AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

See

SF1442

Amend 08

J 1 1

0008 Jul 29, 2016

W9126G

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

SEE ITEM 6.

WW9126G-16-R-0081

01-Jul-2016

The Solicitation for Air And Marine Operations Center (AMOC) Expansion Building 605C, March Air Reserve Base, CA, is amended as follows-

1. The due date for the Technical Proposal remains 1 August 2016, 2PM Central Daylight Time.

2. The due date for the Price Proposal is revised to 3 August 2016, 2PM Central Daylight Time.

See continuation page

X the Technical Proposal remains 1 August The due date for

The due date for the Price Proposal is revised to 3 August 2016, 2016,2

W9126G-16-R-0081

AMENDMENT 000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

3.

4.

End of Summary of Changes

W912PL-16-R-0015

AMENDMENT 0008

Correct typo in Amendment 0007, SF30 page 2, para 3. Amended Drawings "S-532" is revised to read "S-531".

Section 00 22 11 Proposal Submission Requirements, Evaluation Criteria, and Basis of Award, Page 9, paragraph f., revise website to read "https://safe.amrdec.army.mil/SAFE/"

All other terms and conditions remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

March ARB AMOC Renovation 605C MARBAMOC

AMENDMENT 0008

SECTION 00 22 11 Page 1

SECTION 00 22 11

Proposal Submission Requirements, Evaluation Criteria, and Basis of Award

PART I – GENERAL INFORMATION

As this is a competitive negotiation acquisition, there is no public bid opening and no information will be given out as to the number of offerors or the results of the competition until all awards are made.

Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

PART II -- PROPOSAL PREPARATION

1. PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

a. REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.

(1) Each offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate files. Ensure each separate file is clearly marked to indicate its contents and the identity of the offeror.

(2) Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.

(3) No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

(4) All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

(5) Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined "unacceptable" and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these shall be resolved prior to submission of the offer.

b. DISCUSSIONS: The Government intends to evaluate proposals and award a task order without discussions with offerors, in accordance with FAR 52.215-1, Instructions to

AMENDMENT 0008

SECTION 00 22 11 Page 2

Offerors—Competitive Acquisitions, however the Government reserves the right to conduct discussions if the Contracting Officer determines them to be necessary.

c. GENERAL INSTRUCTIONS

(1) All pages must be numbered.

(2) Submit only the information/documents specifically required. Do not submit excess information, to include audio-visual materials, electronic media, etc.

(3) Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers.

(4) The proposals must be organized by the TABs indicated in this section.

(5) “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors— Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

(6) In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.

(7) For submissions with page limitations, the pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.

d. INSTRUCTIONS FOR THE PRICE PROPOSAL AND MISC DOCUMENTS

Price Proposal: The Price Proposal file shall be appropriately titled as such. It shall consist of a cover letter and the CLIN Schedule (from Section 001100), completed in its entirety

Acknowledgement Sheet. A completed Acknowledgement Sheet (Attachment 1) shall be completed by the offeror and duly executed with an original signature by an official authorized to bind the company in accordance with instructions at FAR 4.102.

Bid Guarantee/bond. Submit a scanned copy of the completed Bid Bond, Standard Form 24, with the proposal. Deliver or mail the original bond to the Contracting Officer post marked no later than the date the proposals are due.

Completed Representations and Certifications from Section 004500:

52.204-8 (if any updates to SAM apply)

AMENDMENT 0008

SECTION 00 22 11 Page 3

52.209-7

e. INSTRUCTIONS FOR THE TECHNICAL PROPOSAL The Technical Proposal will be appropriately labeled as follows:

Factor 1, EXPERIENCE Factor 2, TECHNICAL APPROACH Factor 3, PAST PERFORMANCE

Page Limitations. The following page limitations are established for each factor described above:

Factor 1, Experience - Limited to 5 pages Factor 2: Technical Approach – Limited to 5 pages Factor 3, Past Performance - No page limitation

FACTOR 1, EXPERIENCE: TECHNICAL NARRATIVE ON PROJECTS OF SIMILAR

SCOPE, MAGNITUDE, AND COMPLEXITY

The Offeror shall submit a completed Experience Information Form (Attachment 2) for at least two and no more than five projects of similar scope, magnitude and complexity as the RFP requirement it and/or its proposed team (i.e., predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement) has/have successfully completed within the past five years.

