Technical_Exhibit_1_Hoist_List.pdf

PDF 21 KB Posted

Attached to
Overhead Hoist Maintenance and Inspections
Solicitation number
W9124M-17-T-0104
Issued by

About this file

Tech Exhibit 1 Hoist

View the file

Other files

File Type Posted
Hoist_Solicitation_Amendment.pdf PDF
Overhead_Hoist_Solicitation.pdf PDF
Hoist_PWS_FY17_12_Apr_17.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1129 1 Vehicle Maintenance Bay Yale 20' Monorail - Chainfall Electric 2 Jun-14 TFW 1129 2 Vehicle Maintenance Bay Cleveland tramrail 20' Monorail - Chainfall Manual 2 Non-operational, not in service 1160 3 Supply Bay (Yale) in house 10' Monrail Manual 2 Jun-14 1170 4 Vehicle Maintenance Bay Yale 10' Jib-Chain Manual 1 Jun-14 Dol-Restriced area; must sign in 1170 5 Vehicle Maintenance Bay Yale 10' Monorail - Chainfall Electric 2 Jun-14 Dol-Restriced area; must sign in 1170 6 Vehicle Maintenance Bay Yale 10' Jib Hoist Electric 1 Non-operational, not in service 1245 2 Supply Bay (CM) in house 10' Monorail - Chainfall Manual 1 May-14 1245 1 Supply Bay (CM) in house 10' Monorail - Chainfall Manual 1 May-14 1412 1 TFW Engineer Plant unknown 20' Jib-Chain Electric 1 1412 2 TFW Engineer Plant unknown 120' Jib-Chain Electric 1 Jun-14 1720 6 Vehicle Maintenance Bay Cleveland tramrail 20' Top Running Bridge Electric 1 Jun-14 7852 1 Radar tower (old) unkown 50' Monorail Electric 0.25 Non-operational, not in service 7855 1 Radar tower (New) unknown 50' Monorail Electric 0.25 Jun-14 8030 2 Equipment Bay Dayton 10' Jib Hoist Electric 1.5 Jun-14 Range Control 8325 1 Boat motor lift CM valuster 6' Monorail - Chain Electric 0.25 Jun-14 8325 2 Boat motor lift CM valuster 6' Monorail - Chain Electric 0.25 Jun-14

19103 1 Vehicle Maintenance Bay unkown ground Monorail - Chain Manual 2

241 1 Vehicle Maintenance Bay Philadelphia Tramrail 30' Underhung Bridge Electric 7.5 Jun-14 243 1 Outside over hang Wampfler 10' Top Running Bridge Electric 7.5 Jun-14 1201 1 Bldg Locked Monorail Circular 3 May-14 1208 1 Supply Bay Manning Maxwell Moorse 20' Underhung Bridge Electric 3 May-14 1215 1 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 5 May-14 1220 1 Bldg Locked Monorail Circular 3 May-14 1259 1 Bldg Locked Underhung Bridge 5 May-14 1261 1 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 5 May-14 1265 1 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 5 Jun-14 1320 1 Vehicle Maintenance Bay Philadelphia Tramrail 20' Top Running Bridge Electric 7.5 Non-operational, not in service 1320 2 Vehicle Maintenance Bay Philadelphia Tramrail 20' Top Running Bridge Electric 5 May-14

Height (approx)

MANUFACTURER &

MODEL

Power Source

Additional Information

Last Inspection Date prior to Award

Height (approx) TypeBuilding Description MANUFACTURER &

MODEL

Last Inspection Date prior to Award

TE 1 - Overhead Hoist List - FS

Load Rate (tons) Additional InformationBldg # Building DescriptionHoist #

Power Source

Total 0 - 2.5 ton hoist (FSGA) = 13 Operational

Bldg #

Type

Hoist # Load Rate (tons)

