B3_W9126G19B0006_Amendment_0002.pdf
PDF 6 MB Posted
- Attached to
- WSMR HVAC Renovation B23640
- Solicitation number
- W9126G19B0006
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for Building 23640 HVAC Renovation White Sands Missile Range, New Mexico is amended as follows.
See SF30 Continuation Sheet(s)
NOTE: Bid Receipt date is 13 August 2019; at 10:00 am.,CDT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G19B0006
X 9B. DATED (SEE ITEM 11)
10 July 2019
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-July-2019
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9126G19B0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO SOLICITATION W9126G19B0006
1. Bid Receipt Date: Change the proposal receipt date from "08 August 2019, 2:00 p.m.CDT" to "13 August 2019,10:00 am, CDT".
2. New Sections - Add the following accompanying new sections, each bearing the notation W9126G19B0006
Appendix A-1- Hazmat
3. Replacement Sections: Replace the following section with the accompanying new section of the same number and title bearing the notation W9126G19B0006 0002
COVER
00 11 00.01 - SOLICITATION, OFFER AND AWARD, SF-1442
00 11 00.02 - CONTRACT LINE ITEM SCHEDULE
00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
01 00 00.00 44 - CONSTRUCTION SCHEDULE
4. Replacement Drawings.- Replace the drawings listed below with the attached new drawings(s) of the same number, bearing the notation W9126G19B0006 0001 shall be added to and become a part of the contract documents:
G0-0-01 COVER SHEET
G0-1-01 GENERAL PROJECT INFO
A1-0-01 FIRST FLOOR PLAN - ARCH DEMO
A1-0-02 REFLECTED CEILING PLAN - ARCH DEMO
A1-1-01 FIRST FLOOR PLAN
A1-1-02 REFLECTED CEILING PLAN
M0-1-01 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS
M2-0-01 FIRST FLOOR PLAN - HVAC DEMO
M2-1-01 FIRST FLOOR PLAN - HVAC DUCTWORK
M2-2-01 FIRST FLOOR PLAN - HVAC PIPING
M5-1-01 MECHANICAL SYSTEM DIAGRAMS
M6-1-01 MECHANICAL DETAILS
M7-1-01 MECHANICAL SCHEDULES
M7-1-02 MECHANICAL SCHEDULES
M8-1-01 MECHANICAL CONTROLS
M8-1-02 MECHANICAL CONTROLS
M8-1-03 MECHANICAL CONTROLS
M8-1-04 MECHANICAL CONTROLS
M9-1-01 MECHANICAL PIPING ISOMETRICS
E0-1-01 ELECTRICAL LEGEND, SYMBOLS AND ABBREVIATIONS
E2-0-01 FIRST FLOOR PLAN - POWER DEMOLITION
E2-1-01 FIRST FLOOR PLAN - POWER
E4-1-01 ELECTRICAL POWER PARTIAL ONE-LINES
24 E4-1-02 ELECTRICAL POWER SCHEDULES
W9126G19B0006
5. Deleted Sections - The following sections have been deleted from the solicitation.
01 45 35 - SPECIAL INSPECTIONS
End of Summary of Changes
Design-Bid-Build <am#0002> Request For Proposal Invitation For Bid </am#0002> Building 23640 HVAC Renovation White Sands Missile Range, New Mexico
W9126G19B0006 May 2019
June 2019
US Army Corps of Engineers Fort Worth District
W9126G19B0006 0002 m2pmjjf9 Cross-Out
Project Title: HVAC Renovation of Bldg B23640.
Location: White Sands Missile Range, New Mexico.
This is a Small Business Design Bid Build construction Invitation for Bid.
Magnitude of Construction is betw een $1,000,000 and $5,000,000.
X
AMANDA N LANE (817) 886-1077
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
<am#0002> 16-Jul-2019 10July2019 </am#0002>
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______1 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________01 00 00.00 44
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
W9126G
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
817-886-6403FAX:TEL: 817-886-1043 TEL: FAX:
W9126G19B0006 45
NOTE: Bid Bond is required IAW FAR 52.228-1. Additionally, the w inning contractor w ill be required to provide Insurance and Perfomance & Payment Bonds IAW FAR 52.228-5 & 52.228-15, respectively.