The Experience Information Form must include the Offeror’s role in the project (i.e., as a prime or a subcontractor), and be fully completed to be considered for this factor.

The specific elements that must be demonstrated within the combined experience demonstrated to be considered of similar scope, magnitude and complexity as the RFP requirement are:

- Contract/TO/PO Dollar Value at least $6,000,000

- Experience with vertical construction of similar size and scope with predominance of management and responsibility for the project.

- Experience working on a DOD installation

- Experience working on a project ensuring continuity of adjacent existing operations throughout construction.

- Experience managing the transfer of operations to new facility without loss of function.

- Experience working with the USACE including Safety Manual EM385-1-1, 3 phase inspection process, Quality Control, Scheduling

The Offeror must explain why it believes the projects are similar in scope, magnitude and complexity to the RFP requirement.

If experience of predecessor companies, key personnel, or major subcontractors is submitted to qualify for this factor the offeror must include a statement indicating their role in the project

AMENDMENT 0008

SECTION 00 22 11 Page 4 being used as experience as well as the percentage of work they will be performing in the proposed project. The Government will not consider the experience provided if it is determined the role in either project is not significant.

Failure to demonstrate the required experience or provide all required information will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for award.

FACTOR 2, TECHNICAL APPROACH: TECHNICAL NARRATIVE ON TECHNICAL

APPROACH, METHODS AND PROCEDURES AND SCHEDULE

The Offeror must provide a narrative that includes, at a minimum, discussion of the proposed sequence of work, mandatory phasing, testing and balancing, and interim and final acceptance.

Offers must include a Gantt chart reflecting the major construction activities with the completion period from the applicable contract Notice to Proceed (NTP). The schedule must be graphically presented, and must be on a maximum paper size of 11”x17”. The schedule must reflect the major construction milestones and the sequence of work required for this project. The schedule must indicate start/finish dates of events and durations. A detailed network analysis is not required as a proposal submittal item.

The narrative must include:

- The Offeror’s technical understanding of the work requirements

- The Offeror’s commitment to accomplish all the work in accordance with the solicitation requirements and schedule

- The Offeror’s approach, methodology and plan for customer service

- The Offeror’s Quality Control procedures

- The Offeror’s construction safety protocols and procedures

- The workability of the Offeror’s approach as well as the technical feasibility to successfully perform on schedule

Offerors are cautioned that if they do not meet the project duration shown in Section 00 73 00 Paragraph 52.211-10, Commencement, execution and Completion of Work of this Request for Proposal their response for Evaluation Factor 2 will be rated Unacceptable. Schedules showing Government submittal review durations to be shorter than are contractually mandated will be rated Unacceptable.

FACTOR 3, PAST PERFORMANCE: For each project submitted under the Experience factor that does not have an evaluation in the Past Performance Information Retrieval System (PPIRS), which includes evaluations submitted in ACASS, CCASS, and CPARS, Offerors shall forward a copy of the Past Performance Evaluation Questionnaire (PPQ) included at Attachment 3 to the points of contact responsible for monitoring performance under those contracts for completion.

Completed PPQs shall be submitted by the offeror with the proposal. If unable to obtain a completed PPQ for a project timely the Offeror shall complete and submit with the proposal

AMENDMENT 0008

SECTION 00 22 11 Page 5 the first page of the PPQ, which will provide contract and client information for the respective project(s).

If any negative past performance information is received to which the Offeror has not previously had an opportunity to respond, the Offeror will be given an opportunity to provide rebuttal.

If a PPQ is received on a project that has an evaluation in PPIRS, the PPQ will not be considered.

f. DIRECTIONS FOR SUBMITTING PROPOSALS

Securely submit your proposal at the AMRDEC SAFE website, https://safe.amrdec.army.mil/SAFE2/

1) At the AMRDEC SAFE website select the link: “I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User”.

2) Complete the required information. At “Files:” upload your proposal documents.

3) In the “Recipient Information” section, enter email address “alice.m.austin@usace.army.mil” and click “Add”

4) In the “Email Setting” section, select:

“FOUO”,

“Encrypt email message when possible”

“Notify me when files are downloaded”

“Require CAC for Pick-up”

5) In the “File Submission” section, click on “Upload”

Contractors are responsible for ensuring the Contracting Office receives their proposal by the due date/time.

