Revised_Sheet_E203.pdf

PDF 327 KB Posted

Attached to
Construct Aircraft Apron- MTANG Federal contract opportunity
Solicitation number
W9124V19B0002
Issued by
Department of the Army Montana Army National Guard

About this file

This document includes an electrical site plan sheet and details for a federal contract opportunity to construct an aircraft apron at Montana Army National Guard. Key requirements include replacing existing lighting with new LED luminaires and floodlights, installing new lighting controls and a panelboard, upgrading power distribution infrastructure to support the new lighting layout, and providing interior and exterior lighting controls at on-site buildings. The solicitation is identified as number W9124V19B0002 and is being issued by the Department of the Army Montana Army National Guard to construct the aircraft apron. No pricing or response deadline details are provided in the opportunity description.

Revised Sheet E203

View the file

Other files for this federal contract opportunity

Other files attached to Construct Aircraft Apron- MTANG, newest first.
File Type Posted
Abstract_OF_1419_certified.pdf PDF
MTANG_Apron_S100,S200,S201.pdf PDF
FAA.P-153.pdf PDF
W9124V19B0002_Amendment_0002_SF_30.pdf PDF
Questions_as_of_22_Aug.pdf PDF
W9124V19B0002_Amendment_0001.pdf PDF
52.204-24.pdf PDF
W9124V19B0002_0001_SF30.pdf PDF
CQCP_C-100.pdf PDF
Revised_Sheet_E415.pdf PDF
52.204-25.pdf PDF
Questions_as_of_16_Aug.pdf PDF
Questions_as_of_8_Aug.pdf PDF
W9124V19B0002_Site_Visit_notes.pdf PDF
SiteVisitSignInSheet.pdf PDF
Pre-Bid_Conference_Slides.pdf PDF
W9124V19B0002_MTANG_Construct_Aircraft_Apron.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 3 5 7

W A R N

IN

G

W A R N

IN

G

W A R N

IN

G

W A R N

IN

G

T T

(12) NEW LED APRON LIGHTS AND (2) NEW

FLOOD LIGHTS MOUNTED ON BUILDING 80.

NEW LOCATION FOR EXISTING POLE

REMOVED DURING DEMOLITION.

J

59' SETBACK LINE. ALL SITE POLES AND

EQUIPMENT LOCATED ABOVE GRADE TO BE

LOCATED OUTSIDE OF THIS LINE.

1 2

6 7

13 14

EXISTING TRANSFORMER

WITH FEED-THROUGH,

PRIMARY LUGS.

NEW LIGHT CONTROLS

MOUNTED ON BUILDING 80

NEW METER/CT'S AND

PANELBOARD LDP

LDP-13

FLAG NOTES THIS SHEET:

1. REPLACE THE (12) EXISTING 1000W HPS

LUMINAIRES REMOVED DURING DEMOLITION WITH

(12) TYPE A LED LUMINARIES. CONNECT TO NEW

LIGHTING DISTRIBUTION PANEL LDP. DRIVERS FOR

THE NEW LUMINAIRES TO BE REMOTELY LOCATED

IN A MUSCO NEMA 3R ENCLOSURE LOCATED ON

THE LIGHT POLE.

2. REPLACE THE (2) EXISTING 400W SECURITY FLOOD

LIGHTS REMOVED DURING DEMOLITION WITH (2)

TYPE B LED LUMINAIRES. DRIVERS FOR THE NEW

LUMINAIRES TO BE REMOTELY LOCATED IN A

MUSCO NEMA 3R ENCLOSURE LOCATED ON THE

LIGHT POLE.

3. PROVIDE NEW LIGHTING CONTROLS IN NEMA 3R

ENCLOSURE MOUNTED ON CONCRETE PEDESTAL.

COORDINATE WITH MUSCO LIGHTING CONTROLS

BEING INSTALLED ON LIGHT POLES.

4. DRIVERS FOR THE NEW LUMINAIRES TO BE

REMOTELY LOCATED IN A MUSCO NEMA 3R

ENCLOSURE LOCATED ON THE LIGHT POLE.

5. PROVIDE NEW CONCRETE BASE TO MATCH

EXISTING AND INSTALL EXISTING POLE REMOVED

AND SAVED DURING DEMOLITION.

