED

DEMO DUCTWORK

x

A1 M401

REMOVE CHILLER-1 - CHILLER -2 WILL REMAIN UNTIL THE NEW

CHILLER 1 IS INSTALLED AND CHANGEOVER PIPING TO EXISTING IS COMPLETE.

AFTER CHANGEOVER IS COMPLETED THE EXISTING CHILLER WILL BE REPLACED

WITH NEW CHILLER -2

EX CHILLER 1

EX CHILLER 2

EXISTING CIF AREA

HVAC SYSTEMS TO REMAIN IN

OPERATION

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S

T F

L O

O R

P L

A N

D

E M

O

MD101

07/24/19

A B C

F E D

Scale: 3/64" = 1'-0" A1

BUILDING 1717 FIRST FLOOR DEMO

PLAN DEMOLITION NOTE:

CONTRACTOR SHALL REMOVE EQUIPMENT AND PRIDE

WILL PICK UP THE EQUIPMENT FROM LAYDOWN AREA.

1 3

A

2 4 5 6 7 8

B

D1

E1

1 32 4 5 6 7 8

F1

G1

H

K

4.1 5.1

L

M

A

B

D1

E1

F1

G1

H

K

1 32

A

B

D1

E1

F1

G1

H

K

1 32

20x14

DEMO DUCT AND AIR DEVICES

EXISTING RTU-1 TO BE REMOVED

EX RTU-2 TO BE REMOVED

REMOVE EXISTING

HORIZONTAL AHU UNITS,

DUCTWORK AND PIPING

DEMO CHILLED AND

HEATING WATER PIPING

TO UNIT

REMOVE DUCTWORK AND AIR DEVICES

REMOVE CHILLED

AND HEATING

WATER PIPING

EXISTING CHILLED AND HEATING

PIPING TO BE REMOVED

DEMO EXISTING MULTIZONE (CHW & HW)

SERVING FIRST AND SECOND LEVELS IN

THIS AREA

EXISTING VENTILATION FAN AND

DUCTWORK TO BE REMOVED

UNIT HEATERS TO BE REMOVED

DEMO DUCTWORK TO FIRST AND SECOND

LEVELS

DEMO AHU AND DUCTWORK

DEMO ALL DUCTWORK SERVING

THIS AREA

EXISTING LOUVER

- BLANK OFF

DEMO HEATING UNIT

DEMO HEATING UNIT

DEMO DUCTWORK

DEMO VRF WALL UNITS

FCU (9)TO REMAIN UNTIL NEW CHILLED WATER

SYSTEM IS OPERATING TO SERVE THE CIF -

MAINTAIN CHILLED WATER FLOW INTO

EXISTING REVERSE RETURN WATER LOOP (P7)

DEMO RA FAN

DEMO ROOF INTAKE HOOD

SECOND FLOOR FIRST FLOOR

REMOVE GAS FIRED UNIT

HEATERS AND FLUES

EX LOUVER TO BE USED

FOR NEW WORK

DEMO UNIT HEATERS - TYP

REMOVE CHILLED

AND HEATING

WATER PIPING

DEMO HEATING WATER PIPING

DEMO DUCT AND AIR DEVICES

DEMO 2 1/2" HWRDEMO 2 1/2" HWS

DEMO 2" CWR AFTER

NEW CHILLED WATER IS

OPERATING TO SERVE THE

CIF AREA

(AC1)

DEMO HEATING WATER PIPING

AND REFRIGERANT PIPING UP

TO AIR COOLED CONDENSING

UNIT ON ROOF

SEE SECOND

FLOOR

DEMO PLAN FOR

CONTINUATION

3/4" CHS

3/4" CHR

2" CHR

/4

C

H S

C H

R

(AC2)

FCU(3) TO REMAIN UNTIL NEW CHILLED WATER

SYSTEM IS OPERATING TO SERVE THE CIF -

MAINTAIN CHILLED WATER FLOW OF 2 GPM INTO

EXISTING REVERSE RETURN WATER LOOP (P7)

A1 M402

A5 M402

1 1

B

E

A

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S

T F

L O

O R

P L

A N

N O

R T

H

D E

M O

MD102

07/24/19

Scale: 1/16" = 1'-0" A1

BUILDING 1717 FIRST /SECOND

FLOOR DEMO PLAN - NORTH

A B C

F E DKEYNOTES

1 BLANK OFF EXISTING LOUVER

1610 11 12 13 14 15

1610 11 12 13 14 15

EX RTU-3 TO BE REMOVED

REMOVE AND CAP EXISTING DUCT

EXISTING CHILLED/HEATING WATER

FAN COIL UNIT (AHU1)TO REMAIN - 14 GPM -

3235 CFM, 815 CFM OA

DEMO DUCTWORK

x

A1 M401

EX FAN COIL (FC-1) TO REMAIN IN OPERATION

CHILLED WATER - 2 GPM, HEATING WATER 1 GPM

C H

S

EX FAN COIL (FC7) TO REMAIN

IN OPERATION - DEMO AFTER NEW

WORK IN RESTROOMS IS COMPLETE

HEATING ONLY - 2 GPM

EXHAUST FAN TO BE REPLACED

EXISTING UNIT HEATERS

TO REMAIN

EX

UH-6

EX

UH-7

EX

UH-8

EX

UH-9

EX

-UH-10

EX

UH-12

EX

UH-11

EX

UH-13

EX

UH-14

EX

UH-15

EX

UH-16

EX

UH-18

EX

UH-17

EX

UH-19

EX

UH-20

(E)1 1/2" HWS

1" HWR

4" HWS

H W

R

H W

S

EXISTING HYDRONIC HEATING

WATER PIPING TO REMAIN -

REVERSE RETURN LOOP (LOOP P4

@ 110 GPM AT 35' HEAD)

(E)4" HWR

EX

CHILLER

EX

CHILLER

SEE ENLARGED DEMO PLAN

PLAN 2 DRAWING M106

HEATING/VENTILATION

UNIT TO BE REMOVED

3/4" CHR

1 1/4" CHS

1 1/2" CHR

4" HWR

EX HWR

EX

430 CFM

EX 425 CFM

EX

425 CFM

2" CHS

EXISTING TO REMAIN-

DEMO AFTER NEW PIPING

IS OPERATING

E1 M402

B

E

A

(E)1" HWS

(E)1" HWR

(D)2"

(D)2"

(E)1 1/2" CHR

(E)1 1/4" CHS

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S

T F

L O

O R

P L

A N

S O

U T

H

D E

M O

MD103

07/24/19

Scale: 1/16" = 1'-0" A1

BUILDING 1717 FIRST FLOOR DEMO

PLAN - SOUTH

A B C

F E D

KEYNOTES

1 DEMO EXHAUST FAN - NEW FAN TO USE EXISTING

OPENING

2 EXISTING PIPING TO REMAIN OPERATIONAL UNTIL

NEW SYSTEM IS INSTALLED.

3 CONNECT TO EXISTING PIPING AFTER NEW SYSTEM

IS OPERATING TO KEEP CIF OPERATING.

4 DEMO EXISTING CHILLED WATER PIPING.

5 DEMO EXISTING HEATING WATER PIPING

6 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS

SPLIT SYSTEM. THE UNITS SHALL REMAIN IN

OPERATION UNTIL NEW COOLING SYSTEMS ARE

OPERATIONAL.

