Request For Proposal
FY18 TEMF Vehicle Maintenance Shop Fort Hood, TX
W9126G18R1986 August 2018
US Army Corps of Engineers Fort Worth District
TEMF Vehicle Maintenance Shop FH18TEMF
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 SOLICITATION, OFFER AND AWARD, SF-1442
00 11 00 00 21 00
00 45 00 00 72 00 00 73 00 00 73 46
CONTRACT LINE ITEM SCHEDULE
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
DESIGN-BID-BUILD SELECTION PROCEDURES
REPRESENTATIONS AND CERTIFICATIONS
CONTRACT CLAUSES
SUPPLEMENTARY CONDITIONS
WAGE DETERMINATION SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 44
01 30 00 01 30 10.00 44 01 31 19.00 44 01 32 01.00 10 01 33 00 01 33 29 01 33 40.00 44 01 35 10.00 44 01 35 26 01 38 00 01 42 00 01 45 00.00 10 01 45 00.15 10
01 50 00 01 56 00.00 44 01 57 20.00 10 01 57 23 01 57 24.01 44 01 57 25.00 44 01 58 00 01 62 35 01 71 23.00 44 01 74 19 01 78 00 01 78 23 01 91 00.15
CONSTRUCTION SCHEDULE
SPECIAL PROJECT REQUIREMENTS
ADMINISTRATIVE REQUIREMENTS
PARTNERING
PROJECT MEETINGS
PROJECT SCHEDULE
SUBMITTAL PROCEDURES
SUSTAINABILITY REPORTING
COLOR/FINISH SAMPLE BOARDS
SPECIAL PROJECT PROCEDURES FOR FORT HOOD
GOVERNMENTAL SAFETY REQUIREMENTS
AIR BARRIER SYSTEM QUALITY CONTROL
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
DUST CONTROL
ENVIRONMENTAL PROTECTION
TEMPORARY STORM WATER POLLUTION CONTROL
STORM WATER POLLUTION PREVENTION PLAN (TEXAS) SWPP
PLAN INSPECTION AND MAINTENANCE REPORT FORM
PROJECT IDENTIFICATION
RECYCLED / RECOVERED MATERIALS
SURVEY, LAYOUT, AND OTHER DATA
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
PROJECT TABLE OF CONTENTS Page 1
00 22 11
01 01 10.00 44
04 20 00 MASONRY
04 72 00.00 44 CAST STONE
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM INSULATION
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 61 16.00 20 HORIZONTAL FALL PROTECTION
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 00 RATED EXPANSION JOINT SYSTEM
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 45 23 INSULATED TRANSLUCENT FIBERGLASS PANEL WALL AND SKYLIGHT
SYSTEM
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 00 COLOR SCHEDULE
PROJECT TABLE OF CONTENTS Page 2
DIVISION 04 - MASONRY
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 50 20 METAL CANOPIES
10 51 13 METAL LOCKERS
10 71 10 METAL SOLAR SHADES
10 82 13 ARCHITECTURAL SCREENS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 26 00 INTERIOR DAYLIGHTING DEVICES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
13 12 80 RELOCATABLE POL AND HAZARDOUS MATERIAL STORAGE BUILDINGS
13 34 19 METAL BUILDING SYSTEMS
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
PROJECT TABLE OF CONTENTS Page 3
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE AND WELDING FUME EXHAUST
REMOVAL SYSTEM(S)
23 35 19.00 20 INDUSTRIAL VENTILATION AND EXHAUST
23 52 00 HEATING BOILERS
23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 31 16.19 TERMITE CONTROL BARRIERS
31 63 26 DRILLED CAISSONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 24.00 10 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 26 SPRIGGING AND SODDING
32 92 31.00 44 ESTABLISHMENT OF TURF
32 93 31.00 44 PLANTING OF TREES, SHRUBS, AND VINES
DIVISION 33 - UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
PROJECT TABLE OF CONTENTS Page 4
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
AMERICAN WATER MILITARY SERVICES
SUBMITTALS
PROJECT CLOSEOUT
AS-BUILT DOCUMENTATION
CAST-IN-PLACE CONCRETE
PRECAST CONCRETE MANHOLES
VALVE BOXES AND METER VAULTS
MANHOLE REHABILITATION
WATER TAP AND SERVICE INSTALLAION
CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION
UTILITY BACKFILL MATERIALS
EXCAVATION BACKFILL FOR UTILITIES
CASING INSTALLATION
