Amendment One (1) White Sands Missile Range Job Order Contract

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The solicitation for Job Order Contract (JOC) for Maintenance, Repair, Upgrade and Construction of Real Property Facilities at White Sands Missile Range, NM is amended as follows:

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is 02 May 2014, 2:00 p.m. Central Time, as previously announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G-13-R-0082

X 9B. DATED (SEE ITEM 11)

02-Apr-2014

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Apr-2014

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W9126G-13-R-0082

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. Submission Instructions for Proposals:

All proposals must be uploaded to Safe Access File Exchange (SAFE) at https://safe.amrdec.army.mil/SAFE2/ Contractors shall request access to SAFE as a Guest User and upload files there.

Solicitation No. W9126G-13-R-0082 Offer Closing Date: 2 May 2014 Offer Closing Time: 2:00 P.M. (Central Standard Time)

(LOCAL TIME)

E-mail addresses:

Mrs. Angelynn Gunn, Contract Specialist, angelynn.l.gunn@usace.army.mil Mr. Dary Bowlin, Contract Specialist, Dary.s.bowlin@usace.army.mil Mr. John H. Rodgers, Contracting Officer john.h.rodgers@usace.army.mil

2. Replacement Sections: The following sections have been replaced in their entirety, bearing the notation “W9126G-13-R-0082, Amendment No. 0001”:

• 00 11 00 – JOC PRICING SCHEDULE

• 00 22 11 – PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, &

BASIS OF AWARD

• 00 73 00 – SPECIAL CONTRACT REQUIREMENTS

• 01 35 26 – GOVERNMENTAL SAFETY REQUIREMENTS

• 01 45 00.00 10 – QUALITY CONTROL

3. Attachments: The following attachments bearing the notation “W9126G-13-R-0082, Amendment No.

0001” have been added to this solicitation in its entirety.

• CONSTRUCTION WATER

End of Summary of Changes https://safe.amrdec.army.mil/SAFE2/ mailto:angelynn.l.gunn@usace.army.mil mailto:Dary.s.bowlin@usace.army.mil mailto:john.h.rodgers@usace.army.mil

Section 00 11 00 - Standard Form (SF) 1442 and CLIN Schedule

Government’s intent is for Offerors to understand that JOC task order proposals are a bare cost line item(s), taken from the unit price book, then adding the appropriate line item quantities, and last to be multiplied by the coefficient. (AM#1) The Government does not think that a coefficient rate under 1.00 can be successful. (/AM#1)

The Government will not accept any task order proposal with additional line item(s) or percent increase markup(s), nor will the Government accept profit, bonding, overhead, etc type costs as additional line item(s) on the Offeror’s proposal. These type cost items (profit, bonding, overhead, etc.) shall already be included within the Offerors Coefficient. Offerors shall reference the coefficient inclusions page referenced in this solicitation.

Sample Problem and Solution: Government providing a sample problem and solution for Offerors to have a better understand of how a JOC task order proposal is to be created.

Sample Problem – A customer located in a maintenance building at Fort Bliss has been approved to make renovations to their break room. A HAZMAT survey has been performed to determine that there is asbestos under the existing VCT flooring. The building will be occupied during construction. A portion of the work must be performed after regular work hours. The features of work have already been determined and the line items have been totaled. Apply the appropriate coefficient to the supplied line item totals, the total cost proposal for the project shows all work and inclusions. To answer the Sample Problem, review the Coefficient Inclusions Page provided within this RFP, which is given to make sure it’s understood that all items such as profit, overhead, bonding, etc., shall be included within the Offeror’s Price Proposal Coefficient number. Additional line items added to the sample problem that are not on the coefficient inclusions list shall not be acceptable, and will result in a deficiency.

