TE1-Specific Tasks.pdf

PDF 163 KB Posted

Attached to
Solid Waste Collection Federal contract opportunity
Solicitation number
W9124M21R0011
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command

About this file

This performance work statement outlines the requirements for recycling collection and processing services at Fort Stewart and Hunter Army Airfield. The contractor shall collect recyclables from containers throughout both installations on a weekly schedule, transport them to the appropriate recycling facilities, and process the materials through sorting, baling, storage and sale. Specific requirements include collecting co-mingled recyclables, cardboard, paper, metal and glass; servicing event recycling; collecting from convenience centers and the 165th Air Wing Command; bulk paper collection from various buildings; construction and demolition recycling; and personal collection restrictions. The contractor must also operate the Fort Stewart Processing Station by offloading, sorting, baling and storing materials and the Fort Stewart and Hunter Army Airfield Recycling Centers by similar processing and storage, as well as deforming brass. Additional responsibilities encompass facility housekeeping, container maintenance and providing periodic facility tours. The related federal contract opportunity is solicitation number W9124M21R0011 from the Department of the Army Materiel Command Mission and Installation Contracting Command for these collection and processing services.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Fort Stewart/Hunter Army Airfield

Technical Exhibit 1

SPECIFIC TASKS

SPECIFIC TASKS:

I. RECYCLING COLLECTION OPERATIONS

1. Recycling Collection Requirements: The Contractor shall provide all resources (labor and equipment, unless otherwise provided by the Government) as necessary to collect recyclable materials throughout Fort Stewart and Hunter Army Airfield and associated facilities as specified in this PWS, weigh the recyclables, and transport them to the FS/HAAF recycling facilities. The Contractor shall collect all co-mingled recyclables, cardboard, paper, metal, glass, magazines, and aluminum from each location. See TE 3 for a listing of locations and type of material. The Contractor shall service each location once a week up to a maximum of five (5) times a week based on the site location and facility function. It is the Contractor’s responsibility to develop a route schedule based on facility requirements. The Contractor shall develop a Recycling Container Pickup Schedule and submit the Schedule NLT 30 days upon NTP. Any changes to the Recycling Container Pickup Schedule will be reported in the Contractor’s Monthly Progress Report submitted to the COR on the third (3rd) work day of each month and a copy of the Schedule will be provided along with the Monthly Progress Report.

In the event of vehicle or equipment failure, the Contractor shall be responsible for either repairing or providing a replacement collection vehicle within forty eight (48) hours. Collection requirements for paper includes pick-up of poly-carts from inside high volume paper generation sites (see Paragraph 5.1.8).

2. Volume. The volume of recyclables to be picked up by the Contractor may increase over the life of the Contract, due to growth of the Installation, the return of Soldiers to the Installation from deployment, and/or increased participation in recycling activity by its tenants.

The contractor shall make adjustments based on the management of information prepared by the driver’s route sheets and final approval of the COR. In addition to the normal service schedule, the Contractor shall also service recycling units by request or as needed, per the COR, to prevent overflow, particularly for special events on the Installation.

3. Container Quantity. The quantity of the containers, locations, and pickups listed in TE 3 may vary by up to 15% on a temporary basis. In the event that a variance exceeds a period of 60 days, an equitable adjustment in the contract price shall be made upon demand of either party based upon the actual increase or decrease of reported containers. The equitable adjustment shall be considered for the period after the initial 60 days. The Contractor shall not add containers in excess of the 15% variation for any container type without prior written approval from the Contracting Officer.

