Attachment_4_-_Questions_ _Answers.pdf
PDF 7 KB Posted
- Attached to
- Heavy Equipment Rental
- Solicitation number
- W9124R-16-T-0008
About this file
This amendment is issued to post Attachment 4 Questions Answers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1-Clauses_and_Provisions.pdf | ||
| Attachment_2_-_DFARS_252-209-7992.pdf | ||
| Attachment_3_-_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Heavy Equipment Rental
Questions & Answers
Question 1: What size manlift does the Government require? How high does the Government require the manlift to reach?
Answer 1: The manlift is to equal a JLG 800A.
Question 2: What size excavator does the Government require?
Answer 2: The excavator is to equal a 330 Caterpillar (full size tracked excavator).
Question 3: What size variable reach forklift does the Government require? What reach and what capacity does the Government require?
Answer 3: The variable reach forklift may be any make or model equal to a JLG 534D9-45 / Gradall G9- 43A / or a Lull 944E-42. All have a 30'-35' reach, a max forward lift of 1600-2000 lbs and an operating weight of 24,420-26,860 lbs.
Question 4: What size mini excavator does the Government require?
Answer 4: The mini excavator may be any make or model equal to a Bobcat 430. *Requires a 16 inch wide bucket*. The mini excavator should only have a 16 inch bucket maximum size.
Question 5: What size motor grader does the Government require? What is the blade length required?
Answer 5: The grader size is to equal a 772GP and no bigger than an 872GP John Deere with a blade length of at least 12 ft.
Question 6: What size and type of soil compactor does the Government require?
Answer 6: The Government requires a dual drum 10 ton vibratory roller/compacter.
Question 7: What size excavator does the Government require? Are attachments required?
Answer 7: As far as the bucket size for the excavator, a standard size of roughly 24 inches to 30 inches.
The bucket should be the only attachment required for the excavator.