Sample Coefficients CLIN 0001 – Normal Working Hours 1.35 CLIN 0002 – Other Than Normal Working Hours 1.41 CLIN 0003 – Non-Prepriced Items 1.21 CLIN 0004 – Asbestos and Lead-Based Paint 1.21

Bare Cost Item Totals – (All below totals are applicable to this sample project)

Normal Working Hours Total $ 23,000.00 Other Than Normal Working Hours Total $ 9,500.00 Non-Prepriced Items $ 600.00 Asbestos Abatement Total $ 4,500.00

Sample Solution:

Normal Working Hours: 23,000 x 1.35 = $31,050 Other Than Normal Working Hours: 9,500 x 1.41 = $13,395 Non-Prepriced Items: 600 x 1.21 = $726 Asbestos Abatement Total 4,500 x 1.21 = $5,445

PROJECT TOTAL: $50,616.00

Contractor proposal is $50,616.00

W9126G-13-R-0082, Amendment No. 0001

CLIN Schedule

JOC Pricing Schedule

Coefficient Item Description Factor

0001 Normal Working Hours: BUILDING CONSTRUCTION Offerors shall perform all functions called out in any Task Order during normal working hours for the unit price sum specified in the Unit Price Book, for any work required to be performed, multiplied times the coefficient factor __________

0002 Other Than Normal Working Hours: BUILDING CONSTRUCTION Offerors shall perform all functions called out in any Task Order during other than normal working hours for the unit price sum specified in the Unit Price Book, for any work required to be performed, multiplied times the coefficient factor __________

0003 Non-Prepriced Items: Overhead and profit rate for all non-prepriced items on task order. Overhead and profit is defined as all items associated with performing the tasks, other than direct labor, equipment, and material costs. Coefficient Factor __________

0004 Asbestos and Lead-Based Paint Abatement - Prepriced Items:

Offerors shall perform all functions called out in any Task Order for the unit price sum specified in the unit price book for any work required to be performed for the removal and disposal of asbestos and lead-based paint, multiplied times the coefficient factor __________

Low price will be evaluated by normalizing the numbers as follows:

0001 will be factored as 85% of the work.

0002 will be factored at 10% of the work.

0003 will be factored at 2.5% of the work.

0004 will be factored at 2.5% of the work.

Example of Reasonable Coefficient Numbers (AM#1) The Government does not think that a coefficient rate under 1.00 can be successful.(/AM#1)

CLIIN Coefficient Factor

0001 1.35 85% 1.1475 0002 1.41 10% 0.141 0003 1.21 2.5% 0.03025 0004 1.21 2.5% 0.03025 Normalized Number

1.349

1.349 will be used as a basis to evaluate the low coefficient from multiple offers.

Coefficient Inclusions Page

NOTES:

1. The offeror's Construction price coefficient factor(s) SHALL include all prime and sub contractor profit, home office overhead, jobsite overhead, and other costs not included in the bare labor, material, and equipment costs from the unit price book or in the non-prepriced items. These costs include, but are not limited to, the following:

(a) Corporate, Regional, and Site offices (i.e. Office buildings, office spaces, office trailers, office management, office equipment and supplies, etc)

(b) Profit

(c) Performance and Payment Bonds (per Army Federal Regulation Supplement (AFARS)

17.9004-2(h))

(d) Insurance

(e) Compliance with environmental laws, protection and safety

(f) Tax Laws

(g) Protection for moving of Government property

(h) Submittals (i.e. preparation and distribution of Work Plans, Risk Analyses and weekly reports, as-builts, CQC Plans, Safety Plans, Accident Prevention Plans, Hazard Analyses, Test Procedures, Tests, Test Reports, Status Reports, Catalog Cut Sheets, Technical Data Sheets, Shop Drawings, etc.)

(i) Price quotations

(j) Contractor adjustments to Government Unit Prices

(k) Clean-up shall be included in each task order.

(l) All waste and excess materials

(m) Permits, licenses and fees

(n) Mobilization and close-out for total contract and each task order. Mobilization shall be negotiated with each task order.

(o) Signs and barriers

(p) Principles, project management, supervision and construction supervision

(q) Technical support staff (i.e. estimator, draftsman/CADD operator, etc.)

(r) Administrative support staff (i.e. clerks, secretaries, assistants, etc.)

(s) Quality Control and Quality Control Staff

(t) Travel (includes all associated costs for all personnel)

(u) Marketing and Training (i.e. videos, user guides, brochures, promotions, associated travel, etc)

(v) Collaboration/face-to-face meetings with all Program/Project stakeholders (i.e. progress reviews, negotiations, etc.)

(w) Interest associated with funding of equipment and payroll

(x) Employee payroll taxes, insurance and fringe benefits

(y) Risk of lower than expected contract dollar volume

(z) Risk of high inflation costs for option periods

(aa) Risk of poor subcontractor performance and re-performance

(bb) Other risks of doing business

(cc) Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)

(dd) The offeror should consider the cost of final clean-up and removal and hauling of trash, debris and rubbish in their coefficient. The Government will not pay nor accept line items for the final clean-up or rubbish hauling, etc., on task orders, unless it is explicitly excluded by the line items in the UPB.

(ee) Fees and subscription costs required to access the Gordian Group’s on-line web service for the Construction Task Catalog (UPB); see Section C DESCRIPTION/ SPECIFICATION/ WORK STATEMENT. (i.e. E4 Clicks Database)

2. The unit prices stated in the (UPB) include labor, materials and equipment. The Contractor shall assume all risk for labor rate increases after award of a contract.

2.11 Coefficient: All prepriced cost proposals shall be adjusted by the contractor’s coefficient.

The coefficient is a numerical factor that shall represent the contractor costs (indirect and direct costs, sales tax, etc.) and profit not considered included in the Unit Price Book (UPB) or Computer Pricing Guide (CPG). The coefficient shall cover all cost associated with:

2.11.1 Design cost.

2.11.2 Contract start-up and close out (if a field office is set up).

2.11.1.1 Mobilization.

2.11.1.2 Demobilization.

2.11.1.3 Utility connects.

2.11.1.4 Facilities.

2.11.1.5 Fences.

2.11.1.6 Contractor yard cleanup (if a field office is set up).

2.11.3 Overhead to include home office and field overhead (if a field office is setup).

2.11.4 Adjustments for Delivery Order size and geographic location of Delivery Order.

2.11.5 Bond premiums and insurance.

2.11.6 Changes in wage rates that occur within each period.

2.11.7 Compliance with all codes and standards.

2.11.8 Compliance and documentation required by law or by this Contract.

2.11.9 Compliance with environmental procedures and laws.

2.11.10 Compliance with tax laws.

2.11.11 Contingencies and risks associated with this contract.

2.11.12 Contractor storage yard cleanup and construction site cleanup to include dumpster rental and hauling charges for each Delivery Order.

2.11.13 Daily and final cleanup of work sites.

2.11.14 Construction site barricades, fencing and dust control to include temporary enclosures of jobsites.

2.11.15 Architectural and engineering work not requiring a Professional Engineer (PE) and/or architectural and engineering work by a PE or Registered Architect (RA) that would normally be part of a construction submittal such as stamped preengineered building structural drawings and stamped fire suppression system drawings.

2.11.16 Hazardous material storage management.

2.11.17 General and administration expenses.

2.11.18 Generators and power cords.

2.11.19 Grass and weed control to match adjacent areas within work sites, staging areas, storage areas and construction yard.

2.11.20 Hand tools (manual and powered).

2.11.21 Cost of the UPBs and UPG’s and inaccuracies in both to include fluctuations in material costs..

2.11.22 Interface with government representatives and coordination with facility occupants.

2.11.23 Labor burden.

2.11.24 Mobilization and demobilization of all equipment and vehicles for each Delivery Order.

2.11.25 Portable toilets.

2.11.26 Profit and overhead to include home office and field overhead (if field office is established).

2.11.27 Project management.

2.11.28 Proposal preparation costs to include site investigations, surveying, sampling and testing, design cost and reprographics.

2.11.29 Protection and moving of government property.

2.11.30 Negotiations.

2.11.31 Ladders, scaffolding and scissor lifts.

2.11.32 Safety (e.g., safety rails, safety nets, tethers, personal protective devices, etc.)

2.11.33 Construction site layout, surveying and testing.

2.11.34 Staging materials.

2.11.35 Subcontractor markup.

2.11.36 Superintendence and field supervision.

2.11.37 Temporary lighting.

2.11.38 Tarpaulins and other temporary controls.

2.11.39 Transportation charges for material delivery to Delivery Order location to include equipment to place large equipment at the install location and staging materials.

2.11.40 Temporary utility connects.

2.11.41 Vehicles.

2.11.42 Final cleanup of job site for each Delivery Order.

2.11.43 Quality Assurance and Inspections.

3. 5152.237-9000 ADJUSTMENT TO CONTRACTOR’S COEFFICIENT

FOR OPTION YEARS (JOB ORDER CONTRACTS) (AFARS)

“Pricing” of option periods, include consideration of any adjustments must be performed by an economic price adjustment for those periods, as follows:

An economic adjustment will be applied to the contract coefficient(s) addressing changes in the cost of labor, equipment and material in the Unit Price Book (UPB) (this includes consideration of Davis Bacon issues). This allows for economic increase or decrease of the prices in the UPB and serves to adjust line item prices by the percentage increase or decrease of the economic trend in the construction market. The economic price adjustment will be based on the Building Cost Index (BCI) found in the Market Trend pages of the Engineering News Record (ENR). The economic adjustment is not applied to the cost items comprising the coefficient. No upward adjustment can apply to task orders awarded prior to the effective date of the adjustment, regardless of the date of commencement of work thereunder.

The adjustment will be made in accordance with the following equation. The resulting revised coefficient(s) must be applied throughout the option year.

N = C + i

Where: N = New Coefficient C = Base Year Coefficient i = Change Factor (% increase or decrease from base to option year)

The Index Factor, i, shall be computed according to the following equation:

i = BCIN – 1

BCIC

Where:

BCIN is the Building Cost Index, published in the ENR, for the month prior to the effective date of the option period.

BCIC is the Building Cost Index, as published in the ENR, on the date of the award of the contract. The BCIC is _________, based on the award date of ____________.

If the BCI or the ENR ceases to be published, the parties shall agree on substitute indices.

EXAMPLE: For the base year of a contract the coefficient is 1.10. The cost to the government for a line item whose cost is $100.00 is 1.10 x $100.00 = $110.00.

Option Year 1. For the first option year the coefficient will be adjusted as follows:

i = BCIN -1 = 3111.86 -1 = 1.0133 -1 = .0133

BCIC 3071.10

The new coefficient would be calculated as follows:

N = C + i = 1.10 + 0.0133 = 1.1133

The above line item under the option period would be 1.1133 x $100.00 = $111.33.

Option Year 2. For the second option year, if the BCI for the month prior to the effective date of the option period was 3002.99, the coefficient will be adjusted as follows:

i = BCIN – 1 = 3062.99 – 1 = .9974 – 1 = -0.0026

BCIC 3071.10

The new coefficient would be calculated as follows:

N = C + i = 1.10 - -0.0026 – 1.0974

The above line item under the option period would be 1.0974 x $100.00 = $109.74.

Note 1. Round calculations for the Change Factor (i) to the nearest ten thousandth.

Note 2. ENR indices for calculation of coefficients for the option years are taken from the McGraw Hill publication, ENR, published during the month prior to the effective date of the option. The ENR Index for the base year (contract award) is the most recent ENR Index published for the month prior to initial contract award.

4. Task Order Limitations (Regulatory Changes)

If regulations change during the course of the contract, the task order limitations may be adjusted accordingly by exercise of a unilateral modification. JOC procedures allow a task order to exceed the $500k maximum if the Contracting Officer determines that it is in the government's best interest. If a task order exceeds $500k, it will require a bilateral agreement between the Contracting Officer and the contractor.

5. Performance and Payment Bonds

Per Army Federal Regulation Supplement (AFARS) 17.9004-2(h), “All cost associated with bonding SHALL be included in the coefficient.”

END OF CLIN SCHEDULE

Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, and Basis of Award One Step - Best Value, Design-Build (Single Award)

00 22 11

SECTION 00 22 11

PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, & BASIS OF AWARD

White Sands Missile Range 8(a) Job Order Contract

I. BASIS FOR AWARD – GENERAL PRINCIPLES

Pursuant to FAR 15.101-2, the Contracting Officer has determined that “Best Value” will be achieved through selection of the technically acceptable proposal with the lowest evaluated price.

Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors.

Tradeoffs are not permitted.

Proposals are evaluated for acceptability but not ranked using the non-cost/price factors.

Exchanges may occur (see FAR 15.306). However, the Contracting Officer intends to award without discussions.

PART II -- PROPOSAL INSTRUCTIONS

1. PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

a. REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS

(1) The Price Proposal and the Technical Proposal must be submitted as separate electronic files.

Ensure that each separate file is clearly marked to indicate its contents; and the identity of the offeror.

(2) Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.

(3) No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

(4) All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

(5) Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined "unacceptable" and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to submission of the offer.

b. DISCUSSIONS. The Government intends to evaluate proposals and award a contract without discussions with offerors, in accordance with FAR 52.215-1, Instructions to Offerors—Competitive Acquisitions. The Government reserves the right to conduct discussions if the Contract Officer later determines them to be necessary.

c. COST OR PRICING DATA. Offerors are not required to submit Cost or Pricing Data with their offers.

d. GENERAL INSTRUCTIONS.

(1) Revisions to electronic proposals shall be highlighted or marked in such a way as to be easily identified and shall show the date of revision. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision.

(2) “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

(3) In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.

e. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL

(1) Submit the Price Proposal in electronic format only.

(2) Size Restrictions and Page Limits. There are no page limits set for the price proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.

(3) Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart.

TAB

CONTENTS OF THE PRICE PROPOSAL

#1

The Proposal Cover Sheet

#2

The SF1442 and Acknowledgement of Amendments

#3

Section B, CLIN Schedule/Pricing Schedule

#4

Representations, Certifications, and Other Statements of Offerors (if the offeror does not have electronic certifications in ORCA)

#5

JV Agreement or Articles of Organization for LLC, if applicable.

#6

8(a) Certified Small Business Administration Eligibility

(4) Detailed Submission Instructions for the Price Proposal

PROPOSAL COVER SHEET

TAB 1: The proposal cover sheet is required by FAR 52.215-1(2) (c) (i)-(v) and a scanned copy must be submitted by all offerors. This provision, titled “Instructions to Offerors—Competitive Acquisition,” and the format for the proposal cover sheet as shown here:

TAB 2:

The SF 1442 is to be completed by all Offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102. The electronic proposal shall include a scanned copy of this form. All amendments must be acknowledged by all Offerors in accordance with the instructions on the Standard Form 30, Amendment of Solicitation.

TAB 3: (AM#1) Section B, CLIN Schedule is to be completed in its entirety by all Offerors. See Section Choose an item with attached notes, for further instructions. (/AM#1)

TAB 4: All Offerors must have electronically completed the annual representations and certifications on the “Online Representations and Certifications Application” (ORCA) website or respond with the completed representations / certifications found in the solicitation.. The offerors are responsible for ensuring that these on-line representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete. Additionally, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in the solicitation. If the offeror is a Joint Venture, all participants must separately complete both the ORCA Representations and Certifications.

TAB 5: If the Offeror is a Joint Venture (JV), include a copy of the JV Agreement. If a JV Agreement has not yet been finalized/approved, indicate its status. JV Agreements must clearly indicate the percentages of the JV participants, in particular the percent of the controlling party, and a clear delineation of responsibilities and authorities between the JV parties. If the Offeror is a Limited Liability Company, include a copy of the Articles of Organization.

PROPOSAL COVER SHEET

1. Solicitation Number:

2. The name, address, and telephone and facsimile numbers of the Offeror (and electronic address if available):

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item. Statement to include any exceptions in technical or cost/price proposal or exceptions inherent in Offeror’s standard terms and conditions.

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

TAB 6: For 8(a) set-aside solicitations, the offeror must provide some type of minimal narrative, statement, or documentation to show proof of an 8(a) bona-fide office, in the geographical designated area where the work is to be performed.

f. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL

(1) Submit the Technical Proposal in Electronic Format Only.

(2) Format and Contents of the Technical Proposal and List of Tabs. Each set shall be organized using the tabs specified in the following chart.

TAB CONTENTS OF THE TECHNICAL

PROPOSAL

TAB

CONTENTS OF THE TECHNICAL

PROPOSAL

Factor #1

EXPERIENCE

Factor #2

PAST PERFORMANCE

Factor #3

PERSONNEL

Factor #4

QUALITY CONTROL

(3) Page Limitations. The following page limitations are established for each factor described above:

Factor #1, EXPERIENCE - Limited to 5 pages (a maximum of 5 forms)

Demonstrate the experience of the offeror and/or proposed team, including sub-contractors, on projects same/similar to that described in the solicitation for same/similar services. The projects submitted should also demonstrate that the offeror and/or the team have performed a same/similar type of services at multiple sites simultaneously.

Same and or similar type services may be as follows:

Job Order Contracts Multiple Award Task Order Contracts Sustainment, Restoration, and Modernization (SRM) Type Projects

The Contractor shall complete a minimum of three (3), but no more than five (5) valued between $2,500.00 and $500,000.00, “Experience Information” forms, attached at the end of this section, in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete.

All projects submitted must have been underway or completed within the last 3 years. At least two (2) of the projects provided must be valued at over $200,000.00.

NOTE: If any of the information required is not included in an Experience Information form, the referenced incomplete form will be deemed non-responsive and will not be evaluated by the Source Selection Evaluation Board If any of the information required is not included in the form then the contractor will be considered nonresponsive and evaluated as unacceptable.

EXPERIENCE INFORMATION

(To be completed by Contractor)

1. Contractor:

Name:

Address:

2. Contract /Task Order(TO) /Purchase Order (PO) Number:

3. Contract/TO/PO Dollar Value:

4. Contract/TO /PO Status: Active Complete

Completion Date (w/ extensions):

5. Project Title:

Location:

6. Project Description-- to include the role of the contractor on the project and specific responsibilities of the contractor in performance of the effort:

7. Project Owner or Project Manager for the Client – provide:

Name:

Address:

Telephone Number and E-mail:

FACTOR #2, PAST PERFORMANCE: Offerors are required to provide a minimum of three and no more than five examples of Past Performance generally relating to construction, JOC Type Contracts, MATOC Type Contracts, and or SRM Renovation Type Contracts. Each such example must have been completed no more than SIX (6) years before the issue date of the subject solicitation. Projects less than 75% complete shall not be considered. Ultimate determinations regarding percentage of completion will be based on input from the customer / User. (AM#1) Each example of Past Performance will be accompanied by a separate Past Performance Assessment Worksheet, (/AM#1) which shall identify the Project, dollar amount and subject matter of the project, when the project was completed, the name, telephone number, and email address of the User / Customer / Contract Administrative Officer / Project Supervisor, and a copy of any and all project performance evaluations on said project. ACASS, CCASS, and CPARS will be used to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate a contractor’s past performance. The Government may contact references provided as part of Factor 1 – Experience, for information regarding the offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed. It is strongly recommended that offerors provide accurate, current, and complete contact information for references provided in the project descriptions. Firms without a history of past performance will be given a neutral rating.

NOTE: Do not request past performance questionnaires (PPQ) on projects that have final CCASS or ACASS evaluations. If a CCASS or ACASS evaluation exists and a PPQ is provided for the same project, the CCASS or ACASS evaluation will be reviewed as the official past performance record for the project, and the PPQ will not be considered by the Source Selection Board, Contracting Officer, or the Source Selection Authority (if applicable).

The Past Performance Questionnaire (PPQ) is provided at the end of this section.

For USACE or other DoD projects which are underway but do not yet have an interim or final CCASS or ACASS evaluation, one PPQ per contract may be submitted; to be considered, the PPQ shall be signed by the Administrative Contracting Officer (ACO) for the contract.

PAST PERFORMANCE QUESTIONAIRRE Section

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple E VG S M U N disciplines

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain Yes No below)

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks.

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

End of Past Performance Questionnaire Section

Factor #3, PERSONNEL – Limited to 2 page for each resume provided.

The offeror must provide resume data for the following key personnel: Project Manager, Superintendent, CQC, SSHO.

Resume information to be provided shall be limited to no more than two (2) page per person and shall include the following information as a minimum:

(a) Name and title

(b) Project assignment

(c) Name of firm with which associated

(d) Years experience with this firm and with other firms

(e) Active professional registration, year first registered, if applicable

(f) Other experience and qualifications relevant to same/similar work required under this contract

(g) Education degree(s), years of experience, specialization, if applicable: A minimum of Six (6) Years Experience is required for a Site Superintendent and Project Manager.

(h) SSHO and CQC must provide copies of the certificate of completion of required training identifying date completed.

(i)The SSHO shall have the following level of experience:

1. A minimum of 5 years safety work on similar projects.

2. 30-hour OSHA construction safety class or equivalent within the last 5 years.

3. SSHO's shall maintain competency through 24 hours of formal safety and health related course work every four years.

4. Competent person training as needed.

PERSONNEL WILL BE EVALUATED BASED ON THE FOLLOWING CRITERIA:

The Government will review the resumes provided in response to the Personnel Factor. Offerors must demonstrate all of the following minimum acceptability standards to receive an “ACCEPTABLE” on this factor. The offeror must demonstrate in all resumes that the key personnel proposed have:

A minimum of Six (6) Years Experience is required for a Site Superintendent.