4. Events. The Contractor shall provide event support as described and a monthly Event Recycling Container Report on the third (3rd) work day of each month following the event to the COR showing the weight of the recyclables (based on the total weight of the collection truck both before and after pick-up) collected for each event pick-up and the reason(s), if applicable, for any event not serviced. The following events shall be covered in the 15% variance.

a. “eCycling” Event: On a semi-annual basis (generally in April and November), the Contractor Shall support the Garrison “eCycling” Event to allow an opportunity for the general public to drop off electronic equipment that is no longer needed (not to include Government-purchased items). These items are then stored at the FS Recycling Center and held there for resale. The Contractor shall be required to assist in these efforts. Note that an average of approximately 1,500 pounds of electronic equipment was sold after each “eCycling” Event during FY 2008 and FY 2009. Based on past experience, a four-hour commitment for one person for each of these two “eCycling” Events is required.

b. America Recycles Day: On an annual basis (generally in November), the Contractor shall support the Garrison America Recycles Day event, during which recyclables are collected in containers at a designated location at both FS and HAAF. These materials are then taken to the FS Processing Station. The Contractor shall be required to assist in these efforts.

c. “Bring One for the Chipper”: On an annual basis (generally in late December through early January), the Contractor shall support the Garrison “Bring One for the Chipper” event, by which used Christmas trees are accepted at an on-post location and recycled. The Contractor shall be required to assist in these efforts.

d. Other Morale, Welfare, and Recreation (MWR) and Belfort Beauty Communities (BBC) Events: The Contractor shall support other MWR and BBC events (e.g. the Freedom Walk, 4th of July Celebration, Garrison and/or Division Organization Days, etc.) by providing containers to collect recyclables, which are then transported to the FS Processing Station.

Historical data indicates a requirement of a four-hour commitment for one person for each of four events per year.

e. National Guard Annual Training Events for up to 10 Guard Units: The Contractor shall support annual National Guard Training Events. The Contractor should assume a minimum of one event per month, providing a cardboard roll-off and 8 yd commingled recycling dumpster per unit per event.

5. Destinations of Collected Recyclables: Cardboard and scrap metal collected at HAAF shall be taken to the HAAF Recycling Center located at HAAF Bldg 727 on Wesley Ave. Paper, plastic, glass, tin cans, steel cans, and aluminum cans collected at either Fort Stewart or Hunter Army Airfield as well as cardboard collected at Fort Stewart shall be delivered to the FS Processing Station. The FS Recycling Center shall be the destination for brass collected from Fort Stewart and Hunter Army Airfield, as well as scrap metal, pallets, wall lockers, desks, shelves, and other miscellaneous reusable or recyclable items collected from Fort Stewart.

6. Convenience Centers: The Contractor shall service recycling containers located at the recycle convenience drop-off centers at Fort Stewart and Hunter Army Airfield. The FS/HAAF convenience drop-off centers are currently serviced weekly; however, this demand is subject to change within the previously mentioned 15% variance.

7. 165th Air Wing Command: The Contractor shall collect recyclables from the 165th Air Wing Command at Hunter Army Airfield. Buildings 199, 295, 916, 1403, and 1917 at Hunter Army Airfield are currently serviced once every two weeks to fulfill this requirement. TE 6 provides historical data reflecting the typical amount of recyclables collected from the 165th Air Wing Command. Note that the frequency of servicing and the volume of recyclables to be collected there is subject to change due to fluctuating demand. Temporary changes exceeding 60 calendar days or significant changes to the pickups or routes may require a formal contract modification.

The Contractor shall provide a monthly report on the third (3rd) work day of each month to the COR showing the weight of the recyclables (based on the total weight of the collection truck both before and after pick-up) collected from the 165th Air Wing Command for each pick-up date, as well as the buildings serviced and the reason(s) for any buildings not serviced. The COR and PM will coordinate changes to the routes and adjustment of the pickups as needed and present changes to the TE quarterly for formal modification.

