AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for Building 23640 HVAC Renovation White Sands Missile Range, New Mexico is amended as follows.

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is 08 August 2019; at 10:00am.,CST, as previously announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G19B0006

X 9B. DATED (SEE ITEM 11)

10 July 2019

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-July-2019

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W9126G19B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO SOLICITATION W9126G19B0006

CHANGES TO DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

11. Replacement Sections: Replace the following section with the accompanying new section of the same number and title bearing the notation W9126G19B0006 0001

00 11 00.01 - SOLICITATION, OFFER AND AWARD, SF-1442

00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

00 21 30 - SITE VISITS

CHANGES TO THE DRAWINGS

14. New Drawings.- The new drawings listed below which are included in this amendment, bearing the notation W9126G19B0006 0001 shall be added to and become a part of the contract documents:

G0-0-01 COVER SHEET

G0-1-01 GENERAL PROJECT INFO

A1-0-01 FIRST FLOOR PLAN - ARCH DEMO

A1-0-02 REFLECTED CEILING PLAN - ARCH DEMO

A1-1-01 FIRST FLOOR PLAN

A1-1-02 REFLECTED CEILING PLAN

M0-1-01 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS

M2-0-01 FIRST FLOOR PLAN - HVAC DEMO

M2-1-01 FIRST FLOOR PLAN - HVAC DUCTWORK

M2-2-01 FIRST FLOOR PLAN - HVAC PIPING

M5-1-01 MECHANICAL SYSTEM DIAGRAMS

M6-1-01 MECHANICAL DETAILS

M7-1-01 MECHANICAL SCHEDULES

M7-1-02 MECHANICAL SCHEDULES

M8-1-01 MECHANICAL CONTROLS

M8-1-02 MECHANICAL CONTROLS

M8-1-03 MECHANICAL CONTROLS

M8-1-04 MECHANICAL CONTROLS

M9-1-01 MECHANICAL PIPING ISOMETRICS

E0-1-01 ELECTRICAL LEGEND, SYMBOLS AND ABBREVIATIONS

E2-0-01 FIRST FLOOR PLAN - POWER DEMOLITION

E2-1-01 FIRST FLOOR PLAN - POWER

E4-1-01 ELECTRICAL POWER PARTIAL ONE-LINES

E4-1-02 ELECTRICAL POWER SCHEDULES

End of Summary of Changes

Project Title: HVAC Renovation of Bldg B23640.

Location: White Sands Missile Range, New Mexico.

This is a Small Business Design Bid Build construction Invitation for Bid.

Magnitude of Construction is betw een $1,000,000 and $5,000,000.

NOTE: Bid Bond is required IAW FAR 52.228-1. Additionally, the w inning contractor w ill be required to provide Insurance and Perfomance & Payment Bonds IAW FAR 52.228-5 & 52.228-15, respectively.

X

AMANDA N LANE (817) 886-1077

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

16-Jul-2019

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______1 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________01 00 00.00 44

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 Aug 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A17

FORT WORTH TX 76102-0300

W9126G

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

817-886-6403FAX:TEL: 817-886-1043 TEL: FAX:

W9126G19B0006 45

<am#0001> Block 13A Date changed from 13Aug2019 to 08Aug2019 </am#0001>

W9126G19B0006 0001

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

SEALED BIDDING INSTRUCTIONS

SEALED BIDDING

INSTRUCTIONS

1. INQUIRIES

OFFEROR'S QUESTIONS AND COMMENTS

All questions and/or comments are to be submitted via ProjNet.

Bidder Inquiry in ProjNet at http://www.projnet.org/projnet

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login.

Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

From this page you may view all bidder inquiries or add inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed.

The Solicitation Number is: W9126G19B0006 The Bidder Inquiry Key is: 6Q2YAY-2Y2C6P

Last day to submit ProjNet questions is 5 calendar days prior to bid closure date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Standard Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

2. INSTRUCTIONS TO OFFERORS

SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BIDS SUBMISSION (FAR

14.302 & 14.304)

a. All bids and a copy of the SF24 Bid Bond MUST be received electronically via the FEDBIZOPPS (FBO.GOV) “Electronic Response” feature no later than <am#001> 22 July 2019 08 August 2019 </am#001> at 10:00 AM (CDT). No bids, or amendments to bids, in Original will be accepted.

b. Electronically submitted offers must include the completed SF 1442 (in accordance with FAR 52.214-18), Acknowledgment of all amendments, completed CLIN schedule, and original Bid Bond.

c. Offers received will be publicly opened at the following location:

US Army Engineer District, Fort Worth 819 Taylor St, Room TBD Fort Worth, TX 76102

02:00 PM (CDT)

d. Teleconference Dial-in Information for the public 1-888-675-2535 Access Code 2998176# Security code: 1234 on <am#001> 22 July 2019 08 August 2019 </am#0001> at 02:00 PM CDT.

e. Please note, oral explanations or instructions are not binding. Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

f. SENDING FILES. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions should be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W9126G19B0006_COMPANY NAME_DESCRIPTION

ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE FEDBIZOPPS

(FBO.GOV) “ELECTRONIC RESPONSE” FEATURE. The FBO vendor user guide has information & instructions on how to utilize this feature. The FBO vendor user guide is accessible via the following web URL:

https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.

File Size Limitations. Offerors are advised to follow the FBO instructions for uploading files larger than 10MB (java upload). FBO has not posted official file size limitations for its electronic response module, however it has been observed that uploads to FBO tend to be problematic when the files are sized 100MB or greater. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified above.

Upload Completion & Deadline. Interested parties shall submit responses no later than the date specified on solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within FBO. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few

W9126G19B0006 0001 m2pmjjf9 Cross-Out m2pmjjf9 Cross-Out minutes—this will allow for unexpected delays in the transmittal process and troubleshooting.

Proposal submission difficulties should be coordinated with the Federal Service Desk at https://fsd.gov and/or +1-866-606-8220 (Mon-Fri 8am-8pm Eastern Time UTC -5:00). Experience shows that if an upload doesn’t complete until after the deadline, the FBO system WILL NOT COMPLETE. The FBO system will automatically shut off the “Electronic Submission” feature at the specified deadline--once that occurs, the feature will disappear from the announcement.

Offerors are encouraged to keep a copy of the upload confirmation for their record. Proposals received after the date and time will be handled in accordance with FAR 15.208-Submission, Modification, Revision and Withdrawal of Proposals.

g. Original copies of the Bid Bond shall be submitted to the following point of contact two (2) calendar days after the bid due date.

US Army Engineer District, Fort Worth ATTN: Amanda Lane 819 Taylor St, Room 2A17 Fort Worth, TX 76102-0300

h. OFFERS BY TELEGRAPH. Offers received by telegraph, modifications thereto, or cancellations of offers will NOT BE ACCEPTED.

i. FACSIMILE OFFERS. Facsimile offers, modifications thereto, or cancellations of offers will

NOT BE ACCEPTED.

j. EMAIL. Modifications and cancellations of offers WILL NOT be accepted. Only the original electronically submitted bid will be accepted by the Government.

k. RESPONSIBILITY. Award will be made to the lowest, responsible bidder whose bid, conforming to the invitation for bids, will be the most advantageous to the Government. To be determined responsible, the apparent low bidder shall:

(1) Have adequate financial resources to perform the contract, or the ability to obtain them. The contractor will be required to provide the Name of the Financial Institution, POC, and phone number.

(2) Have a satisfactory performance record. The contractor shall have no performance annotated with an individual rating of less than SATISFACTORYon any Final Evaluation within the last six (6) years from the bid opening date.

(3) Have a satisfactory record of integrity and business ethics. Awardee will be required to provide at least three (3) references for like work, to include Business Name, Point of Contact, and telephone number.

(4) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors). Per FAR 9.104-3, acceptable evidence normally consists of a commitment or explicit arrangement that will be in existence at the time of the contract to acquire the needed facilities, equipment, other resources or personnel.

(5) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and

(6) Be otherwise qualified and eligible to receive an award under applicable laws and regulations

3. NOTIFICATION OF UNSUCCESSFUL BIDDERS. All contract award information for this solicitation will be published electronically on FedBizOpps (FBO) at www.fbo.gov/ Solicitation Number W9126G19B0006. Written unsuccessful bidder letters will not be issued.

4. PREPROPOSAL CONFERENCE / SITE VISIT

SITE VISIT. See FAR clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) –

ALTERNATE I (FEB 1995)

IMPORTANT NOTES. (1) Remarks and explanations addressed during the conference shall not qualify or alter the terms and conditions of the solicitation. (2) The terms and conditions of the solicitation remain unchanged unless the solicitation is formally amended in writing.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.217-5 Evaluation Of Options JUL 1990 52.225-10 Notice of Buy American Requirement--Construction

Materials

MAY 2014

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price (FFP) contract resulting from this solicitation.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be Twenty (20%) percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

USACE Fort Worth Attention: John H. Rodgers 819 Taylor St.

Fort Worth, TX 76102 SWF-Protest@usace.army.mil

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Refer to Section 00 21 30 for Site Visit information.

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vmdfara.htm http://www.usace.army.mil/Portals/2/docs/Contracting/UAI_Version%203__1%20NOV%202014.pdf

(End of provision)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

B23640 HVAC Renovation WSMR19B23640

SECTION 00 21 30

SITE VISITS

PART 1 GENERAL

1.1 SITE VISITS

(a) Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," and the Site Visit Clause in Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, prospective bidders will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Bidders are urged and expected to inspect the site where the work will be performed. Site visits will be arranged during normal duty hours.

(b) Site visit information: See for site visit dates, time, location, and point of contact information.The site visit will be:

Date: [ TBD ] Time: [ TBD ] Location: [ TBD ]

POC:

Name: Thomas G Smiley, P.E. (Primary) Address:Bldg 102 Headquarters Ave, White Sands Missile Range, NM 88002-5008

Telephone: (575) 678-2591 Email: Thomas.G.Smiley@usace.army.mil

Name: Daniel Hartell (Secondary) Address:Bldg 102 Headquarters Ave, White Sands Missile Range, NM 88002-5008

Telephone: (575) 678-3288 Email: Daniel.H.Hartell@usace.army.mil

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

DOCUMENT 00 21 30 Page 1

</am#0001>

<am#0001> 22 July 2019

0900 - 1200 MST

Building 23640, White Sands Missile Range, NM

W9126G19B0006 0001 m2pmjjf9 Cross-Out m2pmjjf9 Cross-Out m2pmjjf9 Cross-Out

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

P L O

T S

C A

L E

US Army Corps of Engineers ®

F

IL

E N

A M

E

SEAL

N O T F

O R

C O N S

TR

U C

TIO

N

IN

A

S S

O C

IA

T

IO

N

W

IT

H

IC

E

D A

N N

E N

B A

U M

J V

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

5/7/2019 2:20:50 PM

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

G0-0-01

C

IM

P

A R

A T

O

C

IM

P

A R

A T

O

IC

E

D

B J

V

R

M E

A D

O R

M A

Y

W

G -1

-D

-0

:1

B

B A

T T

E R

Y C

O N

T R

O L

B U

IL

D

IN

G

C O

VE

R

SH

EE

T

F O

R T

W O

R T

H D

IS

T

R

IC

T

FORT WORTH DISTRICT

MAY 08, 2019 ISSUE DATE.:

VO LUME: 1

B23640

R

M

E C

H .r v t

B23640 BATTERY CONTROL BUILDING

M A

Y

F

IN

A L D

E S

IG

N

D

100% FINAL DESIGN

WHITE SANDS MISSILE RANGE

BUILDING 23640 REPAIRS

WHITE SANDS MISSILE RANGE, NM

W H

IT

E

S A

N D

S M

IS

S

IL

E

R A

N G

E

B U

IL

D

IN

G

R

E P

A

IR

S

ENVIRONMENTAL NOTES

A.

B.

C.

D.

E.

F.

HAZMAT MATERIAL WAS FOUND IN THE BUILDING THROUGH FIELD

SAMPLES COLLECTED BY TERRACON WHICH ARE INCLUDED IN

APPENDIX A OF DESIGN ANALYSIS REPORT (DAR). HAZMAT MATERIAL

SHALL BE HANDLED, STORED, AND DISPOSED OF IN ACCORDANCE

WITH CURRENT FEDERAL AND STATE LAWS AND REGULATIONS, AND

MUST ALSO ADHERE TO WSMR DPW'S ENVIRONMENTAL

REQUIREMENTS.

A SATELLITE ACCUMULATION POINT (SAP) MUST BE ESTABLISHED BY

THE CONTRACTOR FOR ACCUMULATION OF LEAD-BASED-PAINT AND

ASBESTOS WASTE GENERATED DURING REMOVAL AND ABATEMENT

ON WSMR. CONTACT THE HAZARDOUS WASTE MANAGEMENT CENTER

(HWMC, 575-678-4641, FOR FURTHER GUIDANCE. A SAP MAY ALSO BE

REQUIRED FOR PROPER MANAGEMENT AND DISPOSAL OF PAINT

RELATED WASTE WHEN MATERIALS OTHER THAN LATEX OR ARCYLIC

PAINT IS USED. AN INVENTORY OF PRODUCTS TO BE USED ON WSMR,

ALONG WITH MANUFACTURER'S SDS/MSDS, SHALL BE PROVIDED TO

THE HWMC PRIOR TO START OF WORK.

COMPLY WITH ALL APPLICABLE OSHA AND THE SAFETY AND HEALTH

REQUIREMENTS MANUAL (EM385-1-1) REQUIREMENTS, INLCUDING (BUT

NOT LIMITED TO): ASBESTOS, LEAD, CONFINED SPACE ENTRY,

HEARING PROTECTION, LOCKOUT-TAGOUT, HOT WORK, RESPIRATORY

PROTECTION, TRENCHING AND SHORING, LIFTING, HAZCOM, ETC.

WHILE NOT ANTICIPATED FOR THIS PROJECT, PROJECTS MUST

PROTECT STORM SEWER DRAINS (INCLUDING AREA DRAINS),

MANHOLES, INLETS, TRENCHES AND SURFACE RUN-OFF DRAINAGES,

ROOF DRAINS, ETC. FROM DISCHARGES OF PROCESS WATER,

SEDIMENT, PETROLEUM RESIDUES, AND ALL OTHER CONTAMINANTS,

DISCHARGES OF CONTAMINATED OR PROCESS WATER MAY ONLY BE

PERMITTED INTO THE SANITARY SEWER IF AUTHORIZED BY THE

CONTRACTING OFFICER AND ENVIRONMENTAL HEALTH & SAFETY (EH

& S) OFFICE AT WHITE SANDS MISSILE RANGE (WSMR).

SHOULD, DURING THE COURSE OF EXCAVATION, DEMOLITION, OR

CONSTRUCTION, POSSIBLE ENVIRONMENTAL CONTAMINATION ISSUES

ARISE CONTACT EH&S OFFICE AT WSMR IMMEDIATELY. IT IS THE

RESPONSIBILITY OF THE CONTRACTOR TO PROPERLY MANAGE AND

DISPOSE OF HAZARDOUS MATERIALS AND WASTE GENERATED

DURING THE COURSE OF THE PROJECT. COPIES OF ALL PAPERWORK

FOR HAZARDOUS MATERIAL AND WASTE DISPOSAL MUST BE

SUBMITTED TO THE HAZARDOUS MATERIALS PROGRAM MANAGER,

AND WHERE APPROPRIATE, THE PROJECT MUST USE THE PROPER

EPA ID NUMBERS ON ALL WASTE DISPOSAL DOCUMENTS.

PAINTING: INCREASE VENTILATION DURING AND AFTER PAINTING TO

REDUCE ODOR MIGRATION. DO NOT USE OIL-BASED PAINTS.

CONTRACTOR'S

LAYDOWN AREA

R A

N G

E R

O A

D

BATTERY CONTROL

BUILDING B23640

PROJECT SITE

PROJECT NOTES

A.

B.

C.

D.

E.

F.

PROJECT SHALL COMPLY WITH THE 2015 INTERNATIONAL

CODE COUNCIL (ICC) CODES AND LATEST UNITED FACILITIES

CRITERIA (UFC) STANDARDS. THE US ARMY CORPS OF

ENGINEERS, FORT WORTH DISTRICT IS THE AUTHORITY

HAVING JURISDICTION (AHJ).

CONTRACTOR SHALL NOT SHUT DOWN OR TAKE OUT OF

SERVICE ANY SYSTEM(S) WITHOUT FIRST COORDINATING

WITH AND RECEIVING APPROVAL FROM THE FROM THE

CONTRACTING OFFICER. A DETAILED SCHEDULE OF ACTIVITY

AND METHOD OF PROCEDURE (MOP) IS REQUIRED WHEN A

CONSTRUCTION ACTIVITY AFFECTS THE SAFETY OF

OCCUPANTS, OR WHEN EVENTS ARE TO BE HELD IN THE

BUILDING DURING CONSTRUCTION.

WHERE DIMENSIONS ARE NOT SHOWN, THE DRAWINGS SHALL

NOT BE SCALED FOR ROUGH-IN MEASUREMENTS OR USED AS

SHOP DRAWINGS. WHERE DRAWINGS ARE REQUIRED FOR

THESE PURPOSES OR HAVE TO BE MADE FROM FIELD

MEASUREMENTS, THE CONTRACTOR SHALL OBTAIN

MEASUREMENTS AND PREPARE THE DRAWINGS.

TEMPORARY HEATING AND COOLING IS NOT REQUIRED

DURING CONSTRUCTION.

ENSURE THAT THE PROJECT STAGING AREA(S) AND

CONSTRUCTION ACTIVITIES DO NOT CAUSE THE

OBSTRUCTION OF PATHS OF EGRESS INSIDE THE BUILDING,

BLOCK EXIT DISCHARGE FROM THE BUILDING OR IMPEDED

EMERGENCY VEHICLE ACCESS TO THE AREA.

NECESSARY MEASURES TO PREVENT THE ACCIDENTAL

ACTIVATION OF NEARBY SMOKE DETECTORS ARE REQUIRED

FOR ACTIVITIES WHICH GENERATE DUST OR FUMES WITHIN

THE BUILDING.

IN THE EVENT THAT FIRE ALARM IS NOT ACTIVE DURING

CONSTRUCITON ACTIVITIES, CONTRACTOR TO PROVIDE

PROVISION FOR FIRE WATCH DURING ANY CUTTING,

GRINDING, WELDING AND OTHER RELATED ACTIVITES. NOTIFY

WSMR AND SITE FIRE OF CONSTRUCTION ACTIVITY PLAN

PRIOR TO COMMENCING WORK.

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

P L O

T S

C A

L E

SHEET OF

F

IL

E N

A M

E

SEAL

N O T F

O R

C O N S

TR

U C

TIO

N

IN

A

S S

O C

IA

T

IO

N

W

IT

H

IC

E

D A

N N

E N

B A

U M

J V

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

5/7/2019 2:20:55 PM

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

G0-1-01

C

IM

P

A R

A T

O

C

IM

P

A R

A T

O

IC

E

D

B J

V

R

M E

A D

O R

M A

Y

W

G -1

-D

-0

:1

B

B A

T T

E R

Y C

O N

T R

O L

B U

IL

D

IN

G

G

EN

ER

AL

P

RO

JE

C

T

IN

FO

F O

R T

W O

R T

H D

IS

T

R

IC

T

B23640

R

M

E C

H .r v t

M A

Y

F

IN

A L D

E S

IG

N

D

100% FINAL DESIGN

W H

IT

E

S A

N D

S M

IS

S

IL

E

R A

N G

E

B U

IL

D

IN

G

R

E P

A

IR

S

SHEET INDEX

SHEET

No.

SHEET

ID SHEET TITLE

1 G0-0-01 COVER SHEET

2 G0-1-01 GENERAL PROJECT INFO

3 A1-0-01 FIRST FLOOR PLAN - ARCH DEMO

4 A1-0-02 REFLECTED CEILING PLAN - ARCH DEMO

5 A1-1-01 FIRST FLOOR PLAN

6 A1-1-02 REFLECTED CEILING PLAN

7 M0-1-01 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS

8 M2-0-01 FIRST FLOOR PLAN - HVAC DEMO

9 M2-1-01 FIRST FLOOR PLAN - HVAC DUCTWORK

10 M2-2-01 FIRST FLOOR PLAN - HVAC PIPING

11 M5-1-01 MECHANICAL SYSTEM DIAGRAMS

12 M6-1-01 MECHANICAL DETAILS

13 M7-1-01 MECHANICAL SCHEDULES

14 M7-1-02 MECHANICAL SCHEDULES

15 M8-1-01 MECHANICAL CONTROLS

16 M8-1-02 MECHANICAL CONTROLS

17 M8-1-03 MECHANICAL CONTROLS

18 M8-1-04 MECHANICAL CONTROLS

19 M9-1-01 MECHANICAL PIPING ISOMETRICS

20 E0-1-01 ELECTRICAL LEGEND, SYMBOLS AND ABBREVIATIONS

21 E2-0-01 FIRST FLOOR PLAN - POWER DEMOLITION

22 E2-1-01 FIRST FLOOR PLAN - POWER

23 E4-1-01 ELECTRICAL POWER PARTIAL ONE-LINES

24 E4-1-02 ELECTRICAL POWER SCHEDULES

Scale: 6" = 1'-0"

1 PROJECT SITE LOCATION

Scale: NTS

C

E

MTR ANTENNA #1

VESTIBULE

SHIELDED VESTIBULE MTR ANTENNA #2

MTR ANTENNA #3

COMPUTER LAB

3-6 AMDTD BATTLE

LAB

BATTERY CONTROL

ROOM

BREAK ROOM

SHIELDED VESTIBULE

BOILER ROOM

MECHANICAL AND

ELECTRICAL

EQUIPMENT ROOM

CORRIDOR

SHIELDED VESTIBULE

PIPE SPACE

NO WORK IN SECURE

AREA

SHIELDED VESTIBULE

VESTIBULE

COMPUTER LAB /

STORAGE

CORRIDOR

FILTER ACCESS

ENTRY

OFFICE 101

OFFICE 102

OFFICE 103

STAIR

MENS RR

WOMENS RR

OFFICE 113

OBSERVATION

3 3

3A 1A

G G

DD

H H

FF

2A

2A A

2B

2B

25' - 0" 34' - 6"

14' - 5"

18' - 0"

17' - 11"

17' - 11"

18' - 1"

18' - 1" 18' -

0"

34' - 6"

94' - 0"

24x24

20x20

36x36

48x42

GENERAL DEMOLITION NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

THE INTENT OF THESE DRAWINGS AND NOTES IS TO INDICATE

THE GENERAL SCOPE OF WORK RELATED TO DEMOLITION.

SPECIFIC ITEMS NOT INDICATED, BUT REQUIRED IN ORDER TO

FACILITATE NEW WORK, SHALL BE INCLUDED AS PART OF THE

CONTRACTOR'S SCOPE OF WORK. THE WORK INDICATED IN

THESE NOTES AND ON THE DRAWINGS SHALL INCLUDE, BUT NOT

BE LIMITED TO: STRUCTURAL DEMOLITION, UTILITIES AND CIVIL

DEMOLITION, AND ARCHITECTURAL DEMOLITION.

IF UNANTICIPATED ARCHITECTURAL, MECHANICAL, ELECTRICAL,

PLUMBING, CIVIL, STRUCTURAL OR OTHER ELEMENTS CONFLICT

WITH DEMOLITION DWGS, REPORT THE NATURE AND EXTENT OF

THE CONFLICT TO THE CONTRACTING OFFICER IN WRITTEN

ACCURATE DETAIL PRIOR TO PROCEEDING. PENDING RECEIPT

OF INSTRUCTIONS, CONTRACTOR SHALL REARRANGE

DEMOLITION SCHEDULE TO MAINTAIN PROGRESS.

CONTRACTOR TO COORDINATE DEMOLITION WITH ALL TRADES.

CONSTRUCTION WORK SHALL BE CONFINED TO THE AREAS

DESIGNATED.

CONSTRUCTION WORK AREA SHALL BE ACCESSED VIA

DEDICATED PASSAGE AND ENTRY. CONTRACTOR SHALL

PROTECT ALL AREAS OF THE EXISTING BUILDING UTILIZED FOR

ACCESS TO AND FROM THE CONSTRUCTION AREA.

ALL EXISTING MEANS OF EGRESS FOR THE OCCUPANTS AND

USERS OF THE BUILDING SHALL BE MAINTAINED CLEAR AND FREE

OF ALL OBSTRUCTIONS AT ALL TIMES. MAINTAIN EMERGENCY

EGRESS DURING DEMOLITION.

THE CONTRACTOR SHALL MAINTAIN COMPLETE AND UP-TO-DATE

DRAWINGS AT THE JOB SITE.

GOVERNMENT ASSUMES NO RESPONSIBILITY FOR ACTUAL

CONDITION OF ITEMS OR STRUCTURES TO BE DEMOLISHED.

THE CONTRACTOR SHALL PROTECT ALL AREAS OUTSIDE THE

CONTRACT LIMITS AND RESTORE ALL SUCH PROPERTY TO ITS

CONDITION PRIOR TO THE START OF THE WORK.

ALL EXISTING CONSTRUCTION, SURFACES AND EQUIPMENT TO

REMAIN SHALL BE FULLY PROTECTED FROM DAMAGE. IF THE

EXISTING CONSTRUCTION TO REMAIN IS IN ANY WAY DISTURBED,

WEAKENED OR DAMAGED DUE TO CONTRACTOR'S NEGLIGENCE

OR PROGRESS OF WORK, IT SHALL BE RESTORED TO ITS

ORIGINAL CONDITION BY THE CONTRACTOR AT NO EXTRA COST

TO THE GOVERNMENT.

MAINTAIN EXISTING UTILITIES. DO NOT INTERRUPT EXISTING

BUILDING UTILITIES EXCEPT WHEN AUTHORIZED IN WRITING BY

THE CONTRACTING OFFICER. SEE GENERAL CONDITIONS IN THE

PROJECT SPECIFICATION MANUAL.

KEEP PASSAGEWAYS AND EXTERIOR SPACES CLEAN

CONTINUOUSLY. NO DEBRIS SHALL BE ALLOWED TO

ACCUMULATE ON THE SITE. DEBRIS SHALL BE REMOVED BY THE

CONTRACTOR AS THE JOB PROCEEDS. LEGALLY DISPOSE OF

MATERIALS OFF-SITE, THE SITE SHALL BE LEFT BROOM CLEAN AT

THE COMPLETION OF DEMOLITION.

FIRE ALARM DEVICES: REMOVE AND STORE FIRE ALARM

DEVICES. FIRE ALARM CONDUIT AND WIRE SHALL REMAIN IN

PLACE.

UNDER THE RECONSTRUCTION SCOPE, RE-INSTALL THE FIRE

ALARM DEVICES IN THEIR ORIGINAL LOCATIONS. REPAIR TO THE

FIRE ALRM SYSTEM AND RE-COMMISSIONING SHAL BE BY

OTHERS.

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

P L O

T S

C A

L E

SHEET OF

F

IL

E N

A M

E

GRAPHIC SCALE

SEAL

N O T F

O R

C O N S

TR

U C

TIO

N

IN

A

S S

O C

IA

T

IO

N

W

IT

H

IC

E

D A

N N

E N

B A

U M

J V

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

5/7/2019 2:20:41 PM

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

A1-0-01

C

IM

P

A R

A T

O

C

IM

P

A R

A T

O

IC

E

D

B J

V

R

M E

A D

O R

M A

Y

W

G -1

-D

-0

:1

B

B A

T T

E R

Y C

O N

T R

O L

B U

IL

D

IN

G

FI

R

ST

F

LO

O

R

PL

AN

AR

C

H D

EM

O

F O

R T

W O

R T

H D

IS

T

R

IC

T

B23640

R

M

E C

H .r v t

M A

Y

F

IN

A L D

E S

IG

N

D

100% FINAL DESIGN

W H

IT

E

S A

N D

S M

IS

S

IL

E

R A

N G

E

B U

IL

D

IN

G

R

E P

A

IR

S

Scale: 1/8" = 1'-0"

1 ARCHITECTURAL DEMOLITION - FIRST FLOOR PLAN

KEYNOTES

1 REMOVE EXISTING CONCRETE HOUSEKEEPING PAD. REPAIR

CONCRETE FLUSH WITH SURROUNDING MECHANICAL ROOM

FLOOR.

2 REMOVE EXISTING 6-INCH THICK CONCRETE CONTAINMENT CURB.

REPAIR CONCRETE FLUSH WITH SURROUNDING MECHANICAL

ROOM FLOOR.

3 EXISTING CONCRETE PAD/CURB IS INTEGRAL TO EXISTING FLOOR

SLAB. SAW CUT AROUND PERIMETER OF EXISTING PAD.

4 EXISTING BOILER ROOM WALL SHALL BE MINIMUM 1-HOUR

FIRE-RATED CONSTRUCITON.

5 ENLARGE EXISTING 48-INCH WIDE BY 24-INCH HIGH OPENING IN

CMU WALL FOR NEW 120-INCH WIDE BY W BY 60-INCH HIGH LOUVER

AS INDICATED ON MECHANICAL DRAWINGS. ALL OPENINGS SHALL

BE PROTECTED IN ACCORDANCE WITH MILITARY HANDBOOK

1013/1A.

6 FILL EXISTING OPENING IN CMU BLOCK WALL AFTER DEMOLITION

OF MECHANICAL EQUIPMENT.

7 EXISTING MECHANICAL ROOM WALLS ARE NOT REQUIRED TO BE

FIRE-RATED UNDER THE INTERNATIONAL BUILDING CODE, SECTION

509. MECHANICAL ROOM DOES NOT CONTAIN FUEL-BURNING

APPLIANCES, BOILERS OF 10 HP OR MORE, BATTERY STORAGE,

COMBUSTIBLE STORAGE, ETC. THE BOILER IS SEPERATED FROM

THE MECHANICAL ROOM BY A RATED WALL, AS INDICATED ON THE

DRAWING.

3A1A

C

D

E

F

1 2

2A A

2B

MTR ANTENNA #1

VESTIBULE

SHIELDED VESTIBULE

MTR ANTENNA #2

MTR ANTENNA #3

COMPUTER LAB

3-6 AMDTD BATTLE

LAB

BATTERY CONTROL

ROOM

BREAK ROOM

SHIELDED VESTIBULE

BOILER ROOM

MECHANICAL AND

ELECTRICAL

EQUIPMENT ROOM

CORRIDOR

SHIELDED VESTIBULE

PIPE SPACE

NO WORK IN SECURE

AREA

SHIELDED VESTIBULE

VESTIBULE

COMPUTER LAB /

STORAGE

CORRIDOR

FILTER ACCESS

ENTRY

OFFICE 101

OFFICE 102

OFFICE 103

STAIR

MENS RR

WOMENS RR

OFFICE 113

OBSERVATION

TYP1

TYP1

TYP1

TYP1

G

D

H

F

2A A

2B

GENERAL DEMOLITION NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L

M..

N.

THE INTENT OF THESE DRAWINGS AND NOTES IS TO INDICATE

THE GENERAL SCOPE OF WORK RELATED TO DEMOLITION.

SPECIFIC ITEMS NOT INDICATED, BUT REQUIRED IN ORDER TO

FACILITATE NEW WORK, SHALL BE INCLUDED AS PART OF THE

CONTRACTOR'S SCOPE OF WORK. THE WORK INDICATED IN

THESE NOTES AND ON THE DRAWINGS SHALL INCLUDE, BUT NOT

BE LIMITED TO: STRUCTURAL DEMOLITION, UTILITIES AND CIVIL

DEMOLITION, AND ARCHITECTURAL DEMOLITION.

IF UNANTICIPATED ARCHITECTURAL, MECHANICAL, ELECTRICAL,

PLUMBING, CIVIL, STRUCTURAL OR OTHER ELEMENTS CONFLICT

WITH DEMOLITION DWGS, REPORT THE NATURE AND EXTENT OF

THE CONFLICT TO THE CONTRACTING OFFICER IN WRITTEN

ACCURATE DETAIL PRIOR TO PROCEEDING. PENDING RECEIPT OF

INSTRUCTIONS, CONTRACTOR SHALL REARRANGE DEMOLITION

SCHEDULE TO MAINTAIN PROGRESS.

CONTRACTOR TO COORDINATE DEMOLITION WITH ALL TRADES.

CONSTRUCTION WORK SHALL BE CONFINED TO THE AREAS

DESIGNATED.

CONSTRUCTION WORK AREA SHALL BE ACCESSED VIA

DEDICATED PASSAGE AND ENTRY. CONTRACTOR SHALL

PROTECT ALL AREAS OF THE EXISTING BUILDING UTILIZED FOR

ACCESS TO AND FROM THE CONSTRUCTION AREA.

ALL EXISTING MEANS OF EGRESS FOR THE OCCUPANTS AND

USERS OF THE BUILDING SHALL BE MAINTAINED CLEAR AND FREE

OF ALL OBSTRUCTIONS AT ALL TIMES. MAINTAIN EMERGENCY

EGRESS DURING DEMOLITION.

THE CONTRACTOR SHALL MAINTAIN COMPLETE AND UP-TO-DATE

DRAWINGS AT THE JOB SITE.

GOVERNMENT ASSUMES NO RESPONSIBILITY FOR ACTUAL

CONDITION OF ITEMS OR STRUCTURES TO BE DEMOLISHED.

THE CONTRACTOR SHALL PROTECT ALL AREAS OUTSIDE THE

CONTRACT LIMITS AND RESTORE ALL SUCH PROPERTY TO ITS

CONDITION PRIOR TO THE START IF THE WORK.

ALL EXISTING CONSTRUCTION, SURFACES AND EQUIPMENT TO

REMAIN SHALL BE FULLY PROTECTED FROM DAMAGE. IF THE

EXISTING CONSTRUCTION TO REMAIN IS IN ANY WAY DISTURBED,

WEAKENED OR DAMAGED DUE TO CONTRACTOR'S NEGLIGENCE

OR PROGRESS OF WORK, IT SHALL BE RESTORED TO ITS

ORIGINAL CONDITION BY THE CONTRACTOR AT NO EXTRA COST

TO THE GOVERNMENT.

MAINTAIN EXISTING UTILITIES. DO NOT INTERRUPT EXISTING

BUILDING UTILITIES EXCEPT WHEN AUTHORIZED IN WRITING BY

THE CONTRACTING OFFICER. SEE GENERAL CONDITIONS IN THE

PROJECT SPECIFICATION MANUAL.

KEEP PASSAGEWAYS AND EXTERIOR SPACES CLEAN

CONTINUOUSLY. NO DEBRIS SHALL BE ALLOWED TO

ACCUMULATE ON THE SITE. DEBRIS SHALL BE REMOVED BY THE

CONTRACTOR AS THE JOB PROCEEDS. LEGALLY DISPOSE OF

MATERIALS OFF-SITE, THE SITE SHALL BE LEFT BROOM CLEAN AT

THE COMPLETION OF DEMOLITION.

FIRE ALARM DEVICES: REMOVE AND STORE FIRE ALARM DEVICES.

FIRE ALARM CONDUIT AND WIRE SHALL REMAIN IN PLACE.

UNDER THE RECONSTRUCTION SCOPE, RE-INSTALL THE FIRE

ALARM DEVICES IN THEIR ORIGINAL LOCATIONS. REPAIR TO THE

FIRE ALRM SYSTEM AND RE-COMMISSIONING SHAL BE BY

OTHERS.

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

P L O

T S

C A

L E

SHEET OF

F

IL

E N

A M

E

GRAPHIC SCALE

SEAL

N O T F

O R

C O N S

TR

U C

TIO

N

IN

A

S S

O C

IA

T

IO

N

W

IT

H

IC

E

D A

N N

E N

B A

U M

J V

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

5/7/2019 2:20:43 PM

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

A1-0-02

C

IM

P

A R

A T

O

C

IM

P

A R

A T

O

IC

E

D

B J

V

R

M E

A D

O R

M A

Y

W

G -1

-D

-0

:1

B

B A

T T

E R

Y C

O N

T R

O L

B U

IL

D

IN

G

R

EF

LE

C

TE

D

C

EI

LI

NG

P

LA

N

AR

C

H D

EM

O

F O

R T

W O

R T

H D

IS

T

R

IC

T

B23640

R

M

E C

H .r v t

M A

Y

F

IN

A L D

E S

IG

N

D

100% FINAL DESIGN

W H

IT

E

S A

N D

S M

IS

S

IL

E

R A

N G

E

B U

IL

D

IN

G

R

E P

A

IR

S

Scale: 1/8" = 1'-0"

ARCHITECTURAL DEMOLITION - REFLECTED

CEILING PLAN

KEYNOTES

1 REMOVE EXISTING CEILING GRID AND STRUCTURAL SUPPORT

TEES AS REQUIRED TO ACCOMMODATE HVAC DEMOLITION AND

ABATEMENT ACTIVITIES. STORE TILES AND TEES FOR

RE-INSTALLATION. CONTRACTOR TO INSPECT AND REPLACE

DAMAGED CEILING TILES AND STRUCTURAL SUPPORT TEES AND

WIRES AS NECESSARY. ASSUME A MINIMUM 25% TILE AND GRID

REPLACEMENT IN BID ESTIMATE.

GENERAL NOTES

A. THE INTENT OF THESE DRAWINGS IS TO INDICATE THE WORK TO

BE PROVIDED BY THE GENERAL CONTRACTOR AS A RESULT OF

THE MECHANCIAL AND ELECTRICAL SYSTEMS REPLACEMENTS.

THERE ARE NO CHANGES TO OCCUPANCY, SPACE USE TYPE,

EGRESS (LIFE SAFETY) OR FIRE RATINGS OF EXISTING

ASSEMBLIES.

C

E

3A1A

C

D

E

F

1 2

2A A

2B

MTR ANTENNA #1

VESTIBULE

SHIELDED VESTIBULE

MTR ANTENNA #2

MTR ANTENNA #3

COMPUTER LAB

3-6 AMDTD BATTLE

LAB

BATTERY CONTROL

ROOM

BREAK ROOM

SHIELDED VESTIBULE

BOILER ROOM

MECHANICAL AND

ELECTRICAL

EQUIPMENT ROOM

CORRIDOR

SHIELDED VESTIBULE

PIPE SPACE

NO WORK IN SECURE

AREA

SHIELDED VESTIBULE

VESTIBULE

COMPUTER LAB /

STORAGE

CORRIDOR

FILTER ACCESS

ENTRY

OFFICE 101

OFFICE 102

OFFICE 103

STAIR

MENS RR

WOMENS RR

OFFICE 113

OBSERVATION

G

D

H

F

2A A

2B

6' - 0"

3' - 6"

5' - 6"

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

P L O

T S

C A

L E

SHEET OF

F

IL

E N

A M

E

GRAPHIC SCALE

SEAL

N O T F

O R

C O N S

TR

U C

TIO

N

IN

A

S S

O C

IA

T

IO

N

W

IT

H

IC

E

D A

N N

E N

B A

U M

J V

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

5/7/2019 2:20:46 PM

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

A1-1-01

C

IM

P

A R

A T

O

C

IM

P

A R

A T

O

IC

E

D

B J

V

R

M E

A D

O R

M A

Y

W

G -1

-D

-0

:1

B

B A

T T

E R

Y C

O N

T R

O L

B U

IL

D

IN

G

FI

RS

T

FL

O O

R

PL

AN

F O

R T

W O

R T

H D

IS

T

R

IC

T

B23640

R

M

E C

H .r v t

M A

Y

F

IN

A L D

E S

IG

N

D

100% FINAL DESIGN

W H

IT

E

S A

N D

S M

IS

S

IL

E

R A

N G

E

B U

IL

D

IN

G

R

E P

A

IR

S

KEYNOTES

1 REPAIR CONCRETE FLUSH WITH SURROUNDING MECHANICAL

ROOM FLOOR.

Scale: 1/8" = 1'-0"

1 ARCHITECTURAL - FIRST FLOOR PLAN

3A1A

C

D

E

F

1 2

2A A

2B

MTR ANTENNA #1

VESTIBULE

SHIELDED VESTIBULE

MTR ANTENNA #2

MTR ANTENNA #3

COMPUTER LAB

3-6 AMDTD BATTLE

LAB

BATTERY CONTROL

ROOM

BREAK ROOM

SHIELDED VESTIBULE

BOILER ROOM

MECHANICAL AND

ELECTRICAL

EQUIPMENT ROOM CORRIDOR

SHIELDED VESTIBULE

PIPE SPACE

NO WORK IN SECURE

AREA

SHIELDED VESTIBULE

VESTIBULE

COMPUTER LAB /

STORAGE

CORRIDOR

FILTER ACCESS

ENTRY

OFFICE 101

OFFICE 102

OFFICE 103

STAIR

MENS RR

WOMENS RR

OFFICE 113

OBSERVATION

TYP1

TYP 1

TYP1

TYP1

G

D

H

F

2A A

2B

GENERAL NOTES

A. THE INTENT OF THESE DRAWINGS IS TO INDICATE THE WORK TO

BE PROVIDED BY THE GENERAL CONTRACTOR AS A RESULT OF

THE MECHANCIAL AND ELECTRICAL SYSTEMS REPLACEMENTS.

THERE ARE NO CHANGES TO OCCUPANCY, SPACE USE TYPE,

EGRESS (LIFE SAFETY) OR FIRE RATINGS OF EXISTING

ASSEMBLIES.

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

P L O

T S

C A

L E

SHEET OF

F

IL

E N

A M

E

GRAPHIC SCALE

SEAL

N O T F

O R

C O N S

TR

U C

TIO

N

IN

A

S S

O C

IA

T

IO

N

W

IT

H

IC

E

D A

N N

E N

B A

U M

J V

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

5/7/2019 2:20:49 PM

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

A1-1-02

C

IM

P

A R

A T

O

C

IM

P

A R

A T

O

IC

E

D

B J

V

R

M E

A D

O R

M A

Y

W

G -1

-D

-0

:1

B

B A

T T

E R

Y C

O N

T R

O L

B U

IL

D

IN

G

R

EF

LE

C

TE

D

C

EI

LI

NG

P

LA

N

F O

R T

W O

R T

H D

IS

T

R

IC

T

B23640

R

M

E C

H .r v t

M A

Y

F

IN

A L D

E S

IG

N

D

100% FINAL DESIGN

W H

IT

E

S A

N D

S M

IS

S

IL

E

R A

N G

E

B U

IL

D

IN

G

R

E P

A

IR

S

Scale: 1/8" = 1'-0"

1 ARCHITECTURAL - REFLECTED CEILING PLAN

KEYNOTES

1 RE-INSTALL CEILING GRID IN EXISTING LOCATION. CONTRACTOR

TO INSPECT AND REPLACE DAMAGED CEILING TILES AND

STRUCTURAL SUPPORT TEES AND WIRES AS NECESSARY.

RE-INSTALL ACRYLIC LENSES IN LOCATIONS TO ALLOW EXISTING

LIGHTING FIXTURES TO SHOW THORUGH CEILING.

SUPPLY

DIFFUSER, TYP.

RETURN

DIFFUSER, TYP.

FLOW ARROW

CONNECT TO EXISTING

PIPE CAPPED

END OF DEMOLITION

AIRFLOW ARROW

DESCRIPTIONSYMBOL

MECHANICAL SYMBOLS LIST

NOTE: NOT ALL SYMBOLS MAY BE USED.

TEMPERATURE SENSOR

HUMIDITY SENSOR

PIPE UNION

REDUCED PRESSURE BACKFLOW PREVENTER

THREE-WAY CONTROL VALVE

TWO-WAY CONTROL VALVE

GENERAL SERVICE VALVE (SEE SPECIFICATIONS

FOR VALVE TYPE PER APPLICATION)

CHECK VALVE (ARROW INDICATES

DIRECTION OF FLOW)

AUTOMATIC BALANCING VALVE

AUTOMATIC AIR VENT

TEMPERATURE/PRESSURE TEST PLUG

(PETE'S PLUG)

DRAIN VALVE WITH THREADED

HOSE CONNECTION

THERMOMETER

STRAINER WITH BLOW DOWN VALVE

PRESSURE GAUGE WITH STOPCOCK

PITCH DOWN IN DIRECTION OF ARROW

FLEXIBLE PIPE CONNECTION

PIPE ANCHOR

MANUAL AIR VENT

PIPE GUIDES OR SLEEVES

FLOW METER

RELIEF VALVE

PRESSURE REDUCING VALVE

MANUAL BALANCING VALVEM

A

AV

MAV

TWO-WAY PRESSURE INDEPENDENT

CONTROL AND BALANCE VALVE

COCO CLEAN OUT

PICBV

THERMOSTAT WITH ADJUSTABLE CONTROLT

HUMIDISTAT WITH ADJUSTABLE CONTROLH

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

NITROGEN DIOXIDE SENSOR

CO2

CO

NO2

H

T

STEAM TRAP

STEAM PRESSURE REGULATING VALVE

OCCUPANCY SENSOR OS

PIPE DROP

PIPE RISE

PIPE TEE DOWN

PIPE REDUCER

HEAT TRACE CONTROL PANELHT

DESCRIPTIONSYMBOL

MECHANICAL SYMBOLS LIST CONT.

NOTE: NOT ALL SYMBOLS MAY BE USED.

SUPPLY DIFFUSER WITH FLEXIBLE DUCT

SUPPLY DIFFUSER

RETURN/EXHAUST GRILLE

SIDEWALL SUPPLY DIFFUSER

SIDEWALL RETURN/EXHAUST GRILLE

DAMPERS

BDD: BACKDRAFT DAMPER

FSD: FIRE/SMOKE DAMPER

FD: FIRE DAMPER

MD: MOTORIZED DAMPER

SD: SMOKE DAMPER

VD: VOLUME DAMPER

BDD

TAG - NECK SIZE

AIRFLOW (CFM)

TAG - NECK SIZE

AIRFLOW (CFM)

TAG - NECK SIZE

AIRFLOW (CFM)

TAG - NECK SIZE

AIRFLOW (CFM)

TAG - NECK SIZE

AIRFLOW (CFM)

S1-6ø

TAG EXAMPLE:

S1-6ø

TAG EXAMPLE:

R1-22x10

TAG EXAMPLE:

S2-12x8

TAG EXAMPLE:

R2-12x8

TAG EXAMPLE:

E1-22x10

E2-12x8

NEW WORK DUCTWORK

EXISTING DUCTWORK

DEMOLITION DUCTWORK

NEW WORK PIPING

EXISTING PIPING

DEMOLISHED PIPING

NEW WORK MECHANICAL EQUIPMENT

(WITH CLEARANCE SHOWN)

EXISTING MECHANICAL EQUIPMENT

DEMOLISHED MECHANICAL EQUIPMENT

VAV TERMINAL BOX (WITH REHEAT)

GENERIC FAN

GENERIC PUMP

RECTANGULAR DUCT ELBOW DOWN

SUPPLY AND OUTDOOR AIR

OVAL DUCT ELBOW DOWN

ROUND DUCT ELBOW DOWN

RECTANGULAR DUCT ELBOW DOWN

RETURN, RELIEF, AND EXHAUST AIR

OVAL DUCT ELBOW DOWN

ROUND DUCT ELBOW DOWN

1. IF MIN COOLING CFM IS NOT SHOWN ON

PLANS, THEN MIN COOLING CFM IS EQUAL

TO 30% OF MAX COOLING CFM.

2. HEATING CFM IS EQUAL TO MIN COOLING

CFM.

TAG EXAMPLES:

DUCTWORK PLANS

TAG

MAX COOLING CFM / MIN COOLING CFM

PIPING PLANS

TAG

GPM

TERMINAL BOXES

TB1

0.5

TB1

500/200

TB1

DUCTWORK

PLANS

PIPING

PLANS

TERMINAL BOX NOTES

ACCESS DOOR

DESCRIPTIONSYMBOL

CONTROLS SYMBOLS GUIDE

NOTE: NOT ALL SYMBOLS MAY BE USED.

AIR FLOW MEASURING DEVICEAF

AIR SWITCHAS

CT CONDUCTIVITY TRANSMITTER

CURRENT SENSORCS

DIFFERENTIAL PRESSURE TRANSMITTERDP

DL DATA LINK

END SWITCHES

FLOW METERFM

HAND-OFF-AUTO SWITCHHOA

LEVEL TRANSMITTERLT

METERM

PHT PH TRANSMITTER

PRESSURE SWITCHPS

PRESSURE TRANSMITTERPT

DUCT SMOKE DETECTORDSD

STARTER

TEMPERATURE SWITCHTS

VARIABLE FREQUENCY DRIVEVFD

VT

WATER FLOW SWITCHFS

VIBRATION TRANSMITTER

ELECTRONIC ACTUATOREA

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

P L O

T S

C A

L E

SHEET OF

F

IL

E N

A M

E

SEAL

N O

T F O

R

C O

N S

TR

U

C

TIO

N

IN

A

S S

O C

IA

T

IO

N

W

IT

H

IC

E

D A

N N

E N

B A

U M

J V

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

5/7/2019 2:22:17 PM

BIM 360://60588760-WSMR B23640/60588760_R18_MECH.rvt

M0-1-01

C

IM

P

A R

A T

O

C

IM

P

A R

A T

O

IC

E

D

B J

V

R

M E

A D

O R

M A

Y

W

G -1

-D

-0

:1

B

B A

T T

E R

Y C

O N

T R

O L

B U

IL

D

IN

G

M

EC

H

AN

IC

AL

L

EG

EN

D

, S

YM

BO

LS

A N

D A

BB

R

EV

IA

TI

O

NS

F O

R T

W O

R T

H D

IS

T

R

IC

T

B23640

R

M

E C

H .r v t

M A

Y

F

IN

A L D

E S

IG

N

D

100% FINAL DESIGN

W H

IT

E

S A

N D

S M

IS

S

IL

E

R A

N G

E

B U

IL

D

IN

G

R

E P

A

IR

S

MECHANICAL ABBREVIATIONS

NOTE: NOT ALL ABBREVIATIONS MAY BE USED.

ABBREVIATION DESCRIPTION

(D) EXISTING TO BE DEMOLISHED

(E) EXISTING TO REMAIN

AFF ABOVE FINISHED FLOOR

APD AIR PRESSURE DROP

BAS BUILDING AUTOMATION SYSTEM

BFP BACKFLOW PREVENTOR

BHP BRAKE HORSEPOWER

BLDG BUILDING

BOB BOTTOM OF BEAM

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BOS BOTTOM OF STRUCTURE

BTUH BRITISH TEHRMAL UNITS PER HOUR

CFM CUBIC FEET PER MINUTE

CL CENTER LINE

CO CLEAN OUT

COP COEFFICIENT OF PERFORMANCE

CV CONSTANT VOLUME

DB DRY BULB

DIA DIAMETER

DN DOWN

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EFF EFFICIENCY

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

FLA FULL LOAD AMPS

FPI FINS PER INCH

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

GAL GALLONS

GPM GALLONS PER MINUTE

HD HEAD

HP HORSEPOWER

ID INNER DIAMETER

IPLV INTEGRATED PART LOAD VALUE

KW KILOWATTS

LAT LEAVING AIR TEMPERATURE

LWT LEAVING WATER TEMPERATURE

MBH THOUSAND BTUH

MCA MAXIMUM CURRENT AMPACITY

MOCP MAXIMUM OVERCURRENT PROTECTION

N/A NOT APPLICABLE

NC NORMALLY CLOSED

NO NORMALLY OPEN

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

PD PRESSURE DROP

PPH POUNDS PER HOUR

PPM PARTS PER MILLION

PRV PRESSURE REDUCING VALVE

PSI PUNDS PER SQUARE INCH

REFRIG REFRIGERANT

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

SEER SEASONAL ENERGY EFFICIENCY RATIO

SP STATIC PRESSURE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

W WATTS

WB WET BULB

WG WATER GAUGE

WPD WATER PRESSURE DROP

MECHANICAL SYSTEM TYPES

NOTE: NOT ALL ABBREVIATIONS MAY BE USED.

ABBREVIATION DESCRIPTION

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DRAIN

EA EXHAUST AIR

GR GEOTHERMAL RETURN

GS GEOTHERMAL SUPPLY

HR HEAT PUMP RETURN

HS HEAT PUMP SUPPLY

HWR HEATIN HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

MW MAKEUP WATER - GENERIC

OA OUTDOOR AIR

PC PUMPED CONDENSATE

R REFRIGERANT

RA RETURN AIR

REL RELIEF AIR

SA SUPPLY AIR

MECHANICAL GENERAL NOTES

24. PROVIDE THERMOSTATS FOR ALL EQUIPMENT THAT MAINTAINS…