A1 M401

C

D

F1

G1

H

K

L

M

F

2 3 4 5 6 8 9 11 12 13 14 15 16

G

H1

EXISTING RTU-1

TO BE REMOVED EX RTU-2 TO

BE REMOVED

EX RTU-3 TO BE REMOVED

DEMO

RTU

EXISTING

FANS TO BE

REMOVED

EXISTING GAS

PIPING TO BE

REMOVED

EXISTING

ROOF HATCH

TO REMAIN

EXISTING GAS

PIPING TO BE

REMOVED

EXISTING

EXHAUST FANS

TO BE REMOVED

EXISTING

EXHAUST FANS

TO BE REMOVED

DEMO VENTILATING UNIT

DEMO ROOF HOODS

EXISTING

FANS TO BE

REMOVED

DEMO ROOF HOOD

DEMO EXHAUST FAN

DEMO FLUESDEMO ACCU

B

E

A

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

D

E M

O R

O O

F P

L A

N

MD104

07/24/19

Scale: 1" = 20'-0" A1

BUILDING 1717 ROOF PLAN DEMO

DEMOLITION NOTE:

CONTRACTOR SHALL REMOVE EQUIPMENT AND PRIDE

WILL PICK UP THE EQUIPMENT FROM LAYDOWN AREA.

A B C

F E D

C

D

F1

G1

H

K

L

M

F

2 3 4 5 6

G

H1

EXISTING RTU-1

TO BE REMOVED

EX RTU-2 TO

BE REMOVED

EXISTING FAN

TO BE REMOVED

EXISTING AC

CONDENSING UNIT

TO BE REMOVED

EXISTING INTAKE

HOOD TO BE

REMOVED

EXISTING INTAKE

HOOD TO BE

REMOVED

EXISTING COOLER

CONDENSING UNITS

TO BE REMOVED

EXISTING

ROOF HATCH

ROOF VENTILATION UNIT

AND DUCTWORK TO

ROOF PENETRATION TO

BE REMOVED - REPAIR

ROOF

EXISTING FANS

TO BE REMOVED

EXISTING

GOOSENECK

EXHAUST VENT

TO BE REMOVED

EXISTING

GOOSENECK

EXHAUST VENT

TO BE REMOVED

EXISTING MINI SPLIT

CONDENSER TO BE

REMOVED

EXISTING FREEZER

CONDENSING UNITS

TO BE REMOVED

EXISTING SMALL

CONDENSING UNITS

TO BE REMOVED

EXISTING

FANS TO BE

REMOVED

EXISTING GAS

PIPING TO BE

REMOVED

CAPPED ROOF CURB

OPENINGS WHERE ROOF

VENTS ONCE WERE

CAPPED ROOF CURB

OPENINGS WHERE ROOF

VENTS ONCE WERE

CURB CAP WHERE ROOFTOP

UNIT WAS REMOVED. TO BE

REUSED THIS AREA FOR AHU

IN NEXT PHASE.

EXISTING

EXHAUST FAN

TO BE REMOVED

EXISTING

MUSHROOM

HOOD TO BE

REMOVED

EXISTING

EXHAUST FANS

TO BE REMOVED

EXISTING FLUES

TO BE REMOVED

EXISTING

EXHAUST FANS

TO BE REMOVEDEXISTING FREEZER

COMPRESSOR /

CONDENSING UNITS TO

BE REMOVED (TYP 3)

EXISTING COOLER

CONDENSING UNITS

TO BE REMOVED

EXISTING

ROOF HATCH

TO REMAIN

EXISTING VRF

CONDENSING UNITS

TO BE REMOVED

EXISTING

EXHAUST FANS

TO BE REMOVED

B

E

A

EXISTING

FANS TO BE

REMOVED

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

D

E M

O R

O O

F P

L A

N

N O

R T

H

MD105

07/24/19

A B C

F E D

Scale: 1/16" = 1'-0" A1

BUILDING 1717 ROOF PLAN DEMO -

NORTH

KEYNOTES

1 EXISTING UNIT TO BE DEMOLISHED WITH

ASSOCIATED DUCTWORK AND CONTROLS.

M401

C

D

F1

G1

H

K

L

M

F

8 9 11 12 13 14 15 16

G

H1

EX RTU-3 TO BE REMOVED

DEMO

RTU

EXISTING GAS

PIPING TO BE

REMOVED

EXISTING

EXHAUST FANS

TO BE REMOVED

E1 M402

A5 M402

B

E

A

DEMO VENTILATION HOOD

EXISTING CIF AREA

HEATING AND VENTILATING EQUIPMENT IN

THIS AREA OF ROOF IS TO REMAIN-

SYSTEMS TO REMAIN IN OPERATION

DEMO EXHAUST FAN

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

D

E M

O R

O O

F P

L A

N

S O

U T

H

MD106

07/24/19

A B C

F E D

Scale: 1/16" = 1'-0" A1

BUILDING 1717 ROOF PLAN DEMO -

SOUTH

KEYNOTES

1 EXISTING TO REMAIN (TYP).

2 EXISTING FAN TO REMAIN

3 DEMO EXHAUST FAN - NEW FAN TO USE EXISTING

OPENING

4 DEMO EXHAUST FAN

LAB

IMMUNIZATIONS

RISER RM

ELEC

OFFICE

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

WOMEN

MEN

ELEC

OFFICE

VITALS

LOCKER RM

OFFICE

OFFICE

EXAM

SCREENING

EXAM

SCREENING

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

CORR

ROOM

ROOM

TR

ADA-M

ADA-W

ROOM

ROOM

ROOM

VEST

VEST

CONF

STOR

WRK RM

TR

ANAM WAITING

STOR

ANAM TESTING

STOR

PROVIDERS

BRK RM

MED PROS CHECK-IN

MED PROS

LOADING DOCK

WOMEN

TR

BEHAVIORAL HEALTH

SECURE

BRK RM

MEDICAL RECORDS

WAITING

ELECRICAL

WRK RM

STOR

MEDICAL SCREENING

VITALS

LOD / NLC

JAN

TR

WAITING

STOR

DENTAL

LOCKER RM

WRK RM

TR

WORK / SUPPLY

STOR

LOADING DOCK

WOMEN

MEN

WAITING

WAITING

OFFICE

AUDIOLOGY

TR

EXAM

ELEC

STOR

CHECK-IN

BRK RM

WRK RM

VISION / OPTOMETRY

EXAM

EXAM

EXAM

DIST / Rx

STOR

SMALL POX

WAITING

ELEC

BIOHZD

WRK RM

AG RECORDS

STOR

COMPUTER LAB

WAITING

NCM

BRFG-A

BRFG-B

BRFG-C

MEDICAL FINAL OUT

VAULT

ELEC

CS / FINANCE

AG

STOR

MEN

S1

SITE MGR

CORR

SRRC OIC

SRRC XD

CMD STE

SRRC 1SGT

WOMEN

JAN

BRK RM

SRPC SCHED

MED OPS

STOR

SRPC MaD

STOR

TR

FINAL OUT

CONF

SECUR

LEGAL

EXAM

SHPE

SHPE WAITING

VEST

MAIN ENTRY

NEW EGRESS DOOR(S)