SECTION 00 22 11 Page 6

Part III. EVALUATION OF PROPOSALS

1. GENERAL ELIGIBILITY FOR TASK ORDER AWARD: In accordance with the FAR, no task order shall be entered into unless the contracting officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met.

2. BASIS OF AWARD: Selection for award will be determined using the Low-Priced, Technically Acceptable Process in accordance with FAR 15.101-2(b)(3). An evaluation for technical acceptability will be performed on each proposal. The technically acceptable proposal that provides the lowest price will be selected for award. To be considered technically acceptable, the technical factors in the proposal must NOT be determined to be unacceptable.

The failure of a proposal to meet any of the acceptability standards for non-cost factors will result in a technically unacceptable rating and preclude award. Tradeoffs are not permitted.

Proposals are not ranked using the non-price factor.

3. EVALUATION OF THE PRICE PROPOSALS

a. Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed prices will be analyzed for reasonableness.

They may also be analyzed to determine whether they are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the information provided by the Offeror. Additionally, all offers will be analyzed for unbalanced pricing.

b. An offeror may be required to confirm its price on either a CLIN, element, or total price basis, and/or provide additional information in support of their price prior to task order award at the Government’s request and discretion.

4. GENERAL TECHNICAL CRITERIA

a. Failure to include all required information may cause the proposal to be considered non-responsive and not considered further for award.

b. Proposals which are generic, vague, or lacking in detail may be considered unacceptable.

5. EVALUATION OF THE TECHNICAL PROPOSAL:

FACTOR 1, EXPERIENCE:

One of the Following Ratings will be Assigned:

Rating Description Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

The Government will review the project experience submitted up to the limits specified.

Offerors must meet all of the PROPOSAL SUBMISSION REQUIREMENTS for Factor 1, Experience to receive a “ACCEPTABLE” rating:

AMENDMENT 0008

SECTION 00 22 11 Page 7

Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for award.

FACTOR 2, TECHNICAL APPROACH

One of the Following Ratings will be Assigned:

Rating Description Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

The Government will review the project experience submitted up to the limits specified.

Offerors must meet all of the PROPOSAL SUBMISSION REQUIREMENTS for Factor 2, Technical Approach to receive a “ACCEPTABLE” rating:

Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for award.

FACTOR 3, PAST PERFORMANCE:

One of the Following Ratings will be Assigned:

Rating Description Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below.)

Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror shall be determined to have unknown past performance and shall be rated “acceptable.”

The Government will review the past performance information for the projects submitted for Factor 1, Experience and assign a rating of Acceptable or Unacceptable, as defined above.

The Government will also review recent and relevant evaluations in the PPIRS as well as any other source deemed appropriate by the Government.

Recent: Projects completed within the last 5 years.

Relevant: Projects similar in size, scope, and complexity to that described in the solicitation.

If any negative past performance information is received to which the Offeror has not previously had an opportunity to respond, the Offeror will be given an opportunity to provide rebuttal.

END OF SECTION

SECTION 00 22 11 Page 8

SECTION 002211 ATTACHMENT 1

ACKNOWLEDGEMENT SHEET

Complete the following information and submit it with your offer:

1. Name and Address of Offeror:

2. DUNS, CAGE, and Tax Identification numbers:

3. Telephone Number:

4. Request for Proposal (RFP) Number:

5. Title of Project:

6. Names, titles, email addresses and telephone numbers of persons authorized to negotiate on the Offeror’s behalf:

7. Name and Title of Person Authorized to sign offer:

Signature:

Note: Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

8. Offer Date:

9. Amendments (Number and Date of Acknowledgement):

Number: Date: Number: Date:

Number: Date: Number: Date:

Number: Date: Number: Date:

Number: Date: Number: Date:

10. The Offeror hereby agrees to perform the work at the prices specified in strict accordance with the terms and conditions of the RFP and any resulting award, if the offer is accepted in writing within ______ calendar days after the offers are due (Insert any number equal to or greater than the minimum requirement). Failure to insert any number means the Offeror accepts the minimum period stated. Offers providing less than the minimum requirement for Government acceptance after the date offers are due may be rejected..