<am#0002> Block 13A Date changed from 08Aug2019 to 13Aug2019 </am#0002> local time 13Aug2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
W9126G19B0006 0002
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W9126G19B0006 0002
Estimated Estimated Item No. Description Quantity Unit Unit Price Amount
0001 All work to to renovate building 23640
HVAC . 1 JOB $ *** $
OPTIONS
1 JOB $ *** $
1 JOB $ *** $
1 JOB $ *** $
OPTION 01:
Remove Existing Cooling Tower (abandonded Abandoned outside building)
OPTION 02:
Remove Exsiting Air Handling Unit EVAP-1 (abandonded Abandoned in place)
OPTION 03:
Remove Existing Ceiling and Paint Walls and Ceiling above 9'-0"
OPTION 04:
Remove Existing Lighting and Provide New Lighting and Controls
1 JOB $ *** $
PROJECT COMPLETION TIME ___ Calendar days* *Contract Duration in Calendar Days After the Notice to Proceed is Received (Not To Exceed the maximum time stated in Section 01 00 00.00 44 CONSTUCTION SCHEDULE) (See Note #7)
TOTAL ALL OPTIONS
CLIN SCHEDULE
Building 23640 HVAC Renovation White Sands Missile Range, New Mexico
TOTAL BASE OFFER
BASE OFFER: All work required by the Contract exclusive of work required by the Option Items.
Solicitation No.W9126G19B0006
TOTAL (BASE OFFER + ALL OPTIONS)
<am#0002>
</am#0002>
W9126G19B0006 0002 m2pmjjf9 Cross-Out m2pmjjf9 Cross-Out m2pmjjf9 Cross-Out
NOTES:
1. ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by bidders:
(1) Obviously misplaced decimal points will be corrected;
(2) In case of discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected; and
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends his bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
2. If a modification to a proposal based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the CLIN Schedule.
3. Offerors must bid on all items.
4. Costs attributable to Division 01 - General Requirements are assumed to be prorated among bid items listed.
5. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.
6. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
(a) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best
CLIN SCHEDULE
interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(b) The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
<am#0002>
7. EXERCISE OF OPTIONS (SWDR 715-1-1 (16 January 1996))
The Government reserves the right to exercise the option(s) by written notice to the Contractor either singularly or in any combination for up to 120 calendar days after award of the Base Offer without an increase in the Offeror's Price. Completion of added items shall continue at the same schedule as the Base Offer unless otherwise noted in Section 01 00 00.00 44 DESIGN AND CONSTRUCTION SCHEDULE, paragraph 1 entitled SCHEDULEEND SCHEDULE.
END OF CLIN SCHEDULE
</am#0002>
W9126G19B0006 0002
M2CD9PAM
Cross-Out
M2CD9PAM
Cross-Out
Section 00 21 00 - Instructions, Conditions and Notices to Offerors
SEALED BIDDING INSTRUCTIONS
SEALED BIDDING
INSTRUCTIONS
1. INQUIRIES
OFFEROR'S QUESTIONS AND COMMENTS
All questions and/or comments are to be submitted via ProjNet.
Bidder Inquiry in ProjNet at http://www.projnet.org/projnet
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login.
Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed.
The Solicitation Number is: W9126G19B0006 The Bidder Inquiry Key is: 6Q2YAY-2Y2C6P
Last day to submit ProjNet questions is 5 calendar days prior to bid closure date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Standard Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
2. INSTRUCTIONS TO OFFERORS
SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BIDS SUBMISSION (FAR
14.302 & 14.304) http://www.projnet.org/projnet
a. All bids and a copy of the SF24 Bid Bond MUST be received electronically via the FEDBIZOPPS (FBO.GOV) “Electronic Response” feature no later than <am#0002>08 13August </am#0002> 2019 at 10:00 AM (CDT). No bids, or amendments to bids, in Original will be accepted.