A1 M401

C C

D D

F1

G1

H

K K

L L

M M

F F

2 3 4 5 6 8 9 11 12 13 14 15 16

G

H1

CH-2(R)

CH-1(R)

B B

E E

A A

EXISTING CIF AREA - NOT IN

SCOPE OF WORK

VAV-2-2

FCU-15

FCU-5

VAV-2-6

VAV-2-5

VAV-2-4

VAV-2-1

VAV-1-5

FCU-12

FCU-10

VAV-2-8

FPVAV-3-2

FCU-13

FPVAV-3-1

FPVAV-3-3

FPVAV-3-5

FPVAV-3-4

VAV-2-7

VAV-4-7

VAV-4-8

FCU-17

FCU-3

VAV-4-6FCU-4

VAV-4-2

VAV-4-10

VAV-4-4

VAV-4-3

FPVAV-4-2

VAV-4-12

VAV-4-13 VAV-4-14

VAV-4-15

FPVAV-4-1

FPVAV-5-6

FPVAV-5-5 FPVAV-5-7

FPVAV-5-8

FPVAV-5-4

FPVAV-5-3

FCU-9

FPVAV-6-3FPVAV-6-2

FPVAV-6-1

VAV-6-3 VAV-6-1

FCU-6

FPVAV-7-3

FPVAV-7-4

VAV-6-5

FCU-16

VAV-6-6

FCU-8

VAV-1-3

VAV-1-4

FPVAV-7-1

VAV-1-6

VAV-1-7

FPVAV-1-1

VAV-1-9

VAV-1-11

VAV-1-1VAV-1-10

FCU-11FCU-1

VAV-6-7

VAV-2-9 VAV-2-3

VAV-2-10

FCU-2

B-2(R)

B-1(R)

VAV-1-2

FCU-8

FPVAV-7-2

FPVAV-6-3

FPVAV-6-4

FPVAV-5-2

VAV-6-2

VAV-1-8

VAV-4-16

VAV-4-1

FCU-14

VAV-4-5

VAV-4-11

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S T

F L

O O

R O

V E

R A

L L

P L

A N

M101

07/24/19

Scale: 3/64" = 1'-0" A1

BUILDING 1717 FIRST FLOOR PLAN

A B C

ROUND DUCT

CONNECTION TO

TOP OF TESTING BOOTH

- 220 CFM (TYP.).

VAV-1-5

VAV-1-10

VAV-1-6

C

D

2 3 4

VAV-1-2

VAV-1-3

FPVAV-7-1

FCU-1

VAV-1-9

VAV-1-7

FPVAV-1-1

VAV-1-8

VAV-1-4

48x20ø 30x20ø 20ø x x x ø

VAV-1-1

VAV-1-11

x

A6 M401

14x1210x10

FCU-11

DSA

DSA

DSA

DSA

DSB

DSB

70 DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

14x12 16x14 ø x

10x8

6ø 12x12 ø ø

8ø ø

12x12 8x8

8ø x x

10x10

8ø

8ø x 28ø

8ø

10x8

DSA

ø

DSA

DSA

DSA

ø x

12x12 x

8ø

DSA

DSA

DSA

DSA

DSA

x

8ø

DSA

DSA

DSA

DSA

DSA

DSA

16x14 12x12 x

12x12 ø ø

16x1612x12

10x10 14x10 x ø ø ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

x

12x12 ø ø

14x14 12x12 16x16

DSA

DSA

DSA

DSA

6x8 x x

6ø

DSA

DSA

DSA

DSA

DSA

DSA

10x10 x ø ø ø ø DSA

DSA

DSA

DSA

DSA

DSA

GRSB

RSB

FCU-12

12x12

14x10 x

FCU-8

10x12

RSA

GRSB

GRSA

RSA

10x10

10x8

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

T

VAV-1-6

T

VAV-1-7

T

FPVAV-1-1

T

VAV-1-9

T

VAV-1-11

T

VAV-1-5

T

VAV-1-2

T

VAV-1-3

T

VAV-1-4

T

VAV-1-8

T

VAV-1-10

T

FPVAV-7-1

T

FCU-8

T

FCU-12

T

FCU-1

T

FCU-11

PRIMARY AIR SUPPLY

DUCT TO AHU-1 CONTINUED ON

SECOND LEVEL PLAN - DRAWING

M102A

GRCB GRCB

8"X8" OA DUCT.

CONNECT TO EXISTING

LOUVER

DSA

100 DSA

DSA

x

GRCA GRCA

12x12

RSA

RSA

E6 M401 x x ø

B

A

6ø 8x10 10x10

DSA

DSA

30x20

24x24

24x24 x

10x8

4 4

5 5

5 5

GRCA

GRCA

M101A

M101F

M101A

M101F

M101B

M101E

M E

24x24

16ø

10ø

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S T

F L

O O

R P

L A

N A

R E

A A

M101A

07/24/19

Scale: 1/8" = 1'-0" A1

BUILDING 1717 FIRST FLOOR PLAN -

AREA A

A B C

F E D

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

KEYNOTES

1 CEILING RETURN GRILLE WITH 18" X 18" SOUND

BOOT. SEE DETAIL A1/M605.

2 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR

RETURN AIR PATH THROUGH WALL TO DECK.

3 SOUND TRAP ON RETURN AIR THROUGH WALL TO

DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.

4 BLANK OFF EXISTING LOUVER

5 OPPOSED BLADE MANUAL BALANCING DAMPER.

6 OUTSIDE AIR DUCT.

7 FIRE RATED WALLS TO DECK - 2 HR - INSTALL FIRE

DAMPERS.SEE DETAIL A6/M605.

8 EXISTING LOUVER TO HAVE PLENUM BOX

CONNECTED AND NEW OA DUCT ROUTED TO FAN

COIL UNIT

VAV-1-5

VAV-2-10

C

D

5 6 8 9

A6 M106

A1 M106 x

20ø x

VAV-1-1

FPVAV-3-5

FPVAV-3-4

FPVAV-3-1

ø ø

10ø

10x12

12ø

14x12

16x16

VAV-2-7

VAV-2-9

VAV-2-8

VAV-2-4

VAV-2-6

VAV-2-5

VAV-2-2

VAV-2-1

x

18x14

A6 M401

EGA

300 EGA

10x10 1 x

14/12 UP TO EF-2

ON ROOF

FCU-2

DSA

DSA

x 28ø

8ø

10x8

DSA

x

DSA

DSA

DSA

x ø

12x12 16x16

DSA

DSA

DSA

12x12 ø ø ø x x

8ø

DSA

12x12 ø

10ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

8x8 x x

10ø ø

DSA

DSA

DSA

DSA

DSA

ø x

DSA

DSA

DSA

DSA

DSA

DSA

DSA

10x10 12x10 x x ø

8ø ø ø ø x

10x10 ø ø x

8ø

DSB

DSB

DSB

DSA

DSA

DSB

DSA

DSA

DSA

DSA

DSA

x x

6ø

8ø x

8x8

6ø ø

12x101 ø

16x12 ø ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

ø 8 ø 8 ø

12x10 8x8 x

DSA

DSA

DSA

DSA

DSA

x

16x14 12x12 ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

ø ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

12x12 ø x x

DSA

DSA

20x1816x1612x12 ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

EGB

FCU-10

16x12

14x12

16x16

RSC

GRSC

RSA

GRSA

18ø24x20ø ø

14x12

6ø

FPVAV-3-2

VAV-2-3

8ø ø

FCU-13

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

DSA

RSA

10x12

EXISTING 120X48" LOUVER TO REMAIN

INSTALL PLENUM SECTION OF DUCTWORK - 120 X 48".

