This document provides specifications for a controlled low-strength material (CLSM) to be used in a project to construct an aircraft apron for the Montana Army National Guard. The CLSM must be designed to achieve a 28-day compressive strength between 100 and 200 psi with no significant strength gain thereafter, and have a consistency allowing an approximate 8-inch diameter spread without segregation. The mix design must be approved by the Resident Project Representative and include proportions of aggregate, fly ash, cement, water, and any admixtures. The CLSM must not be placed on frozen ground and is subject to temperature limitations for mixing, placement, and curing. The Department of the Army Montana Army National Guard will accept the CLSM if it meets the specifications for mix design, consistency, curing, and compressive strength.

CONTROLLED LOW-STRENGTH MATERIAL (CLSM) Section

View the file

Other files for this federal contract opportunity

Other files attached to Construct Aircraft Apron- MTANG, newest first.
File Type Posted
Abstract_OF_1419_certified.pdf PDF
MTANG_Apron_S100,S200,S201.pdf PDF
W9124V19B0002_Amendment_0002_SF_30.pdf PDF
Questions_as_of_22_Aug.pdf PDF
Revised_Sheet_E203.pdf PDF
W9124V19B0002_Amendment_0001.pdf PDF
52.204-24.pdf PDF
W9124V19B0002_0001_SF30.pdf PDF
CQCP_C-100.pdf PDF
Revised_Sheet_E415.pdf PDF
52.204-25.pdf PDF
Questions_as_of_16_Aug.pdf PDF
Questions_as_of_8_Aug.pdf PDF
SiteVisitSignInSheet.pdf PDF
W9124V19B0002_Site_Visit_notes.pdf PDF
Pre-Bid_Conference_Slides.pdf PDF
W9124V19B0002_MTANG_Construct_Aircraft_Apron.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTROLLED LOW-STRENGTH MATERIAL (CLSM) P-153.1

ITEM P-153

CONTROLLED LOW-STRENGTH MATERIAL (CLSM)

DESCRIPTION

153-1.1 This item shall consist of furnishing, transporting, and placing a controlled low-strength material (CLSM) as flowable backfill in trenches or at other locations shown on the plans or as directed by the Resident Project Representative (RPR).

MATERIALS

153-2.1 Materials.

a. Cement. Cement shall conform to the requirements of ASTM C150 Type I, II, or V.

b. Fly ash. Fly ash shall conform to ASTM C618, Class C or F.

c. Fine aggregate (sand). Fine aggregate shall conform to the requirements of ASTM C33 except for aggregate gradation. Any aggregate gradation which produces the specified performance characteristics of the CLSM and meets the following requirements, will be accepted.

Sieve Size Percent Passing by weight 3/4 inch (19.0 mm) 100 No. 200 (75 µm) 0 - 12

d. Water. Water used in mixing or curing shall be from potable water sources. Other sources shall be tested in accordance with ASTM C1602 prior to use.

e. Dyes and other methods of coloring the backfill material may be incorporated if required.

MIX DESIGN

153-3.1 Proportions. The Contractor shall submit, to the RPR, a mix design including the proportions and source of aggregate, fly ash, cement, water, and approved admixtures. No CLSM mixture shall be produced for payment until the RPR has given written approval of the proportions. The proportions shall be prepared by a laboratory and shall remain in effect for the duration of the project. The proportions shall establish a single percentage or weight for aggregate, fly ash, cement, water, and any admixtures proposed. Laboratory costs are incidental to this item.

a. Compressive strength. CLSM shall be designed to achieve a 28-day compressive strength of 100 to 200 psi (690 to 1379 kPa) when tested in accordance with ASTM D4832, with no significant strength gain after 28 days.

b. Consistency. Design CLSM to achieve a consistency that will produce an approximate 8-inch (200

mm) diameter circular-type spread without segregation. CLSM consistency shall be determined per

ASTM D6103.

CONTROLLED LOW-STRENGTH MATERIAL (CLSM) P-153.2

CONSTRUCTION METHODS

153-4.1 Placement.

a. Placement. CLSM may be placed by any reasonable means from the mixing unit into the space to be filled. Agitation is required during transportation and waiting time. Placement shall be performed so structures or pipes are not displaced from their final position and intrusion of CLSM into unwanted areas is avoided. The material shall be brought up uniformly to the fill line shown on the plans or as directed by the RPR. Each placement of CLSM shall be as continuous an operation as possible. If CLSM is placed in more than one lift, the base lift shall be free of surface water and loose foreign material prior to placement of the next lift.

b. Contractor Quality Control. The Contractor shall collect all batch tickets to verify the CLSM delivered to the project conforms to the mix design. The Contractor shall verify daily that the CLSM is consistent with 153-3.1a and 153-3.1b. Adjustments shall be made as necessary to the proportions and materials as needed. The Contractor shall provide all batch tickets to the RPR.

c. Limitations of placement. CLSM shall not be placed on frozen ground. Mixing and placing may begin when the air or ground temperature is at least 35°F (2°C) and rising. Mixing and placement shall stop when the air temperature is 40°F (4°C) and falling or when the anticipated air or ground temperature will be 35°F (2°C) or less in the 24-hour period following proposed placement. At the time of placement, CLSM shall have a temperature of at least 40°F (4°C).

153-4.2 Curing and protection

a. Curing. The air in contact with the CLSM shall be maintained at temperatures above freezing for a minimum of 72 hours. If the CLSM is subjected to temperatures below 32°F (0°C), the material may be rejected by the RPR if damage to the material is observed.

b. Protection. The CLSM shall not be subject to loads and shall remain undisturbed by construction activities for a period of 48 hours or until a compressive strength of 15 psi (105 kPa) is obtained.

The Contractor shall be responsible for providing evidence to the RPR that the material has reached the desired strength. Acceptable evidence shall be based upon compressive tests made in accordance with paragraph 153-3.1a.

153-4.3 Quality Assurance (QA) Acceptance. CLSM QA acceptance shall be based upon batch tickets provided by the Contractor to the RPR to confirm that the delivered material conforms to the mix design.

METHOD OF MEASUREMENT

153-5.1 All work items and quantities will be included in the lump sum bid item.

BASIS OF PAYMENT

153-6.1 All work will be paid for and included in the lump sum contract price, which will constitute full compensation for construction completion.

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

CONTROLLED LOW-STRENGTH MATERIAL (CLSM) P-153.3

ASTM International (ASTM) ASTM C33 Standard Specification for Concrete Aggregates ASTM C150 Standard Specification for Portland Cement ASTM C618 Standard Specification for Coal Fly Ash and Raw or Calcined Natural

Pozzolan for Use in Concrete ASTM C595 Standard Specification for Blended Hydraulic Cements ASTM C1602 Standard Specification for Mixing Water Used in the Production of

Hydraulic Cement Concrete ASTM D4832 Standard Test Method for Preparation and Testing of Controlled Low-

Strength Material (CLSM) Test Cylinders ASTM D6103 Flow Consistency of Controlled Low Strength Material (CLSM)

END OF ITEM P-153

ITEM P-153
ITEM P-153
CONTROLLED LOW-STRENGTH MATERIAL (CLSM)
CONTROLLED LOW-STRENGTH MATERIAL (CLSM)