b. Electronically submitted offers must include the completed SF 1442 (in accordance with FAR 52.214-18), Acknowledgement of all amendments, completed CLIN schedule, and original Bid Bond.
c. Offers received will be publicly opened at the following location:
US Army Engineer District, Fort Worth 819 Taylor St, Room TBD Fort Worth, TX 76102
02:00 PM (CDT)
d. Teleconference Dial-in Information for the public 1-888-675-2535 Access Code 2998176# Security code: 1234 on <am#0002> 08 13 August </am#0002>2019 at 02:00 PM CDT.
e. Please note, oral explanations or instructions are not binding. Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
f. SENDING FILES. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions should be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W9126G19B0006_COMPANY NAME_DESCRIPTION
ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE FEDBIZOPPS
(FBO.GOV) “ELECTRONIC RESPONSE” FEATURE. The FBO vendor user guide has information & instructions on how to utilize this feature. The FBO vendor user guide is accessible via the following web URL:
https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.
File Size Limitations. Offerors are advised to follow the FBO instructions for uploading files larger than 10MB (java upload). FBO has not posted official file size limitations for its electronic response module, however it has been observed that uploads to FBO tend to be problematic when the files are sized 100MB or greater. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified above.
Upload Completion & Deadline. Interested parties shall submit responses no later than the date specified on solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within FBO. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few
W9126G19B0006 0002 https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf m2pmjjf9 Cross-Out minutes—this will allow for unexpected delays in the transmittal process and troubleshooting.
Proposal submission difficulties should be coordinated with the Federal Service Desk at https://fsd.gov and/or +1-866-606-8220 (Mon-Fri 8am-8pm Eastern Time UTC -5:00). Experience shows that if an upload doesn’t complete until after the deadline, the FBO system WILL NOT COMPLETE. The FBO system will automatically shut off the “Electronic Submission” feature at the specified deadline--once that occurs, the feature will disappear from the announcement.
Offerors are encouraged to keep a copy of the upload confirmation for their record. Proposals received after the date and time will be handled in accordance with FAR 15.208-Submission, Modification, Revision and Withdrawal of Proposals.
g. Original copies of the Bid Bond shall be submitted to the following point of contact two (2) calendar days after the bid due date.
US Army Engineer District, Fort Worth ATTN: Amanda Lane 819 Taylor St, Room 2A17 Fort Worth, TX 76102-0300
h. OFFERS BY TELEGRAPH. Offers received by telegraph, modifications thereto, or cancellations of offers will NOT BE ACCEPTED.
i. FACSIMILE OFFERS. Facsimile offers, modifications thereto, or cancellations of offers will
NOT BE ACCEPTED.
j. EMAIL. Modifications and cancellations of offers WILL NOT be accepted. Only the original electronically submitted bid will be accepted by the Government.
k. RESPONSIBILITY. Award will be made to the lowest, responsible bidder whose bid, conforming to the invitation for bids, will be the most advantageous to the Government. To be determined responsible, the apparent low bidder shall:
(1) Have adequate financial resources to perform the contract, or the ability to obtain them. The contractor will be required to provide the Name of the Financial Institution, POC, and phone number.
(2) Have a satisfactory performance record. The contractor shall have no performance annotated with an individual rating of less than SATISFACTORYon any Final Evaluation within the last six (6) years from the bid opening date.
(3) Have a satisfactory record of integrity and business ethics. Awardee will be required to provide at least three (3) references for like work, to include Business Name, Point of Contact, and telephone number.
(4) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety https://fsd.gov/ programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors). Per FAR 9.104-3, acceptable evidence normally consists of a commitment or explicit arrangement that will be in existence at the time of the contract to acquire the needed facilities, equipment, other resources or personnel.
(5) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and
(6) Be otherwise qualified and eligible to receive an award under applicable laws and regulations
3. NOTIFICATION OF UNSUCCESSFUL BIDDERS. All contract award information for this solicitation will be published electronically on FedBizOpps (FBO) at www.fbo.gov/ Solicitation Number W9126G19B0006. Written unsuccessful bidder letters will not be issued.