8. Bulk Paper Collection: The Contractor shall collect bulk paper from large paper product consumers/customers every two weeks. The Contractor shall provide a monthly report to the COR showing the weight of the recyclables (based on the total weight of the collection truck both before and after pick-up) collected from these facilities for each pick-up date, as well as the buildings serviced and the reason(s) for any buildings not serviced on the third (3rd) work day of each month. This involves retrieving poly carts from within the following customer locations, and providing poly carts to specified buildings when requested as noted below. The five specified “upon request” locations may require up to 6 poly carts twice a year. Other locations may replace these five “upon request” locations without modification. In addition, special requests may be made for an additional 5 locations each year to support Spring and Fall Cleanup events:

a. FS Bldg 253, Soldier Service Center (1st and 2nd floors) – 6 poly carts

b. FS Bldg 411, Library – upon request

c. FS Bldg 621, MICC/RMO/Comptroller – 1 poly cart

d. FS Bldg 622, Finance – upon request

e. FS Bldg 620, Staff Judge Advocate office – 4 poly carts

f. FS Bldg 1141, DPW Business Operations and Integration Division – upon request

g. FS Bldg 1119, DPW Administration – upon request

h. HAAF Bldg 1286, Army Community Services/Soldier Services Center – 4 poly carts

i. FS Bldg 01, Division Headquarters – 3 poly carts

j. FS Bldg 201, Employee Assistance Program Bldg – 2 poly carts

k. FS Bldg 709, Garrison Command Headquarters – upon request

9. Construction and Demolition (C&D) Materials: The Contractor shall, as identified by the COR, place roll-off containers at construction sites to collect recyclables (i.e. cardboard, scrap metal) and service them as necessary (i.e. bring cardboard to the Processing Station and the scrap metal to the Recycling Center). The Contractor shall provide a monthly report to the COR showing the weight of the recyclables (based on the total weight of the collection truck both before and after pick-up) collected from these facilities for each pick-up date, as well as the sites serviced on the third (3rd) work day of each month.

10. Personal Gain: Materials collected by the Contractor or received at any of the 3 recycling facilities and the FS/HAAF convenience center locations shall not be taken for personal gain or placed in the hands of unauthorized personnel or otherwise illegally taken, used, or disposed. The Contractor shall instruct employees to report unauthorized personnel hauling recyclable materials off-post to the PM/APM, who shall in-turn inform the COR of the unauthorized activity within 2 hours of identification.

11.Daily Route Sheets: The Contractor shall provide a preprinted Daily Route Sheet to the driver of each route each day for recycle collection. Each Daily Route Sheet shall include a full list of each location to be serviced for the daily route, to include the building number, recycling unit type (i.e. front load, roll-off, etc.), recycling unit size in cubic yards, and quantity of recycling units at each location along the route. The top of the Daily Route Sheet shall also include blocks for the driver to indicate total time spent completing the route; the total mileage for the day; any fuel, engine oil, hydraulic oil, and transmission fluid added to the vehicle; the driver's name and truck number; and the weight (in tons) collected. The bottom of the Daily

Route Sheet shall include a signature block for the driver to indicate completion of before, during and after vehicle inspections. Upon completing daily route, each driver shall complete the Daily Route Sheet. When completing the Daily Route Sheets, the driver shall identify any units not serviced, to include the reason the container was not serviced (i.e., the container is blocked, full of prohibited waste, etc.). Daily Route Sheets shall also identify violations of the recycling policy observed by the truck drivers (e.g. trash in recycling containers or the presence of yard waste in containers). At the end of each day, the driver will give the completed Daily Route Sheet to the PM/APM to use for reporting requirements. The COR will provide a sample Daily Route Sheet to the Contractor at the Post Award Conference. On the third (3rd) work day of each month the Contractor shall provide the COR with a summary of the Daily Route Sheet information with the monthly reporting. Daily Route Sheets shall be kept on file for the duration of the contract period and turned over to the COR at contract closeout.

12. Maintaining Control of Transported Material: The Contractor shall ensure all co-mingled recyclables are to be kept within the truck body at all times. The Contractor is responsible for ensuring that the truck contents are not allowed to escape from the truck body and cause litter in the community. Loaded trucks transporting commercial containers shall be secured with an adequate close fittings designed to cover the recycle load. Any materials or debris that falls while in transit shall be picked up immediately to prevent litter and a potential safety hazards to other motorist. Trucks shall be kept clean and free of objectionable odors and shall be kept in good mechanical condition at all times during the performance of the contract. Vehicles shall be subject to inspection by the COR periodically. Prior to collecting recyclable materials, refuse trucks shall be rinsed out to remove any waste or spoils, and they shall be allowed to dry to prevent moisture from saturating the recyclable materials and to prevent liquids from entering the Processing Station.