AMENDMENT 0008

SECTION 00 22 11 Page 9

SECTION 002211 ATTACHMENT 2

EXPERIENCE INFORMATION

(To be completed by Contractor)

1. Contractor:

Name:

Address:

2. Contract /Task Order(TO) /Purchase Order (PO) Number:

3. Contract/TO/PO Dollar Value:

4. Contract/TO /PO Status: Active Complete

Completion Date (w/ extensions):

5. Project Title:

Location:

6. Project Description-- to include the role of the contractor on the project and specific responsibilities of the contractor in performance of the effort:

7. Project Owner or Project Manager for the Client:

Name:

Address:

Telephone Number and E-mail:

AMENDMENT 0008

SECTION 00 73 46 Page 1

Section 00 73 46 - Wage Determination Schedule

General Decision Number: CA160036 07/29/2016 CA36

Superseded General Decision Number: CA20150036

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

County: Riverside County in California.

BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 02/26/2016 3 03/04/2016 4 04/01/2016 5 05/20/2016 6 07/08/2016 7 07/22/2016 8 07/29/2016

ASBE0005-002 07/01/2015

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 36.74 19.49 Fire Stop Technician (Application of Firestopping Materials for wall openings

AMENDMENT 0008

SECTION 00 73 46 Page 2 and penetrations in walls, floors, ceilings and curtain walls)...........................$ 25.38 16.81

ASBE0005-004 06/29/2015

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 18.06 10.57

BOIL0092-003 10/01/2012

Rates Fringes

BOILERMAKER......................$ 41.17 28.27

* BRCA0004-011 05/01/2016

Rates Fringes

BRICKLAYER; MARBLE SETTER........$ 38.38 14.17

*The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the standard San Bernardino/Riverside County hourly wage rate

BRCA0018-004 06/01/2014

Rates Fringes

MARBLE FINISHER..................$ 28.45 11.38

TILE FINISHER....................$ 23.78 9.84

TILE LAYER.......................$ 35.14 14.33

BRCA0018-010 09/01/2013

Rates Fringes

TERRAZZO FINISHER................$ 26.59 10.34

TERRAZZO WORKER/SETTER...........$ 33.63 11.13

CARP0409-001 07/01/2015

Rates Fringes

AMENDMENT 0008

SECTION 00 73 46 Page 3

CARPENTER

(1) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker and acoustical installer...................$ 39.83 11.58

(2) Millwright..............$ 40.90 11.58

(3) Piledrivermen/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler (Commercial)................$ 40.53 11.58

(4) Pneumatic Nailer, Power Stapler...............$ 37.60 11.58

(5) Sawfiler...............$ 37.44 11.58

(6) Scaffold Builder.......$ 28.55 11.58

(7) Table Power Saw Operator....................$ 37.45 11.58

FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a substitute for back forms (which work is performed by piledrivers): $0.13 per hour additional.

CARP0409-002 07/01/2008

Rates Fringes

Diver

(1) Wet.....................$ 663.68 9.82

(2) Standby.................$ 331.84 9.82

(3) Tender..................$ 323.84 9.82

(4) Assistant Tender........$ 299.84 9.82

Amounts in "Rates' column are per day

CARP0409-005 07/01/2015

Rates Fringes

Drywall

DRYWALL INSTALLER/LATHER....$ 40.40 15.03

STOCKER/SCRAPPER............$ 10.00 7.17

CARP0409-008 08/01/2010

Rates Fringes

Modular Furniture Installer......$ 17.00 7.41

AMENDMENT 0008

SECTION 00 73 46 Page 4

* ELEC0440-001 06/27/2016

Rates Fringes

ELECTRICIAN

INSIDE ELECTRICIAN..........$ 36.56 3%+22.01

INTELLIGENT TRANSPORTATION

SYSTEMS

Electrician................$ 36.56 23.11 Technician.................$ 27.42 22.84

ZONE PAY: Zone A: Free travel zone for all contractors performing work in Zone A.

Zone B:Any work performed in Zone (B) shall add $12.00 per hour to the current wage scale. Zone (B) shall be the area from the eastern perimeter of Zone (A) to a line which runs north and south begininng at Little Morongo Canyon (San Bernardino/Riverside County Line), Southeast along the Coachella Tunnels, Colorado River Aqueduct and Mecca Tunnels to Pinkham Wash then South to Box Canyon Road, then southwest along Box Canyon Road to Highway 195 west onto 195 south to Highway 86 to Riverside/Imperial County Line.