4. PREPROPOSAL CONFERENCE / SITE VISIT
SITE VISIT. See FAR clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) –
ALTERNATE I (FEB 1995)
IMPORTANT NOTES. (1) Remarks and explanations addressed during the conference shall not qualify or alter the terms and conditions of the solicitation. (2) The terms and conditions of the solicitation remain unchanged unless the solicitation is formally amended in writing.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.217-5 Evaluation Of Options JUL 1990 52.225-10 Notice of Buy American Requirement--Construction
Materials
MAY 2014
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.
AUG 2018
CLAUSES INCORPORATED BY FULL TEXT
http://www.fbo.gov/
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price (FFP) contract resulting from this solicitation.
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be Twenty (20%) percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
USACE Fort Worth Attention: John H. Rodgers 819 Taylor St.
Fort Worth, TX 76102 SWF-Protest@usace.army.mil
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Refer to Section 00 21 30 for Site Visit information.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vmdfara.htm http://www.usace.army.mil/Portals/2/docs/Contracting/UAI_Version%203__1%20NOV%202014.pdf
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
B23640 HVAC Renovation WSMR19B23640
SECTION 01 00 00.00 44
CONSTRUCTION SCHEDULE
PART 1 GENERAL
1.1 SCHEDULE
Commence, prosecute, and complete the work under this contract in accordance with the following schedule and Section 00 72 00 CONTRACT CLAUSES COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK and LIQUIDATED
DAMAGES:
Item of Work Commencement of Work
(Calendar days)
Completion of Work
(Calendar days)
Liquidated Damages per calendar days
(1) All work, including O&M Manuals and Final Record Drawings , Upon Contractor Acknowledgment of
NTP .
365 $ 1309.20
( ) O & M Manuals ** ** None
( ) Final Record Drawings
*** *** None
NOTE: All work on this project shall be completed within the number of calender days stated in Item of Work (1) above, inclusive of all review periods and Government phasing requirements specified. If the Government accepts a proposal for a completion period of lesser duration, and such proposal alters the time periods for review and phasing, the Contract shall be read to include the original periods for review and phasing. If a completion period of lesser duration is proposed and accepted by the Government, the accepted completion period will replace the original construction schedule listed above in the Schedule. If an alternate completion period is proposed, the Bid Schedule must reflect pricing information for the alternate proposed completion period. The liquidated damages stated above will be applied for each calendar day the Contractor exceeds the Contract scheduled duration.
SECTION 01 00 00.00 44 Page 1
a. Liquidated damages for individual items of work will not be combined. Only the rate of the affected item of work will be assessed.
** Operation and Maintenance Manuals: See Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph OPERATION AND MAINTENANCE MANUALS for requirements <am#0002> and 00 11 00 CLIN Schedule </am#0002> for withholding amount to ensure completion of O&M Manuals.
*** Record Drawings: See Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph titled RECORD DRAWINGS for requirements <am#0002> and 00 11 00 CLIN Schedule </am#0002> for withholding amount to ensure completion of record drawings.
1.2 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (OCT 1989)
(ER 415-1-15)(52.0001-4038 1/96)
a. This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the contract clause FAR 52.249-10 entitled "DEFAULT: (FIXED PRICE CONSTRUCTION)." In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor.
b. The following schedule of monthly anticipated adverse weather delays due to precipitation and temperature is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations.
The contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities. Wind is not considered in the Monthly Anticipated Adverse Weather Calendar Day Schedule.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV
DEC 1 1 1 1 2 1 4 4 2 1 1
c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the contractor's scheduled work day.
d. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last
SECTION 01 00 00.00 44 Page 2
W9126G19B0006 0002 m2pmjjf9 Cross-Out day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph "b", above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the contract clause entitled "Default (Fixed Price Construction)."
1.3 CONSTRUCTION PHASING
1.4 WORK RESTRICTIONS
1.4.1 Working Hours
Normal working hours are Monday through Friday, 0630 to 1700 hours, unless otherwise indicated at the preconstruction conference. Requests to work at times other than the stated working hours, including scheduled utility outages discussed below, shall be submitted to the Contracting Officer for approval. Contractor shall not work outside of the above stated working hours without prior written approval of the Contracting Officer.