INSTALL 4 - 36 X 24 MOTORIZED DAMPER(S) FOR BUILDING

PRESSURE RELIEF DURING ECONOMIZER

MODE OF OPERATIONS.

DSA

S

SOUND TRAP

CH-1(R) CH-2(R)

T

VAV-1-5

T

VAV-1-1

T

VAV-2-1

T

VAV-2-2

T

VAV-2-5

T

VAV-2-6

T

VAV-2-9

T

VAV-2-8

T

VAV-2-4

T

VAV-2-3

T

VAV-2-7

T

VAV-2-10

T

FPVAV-3-2

T

FPVAV-3-1

T

FPVAV-3-4

T

FPVAV-3-5

T

FCU-12 T

FCU-2

T

FCU-10

T

FCU-13

x

GRCA

DSA

GRCA

GRCA

GRCA

E1 M402 x x

B

E

A

DSA

DSA

52x20ø 24x18ø ø ø

16ø

42x20ø 32x20ø

DN TO CL 12'-0"

EF-9

OUTINE OF RTAHU-2

ON ROOF ABOVE

DSA

DSB

EGA

30x20

10x10

8x10 ø x x

6 6

12x12

12x12

10x10

12x12 x

6ø

M101A

M101F

M101B

M101E

4' - 6 1/2"

30x20 x

24x36

EXHAUST DUCT UP

TO EF-6 ON ROOF

16ø

10ø

6x6

8x6

DSB

EGC

60 EGC

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S T

F L

O O

R P

L A

N A

R E

A B

M101B

07/24/19

Scale: 1/8" = 1'-0" A1

BUILDING 1717 FIRST FLOOR PLAN -

AREA B

A B C

F E D

NEW ROOF MOUNTED

EXHAUST 600 CFM

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

KEYNOTES

7 OPPOSED BLADE MANUAL BALANCING DAMPER.

8 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS

SPLIT SYSTEM. THE UNITS SHALL REMAIN IN

OPERATION UNTIL NEW COOLING SYSTEMS ARE

OPERATIONAL.

9 FIRE RATED WALLS TO DECK - 2 HR - INSTALL FIRE

DAMPERS.SEE DETAIL A6/M605.

10 EXISTING LOUVER TO HAVE PLENUM BOX

CONNECTED AND NEW OA DUCT ROUTED TO FAN

COIL UNIT

KEYNOTES

1 CEILING RETURN GRILLE WITH 18" X 18" SOUND

BOOT. SEE DETAIL A1/M605.

2 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR

RETURN AIR PATH THROUGH WALL TO DECK.

3 SOUND TRAP ON RETURN AIR THROUGH WALL TO

DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.

4 EXHAUST UP TO EXHAUST FAN ON ROOF

5 MOTORIZED DAMPER (TYP).

6 BLANK OFF EXISTING LOUVER

D

11 12 13 14 15 16

EX

UH-13

EX

UH-8

EX

UH-7

EX

UH-6

EX

UH-9

EX

-UH-10

EX

UH-12

EX

UH-11

EX FAN COIL TO REMAIN IN OPERATION

CHILLED AND HEATING

EX FAN COIL SERVING CIF TO REMAIN IN OPERATION

HEATING ONLY

10ø

FPVAV-3-3

18x14 x x

EGA

EGA

14x14

DSA

DSA

DSA

DSA

DSA

DSA

12x12 10x10 ø ø x x

6ø ø

DSA

DSB

DSA

DSA

DSB

DSB

10ø

8x81 x

DSA

DSA

DSA

DSA

DSA

DSA

12x12 ø ø

10ø

DSA

DSA

DSA

x x

DSA

DSA

DSA

GRCA

GRCA

GRCA

GRCA

T

FPVAV-3-3

DSA

GRCA GRCA GRCA

GRCA

DSA

10ø

DSA

B

E

A

24x24 x ø

8ø

M101C

M101D

M101B

M101E

M101C

M101D

6x6

12X14 UP TO EF-4

(R) ON ROOF

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S

T F

L O

O R

P L

A N

A

R E

A C

M101C

07/24/19

Scale: 1/8" = 1'-0" A1

BUILDING 1717 FIRST FLOOR PLAN -

AREA C

A B C

F E D

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

KEYNOTES

1 CEILING RETURN GRILLE WITH 18" X 18" SOUND

BOOT. SEE DETAIL A1/M605.

2 SOUND TRAP ON RETURN AIR THROUGH WALL TO

DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.

3 EXHAUST UP TO EXHAUST FAN ON ROOF

F1

G1

H

K

L

M

F

11 12 13 14 15 16

EX

UH-17

EX

UH-16

EX

UH-18

EX

UH-19

EX

UH-20

EX

UH-14

EX

UH-15

EXISTING ROOF MOUNTED SUPPLY VENTILATOR

EX FAN COIL TO REMAIN IN OPERATION

G

H1

16ø ø

18ø28x18ø ø

10x10

12ø ø

14ø x

28x18ø x

10ø

VAV-4-15

VAV-4-13

VAV-4-10

VAV-4-11VAV-4-9

VAV-4-5

VAV-4-6

VAV-4-8

VAV-4-2

VAV-4-3

VAV-4-4

8x81 x

6ø

6ø

DSA

DSA

DSA

DSA

DSA

40 DSA

x

7ø

DSA

DSA

6ø x x

DSA

DSA

DSA

DSA

DSA

ø ø ø ø

12x12

8ø10x10 x

8ø

DSA

DSA

DSA

6ø

VAV-4-14

DSA

DSA

DSA

DSA

x x

8ø

8ø

14x12 12x10 8x10

DSC

DSC

DSC

DSC

DSC

DSC

DSB

DSC

DSC

DSC

DSA

DSA

12x10 10x8 ø ø 6 ø

12ø

12x10 6ø ø ø

6ø

DSC

DSC

DSB

DSA

DSA

DSA

DSA

12x12 10ø

6ø

DSA

DSA

DSA

8ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

x

6ø

6ø

DSA

x x

DSA

DSA

DSA

x

6ø

DSA

10x10

10x8

FCU-17

GRSA

RSA

FCU-3 GRSB

RSA

12x12 x

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCB

GRCA

GRCA

GRCA

GRCA

GRCA

VAV-4-16

T

VAV-4-8

T

VAV-4-16

T

VAV-4-6

T

VAV-4-5

T

VAV-4-9

T

VAV-4-11

T

VAV-4-15

T

VAV-4-14

T

VAV-4-13

T

VAV-4-12

T

VAV-4-10

T

VAV-4-4

T

VAV-4-2

T

FCU-17

T

FCU-3

DSA

EGB

GRCA

GRCB

GRCB GRCB GRCB GRCB

GRCBGRCB

GRCB GRCB GRCB GRCB GRCB GRCB

DSC

GRCA

16x16

30x20

M101C

M101D

M101B

M101E

M101C

M101D

LOCATION OF HVAC

EMERGENCY SHUT-OFF

SWITCH

6x6

M101D x

12X14 UP TO EF-4

(R) ON ROOF

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S

T F

L O

O R

P L

A N

A

R E

A D

M101D

07/24/19

Scale: 1/8" = 1'-0" A1

BUILDING 1717 FIRST FLOOR PLAN -

AREA D

A B C

F E D

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

KEYNOTES

1 CEILING RETURN GRILLE WITH 18" X 18" SOUND

BOOT. SEE DETAIL A1/M605.