6. PROVIDE BARE COPPER 2/0 AWG DOWN LEAD

FROM LIGHTNING PROTECTION AIR TERMINAL

DOWN INSIDE POLE AND OUT TO A BURIED 3/4" DIA

OR LARGER COPPER GROUND ROD, 10'-0" MIN

EMBEDMENT.

7. PROVIDE NEW 277V POWER CONNECTION TO

EXISTING FAA OBSTRUCTION LIGHTS TO NEW

PANEL LDP.

8. PROVIDE PRIMARY FEEDER FROM EXISTING

TRANSFORMER FOR RECONNECTION OF EXISTING

RELOCATED 500KVA TRANSFORMER. PROVIDE

NEW TRANSFORMER PAD WITH CUT OUTS IN PAD

FOR INCOMING AND OUT GOING CONDUITS FOR

TRANSFORMER CONNECTIONS AND ALSO THE

CONDUITS BEING PROVIDED FOR FUTURE USE.

SEE FLAG NOTES 9 AND 10 BELOW.

9. PROVIDE (1) 4" PVC CONDUIT FROM EXISTING

RELOCATED 500KVA AROUND NEW APRON

LOCATION TO EXISTING FENCE LINE TO THE WEST

OF FORMER BUILDINGS 45,46,47, 48, (THESE

BUILDINGS HAVE BEEN REMOVED, USE PAD FOR

LOCATION REFERENCE) AND OUT TO ROAD

CROSSING TO THE SOUTHWEST OF THESE

BUILDINGS. IN -GRADE PULL BOXES TO BE

INSTALLED EVERY 400'-0" ALONG CONDUIT

ROUTING. EXACT LOCATIONS OF BOXES TO BE

FIELD VERIFIED WITH OWNER PRIOR TO START OF

WORK.

10. PROVIDE (3) 3" CONDUITS FROM TRANSFORMER

SECONDARY STUB OUT INTO IN GRADE BOX FOR

FUTURE USE.

11. PROVIDE (1) 4" PVC FOR 480V FUTURE POWER

(SEE FLAG NOTE 9.) AND FEEDER FOR NEW

SERVICE ENTRANCE RATED PANELBOARD LDP.

SEE ONE LINE DIAGRAM ADDITIONAL ELECTRICAL

REQUIREMENTS AND INFORMATION.

12. FEEDER FOR NEW SERVICE ENTRANCE RATED

PANELBOARD LDP AND A FEEDER FOR LIGHT POLE

CIRCUIT IN A 3"PVC, SEE ONE LINE DIAGRAM AND

PANELBOARD SCHEDULE FOR ADDITIONAL

ELECTRICAL REQUIREMENTS AND INFORMATION.

13. PROVIDE (12) TYPE A LED LUMINAIRES MOUNTED

ON BUILDING 80. CONNECT TO NEW LIGHTING

DISTRIBUTION PANEL LDP. DRIVERS FOR THE NEW

LUMINAIRES TO BE REMOTELY LOCATED IN A

MUSCO NEMA 3R ENCLOSURE LOCATED ON THE

BUILDING. COORDINATE WITH MUSCO SUPPLIER.

SEE STRUCTURAL SHEETS FOR ADDITIONAL

MOUNTING INFORMATION.

14. PROVIDE (2) TYPE B LED LUMINAIRES MOUNTED

ON BUILDING 80 AT +30'-0'' AFG. CONNECT TO NEW

LIGHTING DISTRIBUTION PANELBOARD

LDP.DRIVERS FOR THE NEW LUMINAIRES TO BE

REMOTELY LOCATED IN A MUSCO NEMA 3R

ENCLOSURE LOCATED ON THE BUILDING.

COORDINATE WITH MUSCO SUPPLIER. SEE

STRUCTURAL SHEETS FOR ADDITIONAL

MOUNTING INFORMATION.

15. PROVIDE NEW LIGHTING CONTROLS IN NEMA 3R

ENCLOSURE SURFACE MOUNTED TO BUILDING.

16. NEW SERVICE ENTRANCE RATED PANELBOARD

'LDP' FED FROM THE EXISTING RELOCATED

500KVA TRANSFORMER FOR POWER

DISTRIBUTION TO ALL SITE POLES. PROVIDE IN

NEMA 3R ENCLOSURE SURFACE MOUNTED TO

BUILDING.