1.4.2 Security Requirements
1.4.2.1 Installation Entrance Requirements
Entrance requirements to the Installation are specified in Section 01 35
20.00 44 SPECIAL PROJECT PROCEDURES FOR White Sands Missile Range.
Access to White Sands Missile Range will be delayed between 5 minutes and 30 minutes or longer due to increased security precautions, including the checking of vehicle ID’s, vehicle manifests, and the searching of all vehicles. Any general or specific threat to the safety of those working or living at White Sands Missile Range could result in longer waiting times at the access points to White Sands Missile Range. Individuals shall have one form of picture ID such as a driver's license (issuing state and number). In addition to the picture ID, conference attendees shall also have their company's name and address, a memo on their company's letterhead stating the reason for entry, and the location on White Sands Missile Range where the conference is located.
1.4.3 Identification of Employees
The Contractor shall be responsible for furnishing to each employee, and for requiring each employee engaged on the work to display, identification as approved and directed by the Contracting Officer. Prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon release of any employee. When required, the Contractor shall obtain and provide fingerprints of persons employed on the project. Contractor and subcontractor personnel shall wear identifying markings on hard hats clearly identifying the company for whom the employee works.
Contractor personnel shall wear visible Contractor-furnished employee identification badges while physically on the Installation. Each badge shall include, as a minimum, the company name, employee name, photograph, Contract Title, Contract Number, and the expiration date of the badge.
SECTION 01 00 00.00 44 Page 3
1.5 UTILITIES
1.5.1 Payment for Utility Services
Utilitiy availability and Payment For Utility Services are specified in Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROL.
1.5.2 Coordination
For Contractor Telephone And Internet Service, the Contractor shall coordinate with ITBC and the local phone company for contractor telephone and internet service during construction.
1.5.3 Outages
The Contractor shall coordinate all requests for utility outages with the Contracting Officer in writing 14 days prior to date of requested outage:The Contractor shall coordinate all requests for utility outages with the Contracting Officer and local utility provider (where applicable) in writing 14 days prior to date of requested outage:
a. Water, gas, steam, and sewer outages shall be held to a maximum duration of 4 hours unless otherwise approved in writing.
b. Electrical outages shall have a maximum duration of 4 hours.
1.6 PAPERLESS CONTRACT SUBMISSION
a. GENERAL INFORMATION ON PAPERLESS CONTRACT SUBMISSION
The goal is to reduce waste, decrease time, decrease associated costs, and to streamline most file transmission procedures.
b. METHODS OF DIGITAL SUBMISSION
This contract shall use digital submission methods to the greatest extent practicable. Acceptable methods are as follows, in order of precedence:
1. RMS - will be used to the greatest extent practicable. Some items may not be submittable via RMS due to program constraints.
Those items shall use an alternate method. All ENGR 4025’s shall be generated and submitted in RMS.
2. Secure, Password Protected Web-Based System Access must be allowed and approved by the Government Representative. Access must be allowed and approved by the Government Representative. This method shall not be used for security sensitive documents.
3. E-mail – Items not submitted via RMS, as discussed above, shall be submitted via e-mail, if possible. E-mail limitations for file size must be considered prior to submission. Under current conditions, 5 megabytes is the limitation for any single file/e-mail.
4. CD/DVD – Will be accepted if no other method is possible and upon prior approval.
c. ITEMS TO BE SUBMITTED VIA HARDCOPY
SECTION 01 00 00.00 44 Page 4
Product samples, color boards, and any other item not feasible to submit digitally, shall be submitted hard copy. ENGR 4025 shall be submitted digitally always. The Government reserves the right to request hard copy submission on any item, if deemed necessary.
Contractor shall be prepared to provide requested hard copy at any time.