2 SOUND TRAP ON RETURN AIR THROUGH WALL TO

DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.

3 EXISTING UNIT HEATER TO REMAIN

4 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS

SPLIT SYSTEM. THE UNITS SHALL REMAIN IN

OPERATION UNTIL NEW COOLING SYSTEMS ARE

OPERATIONAL.

5 FIRE RATED WALLS TO DECK - 2 HR - INSTALL FIRE

DAMPERS.SEE DETAIL A6/M605.

6 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR

RETURN AIR PATH THROUGH WALL TO DECK.

SA DN FROM RTAHU-4

M401

F1

G1

H

K

M

F

5 6 8 9

10ø

G

H1

18ø30x18ø40x18ø

10ø x x x x

40x18ø 28x18ø x

10ø x x

FPVAV-4-1

FPVAV-4-2

FPVAV-5-1

FPVAV-5-2

FPVAV-5-4 FPVAV-5-5

FPVAV-5-6

FPVAV-5-7

FPVAV-5-8

FPVAV-6-2

FPVAV-6-3

FPVAV-6-4

VAV-6-2

VAV-6-1

VAV-4-1

VAV-4-2

VAV-4-7

EGA

EGA

12x10 x x x x

DSA

DSA

DSA

DSA

x

8x8

6ø

12x101 ø

DSA

DSA

DSA

12x12 ø ø

12x10

DSA

DSA

DSA

DSA

DSA

DSA

8ø

10x1216x10

DSA

DSA

DSA

DSA

DSA

DSA

DSA

x

8ø x

DSA

DSA

DSA

DSA

10ø

10ø1 x x x x

10ø

DSA

DSA

DSA

DSA

x

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

10ø

10ø x x

FPVAV-5-3

DSA

DSA

10ø

10ø 10ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

ø x

10x10 14x12

DSA

DSA

x ø8 x

EGA

EGA

DSA

DSA

DSA

DSA

DSA

DSA

x

6ø

6ø x x

8ø

DSA

DSA

x

12x10 ø ø

DSA

DSA

80DSA

DSA

DSB

DSA

DSA

x x

6ø

6ø

DSA

DSA

DSA

DSA

DSA

DSA

DSB

DSB

DSB

DSB

DSA

10x10 8ø

8ø10x10 x x

6øDSA

DSA

DSA

DSA

x

6ø

DSA

DSA

DSA

DSA

DSA

8ø ø x x x

10ø

10ø

10ø

DSA

DSA

DSA

DSA

DSA

ø

10x10

DSA

DSA

DSA

x x

FCU-15

RSA

GRSA

GRSB

FCU-5

RSA

10x12

12x12 x x

FCU-14

RSA

GRSA

12x12

FCU-4

GRSB

RSA

x

GRSC

FCU-9

DSA

NEW CABINET

EXHAUST FAN,

TERMINATE DUCT AT

ROOF WITH

GOOSENECK

EF-7

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

48x30

T

VAV-4-7

T

VAV-4-1

T

VAV-4-3

T

FPVAV-4-2

T

FPVAV-4-1

T

FPVAV-5-8

T

FPVAV-5-7

T

FPVAV-5-5

T

FPVAV-5-6

T

FPVAV-5-4

T

FPVAV-5-3

T

FPVAV-5-1

T

FPVAV-5-2

T

FPVAV-6-3

T

FPVAV-6-4

T

VAV-6-2

T

FPVAV-6-2

T

FCU-14

T

FCU-5

T

FCU-15

T

FCU-9

T

FCU-4

GRCA

GRCA

GRCA

GRCA1

ø x

10ø

EGA

EGA

GRCA

DSA

DSA

DSB

DSA

A5 M402

EXISTING GYP CEILING AT 13'-4" AFF

RSB

400 GRSB

10'

CEILING

LAY-IN CEILING AT 9' AFF

EXISTING GYP CEILING AT 13'-4" AFF

EXISTING LAY-IN

CEILING AT 9' AFF

GRCA

OUTLINE OF RTAHU-4

ON ROOF ABOVEOUTLINE OF RTAHU-5

ON ROOF ABOVE

x

1 1

30x20

30x20

24x24

30x20

14x12

10x10

14x14

RSC

M101A

M101F

M101B

M101E

M E

M E

M F

14ø

30x20

30x20

30x20

16X16 UP TO EF-3

ON ROOF

UP TO EF-5(R)

ON ROOF

66X66 RELIEF DUCT UP

TO RH-1 ON ROOF

66x42

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S

T F

L O

O R

P L

A N

A

R E

A E

M101E

07/24/19

Scale: 1/8" = 1'-0" A1

BUILDING 1717 FIRST FLOOR PLAN -

AREA E

A B C

F E D

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

KEYNOTES

1 CEILING RETURN GRILLE WITH 18" X 18" SOUND

BOOT. SEE DETAIL A1/M605.

2 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR

RETURN AIR PATH THROUGH WALL TO DECK.

3 SOUND TRAP ON RETURN AIR THROUGH WALL TO

DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.

4 12" X 12" OPENING IN WALL IN PLENUM ABOVE FOR

RETURN AIR PATH THROUGH WALL TO DECK.

5 FIRE RATED WALLS TO DECK - 2 HR - INSTALL FIRE

DAMPERS.SEE DETAIL A6/M605.