13. Recycling Containers: The Contractor shall safe guard container(s) to ensure no damage occurs. IAW the FS/HAAF Integrated Solid Waste Management Plan, the Contractor shall not service recycle collection containers that are contaminated with trash. In these instances, the Contractor will notify the COR by phone or email as soon as practicable but NLT 24 hours upon encountering a contaminated container. A summary of these violations will be provided to the COR on a weekly basis by close of business on the first working day of the following week (weekly report). A contaminated container is defined as one containing hazardous waste, regulated medical waste, other non-recyclable materials or an excessive amount of waste is present. On the third (3rd) work day of each month the Contractor shall provide the COR with a monthly report of containers (1) not serviced and the reason for their not being serviced, (2) taken out of service for being unserviceable, and (3) beyond reasonable repair in a Monthly Recycling Container Service Summary/Log.

14. Recordkeeping: All reports and records, including scale and haul sheets, shall be available for COR inspection at any time and be kept by the Contractor for the duration of the contract.

II. FS PROCESSING STATION OPERATIONS

1. General. The Contractor shall offload, separate, process, bale/containerize, and warehouse/store all recyclable materials as a raw material in a manner that constitutes recycling in compliance with the Resource Conservation and Recovery Act (as last amended in 1996) and in a manner that complies with all laws and regulations applicable at the time of Contract award. The Contractor shall package materials utilizing GFE in accordance with the operations procedures of said equipment.

2. Sorting Operation: The Contractor shall deliver weighed recyclable materials to the FS Processing Station per paragraph 5.1 and off-load them onto the main facility/tipping pad.

The Contractor shall then feed these recyclables onto the conveyor of the facility's main sorting line and hand-sort all commingled recyclable materials into required types (e.g. glass, paper, plastic, etc.) by dropping them into separate bins below the sorting line. The Contractor shall segregate the paper into individual categories (e.g. newspaper, magazines, white paper, etc.) via the paper sorting belt. Documents containing Personally Identifiable Information (PII) will be separated and processed through the shredder. The Contractor shall ensure all materials entering and leaving the Processing Station are weighed, to include non-recyclable waste from the segregating process (i.e. trash and contaminated recyclables). The Contractor shall maintain and provide an accurate inventory of recycled products and provide reports as specified in this PWS. TE 6 provides historical data regarding the combined total weight of recyclables that were processed/sold at the FS & HAAF Recycling Centers and FS Processing Station. Based on past experience/workload, the Contractor is expected to process a maximum of 300 tons of material per month through the Processing Station. (Averages are between six (6) – ten (10) tons per day with a maximum day of 25 tons based on the historical 4-year data (FY16-FY19).

3. Baling Preparation: The Contractor shall consolidate all materials (e.g. white paper, newspaper, plastic, etc.) with like materials in preparation for baling according to the manufacturer’s instructions and to meet buyers' specifications for adequate bales. Sufficient quantities of like materials must be accumulated before bales can be made. Certain materials will not be baled (e.g. glass). These materials shall be consolidated in accordance with the buyer's requirements in place at time of award and adjusted throughout the contract period of performance IAW industry/market standards.

4. Baling and Storage Procedures: The Contractor shall bale materials once sufficient quantities of like materials have accumulated. The Processing Station has an auto-tie baler inside the facility for baling cardboard. The Contractor shall use this baler to bale cardboard and then store the baled cardboard outside the facility (the baled cardboard is able to withstand the effects of the weather). The Processing Station also has a closed-door horizontal baler outside the facility that is used for baling plastic, metal cans, and paper. The Contractor shall bale all of these items with this baler and store them in the covered storage area outside the main facility (as these items must be protected from the effects of the weather). Glass and any other items beside cardboard shall also be stored in the covered storage area outside the main facility. It is the Contractor’s responsibility to provide all supplies necessary to operate and maintain the baling equipment.