1.7 CONTRACTOR PERFORMANCE EVALUATIONS
In accordance with the provisions of Subpart 36.201 (Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $700,000.00, the USACE will evaluate contractor’s performance and prepare a performance report using the Contractor Performance Assessment Reporting System (CPARS), which is now a web-based system. After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 60 days. Accessing and using CPARS requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site: http://www.cpars.csd.disa.mil/ . If the Contractor wishes to participate in the performance evaluation process, access to CPARS and PKI certification is the sole responsibility of the Contractor.
1.8 CONTRACTOR PAYROLL RECORD
Contractor shall be required to log payrolls for all their own employees and subcontractors utilizing ENG Form 3180. Each subcontractor requires a separate ENG 3180 for their payrolls. The Contractor shall maintain the ENG 3180, along with the payrolls, on site and available for review by the Contracting Officer's Representative. The ENG 3180's shall be updated weekly as payrolls are submitted. After making copies for their files, the Contractor is required to submit the originals of each week’s payrolls to the Resident Office. Before final payment, the Contractor shall provide the completed ENG 3180’s to the Contracting Officer's Representatives.
1.9 CONTRACTOR SUPPLY and USE OF ELECTRONIC SOFTWARE FOR PROCESSING WAGE
RATE REQUIREMENTS CERTIFIED LABOR PAYROLLS
(a) The contractor is required to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Wage Rate Requirements statute.
(b) The contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with the Wage Rate Requirements statute. When the contractor uses an electronic payroll system, the electronic payroll service shall be used
SECTION 01 00 00.00 44 Page 5 by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. The contractor shall obtain and provide electronic system access to the Government, as required to comply with the Wage Rate Requirements over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
(c) The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria:
(1) commercially available;
(2) compliant with appropriate Wage Rate Requirements statute payroll provisions in the Federal Acquisition Regulation (FAR);
(3) able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract
(4) capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's RMS;
(5) demonstrated security of data and data entry rights;
(6) ability to produce contractor-certified electronic versions of weekly payroll data;
(7) ability to identify erroneous entries and track the date/time of all versions of the certified Wage Rate Requirements statute payrolls submitted to the government over the life of the contract;
(8) capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic payroll processing system shall be provided to the Government during contract closeout.
(d) All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for compliance with the Wage Rate Requirements statute by using electronic payroll processing services shall not be a separately bid or reimbursed item under this contract.
1.10 ADDITIONAL CONTRACTOR PAYROLL RECORD
(1) Reference the Special Contract Requirement CONTRACTOR SUPPLY and USE
OF ELECTRONIC SOFTWARE FOR PROCESSING WAGE RATE REQUIREMENTS CERTIFIED
LABOR PAYROLLS. The Fort Worth District requires the contractor and all sub-contractors to use an electronic payroll system meeting the requirements the above referenced requirements and the following.
SECTION 01 00 00.00 44 Page 6
(a) The Certified Labor Payrolls must be tracked electronically via WEB-based software and all data must be submitted via WEB. Payroll guidelines,"Instructions to Contractors on Contract Labor Requirements, published as "Appendix A, SWFP 1185-1-1" (also known as the Green book), will be provided to advise/inform contractors how these labor provisions will be administered and enforced.
(b) The WEB-based software must be capable of downloading data directly from existing electronic payrolls, track workers to ensure that overtime is being paid when overtime status is reached on Government contracts whether on one or multiple contracts or different sub-contractors. The software must track apprentices and journeyman ratios, create and track SF-1444 "Request for Authorization of Additional Classification and Rate", track workers by name/address/with or without Social Security Numbers, allow automated redaction of information appearing on payroll statements for agency response to Freedom of Information Act (FOIA requests), and provide free online training by the software provider to any user of the software.
(c) The software must allow fringe benefit statement to track fringe benefits "whether cash or into an approved plan, fund, or program. If the fringe benefits are paid into a plan, fund, or program the company's name (receiving benefits), phone number, and address shall be listed on the Statement of Compliance Form (DD Form 879 or WH-347).
(d) Software must provide a method of tracking standard and non-standard deductions such as restitution, alimony, child support, and allow for custom entries. Method of tracking must list the deductions on the statement of compliance or be listed as an attachment.