6 EXHAUST UP TO EXHAUST FAN ON ROOF

F1

G1

H

K

L

M

F

2 3 4

26x18ø ø

12ø

10ø

16x1410x12

10ø12ø16ø

G

H1

FPVAV-6-1

14x14

VAV-6-5

VAV-6-4

VAV-6-7

VAV-6-6

FPVAV-7-4

VAV-6-3 VAV-6-1

x x x x ø x ø

FPVAV-7-2

EGA

14x1210x10

NEW EXHAUST

FAN ON ROOF

600 CFM

12x12

DSA

DSA

DSA

DSA

DSA

x

8ø

DSA

DSA

ø x x

6ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

6ø x x x

10ø

10ø

10ø

10ø

DSA

DSA

DSA

DSA

DSA

DSA

ø

12x12

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

6ø x

DSA

DSA

DSA

DSA

DSA

DSA

DSA

8ø

8ø ø ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

10x10

20x18 16x12 ø ø

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

DSA

8ø 1 ø ø

8ø ø x

DSB

150 DSB

DSA

DSA

DSA

DSA

RSB

FCU-6

12x12

18x10

GRSB

10x8

10x10

FCU-16

RSA

GRSA

x ø ø

14ø ø

28x18ø

FPVAV-7-3

ø ø

8ø x

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

GRCA

T

FPVAV-6-1

T

FPVAV-6-2

T

VAV-6-1

T

VAV-6-3

T

VAV-6-6

T

VAV-6-7

T

VAV-6-4

T

VAV-6-5

T

FPVAV-7-3

T

FPVAV-7-4

T

FPVAV-7-2

T

FCU-6

T

FCU-16

T

FCU-7

GRCA

36x18ø 24x16ø 14ø ø x ø

8x8 x

DSA

DSA

x x

DUCT FROM AHU-7

RE: M102

DSA

x

EGA

GRCA

GRCA

GRCAGRCA

DSA

DSA

E1 M401

E6 M401

A1 M402

20x10

6ø 8x10 10x10

OUTLINE OF RTAHU-6

ON ROOF ABOVE

x

24x24

M101A

M101F

DSB

M E

M E

M F

30x20

30x20

30x20 x

84X42 RELIEF UP TO

RH-2 ON ROOF

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S

T F

L O

O R

P L

A N

A

R E

A F

M101F

07/24/19

Scale: 1/8" = 1'-0" A1

BUILDING 1717 FIRST FLOOR PLAN -

AREA F

A B C

F E D

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

KEYNOTES

1 CEILING RETURN GRILLE WITH 18" X 18" SOUND

BOOT. SEE DETAIL A1/M605.

2 18" X 18" OPENING IN WALL IN PLENUM ABOVE FOR

RETURN AIR PATH THROUGH WALL TO DECK.

3 SOUND TRAP ON RETURN AIR THROUGH WALL TO

DECK IN PLENUM ABOVE - SEE DETAIL A1/M605.

4 OA DUCT DOWN FROM GRAVITY INTAKE HOOD ON

ROOF.

5 12" X 12" OPENING IN WALL IN PLENUM ABOVE FOR

RETURN AIR PATH THROUGH WALL TO DECK.

6 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS

SPLIT SYSTEM. THE UNITS SHALL REMAIN IN

OPERATION UNTIL NEW COOLING SYSTEMS ARE

7 EXHAUST UP TO EXHAUST FAN ON ROOF

D

F1

F

VAV-1-6

x

48x20ø ø ø

20x16ø

28x18ø x ø

1 1/4" HWS

1 1/4" HWR

C H

S

C H

R

3" CHS

3" CHR

2" HWR

2" HWS

E1 M401

36x66

E6 M401

FPVAV-7-1

VAV-1-3

VAV-1-4

x ø

60x30

B

FCU-7

14x1410x12

1" HWS

1" HWR

1" CHR

1" CHS

/4

H

W R

/4

H

W S x

60x20

14x14

DN UNDER

BEAM

DN UNDER BEAM

SECOND LEVEL

FLOOR SLAB AT 12'-2" AFF

2 1/2" CHS

1 1/2" HWR

DN UNDER BEAM

VAV-1-2

AHU-7

AHU-1

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

S

E C

O N

D F

L O

O R

P L

A N

M102

07/24/19

Scale: 1/8" = 1'-0" A5

BUILDING 1717 SECOND FLOOR

PLAN AREA F

A B C

F E D

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

KEYNOTES

1 OPEN END RA DUCT.

2 3/4" HWS & R TO VAV TERMINAL HEATING COIL

3 BLANK OFF EXISTING LOUVER

4 EXHAUST UP TO EXHAUST FAN ON ROOF

5 UP TO INTAKE HOOD ON ROOF.

6 ROUTE CONDENSATE DRAIN TO NEAREST FLOOR

DRAIN OR TAILPIECE OF NEAREST SINK (TYP).

REFER TO SHEET M101A

2 4 5 6 7 8 9

B

D1

E1

1 32 4 5 6 8 9

F1

G1

H

K

1610 11 12 13 14 15

1610 11 12 13 14 154.1 5.1

A1 M401

RTAHU-4

EF-1

EF-2

EF-3

EF-5(R)

EF-4(R)

EF-6

RTAHU-2

RTAHU-6 RTAHU-5

B

E

A

RTAHU-3

OAI-1

OAI-2

RH-2

RH-1

EX ROOF HATCH

EX ROOF HATCH

NEW BOILER FLUE

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

R

O O

F P

L A

N

O V

E R

A L

L

M103

07/24/19 Scale: 1" = 20'-0"

A1

BUILDING 1717 ROOF PLAN

A B C

0' 10' 20' 40' 80'

2 4 5 6 7 8 9

B

D1

E1

1 32 4 5 6 8 9

F1

G1

H

K

4.1 5.1

RTAHU-2

RTAHU-6

RTAHU-5

OA INTAKE HOOD

AHU-7

CL OF ROOF JOISTS BELOW - 4' O.C.

EF-6

EF-2

EF-3

EF-5(R)

EF-1

OA INTAKE HOOD

AHU-1

CL OF ROOF JOISTS

BELOW - 4' O.C.

PIPING ENCLOSURE

RETURN AIR

SA DNSA DN

RA UP PIPING ENCLOSURE

OAI-1

OAI-2

1" CONDENSATE DRAIN

TO ROOF DRAIN

1 1/4" CONDENSATE DRAIN

TO ROOF DRAIN

A1 M402

A5 M402

EDGE OF ROOF

AT 22' T.O.S

B

E

A

DEMO VRF CONDENSING UNIT

ALONG WITH ALL PIPING AND WIRING

EXISTING ROOF HATCH

SERVING MECHANICAL

MEZZANINE BELOW

1" CONDENSATE DRAIN

TO ROOF DRAIN

PIPING ENCLOSURE

RH-2

ROOF HATCH

OAI-3

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

R

O O

F P

L A

N

N O

R T

H

M104

07/24/19

Scale: 1/16" = 1'-0" A1

BUILDING 1717 ROOF PLAN - NORTH

A B C

F E D

0 4' 8' 16' 32' 48'

SCALE: 1/16" = 1'-0"

KEYNOTES

1 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS

SPLIT SYSTEM. THE UNITS SHALL REMAIN IN

8 9

8 9

1610 11 12 13 14 15

1610 11 12 13 14 15

A1 M401

RTAHU-4

EXISTING ROOF MOUNTED

VENTILATION UNIT - TYP 6

EXISTING ROOF MOUNTED

EXHAUST FANS TYP 6

NEW FLUE STACK

EF-4(R)

EF-5(R)

CL OF ROOF JOISTS BELOW - 6' O.C.

CL OF ROOF JOISTS BELOW - 6' O.C.

1" CONDENSATE

DRAIN TO ROOF DRAIN

1" CONDENSATE

DRAIN TO ROOF DRAIN

E1 M402

EDGE OF ROOF AT 24' 6" T.O.S.

HIGH POINT

LOW POINT OF ROOF AT

23'-6" T.O.S. , 23'-10" APPROX T.O. ROOF -

EXISTING JOISTS ARE 24" DEPTH AT 6' O.C.