1320 3 Vehicle Maintenance Bay Philadelphia Tramrail 20' Top Running Bridge Electric 7.5 Non-operational, not in service 1339A 1 Outside over hang unknown 20' Underhung Bridge Manual 7.5 Non-operational, not in service 1339B 1 Outside over hang unknown 20' Underhung Bridge Manual 7.5 Non-operational, not in service 1340 1 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 5 Jun-14 1349 1 Outside over hang unknown 20' Underhung Bridge Electric 7.5 May-14 1350 1 Outside over hang unknown 20' Underhung Bridge Electric 7.5 May-14 1510 1 Vehicle Maintenance Bay Deshazo 20' Underhung Bridge Electric 5 1720 4 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 5 Jun-14 1720 5 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 5 Jun-14 1803 1 Vehicle Maintenance Bay Demag 20' Underhung Bridge Electric 5 Jun-14 1809 1 Vehicle Maintenance Bay FHS 20' Underhung Bridge Electric 7.5 Apr-14 1810 1 Vehicle Maintenance Bay FHS 20' Top Running Bridge 7.5 Jun-14 1820 1 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 7.5 Jun-14 1820 2 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 7.5 Jun-14 4502 1 Vehicle Maintenance Bay Cleveland tramrail 30' Underhung Bridge Electric 7.5 Apr-14 Gate Guard; must show ID 4528 1 Vehicle Maintenance Bay Deshazo 20' Top Running Bridge Electric 7.5 Jun-14 4531 1 Outside over hang Detriot 20' Underhung Bridge Electric 7.5 Apr-14 4577 1 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 7.5 Apr-14 4580 1 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 7.5 Jun-14 Gate Guard; must show ID 7704 1 Supply Bay American 20' Monorail - Chainfall Manual 3 Jun-14 8030 1 Equipment Bay Gajjar 20' Top Running Bridge Electric 5 Jun-14 Range Control

275 1 Vehicle Maintenance Bay Deshazo 20' Top Running Bridge Electric 10 Jun-14 1065 1 Vehicle Maintenance Bay Dearborn Crane 20' Demag Electric 10 Jun-14 Dol-Restriced area; must sign in 1065 2 Vehicle Maintenance Bay Dearborn Crane 20' Demag Electric 10 Jun-14 Dol-Restriced area; must sign in 1065 4 Vehicle Maintenance Bay Dearborn Crane 20' Demag Electric 10 Non-operational, not in service 1160 1 Vehicle Maintenance Bay Abell-Howe 20' Top Running Bridge Electric 25 Jun-14 1160 2 Vehicle Maintenance Bay Abell-Howe 20' Top Running Bridge Electric 15 Jun-14 1170 1 Vehicle Maintenance Bay Abell-Howe 20' Top Running Bridge Electric 25 Jun-14 Dol-Restriced area; must sign in 1170 2 Vehicle Maintenance Bay Abell-Howe 20' Top Running Bridge Electric 25 Jun-14 Dol-Restriced area; must sign in 1170 3 Vehicle Maintenance Bay Spanmaster 20' Underhung Bridge Electric 10 Jun-14 Dol-Restriced area; must sign in 1170 7 Vehicle Maintenance Bay Dearborn Crane 20' Demag Electric 35 Jun-14 Dol-Restriced area; must sign in 1620 1 Vehicle Maintenance Bay Philadelphia Tramrail 20' Top Running Bridge Electric 10 Jun-14 1630 1 Vehicle Maintenance Bay Philadelphia Tramrail 20' Top Running Bridge Electric 10 Jun-14 1720 1 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 25 Jun-14

Power Source

Load Rate (tons)

Height (approx)