(e) The Contractor is required to provide the updated 3080's and notify the Contracting Officer's Representatives weekly by email when the current payrolls are complete and ready for inspection/review on the WEB. Before final payment, the Contractor shall provide the completed ENG For 3180's and 3 disks (CD/DVD) which include complete copies of the Contractor and sub-contractor's payrolls/attachments, to the Contracting Officer's Representatives.
(2) Electronic copies of electronically/manually signed forms/memos/letters such as SF 1413 Statement of Acknowledgement (sub-contractor agreement), SF-1444 "Request for Authorization of Additional Classification and Rate", employee deduction authorization, certification of apprentices and trainees shall be provided to the Contracting Officer's Representative as required by FAR.
1.11 STREET CLOSINGS
The Contractor shall coordinate all requests for street closings with the Contracting Officer in writing 14 days prior to date of requested outage:
a. One lane traffic shall be maintained at all times (except that a total closing may be allowed for specific 8-hour periods).
b. The final street repair shall be completed within 14 days after the start of any street crossing. Any part of the street returned to service prior to final repair shall be maintained smooth with hot-mix cold-lay surface course.
<am#0002>
SECTION 01 00 00.00 44 Page 7
1.9 MOBILIZATION AND DEMOBILIZATION
</am#0002>
1.12 Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veteran Affairs - VOW to Hire Heroes Act http://benefits.va.gov/vow Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation - Hiring Our Heroes http://www.hiringourheroes.org/ Guide to Hiring Veterans - Reference Material -http://whitehouse.gov/sites/default/files/docs/white_house_business_council_-_guide_to_hiring_veterans_0.pdf
-- End of Section --
SECTION 01 00 00.00 44 Page 8
W9126G19B0006 0002
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
X
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
P L O
T S
C A
L E
US Army Corps of Engineers ®
CONTRACT NO.:
ISSUE DATE.:
F
IL
E N
A M
E
IN
A
S S
O C
IA
T
IO
N
W
IT
H
IC
E
D A
N N
E N
B A
U M
J V
BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt
6/6/2019 8:39:28 AM
BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt
G0-0-01
C
IM
P
A R
A T
O
C
IM
P
A R
A T
O
IC
E
D
B J
V
R
M E
A D
O R
J U
N E
W
G -1
-D
-0
W
G
F
:1
B
B A
T T
E R
Y C
O N
T R
O L
B U
IL
D
IN
G
C O
VE
R
SH
EE
T
F O
R T
W O
R T
H D
IS
T
R
IC
T
FORT WORTH DISTRICT
W9126G18F0385
JUNE 6, 2019
B23640
R
M
E C
H .r v t
B23640 BATTERY CONTROL BUILDING
J U
N E
C O
R R
E C
T E
D F
IN
A
L
100% CORRECTED FINAL
WHITE SANDS MISSILE RANGE
BUILDING 23640 REPAIRS
WHITE SANDS MISSILE RANGE, NM
W H
IT
E
S A
N D
S M
IS
S
IL
E
R A
N G
E
B U
IL
D
IN
G
R
E P
A
IR
S
ENVIRONMENTAL NOTES
A.
B.
C.
D.
E.
F.
HAZMAT MATERIAL WAS FOUND IN THE BUILDING THROUGH FIELD
SAMPLES COLLECTED BY TERRACON WHICH ARE INCLUDED IN
APPENDIX A OF DESIGN ANALYSIS REPORT (DAR). HAZMAT MATERIAL
SHALL BE HANDLED, STORED, AND DISPOSED OF IN ACCORDANCE
WITH CURRENT FEDERAL AND STATE LAWS AND REGULATIONS, AND
MUST ALSO ADHERE TO WSMR DPW'S ENVIRONMENTAL
REQUIREMENTS.
A SATELLITE ACCUMULATION POINT (SAP) MUST BE ESTABLISHED BY
THE CONTRACTOR FOR ACCUMULATION OF LEAD-BASED-PAINT AND
ASBESTOS WASTE GENERATED DURING REMOVAL AND ABATEMENT
ON WSMR.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.