B

E

A

RH-1

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

R

O O

F P

L A

N

S O

U T

H

M105

07/24/19

A B C

F E D

Scale: 1/16" = 1'-0" A1

BUILDING 1717 ROOF PLAN - SOUTH

0 4' 8' 16' 32' 48'

SCALE: 1/16" = 1'-0"

KEYNOTES

1 DEMO EXHAUST FAN - NEW FAN TO USE EXISTING

OPENING

2 EXISTING VENTILATING UNIT TO REMAIN

3 EXISTING FAN TO REMAIN

4 EXISTING TR ROOMS ARE SERVED BY A DUCTLESS

SPLIT SYSTEM. THE UNITS SHALL REMAIN IN

NEW EGRESS DOOR(S) NEW EGRESS DOOR(S)

EXISTING TO REMAIN UNTIL NEW

CHIILERS ARE ON LINE

EXISTING TO REMAIN TO KEEP CIF

IN OPERATION UNTIL NEW BOILERS

ARE IN OPERATION - DEMO

3"

3"

4" HWS

4" HWS

BOILER FLUE TO BE REMOVED

EX

CHWP-1

EX

HWP-1

EX

HWP-2(DEMO)

EX

CHWP-2

EX

CHWP-3

EX

CHWP-4

EX

HWP-3

EX

CHILLER

EX

CHILLER

3"

4" HWR

H W

R

2" CHS

4" HWS

DEMO PIPING

DEMO PUMP

DEMO PIPING

DEMO PUMP

EXISTING TO REMAIN UNTIL NEW

CHIILERS ARE ON LINE - DEMO

AFTER COMPLETION OF NEW

E7 M402

A

EXISTING PUMPS MODEL AND CAPACITIES

HWP-3 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP

CHWP-4 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP

CHWP-3 ARMSTRONG 4280, 1.5 X 1 X 8, 26 GPM , 43 FT HEAD, 1.5 HP

CHWP-2 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP

HWP-2 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP

HWP-1 ARMSTRONG 4030, 3 X 2 X 8 135 GPM, 51 FT HEAD, 5 HP

CHWP-1 - ARMSTRONG 4280, 1.5 X 1 X 8, 26 GPM , 43 FT HEAD, 1.5 HP

4" CHR

4" CHR

1 1/2" CHS

C H

S

C H

R

DEMO BOILERS

DEMO AND REPLACE WITH

NEW SF-1

H W

R

4"

CAP EXISTING TO ALLOW

USE OF EXISTING SYSTEM UNTIL NEW

EQUIPMENT IS IN OPERATION - TYP

4" CHS

WAREHOUSE - CIF

HEATING WATER RETURN TO

REMAIN UNTIL NEW SYSTEM IS

OPERATING

WAREHOUSE - CIF

HEATING WATER SUPPLY

LOOP TO REMAIN UNTIL NEW

SYSTEM IS OPERATING

4" HWS

4" HWR

4" HWR

NEW 20" FLUE UP

TO ROOF CAP

4" CHS

4" CHR

4" CHS

4" CHR

C H

S

C H

R

H W

S

H W

R

CH-1(R)

CH-2(R)

CHILLED WATER SUPPLY

TO CIF TO REMAIN IN OPERATION

2" CHS

H W

R

4" HWS

6" HWS

4" HWS

4" HWS

6" HWS

HWP-2(R)

NEW HWP-1(R)

EX

HWP-2(DEMO)

CONNECT TO EXISTING

INSTALL NEW VALVE

CHILLER PUMP TO REMAIN IN OPERATION

UNTIL NEW CHILLER IS OPERATIONAL

EXISTING CHILLED WATER PIPING TO

REMAIN FOR OPERATION OF CIF UNITS UNTIL

NEW IS IN OPERATION

6" FLUES FROM

WATER HEATERS UP TO

ROOF CAPS

B-2(R)

B-1(R)

E7 M402

A

4" HWR

6" HWR

2" CHS

6" CHR

6" CHS

CONNECT TO EXISTING

CONNECT TO EXISTING

DEMO EXISTING CHILLER AFTER

CHILLED WATER FROM CH-2 IS

IN OPERATION

CHEMICAL

FEEDER

HYDRONIC SYSTEM

EXPANSION TANK

CHILLED WATER CHEMICAL

FEED TANK

DEMO PIPING

DOMESTIC WATER HEATERS

RE: PLUMBING DWGS

AIR SEPARATOR FOR CHILLED WATER

CHILLED WATER EXPANSION TANK

HW-B-2(R)

HW-B-1(R)

HEATING WATER PUMP TO REMAIN IN OPERATION

UNTIL NEW BOILER IS OPERATIONAL

SF-1(R)

PIPE SUPPORT - TYP

CARBON MONOXIDE DETECTOR

CONTROL PANEL

CARBON MONOXIDE

SYSTEM ALARM/STROBE

EXISTING LOUVERS - 6' H X 4' W

ONE LOW AND ONE HIGH

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

M

E C

H A

N

IC

A L

R O

O M

P L

A N

S

M106

07/24/19

Scale: 1/4" = 1'-0" A1

BUILDING 1717 ENLARGED MECH

RM PLAN - DEMO

0 4' 8' 12'2'1'

SCALE: 1/4" = 1'-0"

Scale: 1/4" = 1'-0" A6

BUILDING 1717 ENLARGED MECH

RM PLAN - NEW WORK

IMMUNIZATIONS

RISER RM

ELEC

OFFICE

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

CORR

WOMEN

MEN

ELEC

OFFICE

VITALS

LOCKER RM

OFFICE

OFFICE

EXAM

SCREENING

EXAM

SCREENING

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

CORR

ROOM

ROOM

TR

ADA-M

ADA-W

ROOM

ROOM

ROOM

VEST

VEST

CONF

STOR

WRK RM

TR

ANAM WAITING

STOR

ANAM TESTING

STOR

PROVIDERS

BRK RM

MED PROS CHECK-IN

MED PROS

LOADING DOCK

WOMEN

TR

BEHAVIORAL HEALTH

SECURE

BRK RM

MEDICAL RECORDS

WAITING

ELECRICAL

WRK RM

STOR

MEDICAL SCREENING

VITALS

LOD / NLC

JAN

TR

WAITING

STOR

DENTAL

LOCKER RM

WRK RM

TR

WORK / SUPPLY

STOR

LOADING DOCK

WOMEN

MEN

WAITING

WAITING

OFFICE

AUDIOLOGY

TR

EXAM

ELEC

STOR

CHECK-IN

BRK RM

WRK RM

VISION / OPTOMETRY

EXAM

EXAM

EXAM

DIST / Rx

STOR

SMALL POX

WAITING

ELEC

BIOHZD

WRK RM

AG RECORDS

STOR

COMPUTER LAB

WAITING

NCM

BRFG-A

BRFG-B

BRFG-C

MEDICAL FINAL OUT

VAULT

ELEC

CS / FINANCE

AG

STOR

MEN

S1

SITE MGR

CORR

SRRC OIC

SRRC XD

CMD STE

SRRC 1SGT

WOMEN

JAN

BRK RM

SRPC SCHED

MED OPS

STOR

SRPC MaD

STOR

TR

FINAL OUT

CONF

SECUR

LEGAL

EXAM

SHPE

SHPE WAITING

VEST

MAIN ENTRY

NEW EGRESS DOOR(S)

A1 M401

C

D

F1

G1

H

K

L

M

F

2 3 4 5 6 8 9 11 12 13 14 15 16

CH-2(R)