Last Inspection Date prior to Award

Total 2.6 - 7.5 ton hoist (FSGA) = 28 Operational

MANUFACTURER &

MODELBldg # Hoist # Building Description Type Additional Information

1720 2 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 25 Jun-14 1720 3 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 10 Non-operational, not in service 1838 1 Vehicle Maintenance Bay Cincinniat Crane 20' Top Run Overhead Electric 10 May-14 4502 2 Vehicle Maintenance Bay Deshazo 30' Top Running Bridge Electric 35 Jun-14 Gate Guard; must show ID 4541 1 Vehicle Maintenance Bay Mazzella 30' Overhead Electric 35 Jun-14 4541 2 Vehicle Maintenance Bay Mazzella 30' Overhead Electric 10 Jun-14 4541 3 Welding Bay Mazzella 30' Top Running Bridge Electric 10 Jun-14 4545 1 Vehicle Maintenance Bay ISI Crane System 30' Overhead Electric 35 Jun-14 4545 2 Vehicle Maintenance Bay ISI Crane System 30' Overhead Electric 10 Jun-14 4577 2 Vehicle Maintenance Bay Deshazo 30' Top Running Bridge Electric 35 Jun-14 4578 1 Vehicle Maintenance Bay Cleveland tramrail 20' Underhung Bridge Electric 20 Jun-14 Gate Guard; must show ID 8005 1 Vehicle Maintenance Bay Deshazo 20' Top Running Bridge Electric 10 Jun-14 8403 1 Vehicle Maintenance Bay Systems Specialties 20' Top Running Bridge Electric 10 May-14 8408 1 Vehicle Maintenance Bay Systems Specialties 20' Top Running Bridge Electric 10 May-14 8413 1 Vehicle Maintenance Bay Systems Specialties 20' Top Running Bridge Electric 10 May-14 8418 1 Vehicle Maintenance Bay Systems Specialties 20' Top Running Bridge Electric 35 Jun-14 8424 1 Vehicle Maintenance Bay Systems Specialties 20' Top Running Bridge Electric 10 May-14 8429 1 Vehicle Maintenance Bay Systems Specialties 20' Top Running Bridge Electric 10 May-14 1839 1 Vehicle Maintenance Bay Deshazo 30' Top Running Bridge Electric 10 New Motor Pool 1720 7 Vehicle Maintenance Bay Dearborn Crane 30' Top Running Bridge Electric 35

Total 7.6 & Above ton hoist (FSGA) = 31 Operational

805 1 GANG Hangar Spacemaster SX 15' Monorail Manual 2 Apr-14 Hangar 805 2 GANG Hangar Spacemaster SX 15' Monorail Manual 2 Mar-14 Hangar 811 1 Shop Yale 10' Underhung - Chain Electric 2.5 May-14 811 2 Shop Yale 10' Stationary Manual 1 Mar-14 Stationary - thru new ceiling 811 3 Shop CM Cyclone 10' Stationary Manual 1.5 Mar-14 Stationary - thru new ceiling 830 1 USCG Hangar Budgit 115845-3 60' Chain Electric 1 Mar-14 Hangar 830 2 USCG Hangar Budgit 115845-3 60' Chain Electric 1 Mar-14 Hangar 830 3 USCG Hangar Shawbox 60' Motor Driven Electric 2 Mar-14 Hangar 842 1 CH-47 Maint Hangar Gorbel 30' Underhung - Chain Hydraulic 1 Non-operational, not in service 850 5 Hangar CM Cyclone 20' Monorail - Chain Manual 1 Mar-14 Hangar 1206 1 1/75 Ranger Parachute Yale 100' Underhung - Cable Electric 1.5 May-14 Parachute Silo 1206 2 1/75 Ranger Parachute Yale 100' Underhung - Cable Electric 1.5 May-14 Parachute Silo 1206 3 1/75 Ranger Parachute Yale 100' Underhung - Cable Electric 1.5 May-14 Parachute Silo 1206 4 1/75 Ranger Parachute Yale 100' Underhung - Cable Electric 1.5 May-14 Parachute Silo 7901 2 3ID Avn Hangar FEM 1B 20' Underhung - Cable Electric 1.5 Mar-14 Hangar 7901 3 3ID Avn Hangar Monorail - Rope 1.5 Mar-14 7901 4 3ID Avn Hangar Monorail - Rope 1.5 Mar-14 7911 1 3/160 SOAR Hangar Yale 60' Monorail Electric 2 May-14 Hangar 7911 2 3/160 SOAR Hangar Yale 15' Monorail Electric 2 Mar-14 Shop 8045 1 Engine Test Pad CM Lodestar 12' Under Running Chain Electric 1 Apr-14 Btwn DAACG & FD

708 1 1/75 Motor Pool Mazzella 50' Top Running Bridge Electric 7.5 Mar-14 Motor Pool 708 2 1/75 Motor Pool FHS 50' Top Running Bridge Electric 7.5 Motor Pool 805 3 GANG Hangar Gajjar 60' Overhead Electric 5 Mar-14 Hangar 833 1 AMCOM Shawbox 12' Top Running Bridge Electric 5 Mar-14 Shop 850 1 Hangar Detroit Hoist 60' Underhung - Cable Electric 4 Jun-14 Hangar 850 2 Hangar Detroit Hoist 60' Underhung - Cable Electric 4 Jun-14 Hangar 850 3 Hangar Detroit Hoist 60' Underhung - Cable Electric 4 Jun-14 Hangar 850 4 Hangar R&M Spacemaster SX 60' Underhung - Cable Electric 4 Jun-14 Hangar