TURF AND GRASSES
PRESSURE AND LEAKAGE TESTS
DISINFECTING PIPELINE
ACCEPTANCE TESTING FOR SANITARY SEWERS
PUMPING AND BYPASSING
HORIZONTAL DIRECTIONAL DRILLING
01 33 00 01 77 00 01 78 29 03 30 00 03 48 10 03 48 20 03 90 00 22 11 16.11 22 11 16.13 31 23 23 31 23 33 31 50 00 32 92 00 33 01 10.13 33 01 10.15 33 01 30.13 33 01 30.51 33 05 23.13
TRACER WIRE
STREAM CROSSING
PIPING - GENERAL PROVISIONS
POLYVINYL CHLORIDE (PVC) PIPING
HIGH DENSITY POLYETHYLENE (HDPE) PIPE & FITTINGS
DUCTILE IRON PIPE AND FITTINGS
POLYETHYLENE WRAP
ABANDONMENT OF WATER MAINS
GATE VALVES
PRESSURE REDUCING VALVES
TAPPING SLEEVES AND VALVES
AIR RELEASE VALVES
FIRE HYDRANTS
NON-RESIDENTIAL WATER METERS
GRAVITY SANITARY SEWERS
ABANDONMENT OF SANITARY SEWERS
SANITARY SEWER LATERALS
SMALL LIFT STATIONS
SANITARY SEWER FORCE MAINS
33 05 27 33 05 29.11 33 11 00 33 11 00.11 33 11 00.13 33 11 00.15 33 11 00.17 33 11 00.19 33 12 16.11 33 12 16.15 33 12 16.17 33 12 16.19 33 12 19 33 12 33 33 31 00.11 33 31 00.13 33 31 00.15 33 32 16 33 34 00
Firm-Fixed Priced construction project to Construct a Tactical Equipment Maintenance Facility at Fort Hood, Texas.
This is an Unrestricted Acquisition. The construction magnitude of this project is betw een $25,000,000 to $100,000,000.
NAICS Code: 236220 FSC: Y1EA Size Standard: $36.5 million
**If the contractor fails to provide adequate and acceptable bond documents and insurance certif icate w ithin ten days af ter contract aw ard, such f ailure shall constitute ground for termination f or default w ithout the requirement for the Contracting Off icer to f irst issue a "show cause" letter. The Government w ill not allow the contractor to w ork on the project unless the bond documents and insurance certif icate have been accepted by the Contracting Off icer and a signed Notice to Proceed has been issued to the contractor.
KRISTI LIKES 817.886.1088
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED (RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________720 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
W9126G
PAGE OF PAGES
1 OF
CODE W9126G
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
CESWF-EC
819 TAYLOR STREET, ROOM 4A17
FORT WORTH, TX 76102
FORT WORTH TX 76102
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
817-886-6403FAX:TEL: 817-886-1043 TEL: 817-886-1680 FAX:
W9126G18R1986 2
Section 00 10 00 - Solicitation, Offer and Award, SF-1442
27 AUGUST 2018
11 October 2018
2PM
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section: 00 11 00 W9126G18R1986
Item Unit Line Item No. Description Quantity Unit Price Amount
0001 All work required for construction of the Tactical Equiment Motorpool Facity (TEMF) as described in the RFP, exclusive of all other work listed seperately 1 JOB $ *** $
0002 All work required by the RFP documents to construct outside the 5ft line of the facility except work completed by privatized utilities for the TEMF. 1 JOB $ *** $
0003 All work required by the RFP documents to complete work perform by American Water for the TEMF. 1 JOB $ *** $
0004 All work required by the RFP documents to complete work perform by Dominion Electric for the TEMF. 1 JOB $ *** $
0005 Caisson Lengths/Reinforcing Steel (Piers)(36” Diameter). 262 VLF $ $
0006 Caisson Lengths/Reinforcing Steel (Piers)(30” Diameter).
1253 VLF $ $
0007 Caisson Lengths/Reinforcing Steel (Piers)(24” Diameter). 570 VLF $ $
OPTIONS
0008 OPTION NO 01: All work required by the RFP to construct Distribution Storage Building 1 JOB $ *** $
Fort Hood, TX
CONTRACT LINE ITEM SCHEDULE
TEMF
FY 18,
TOTAL BASE OFFER
BASE OFFER: All work required by the plans and specifications exclusive of work required by the Option Items.