CH-1(R)

B

E

A

VAV-1-9

VAV-1-10

VAV-1-11

VAV-1-6

FPVAV-7-1

VAV-1-8

FCU-11

FCU-1

FPVAV-1-1

VAV-1-7

FCU-12

VAV-1-1

VAV-1-5

VAV-2-1

VAV-2-2

VAV-2-5

VAV-2-6

VAV-2-4 FPVAV-3-2 VAV-2-8

VAV-2-9

FCU-2

FCU-13

VAV-2-10

VAV-2-3

FPVAV-3-1

FPVAV-3-5

FPVAV-3-4

VAV-2-7

FPVAV-3-3

FCU-17

VAV-4-16

VAV-4-8

FCU-3

VAV-4-7

FCU-14

VAV-4-6

VAV-4-11

VAV-4-10

VAV-4-9

VAV-4-5

VAV-4-2

VAV-4-3 VAV-4-4

VAV-4-1

FCU-4

FPVAV-4-2

VAV-4-12

VAV-4-14

VAV-4-15

FPVAV-4-1

FCU-9

FPVAV-6-4

FPVAV-5-8

FPVAV-5-7

FCU-5

FCU-15

FPVAV-5-4

FPVAV-5-3

FPVAV-5-2

FPVAV-5-1

VAV-6-2

FPVAV-6-4

FPVAV-6-3

FPVAV-6-2FPVAV-6-1

VAV-6-3 VAV-6-1

FCU-6

FPVAV-7-4

FPVAV-7-3 VAV-6-6

VAV-6-7

VAV-6-4

VAV-6-5FCU-7

FPVAV-7-2

FCU-8

VAV-1-4

VAV-1-3

VAV-1-2

FCU-16

FCU-10

FPVAV-5-6

FPVAV-5-5

VAV-4-13

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S T

F L

O O

R O

V E

R A

L L

P

IP

IN

G

P L

A N

M311

07/24/19

A B C

F E D

Scale: 3/64" = 1'-0" A1

BUILDING 1717 FIRST FLOOR PIPING

PLAN

RISER RM

CORR

CORR

CORR

OFFICE

TR

SECURE

BRK RM

MEDICAL RECORDS

MEDICAL SCREENING

WORK / SUPPLY

STOR

LOADING DOCK

WAITING

WAITING

OFFICE

AUDIOLOGY

TR

EXAM

ELEC

STOR

CHECK-IN

BRK RM

WRK RM

VISION / OPTOMETRY

EXAM

EXAM

C

D

2 3 4 5

A6 M401

VAV-1-5

VAV-1-10

VAV-1-6

VAV-1-2

VAV-1-3

FPVAV-7-1

FCU-1

VAV-1-9

VAV-1-7

FPVAV-1-1

VAV-1-8

VAV-1-4

VAV-1-1

VAV-1-11

3" HWS

1" HWR

C H

S

H W

R

H W

S

/2

H W

R

/2

H W

S

2" HWR

FCU-11

FCU-12

FCU-8

/4

H

W R

/4

H

W S

/4

H

W R

/4

H

W S

1" HWS

1" HWR

3/4" CHS

3/4" CHR

3/4" HWS

3/4" HWR

2" HWS

2" HWR

/4

H

W S

/4

H

W R

3/4" CHS

3/4" CHR

C H

S

C H

R

H W

R

/4

H

W S

/4

H

W R

/4

H

W S

C H

R

PIPING UP TO

MECHANICAL LEVEL

SEE M102 FOR CONTINUATION

PIPE ANCHORS

E6 M401

B

A

2" CHREX

6" CHS

C H

S

3" CHS

3" CHR

/4

C

H S

C H

R

/2

C H

R

/2

C H

S

1" CHR2 1/2" CHR

2" HWR

H W

S

4" HWS

/2

C H

R

PIPING UP TO

RTAHU-2

M312

M317

M313

M316

CORRECTED FINAL SUBMITTAL 24 JULY 2019

US Army Corps of Engineers

A N

S I_

D

IC

E

-D E

C J

V

W G

-1 -B

-0

/2

/2

T B

D

J V

-0

F O

R T

B L

IS

S T

E X

A S

M A

R K

D A

T E

D

E S

C R

IP

T

IO

N

D E

S

IG

N B

Y

SHEET ID

D R

A W

N B

Y

C H

E C

K E

D B

Y

S

IZ

E

IS

S

U E

D A

T E

F

IL

E N

A M

E :S

O L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T R

O O

M

A

F O

R T

W O

R T

H T

X

S U

B M

IT

T

E D

B Y

A

E C

O M

K

A T

Y F

R E

E W

A Y

S U

IT

E

H O

U S

T O

N T

X

B1717

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN

NORTH

W

G

-1

D -0

B

U

IL

D

IN

G

F

IR

S T

F L

O O

R P

IP

IN

G P

L A

N

A R

E A

A

M312

07/24/19

Scale: 1/8" = 1'-0" A1

BUILDING 1717 FIRST FLOOR PIPING

PLAN - AREA A

A B C

F E D

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

KEYNOTES

1 EXISTING PIPING TO REMAIN OPERATIONAL UNTIL

NEW SYSTEM IS INSTALLED.

2 EXISTING FAN COIL UNIT TO REMAIN IN OPERATION

UNTIL NEW SYSTEM IS OPERATIONAL TO MAINTAIN

MINIMUM SYSTEM VOLUME FOR THE CHILLER TO

MAINTAIN COOLING IN THE CIF AREA. DEMO AFTER

NEW STSEM IS OPERATING.

3 3/4" HWS & R TO VAV TERMINAL HEATING COIL

4 3/4" CHILLED WATER SUPPLY AND RETURN TO FAN

COIL UNIT

5 3/4" CHWS&R AND 3/4" HWS&R TO FAN COIL UNIT.

6 ROUTE CONDENSATE DRAIN TO NEAREST FLOOR

IMMUNIZATIONS

CORR

CORR

CORR

CORR

VITALS

LOCKER RM

STOR

DENTAL

LOCKER RM

WRK RM

TR

WORK / SUPPLY

WOMEN

MEN

EXAM

EXAM

EXAM

DIST / Rx

STOR 190

SMALL POX

WAITING

ELEC

BIOHZD

WRK RM

AG RECORDS

STOR

WAITING

NCM

CS / FINANCE

NEW EGRESS DOOR(S)

C

D

5 6 8 9 11

A6 M401

VAV-1-5 VAV-2-10

VAV-1-1

3" HWS

1" HWR 1" HWR

4" HWS

6" CHS

4" HWS

C H

S

C H

R

H W

S

H W

R

4" HWS

1" HWR

/2

C H

S

C H

R1

/2

H W

S

H W

R

FPVAV-3-5

FPVAV-3-4

FPVAV-3-1

VAV-2-7

VAV-2-9

VAV-2-8

VAV-2-4

VAV-2-6

VAV-2-5

VAV-2-2

VAV-2-1

/2

H W

R

/2

H W

S

FCU-2

FCU-10

FPVAV-3-2

VAV-2-3

FCU-13

/4

H

W S

/4

H

W R

/4

H

W S

/4

H

W R

H W

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.