A minimum of Six (6) Years Experience is required for a Project Manager.

CQC must provide copies of the certificate of completion of required training identifying date completed

(CQC training information can be found at the following link:

http://www.swf.usace.army.mil/BusinessWithUs/ConstructionQualityManagementTraining.aspx)

SSHO shall have the following level of experience:

1. A minimum of 5 years safety work on similar projects.

2. 30-hour OSHA construction safety class or equivalent within the last 5 years.

3. An average of at least 24 hours of formal safety training each year for the past 5 years.

4. Competent person training as needed.

(AM#1) SSHO must provide copies of the certificate of completion of required training identifying date completed CQC must provide copies of the certificate of completion of required training identifying date completed

(/AM#1)

http://www.swf.usace.army.mil/BusinessWithUs/ConstructionQualityManagementTraining.aspx

RESUME FORM - KEY PERSONNEL

(Complete one form for each key person)

1. NAME AND TITLE:

2. ROLE IN THIS CONTRACT:

3. NAME OF FIRM WITH WHICH ASSOCIATED (city and state):

4. YEARS EXPERIENCE:

Total:________________ With current firm:_____________

5. CURRENT PROFESSIONAL REGISTRATION (state and discipline), IF APPLICABLE:

6. EDUCATION (degree and specialization), IF APPLICABLE:

7. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):

8. OTHER RELEVANT EXPERIENCE ON SAME/SIMILAR PROJECTS:

a.

(1) TITLE AND LOCATION (city and state):

(2) DATE COMPLETED:

(3) PROJECT DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE:

b.

c.

d.

Factor #4, QUALITY CONTROL – Limited to 2 page.

Quality Control: Provide information on your team’s capabilities to assure quality control. Describe your quality control approach, corporate systems, and capabilities to maintain quality control of the execution of a JOC contract. The Offeror shall describe their understanding of JOC processes. Provide information how you will handle internal and external requests for information (RFIs), shop drawings, submittal reviews, progress meetings, site visits, contract completion, closeout, as-built, and completion documentation. Do not submit a quality control plan. After contract award, the successful Offeror will submit their Quality Control Plan for Government approval.

Part III. EVALUATION OF PROPOSALS

GENERAL TECHNICAL CRITERIA

a. Material omission(s) may cause the technical proposal to be rejected as unacceptable.

b. Proposals which are generic, vague, or lacking in detail may be considered unacceptable. The offeror’s failure to include information that the Government has indicated should be included in the proposal may result in the offer being found deficient.

c. The Government cannot make award based on a deficient offer. Therefore, receipt of an “UNACCEPTABLE” rating for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal.

EVALUATION OF OPTIONS (JUL 1990) – (If applicable) 52.217-5 Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

a. ELIGIBILITY FOR CONTRACT AWARD. In accordance with the FAR, no contract shall be entered into unless the contracting officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met.

This includes the FAR requirement that no award shall be made unless the contracting officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

b. SOURCE SELECTION USING THE LOW-PRICED, TECHNICALLY ACCEPTABLE PROCESS. An evaluation for acceptability will be performance on each proposal in accordance with FAR 15.101-2(b)(3). The proposal that provides the lowest price and is otherwise technically acceptable in all factors will be selected for award. To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the factors will result in a technically unacceptable rating and preclude award.

c. BASIS OF AWARD. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. Tradeoffs are not permitted. Proposals are evaluated for acceptability but not ranked using non-cost/price factors.

d. EVALUATION OF THE PRICE PROPOSALS

1. Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed prices will be analyzed for reasonableness. They may also be analyzed to determine whether they are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the information provided by the Offeror.

Additionally, all offers will be analyzed for unbalanced pricing.

2. The otherwise technically-acceptable, lowest-priced offeror may be required to confirm its price on either a CLIN, element, or total price basis, and/or provide additional information in support of their price, prior to contract award at the Government’s request and discretion.

3. Low price will be evaluated by normalizing the CLIN coefficients as follows:

0001 will be factored as 85% of the work.

0002 will be factored at 10% of the work.

0003 will be factored at 2.5% of the work.

0004 will be factored at 2.5% of the work.

1.349 will be used as a basis to evaluate the low coefficient from multiple offers

Other Award Factors: The Contracting Officer shall consider several factors in the selection process which are important, but not quantified,…