17. FEEDER FOR NEW SERVICE ENTRANCE RATED

PANELBOARD LDP AND (2) FEEDERS FOR LIGHT

POLE CIRCUITS EACH IN A 2"PVC. SEE ONE LINE

DIAGRAM AND PANELBOARD LDP SCHEDULE ON

E4.0 FOR ADDITIONAL ELECTRICAL

REQUIREMENTS AND INFORMATION.

18. INTERCEPT EXISTING 2"PVC AND PROVIDE A PULL

BOX. EXTEND TO PANELBOARD 'LDP'.

19. PROVIDE NEW POWER WIRING FOR NEW POLE

LIGHTING IN EXISTING 2"PVC.

20. PROVIDE NEW POLE LIGHT POWER FEED IN 2" PVC.

21. PROVIDE TYPE 'BP' FIXTURE ON BACKSIDE OF

BUILDING 80 AT 30' AFG. SEE STRUCTURAL PLANS

FOR ADDITIONAL MOUNTING INFORMATION AND

EXACT LOCATION. FIXTURE CONTROLLED VIA

INTEGRAL PHOTOCELL.

22. PROVIDE NEW EXTRA HEAVY DUTY AIR PORT

RATED COVER ON EXISTING IN GROUND PULL

BOX. COORDINATE EXACT LOCATION WITH

MONTANA AIR NATIONAL GUARD. SEE DETAILS ON

SHEET E415 FOR ADDITIONAL INFORMATION.

23. EXISTING 18" RCP CULVERT.

24. EXISTING FIRE HYDRANT.

25. EC SHALL PROVIDE INTERIOR LIGHTING CONTROL

STATIONS AT MOCC AND BDOC ON CAMPUS.

PROVIDE EXTERIOR ANTENNA ON BUILDING(S)

WITHIN 50' OF CONTROL LOCATION. SEE INTERIOR

LIGHTING CONTROL SCHEMATIC AND LIGHTING

CONTROL SEQUENCE OF OPERATIONS FOR MORE

INFORMATION. COORDINATE EXACT LOCATIONS

OF INTERIOR CONTROLS WITH OWNER ON SITE.

NOTE: NOT ALL FLAG NOTES MAY BE USED ON THIS SHEET.

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2019 SMA, P.C.

KEYMAP:

BILLINGS

175 North 27th Street | Suite 1312 Billings | MT | 59101 P| 406/545.46420 www.mkkeng.com

ENGINEER SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

HELENA

920 Front Street | Suite 104 Helena | MT | 59601 P| 406/438.1467 www.mkkeng.com

BID SET

REVISIONS:

No. Date Revision Description

F:\sitedev\17209 - MANG Apron\Apron-CADD

JKSE 169101

16 MAY 2019

W. VORDERBERG

C. LAFERRIERE

MTANG C-130 APRON

GREAT FALLS, MT

TYPE B-3 SUBMITTAL

Robert Peccia & Associates, Inc.

1-800-667-8160 ã 2019

5/16/19

5/ 1/

F ile fil es

\C or po ra te \O ffi ce s\ De nv er

\M

KK

\0 3-

Bi lli ng s\

.0 3.

M

TA

NG

A pr on

L ig ht in g\

DW

GS

\E

1.

EL

EC

TR

IC

AL

S

IT

E

PL

AN

PA

RT

IA

L_ 1.

dw g

E203

APRON ELECTRICAL SITE PLAN

- PARTIAL AREA B

SCALE:

NORTH

APRON ELECTRICAL SITE PLAN - PARTIAL AREA B

1" = 100'1

N

1 13 AUG 2019 ADDENDUM #1

AutoCAD SHX Text

SM

AutoCAD SHX Text

ELECT

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

CO

AutoCAD SHX Text

SM

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

MW

AutoCAD SHX Text W

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text

PV

AutoCAD SHX Text

ELECT

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

PV

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

PV

AutoCAD SHX Text

ELECT

AutoCAD SHX Text D

AutoCAD SHX Text

PV

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text

PV

AutoCAD SHX Text

CO

AutoCAD SHX Text

MW

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text

MW

AutoCAD SHX Text

EXIT

AutoCAD SHX Text

EXIT

AutoCAD SHX Text

EXIT

AutoCAD SHX Text

EXIT

AutoCAD SHX Text

EXIT

AutoCAD SHX Text

REFERENCE

AutoCAD SHX Text

TRUE

Sheets and Views
E1.2 ELECTRICAL SITE PLAN - PARTIAL AREA B

File details come from the government source that posted it. Updated .