Power Source

Additional Information

Height (approx)

Bldg # Hoist # Building Description MANUFACTURER &

MODEL

Height (approx)

Type

Type

Last Inspection Date prior to Award

Last Inspection Date prior to Award

TE 1 - Overhead Hoist List - HAAF

Load Rate (tons) Additional InformationHoist #Bldg # Building Description MANUFACTURER &

MODEL

Power Source

Load Rate (tons)

Total 0 - 2.5 ton hoist (HAAF) = 19 Operational

860 1 Hangar Detroit Hoist 60' Underhung - Cable Electric 4 Jun-14 Hangar 860 2 Hangar Detroit Hoist 60' Underhung - Cable Electric 4 Jun-14 Hangar 860 3 Hangar Detroit Hoist 60' Underhung - Cable Electric 4 Jun-14 Hangar 860 4 Hangar Detroit Hoist 60' Underhung - Cable Electric 4 Jun-14 Hangar 1062 1 DPW Maint Bay Spacemaster SX 40' Underhung - Cable Electric 5 Mar-14 Motor Pool 1130 1 224 MI Hangar R&M 40' Underhung - Cable Electric 3.5 Jun-14 MI Hangar 1130 2 224 MI Hangar Harrington 40' Underhung - Chain Electric 3.5 Jun-14 MI Hangar 1131 1 224 MI Hangar R&M 40' Underhung - Cable Electric 3.5 Jun-14 MI Hangar 1131 2 224 MI Hangar R&M Spacemaster SX 40' Underhung - Cable Electric 3.5 Jun-14 MI Hangar 1132 1 224 MI Hangar R&M 40' Underhung - Cable Electric 3.5 Jun-14 MI Hangar 1132 2 224 MI Hangar R&M 40' Underhung - Cable Electric 3.5 Jun-14 MI Hangar 1336 1 4/3 Avn Bn Motor Pool Electric 7.5 Mar-14 Motor Pool 1336 2 2/3 Avn Bn Motor Pool Wright 30' Underhung - Cable Electric 7.5 Mar-14 Motor Pool 1420 1 603d ASB Motor Pool R&M Spacemaster SX 40' Underhung - Cable Electric 7.5 Mar-14 Main Fuel Point 1420 2 603d ASB Motor Pool R&M Spacemaster SX 40' Underhung - Cable Electric 7.5 Mar-14 Main Fuel Point 7901 1 3ID Avn Hangar FEM 2M 60' Underhung - Cable Electric 4 Mar-14 Hangar 7902 1 3/160 SOAR Hangar FEM 2M 40' Underhung - Cable Electric 4 Mar-14 Hangar 7902 2 3/160 SOAR Hangar FEM 2M 40' Underhung - Cable Electric 4 Mar-14 Hangar 7911 3 3/160 SOAR Hangar Yale 15' Overhead Electric 3 Mar-14 Shop 7911 4 3/160 SOAR Hangar Yale 50' Overhead Electric 5 Mar-14 Hangar 7911 5 3/160 SOAR Hangar Yale 50' Overhead Electric 5 Mar-14 Hangar 8005 1 3/160 Motor Pool RJ Mack Co 30' Double Girder - Cable Electric 7.5 Apr-14 Motor Pool 8657 1 IRC Motor Pool Morris OMI 40' Top Running Bridge Electric 7.5 Mar-14 Motor Pool across from Sabre Hall complex

1310 1 603 Avn Bn Motor Pool Demag 20' Underhung - Cable Electric 10 Mar-14 Motor Pool

Last Inspection Date prior to Award

Bldg # Hoist # Building Description MANUFACTURER &

MODEL

Height (approx)

Total 7.6 & Above ton hoist (HAAF) = 1 Operational

Load Rate (tons) Additional InformationType Power

Source

Total 2.6 - 7.5 ton hoist (HAAF) = 31 Operational

File details come from the government source that posted it. Updated .