5. Sale of Recyclables: The COR shall determine when processed recyclable materials will be sold. The Contractor shall assist in loading processed recyclables onto pre-designated buyer’s vehicles. The Government shall provide at least a 12-hour notice to the Contractor before arranging for scheduled pick-up of processed recyclables. For each sale, the Contractor shall record the weight of all recyclable materials, in pounds, by recyclable type/commodity, at or before the point of sale; the Contractor shall then provide the COR with this information NLT 24 hours after the pickup.

6. Serviceable and Non-Serviceable Parts and Equipment from Military Vehicles: The Contractor shall report any and all serviceable or non-serviceable parts or equipment from Military Vehicles turned in at the Processing Station to the COR within 24 hours of receipt.

A record of the name and unit making the turn-in, the date, and the item name must be recorded at the time of turn-in and the item must be separated from the other recyclables.

7. Accepting Materials Delivered to the FS Processing Station: The Contractor shall accept and process recyclable materials from surrounding counties/communities and from FS/HAAF government construction contractors with COR approval that wish to drop off pre-sorted and segregated recyclables. These materials are primarily separated (prior to delivery).

TE 6 provides historical data regarding the combined total weight of recyclables that were processed/sold at the FS & HAAF Recycling Centers and FS Processing Station. IAW the Memorandum of Agreement with Liberty County, presorted paper, glass, and cardboard are delivered to the Processing Station. The COR will tabulate, by organization/entity delivering the commodities, the weight of these deliveries and provided to the COR by the third (3rd) work day of the month with the monthly reporting.

8. Disposal of Non-Marketable Recyclable Materials: Non-recyclable solid waste inadvertently collected in the recyclable waste stream shall be transported to FS’s landfill. In each instance in which non-marketable recyclable materials must be taken to the landfill, the Contractor shall ensure that the materials are weighed before they are taken to the landfill and a report provided to the COR with the monthly reporting.

9. Monthly Recycling Product Report: The Contractor shall provide data to the COR for the Monthly Recycling Product Report, which provides a monthly summary of recycling activities for each of the three (3) recycling facilities. This data shall include the total weight in pounds of commingled material collected, the total amount of material shipped out to buyers, the total amount of waste hauled out of the Processing Station and Recycling Yard as trash after processing operations, the total number of bales processed for each recyclable product stream, and the total outgoing tonnages (sold) by product stream for the month. The Contractor shall provide weight tickets from the Government scale and record of receipts, if any, for each monthly report. The Contractor shall submit this data to the COR by the third (3rd) work day of the month. A sample Monthly Recycling Product Report will be provided to the Contractor before initiating recycling operations.

III. FS RECYCLING CENTER (METAL YARD) OPERATIONS

1. General. The Contractor shall operate and maintain the current Recycling Center located at Building 1143 at the end of Italy Street. This location shall be a brass deforming operation center, and a collection point for scrap metal, pallets, and miscellaneous items including but not limited to electronic equipment, washing machines, dryers, refrigerators, printer cartridges, scrap metal (i.e. wall lockers, desks, shelves, etc.), as well as for bulk storage of processed recyclable materials. The Contractor is required to load and weigh marketable materials that enter the Recycling Center, segregate them by type (e.g. boxed pallets from wing pallets, copper from aluminum, etc.), store, load, and weigh the marketable materials that exit the Recycling Center.