TOTAL ALL OPTIONS
TOTAL OFFER (BASE + OPTIONS)
Section: 00 11 00 W9126G-18-R-1986
TEMF Vehicle Maintenance Shop
FY 2018
Fort Hood, TX
CONTRACT LINE ITEM SCHEDULE
NOTES:
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable
NOTE NO. 3. CONDITIONS GOVERNING EVALUATION OF OFFERS AND AWARD OF CONTRACTS:
The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule. Subject to the availability of funds, the Contracting Officer may exercise the option by written notice to the Contractor within the time indicated below from the Notice to Proceed
NOTE NO. 4. All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
NOTE NO. 5. Include all costs for coordination and accommodation of Government-Furnished, Government- Installed Equipment, in the Contract Line Items for construction of the associated facilities.
NOTE NO. 6. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for construction through completion, ready for turnover shall not exceed the number of calendar days specified in Section 00 73 00 Supplemental Conditions and 01 00 00.00 44 Construction Schedule. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP
NOTE NO. 7. At the option of the Government, the Government may require the Contractor to perform the work identified as Optional line item(s) at the price(s) stated in the CLIN Schedule. The Contracting Officer may exercise one or more of the Option(s) by written notice to the Contractor within 30 calendar days after the date of the acknowledgment of the Notice to Proceed by the Contractor. There is no separate completion period for these option(s) and the work included therein shall be completed within the contract duration as proposed above.
Exercise of the Option(s) shall be evidenced on Standard Form 30, citing this CLIN Schedule note as the authority for exercising the Option. The Option shall be deemed exercised at the time the Government deposits the SF30 in the mail or, if earlier, at the time it is delivered to the Contractor.
NOTE NO. 8. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
(a) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
Section: 00 11 00 W9126G-18-R-1986
TEMF Vehicle Maintenance Shop
FY 2018
Fort Hood, TX
CONTRACT LINE ITEM SCHEDULE
(b) The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
NOTE NO. 9. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.
NOTE NO. 10. Any proposal that is materially unbalanced as to prices for the Base Schedule may be rejected.
An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.
NOTE NO. 11. ABBREVIATIONS
For the purpose of this solicitation, the units of measure are represented as follows:
a. JOB (job)
b. VLF (vertical linear feet)
END OF CLIN SCHEDULE
W9126G18R1986
Section 00 21 00 - Instructions
LOCAL INFORMATION
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 GOVERNMENT REQUIREMENTS FOR INCOMING MAIL AND PACKAGES
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR’S QUESTION AND COMMENTS
1.5 SMALL BUSINESS SIZE STANDARDS/ NAICS CODE
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 SITE VISIT
1.8 ACCURACY IN PROPOSALS
1.9 PROPOSAL SUBMITTALS AND PROPOSAL FORMAT & GENERAL INSTRUCTIONS
1.10 PROPOSAL FORMAT
1.11 JOINT VENTURE PROPOSAL REQUIREMENTS
1.12 BID GUARANTEE
1.13 CONTRACT PRICES-BIDDING SCHEDULE
1.14 ESTIMATED CONSTRUCTION COST
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
This Request for Proposal (RFP) solicits for the construction of a Tactical Equipment Maintenance Facility (TEMF), Fort Hood, Texas. The Design-Bid-Build project shall consist of the construction of a Standard design Vehicle Maintenance Shop with a large TEMF, Organizational Storage with accompanying parking and Supporting facilities. This solicitation is for a Design-Bid-Build, Firm-Fixed Price (FFP) contract Fort Hood, Texas. The work shall be in accordance with the Request for Proposal documents. The proposed project will be a competitive Unrestricted, Full-and-Open competition resulting in the award of a firm-fixed price contract procured in accordance with FAR 15.101, Negotiated Procurement using the “Tradeoff Process”.
1.2. GOVERNMENT REQUIREMENTS FOR INCOMING MAIL
The Offeror(s) must ensure that ALL mail inquiries are sent to the Fort Worth District, U.S. Army Corps of Engineers, relating to either pre-contract or post-contract award. A return mailing address is required on the outside of the envelope, package, box, etc. All mail must be addressed to the Contracting office as specified below (no exceptions):
U.S. Army Corps of Engineers, Fort Worth District ATTN: Kristi Likes, Contract Specialist 819 Taylor Street (Room 2A17) Fort Worth, TX, 76102-0300
All Federal Express/UPS/etc. packages are required to have Offeror’s physical address and the above contracting office address including room number, contract specialist’s name for proper delivery.
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and all amendments are available by INTERNET ACCESS ONLY. All solicitation documents and amendments will be posted on Federal Business Opportunities (FBO) website at http://www.fbo.gov/ and Offeror can access solicitation documents by the solicitation number without dashes, W9126G18R1986.
It is solely the Contractor’s responsibility to check the fbo.gov website for the solicitation and any amendments prior to the RFP closing date. The Offeror shall submit in its proposal all requested information as specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation. The Offeror must be registered with the System for Award Management Database (SAM) to receive a Government contract award.
Additional information regarding this solicitation and potential Offerors (i.e., interested vendors list) and/or sub-contractors will be available on the fbo.gov website under the solicitation number.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via ProjNet:
Bidder Inquiry in ProjNet at http://www.projnet.org/projnet To submit and review bidder inquiries, bidders will need to be a current registered user or self-register into the ProjNet system. To self-register go to web page at http://www.projnet.org/projnet, click the BID tab, select Bidder Inquiry, select agency USACE, enter the Key for this RFP (listed above) and your e-mail address, and click login.
Fill in all required information and click create user. Verify that the information on the next screen is correct and click to continue.
From this page you may view all bidder inquiries or add an inquiry. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. Only one question will be allowed per inquiry. If multiple questions are included in a single inquiry, only the first question will be answered. All others will remain unanswered until entered in as a single inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W9126G18R1986 The Bidder Inquiry Key is: NP78RZ-SN9R9W
The Bidder Inquiry System will be unavailable for new inquires 7 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the RFP, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay as a direct charge any costs incurred by the Offeror in the preparation and submission of its proposal or revisions. A stipend is not authorized for unsuccessful offerors.
1.7. SITE VISIT
Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors are urged and expected to inspect the site where the work will be performed.
Reference Section 00 21 30 for site visit details.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth with full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.9. PROPOSAL SUBMITTALS AND PROPOSAL FORMAT & GENERAL INSTRUCTIONS
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions should be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W9126G18R1986_COMPANY NAME_PRICE
W9126G18R1986_COMPANY NAME_TECHNICAL
At the AMRDEC SAFE website, select the box "Click Here" on the side for Non-CAC Users. The website will require offeror to enter Personal Information, upload files (PDF format required), and include a brief description with the RFP number. In Recipient Information type in the Contract Specialist email address (see below) and click the “Add” tab. No other boxes are required to be checked. Click Upload, click I Agree to the SAFE Usage Policy, and you should see the spinning wheel that says “uploading”. Once uploading is complete, the website will tell you that your files were successfully (or unsuccessfully) uploaded. In order to complete the proposal submission you must check your email for further instructions. Once you verify your email address the Government will then be able to download the files.
Contract Specialist, Ms. Kristi Likes, email: Kristi.L.Likes@usace.army.mil
NOTE: Save all emails received from SAFE.Team@amrdec.army.mil for your records. AMRDEC SAFE WEBSITE IS NOT DESIGNED FOR LAST MINUTE SUMISSIONS OF PROPSALS. YOU ARE ADVISED TO NOT WAIT UNTIL THE LAST MINUTE. Proposals received after the date and time will be handled in accordance with FAR 15.208 -- Submission, Modification, Revision, and Withdrawal of Proposals.
When completing the information for transmittal at the AMRDEC SAFE website and verifying your email address, send a separate email notification to the Contract Specialist stating that you have successfully submitted (and uploaded) a proposal at the AMRDEC SAFE website. Include the solicitation number, W9126G18R1986 in the subject line of your email.
Offers, modifications thereto, or cancellations of offers received by telegraph, facsimile or by e mail will not be accepted.
1.10. PROPOSAL FORMAT
Submit only the electronic documents. Submit only the electronic files that are specifically requested in Section 00 22 11. All files submitted shall be in PDF format. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages shall be numbered.
Searchable PDF pages shall be formatted to print on 8 ½ by 11 inch paper, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Spreadsheets and presentation drawings must fit to 11” x 14” or 11” x 17” paper size unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers of the solicitation, project title and company.
Hard copies shall not be submitted, with the exception of the bid guarantee. Refer to this section, 1.12 Bid Guarantee, for bid guarantee submission requirements.
“Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal.
Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR Clause (P) 52.215-1, Instructions to Offerors -- Competitive Acquisition, paragraph (e), Restriction on disclosure and use of data.
In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.
For submissions with page limitations, the corresponding PDF pages will be counted.
Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision or amendment, e.g., Error, Omission or Clarification shall be included and be annotated for each revision. Proposal replacement pages shall be numbered and clearly marked “REVISED”, with the date of revision.
1.11. JOINT VENTURE / LLC PROPOSAL REQUIREMENTS
Joint Venture:
When proposing as a joint venture, all members of the joint venture shall sign the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.
If this is an 8(a) or HUBZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
LLC:
When proposing as an LLC, the offeror must submit a copy of the operating agreement which clearly demonstrates the authority to bind the LLC.
1.12. BID GUARANTEE
Submit the Bid Guarantee in accordance Provision 52.228-1, Bid Guarantee. One (1) copy of the bid guarantee shall be submitted electronically as part of Volume 2 and one (1) hard copy submission of the bid guarantee is due by the date and time for proposal submission. The bid guarantee shall be sent to the address in paragraph 1.2. Government Requirements For Incoming Mail And Packages, on or before the date indicated in Box 13 of the SF1442.
1.13. CONTRACT PRICES - BIDDING SCHEDULE
Payment for the items listed in the Bidding Schedule shall constitute full compensation for furnishing all plant, labor, equipment, appliances, materials and bonds (performance and payment), and for performing all operations required to complete the work in conformity with the drawings and specifications. All costs for work not specifically mentioned in the Bidding Schedule shall be included in the contract prices for the items listed.
1.14. ESTIMATED CONSTRUCTION COST
The estimated magnitude of the proposed construction is between $25,000,000 and $100,000,000.
SECTION 00 22 11
DESIGN-BID-BUILD SELECTION PROCEDURES
1. OVERVIEW
2. BASIS OF AWARD
3. GENERAL INSTRUCTION
3.1. GENERAL PROPOSAL FORMAT
4. EVALUATION FACTORS AND WEIGHTING, VOLUME 1, TECHNICAL
4.1. GENERAL
4.2. PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS
5. TAB A– FACTOR 1–PAST PERFORMANCE
5.1. SUBMISSION REQUIREMENTS
5.2. RELEVANCY DETERMINATION
5.3. CONFIDENCE EVALUATION CRITERIA
6. TAB B – FACTOR 2 – SUMMARY SCHEDULE
6.1. SUBMISSION REQUIREMENTS
7. TAB C –FACTOR 3 – SMALL BUSINESS PARTICIPATION
7.1. SUBMISSION REQUIREMENTS
8. PRICE AND OTHER REQUIRED INFORMATION, VOLUME 2, PRICE
8.1. TABLE 2 - Volume 2 – PRICE AND OTHER REQUIRED INFORMATION
8.2. GENERAL
9. TAB A – FACTOR 4 – PRICE (STANDARD FORM 1442 AND BID SCHEDULE)
9.1. SUBMISSION REQUIREMENTS
9.2. EVALUATION CRITERIA
10. TAB B – BID GUARANTEE
10.1. SUBMISSION REQUIREMENTS
10.2. EVALUATION CRITERIA
11. TAB C – REQUIRED PRE-AWARD INFORMATION
11.1. SUBMISSION REQUIREMENTS
11.2. EVALUATION CRITERIA
12. TAB D – SUBCONTRACTING PLAN
12.1. SUBMISSION REQUIREMENTS
12.2. EVALUATION CRITERIA
13. TAB E –REPRESENTATIONS AND CERTIFICATIONS
13.1 SUBMISSION REQUIREMENTS
13.2 EVALUATION CRITERIA
14. EVALUATION CRITERIA
14.1. GENERAL
14.2. DISCUSSIONS (IF NECESSARY)
15. EVALUATION AND RATING SYSTEM
15.1.GENERAL
15.2 REVIEW WRITE-UP
15.3 RATING SYSTEM
16. DEFINITIONS
17. PAST PERFORMANCE RATINGS
18. ATTACHMENTS
ATTACHMENT 1- PROPOSAL DATA SHEETS
ATTACHMENT 2- PAST PERFORMANCE ASSESSMENT WORKSHEET
ATTACHMENT 3- COMPANY PAST PERFORMANCE QUESTIONAIRRE
ATTACHMENT 4- SMALL BUSINESS PARTICIPATION PLAN
ATTACHMENT 5- CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010)
1.0 OVERVIEW
This Request for Proposal (RFP) solicits for the construction of a Tactical Equipment Maintenance Facility (TEMF), Fort Hood, Texas. The Design-Bid-Build project shall consist of the construction of Standard design Vehicle Maintenance Shop with a large TEMF, Organizational Storage with accompanying parking and Supporting facilities.
This solicitation is for a Design-Bid-Build, Firm-Fixed Price (FFP) contract at Fort Hood, Texas. The work shall be in accordance with the Request for Proposal documents. The proposed project will be a competitive Unrestricted, Full-and-Open competition resulting in the award of a firm-fixed price contract procured in accordance with FAR 15.101, Negotiated Procurement using the “Tradeoff Process”.
The Tradeoff Process permits the tradeoffs among cost, price and/or non-cost factors and allows the Government to accept other than the lowest priced proposal. Offerors submit their performance and capability information for review and consideration by the Government. Relative weights among technical factors are provided in Section 4: Evaluation Factors & Weighting. The Source Selection Evaluation Board (SSEB) reviews, evaluates, and rates the proposals against the source selection criteria in the RFP. A competitive range consisting of the most highly qualified technical Offerors will be established prior to discussions (if held). Concurrently, the Government analyzes price proposals of Offerors utilizing the project cost proposal. Price will not be rated, but will be a factor in making the final best value determination for award. The Source Selection Authority (SSA) compares proposals and determines the best value for the government. The perceived benefits of the higher priced proposal must merit the additional cost, and the rationale for tradeoffs must be documented.
2.0 BASIS OF AWARD
The Contracting Officer (KO) will award a firm fixed-price contract to that responsible Offeror whose proposal the Source Selection Authority (SSA) determines offers the best overall value to the Government. Best Value means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirement. In using the best value approach, the Government seeks to award a contract to the Offeror who gives the Government the greatest confidence that it will best meet our requirements.
This process may result in an award being made to a firm with a higher-priced offer where the decision is consistent with the evaluation criteria/factors and the SSA determines that the technical or service superiority and/or overall business approach and/or superior past performance of the higher-priced offer outweighs the cost difference.
The SSA, using sound business judgment, bases the award decision on an integrated assessment of the evaluation criteria in the factors described below. While the entire evaluation team strives for maximum objectivity, the selection process is subjective by nature and professional judgment is implicit throughout the best value process. Ultimately, the contract shall be awarded to the Offeror whose proposal, based upon the evaluation criteria, represents the best value to the Government.
Proposals must meet the criteria stated in the RFP in order to be eligible for award, to include responsiveness, technical acceptability and responsibility.
In order to determine which proposal(s) represent the best value, the Government will be determined by a comparative assessment of proposals against all source selection criteria in this RFP.
As technical ratings and relative advantages and disadvantages become less distinct, differences in price between proposals are of increased importance in determining the most advantageous proposal.
Conversely, as differences in price become less distinct, differences in technical ratings and relative advantages and disadvantages between proposals are of increased importance to the determination. All evaluation factors when combined are significantly more important than price.
The Government reserves the right to accept other than the lowest priced offer(s). The right is also reserved to reject any and all offers.
Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer.
3.0 GENERAL INSTRUCTIONS
Firms formally organized as a single entity firms that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors. Any legally organized Offeror may submit a proposal.
Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which: two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement.
Any Offeror submitting an offer in the name of a joint venture, shall include a fully executed copy of the joint venture agreement with the offer. Joint venture agreements which require SBA approval may be submitted absent the requisite SBA Servicing Agency approving authorities’ signature; however, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel.
Offerors shall submit their proposal per the instructions provided in Section 00 21 00. Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
3.1 PROPOSAL FORMAT:
(1) Submit only the electronic documents. Submit only the electronic files specifically requested. All files submitted shall be in PDF format. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages shall be numbered.
(2) PDF pages shall be formatted to print on 8 ½ by 11 inch paper, unless another paper size is specifically authorized for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers of the solicitation, project title and company. PDF drawings and summary schedule diagrams shall be sized to print on 11x17 inch paper.
(3) Hard copies shall not be submitted, with the exception of the bid guarantee. Refer to Section 00 21 00,
1.12 Bid Guarantee for bid guarantee submission requirements.
(4) “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.
(5) In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.
(6) For submissions with page limitations, the corresponding PDF pages will be counted.
(7) Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision or amendment, e.g., Error, Omission or Clarification shall be included and be annotated for each revision. Proposal replacement pages shall be numbered and clearly marked “REVISED”, with the date of revision.
(8) Within three (3) days of contract award, the contractor receiving the award shall electronically submit their conformed proposal.
4.0 EVALUATION FACTORS AND WEIGHTING, VOLUME 1, TECHNICAL
4.1 GENERAL:
Offerors are invited to submit a proposal, as indicated below. The Government will evaluate the proposals in accordance with the evaluation criteria described herein, using the evaluation rating systems outlined in the Design- Bid-Build selection procedures. Price information will be evaluated for fairness, reasonableness, and for material unbalancing, as described herein. The evaluation will be conducted in accordance with FAR Part 15.
4.2. PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS
VOLUME 1 – Technical
Table 1 - Volume 1 – PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS
Location Factor Number
Description Relative Importance
TAB A Factor 1 PAST PERFORMANCE Most Important
TAB B Factor 2 SUMMARY SCHEDULE Less Important than Factor 1. More Important than Factor 3.
TAB C Factor 3 SMALL BUSINESS
PARTICIPATION
Less Important than Factor 1 & Factor 2.
5.0 TAB A – FACTOR 1 - PAST PERFORMANCE
5.1 SUBMISSION REQUIREMENTS:
5.1.1. The Offerors shall demonstrate past performance through the submission of similar projects, using the Construction – Past Performance Assessment Worksheet (Attachment 2). If the Offeror is a Joint Venture, Partnership, Teaming Arrangement, or Parent company/subsidiary/affiliate as identified in the offeror’s proposal, provide past performance information for construction projects relevant to each of the proposed roles on this project. If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. If projects were design-bid-build, identify them as such.
Offerors can submit no more than five (5) projects (up to one proposal data sheet per project) that are similar in size, scope, and complexity to the scope of the work for this solicitation to be considered relevant. Two (2) of the five (5) projects submitted for past performance may be a current construction project with at least 50% construction progress completed. If offeror is proposing as a Joint Venture (JV), Partnership and/or Teaming Arrangement and past performance cannot be provided as such, each partner shall submit past performance information, with no more than three (3) projects each.
5.1.2. The Past Performance Questionnaire (PPQ) included in the solicitation (Attachment 3) is provided for the Offeror to submit to the client for each project the Offeror included for Factor 1, Past Performance that does not have an interim or final CPARS or CCASS evaluation or is a non- Federal Government project. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQ should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If any negative past performance information is received to which the Offeror has not an opportunity to respond, the contractor will be given an opportunity to provide rebuttal. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Kristi Likes, via e-mail at: Kristi.L.Likes@usace.army.mil prior to proposal closing date.
5.1.2.1. Offerors shall not incorporate by reference into their proposals PPQ’s previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
5.1.2.2. Do not request PPQ on projects that have interim or final CPARS or CCASS evaluations. If an interim or final CPARS or CCASS evaluation exists and a PPQ is provided for the same project, the CPARS or CCASS evaluation will be reviewed as the official past performance record for the project, and the PPQ will not be considered by the Source Selection Board or the Source Selection Authority.
5.1.2.3. For USACE or other DoD projects which are underway but do not yet have an interim or final CPARS or CCASS evaluation, one PPQ per contract may be submitted; to be considered, the PPQ shall be signed by the Administrative Contracting Officer (ACO) for the contract.
5.1.3. Offerors are not required to submit any additional past performance information. The Government will utilize CPARS, CCASS and any other information deemed relevant to assess confidence in the Offeror’s ability to perform.
5.1.3.1. Offerors may submit information on past performance issues and corrective actions taken to prevent these issues from reoccurring. Discuss whether these corrective actions have been implemented on contracts awarded subsequent to the performance issues, the effectiveness of the corrective actions, and POC information for the subsequent contracts.
5.1.4. In addition to the above, the Government may review any other sources of information for evaluation of past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS number of team members (Partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquires of owner representative(s), Federal Awardees Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
5.1.5. The Offeror may provide a supplemental narrative (not project lists), not to exceed two pages, explaining how any corporate past performance that is not directly related to the specific projects above is applicable to this project and how the Government will benefit.
5.2 RELEVANCY DETERMINATION:
mailto:Kristi.L.Likes@usace.army.mil
5.2.1. Offeror may submit no more than five (5) projects. Offeror must have a minimum of two (2) projects that are similar in size, scope, and complexity to the Tactical Equipment Maintenance Facility for this solicitation AND with the construction value of at least $25 million…