ELEC0440-004 05/26/2014

COMMUNICATIONS AND SYSTEMS WORK

Rates Fringes

Communications System Installer...................$ 28.38 4%+11.45 Technician..................$ 30.18 4%+11.45

SCOPE OF WORK:

Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call systems, radio page, school intercom and sound, burglar alarms, fire alarms, and low voltage master clock systems in commercial buildings. Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Does not cover work performed at China Lake Naval Ordnance Test Station.

AMENDMENT 0008

SECTION 00 73 46 Page 5

ELEC1245-001 06/01/2015

Rates Fringes

LINE CONSTRUCTION

(1) Lineman; Cable splicer..$ 52.85 15.53

(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 42.21 14.32

(3) Groundman...............$ 32.28 14.03

(4) Powderman...............$ 47.19 14.60

HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day

ELEV0018-001 01/01/2015

Rates Fringes

ELEVATOR MECHANIC................$ 49.90 28.38

FOOTNOTE:

PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0012-003 07/06/2015

Rates Fringes

OPERATOR: Power Equipment (All Other Work)

GROUP 1....................$ 39.95 23.35

GROUP 2....................$ 40.73 23.35

GROUP 3....................$ 41.02 23.35

GROUP 4....................$ 42.51 23.35

GROUP 5....................$ 41.86 23.35

GROUP 6....................$ 41.83 23.35

GROUP 8....................$ 42.84 23.35

GROUP 9....................$ 42.19 23.35

GROUP 10....................$ 42.96 23.35

GROUP 11....................$ 42.31 23.35

GROUP 12....................$ 43.13 23.35

GROUP 13....................$ 43.23 23.35

GROUP 14....................$ 43.26 23.35

AMENDMENT 0008

SECTION 00 73 46 Page 6

GROUP 15....................$ 43.34 23.35

GROUP 16....................$ 43.46 23.35

GROUP 17....................$ 43.63 23.35

GROUP 18....................$ 43.73 23.35

GROUP 19....................$ 43.84 23.35

GROUP 20....................$ 43.96 23.35

GROUP 21....................$ 44.13 23.35

GROUP 22....................$ 44.23 23.35

GROUP 23....................$ 44.34 23.35

GROUP 24....................$ 44.46 23.35

GROUP 25....................$ 44.63 23.35

OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting)

GROUP 1....................$ 41.30 23.35

GROUP 2....................$ 42.08 23.35

GROUP 3....................$ 42.37 23.35

GROUP 4....................$ 42.51 23.35

GROUP 5....................$ 42.73 23.35

GROUP 6....................$ 42.84 23.35

GROUP 7....................$ 42.96 23.35

GROUP 8....................$ 43.13 23.35

GROUP 9....................$ 43.30 23.35

GROUP 10....................$ 44.30 23.35

GROUP 11....................$ 45.30 23.35

GROUP 12....................$ 46.30 23.35

GROUP 13....................$ 47.30 23.35

OPERATOR: Power Equipment (Tunnel Work)

GROUP 1....................$ 41.80 23.35

GROUP 2....................$ 42.58 23.35

GROUP 3....................$ 42.87 23.35

GROUP 4....................$ 43.01 23.35

GROUP 5....................$ 43.23 23.35

GROUP 6....................$ 43.34 23.35

GROUP 7....................$ 43.46 23.35

PREMIUM PAY:

$3.75 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton

Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator.

SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator

AMENDMENT 0008

SECTION 00 73 46 Page 7 operator-inside; Engineer Oiler; Forklift operator (includes loed, lull or similar types under 5 tons;

Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman

GROUP 2: Asphalt-rubber plant operator (nurse tank operator);

Concrete mixer operator-skip type; Conveyor operator;

Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd.

without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler

GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground);

Stationary pipe wrapping and cleaning machine operator

GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator;

Concrete cleaning decontamination machine operator;

Concrete Pump Operator (small portable); Drilling machine operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types -drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling (above ground tunnel); Power concrete curing machine operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck

GROUP 5: Equipment Greaser (Grease Truck/Multi Shift).