2. Brass Deforming Operations: The Contractor shall weigh and deform 50 caliber or below expended brass gleaned from firing range clearance operations delivered to the FS Metal Yard from the FS/HAAF Ammunition Supply Point (ASP). The Contractor, upon receipt, shall weigh the brass and provide this information to the COR by the third (3rd) work day of the month with the monthly commodities reporting. The brass requiring deformation will be accompanied by the appropriate safe clearance certifications with dual signatures provided on a DD Form 1348, Issue Release/Receipt Document prior to acceptance. ASP signatories will have completed appropriate training in the identification and recognition of Ammunition, Explosives and other Dangerous Articles (AEDA) as confirmed on a list provided annually by the Logistics Resource Center. The Contractor shall ensure all expended brass (50 caliber or below) is deformed. No expended brass larger than 50 caliber gleaned from firing range clearance shall be accepted at this facility. The Contractor shall maintain all copies of 1348s throughout the duration of the contract period of performance. All documents are the property of the government and shall be retained on site after contract closeout.

3. Accepting Materials Delivered to the FS Metal Yard: The Contractor shall accept and process recyclable materials from surrounding counties/communities and from FS/HAAF government construction contractors with COR approval that wish to drop off recyclables.

These materials are primarily separated (prior to delivery). TE 6 provides historical data regarding the combined total weight of recyclables that were processed/sold at the FS & HAAF Recycling Centers and FS Processing Station. . IAW the Memorandum of Agreement with Liberty County, presorted paper, glass, and cardboard are delivered to the Processing Station. The COR will tabulate, by organization/entity delivering the commodities, the weight of these deliveries and provided to the COR by the third (3rd) work day of the month with the monthly reporting.

4. Sale of Recyclables: The COR shall determine when processed recyclable materials will buyer’s vehicles. The Government shall provide at least a 12-hour notice to the Contractor before arranging for scheduled pick-up of processed recyclables. For each sale, the Contractor shall record the weight of all recyclable materials, in pounds, by recyclable

5. Serviceable Parts and Equipment: The Contractor shall report any and all serviceable parts or equipment turned in at the FS Metal Yard to the COR within 24 hours of receipt. A record of the name and unit making the turn-in, the date, and the item name must be recorded at the time of turn-in and the item must be separated from the other recyclables.

IV. HAAF RECYCLING CENTER OPERATIONS

1. General. The Contractor shall collect, transport, offload, separate, process, bale/containerize, and warehouse/store all recyclable materials as a raw material in a manner that constitutes recycling as defined in the RCRA. The Contractor shall package materials to be sold in accordance with buyer's specifications at the time of contract award.

2. Baling and Storage Procedures: The Contractor shall bale cardboard via the auto-tie baler once sufficient quantities of like materials have accumulated, and then store the bales in a manner to prepare them for sale. It is the Contractor’s responsibility to provide all supplies necessary to operate the baling equipment.

3. Accepting Materials Delivered to the HAAF Recycling Center: The Contractor shall accept and process recyclable materials from HAAF government construction contractors with COR approval that wish to drop off recyclables. These materials are primarily separated (prior to delivery). The weight of these deliveries will be tabulated by organization/entity delivering the commodities and provided to the COR by the third (3rd) work day of the month with the monthly reporting.

4. Sale of Recyclables: The COR shall determine when processed recyclable materials will buyer’s vehicles. The Government shall provide at least a 12-hour notice to the Contractor before arranging for scheduled pick-up of processed recyclables. For each sale, the Contractor shall record the weight of all recyclable materials, in pounds, by recyclable

5. Serviceable Parts and Equipment: The Contractor shall report any and all serviceable parts or equipment turned in at the HAAF Recycling Center to the COR within 24 hours of receipt. A record of the name and unit making the turn-in, the date, and the item name must be recorded at the time of turn-in and the item must be separated from the other recyclables.

V. CONTAINER MAINTENANCE

The Contractor shall perform maintenance, cleaning, repair, and painting as needed to maintain containers in a serviceable and presentable appearance and to control odors, insects, and disease vectors. For the purpose of this task, containers are defined as the government furnished 4,000 lb tip-hoppers, 8 yd dumpsters, 30 yd roll-off containers, and 20 yd trailers listed in GFE Paragraph 7.4 and TE 2. The Contractor shall inspect and perform maintenance, cleaning, repairs, and painting of 25% of the containers per quarter in order to maintain containers in a serviceable and presentable appearance and to control odors, insects, and disease vectors.