GROUP 6: Articulating material hauler; Asphalt plant engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator;

Derrickman (oilfield type); Drilling machine operator, bucket or auger types (Calweld 100 bucket or similar types

- Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45' maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete, Clary-Johnson-Bidwell or similar); Micro tunnel system (below ground); Pavement breaker operator (truck mounted);

Road oil mixing machine operator; Roller operator (asphalt

AMENDMENT 0008

SECTION 00 73 46 Page 8 or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator (crawler and wheel type, over 3/4 yd. and up to and including 1-1/2 yds.); Slip form pump operator (power driven hydraulic lifting device for concrete forms);

Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator

GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator;

Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor;

Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types -drilling depth of 60' maximum); Elevating grader operator;

Grade checker; Gradall operator; Grouting machine operator;

Heavy-duty repairman; Heavy equipment robotics operator;

Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar type);

Pumpcrete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber-tired earth-moving equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu.

yds. struck); Rubber-tired earth-moving equipment operator (multiple engine up to and including 25 yds. struck);

Rubber-tired scraper operator (self-loading paddle wheel type-John Deere, 1040 and similar single unit); Self-propelled curb and gutter machine operator; Shuttle buggy;

Skiploader operator (crawler and wheel type over 1-1/2 yds.

up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p. and over, or similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator;

Trenching machine operator (over 6 ft. depth capacity, manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull (compaction) operator

AMENDMENT 0008

SECTION 00 73 46 Page 9

GROUP 9: Heavy Duty Repairman

GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail locomotive operator (diesel, gas or electric); Motor patrol-blade operator (single engine); Multiple engine tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator;

Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment)

GROUP 11: Heavy Duty Repairman - Welder Combination, Welder - Certified.

GROUP 12: Auto grader operator; Automatic slip form operator;

Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu.

yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine);

Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units)

GROUP 13: Rubber-tired earth-moving equipment operator operating equipment with push-pull system (single engine, up to and including 25 yds. struck)

GROUP 14: Canal liner operator; Canal trimmer operator;

Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional);

Wheel excavator operator (over 750 cu. yds.)

GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine-up to and including 25 yds. struck)

GROUP 16: Rubber-tired earth-moving equipment operator, AMENDMENT 0008

SECTION 00 73 46 Page 10 operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)

GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck);

Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type)

GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units -single engine, up to and including 25 yds. struck)

GROUP 19: Rotex concrete belt operator (or similar types);

Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50

cu. yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, up to and including 25 yds. struck)

GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units -single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)

GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units -multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)

GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, up to and including 25 yds. struck)

GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck)

AMENDMENT 0008

SECTION 00 73 46 Page 11

GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds.

struck)

GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)

CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS

GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types)

GROUP 2: Truck crane oiler

GROUP 3: A-frame or winch truck operator; Ross carrier operator (jobsite)

GROUP 4: Bridge-type unloader and turntable operator;

Helicopter hoist operator

GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum)

GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator

GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane repair; Tugger hoist operator (3 drum)

GROUP 8: Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.)

GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator;

Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons

SECTION 00 73 46 Page 12

GROUP 10: Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.); Tower crane operator and tower gantry

GROUP 11: Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc)

GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)

GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons);

Mobile tower crane operator (over 300 tons)

TUNNEL CLASSIFICATIONS

GROUP 1: Skiploader (wheel type up to 3/4 yd. without attachment)

GROUP 2: Power-driven jumbo form setter operator

GROUP 3: Dinkey locomotive or motorperson (up to and including 10 tons)

GROUP 4: Bit sharpener; Equipment greaser (grease truck);

Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum);

Tunnel locomotive operator (over 10 and up to and including 30 tons)

GROUP 5: Backhoe operator (up to and including 3/4 yd.);

Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson;

Loader operator (Athey, Euclid, Sierra and similar types);

Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum);

Tunnel locomotive operator (over 30 tons)

GROUP 6: Heavy Duty Repairman

SECTION 00 73 46 Page 13

GROUP 7: Tunnel mole boring machine operator

ENGINEERS ZONES

$1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below:

That area within the following Boundary: Begin in San Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 6, T25S, R42E, MDM. Continue W along the Inyo and San Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM.

Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM.

Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM.

Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM.

Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line.