Minor welding and painting of the containers as well as repacking of wheel bearings and repair/replacement of tires on the 20 yd trailers is required as part of the services provided.

Additionally, replacement of doors and lids as well as drain caps is also required under this task to ensure stormwater infiltration is minimized and stormwater pollution is prevented.

Cleaning shall include thoroughly washing containers with steam or water. The Contractor shall, during the course of the Contract, assess the condition of the containers and report to the COR the estimated repair cost of those containers that are not in a serviceable condition.

If the estimated repair cost is less than 50 percent of the replacement cost, the Contractor shall repair the container upon COR approval, but if the estimated repair cost is 50 percent of the replacement cost or greater, the Government shall replace the container. Estimated repair cost quotes for repairs greater than 50 percent of the replacement cost must be submitted to the COR with the monthly report.

The Contractor shall coordinate with the COR to ensure replacement containers are provided whenever containers are removed from service to ensure that customers have access to recycling containers at all times. The Contractor shall notify the COR when additional containers are needed to handle increasing recyclable collections.

The Contractor shall perform all cleaning, painting, repair, and other maintenance requirements of containers in a location and in a manner that meets all local, state and federal rules and regulations. All container cleaning shall be performed at landfill wash rack #1380. Painting can be performed on Post at FS Bldg 1143 and HAAF Bldg 727.

The Contractor shall prepare and submit a Container Maintenance Plan NLT 30 days from NTP that outlines the plan to accomplish the requirements under this task. The Contractor will provide all labor, materials, supplies, and equipment necessary to accomplish this task. Paint supplied for this task shall be rust inhibiting and match existing color. Stickers and labels will be replaced when faded or worn and will be replaced in kind. On the third (3rd) work day of each month the Contractor shall provide the COR with a summary of the monthly container inspection and maintenance/repair activities which clearly demonstrates that the Contractor has inspected and performed maintenance, cleaning, repairs, and painting of 25% of the containers per quarter in order to maintain containers in a serviceable and presentable appearance and to control odors, insects, and disease vectors.

VI. FACILITY HOUSEKEEPING/APPEARANCE:

The Contractor shall maintain the internal and external appearances of the FS & HAAF Recycling Centers and FS Processing Station as it pertains to the activities associated with processing recyclable materials. This includes keeping the fencing free of vegetation, trimming the grass surrounding the facility and picking up all litter and trash both in and around the facility, The Contractor shall also pick up all recyclable materials that may fall in or around the facility or grounds during the drop-off and processing of materials. The Contractor shall maintain general housekeeping as required by the Resource Conservation and Recovery Act

(RCRA) as well as maintain the cleanliness of bathrooms and trash collection facilities. Care shall be exercised in the transfer of materials from initial and intermediate containers, and the Contractor shall clean up spillage by the end of each work day.

VII. HISTORICAL DATA:

TE 4 provides historical data regarding the combined total weight of recyclables that were processed/sold at the FS & HAAF Recycling Centers and FS Processing Station. Note that these recyclable commodities are collected, processed, and baled on a consistent basis even though some of the commodities are sold at irregular intervals. While this data provides insight into the volume of recyclables the Contractor may anticipate processing, the volume of recyclables may increase over the life of the Contract due to growth of the Installation, the return of soldiers to the Installation from deployment, and/or increased participation in recycling activity by its tenants.

VIII. TOURS:

The Contractor will ensure the facility is presentable and a safe environment to accommodate large groups of people (50-100) for the following periodic 1-hour tours that are not expected to impact operations:

1. Environmental Quality Control Committee (EQCC) - annually.

2. New Employee Orientation’s Briefing - quarterly.

3. Environmental Compliance Officer/Environmental Compliance Non- Commissioned Officer Course - quarterly.

4. Recycling Compliance Person (RCP) - monthly.

5. School, Youth Activity, Child Development Center, and Environmental Interest Groups – periodically (assume one per month)

Technical Exhibit 1
SPECIFIC TASKS
VIII. TOURS: