TE5_2-036_Performance_Requirements.pdf
PDF 15 KB Posted
- Attached to
- FORT KNOX HVAC SERCIVE
- Solicitation number
- W9124D-15-B-0012
About this file
Performance Requirements Summary
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 5.2-36
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Required Services (Tasks)
Performance Standard ACCEPTABLE
QUALITY
LEVEL %
Method of Surveillance
Disincentive
# 1 Preventive Maintenance (paragraph 5.2.1.4.1)
Perform work as specified and in accordance with all applicable regulations, and professional and quality standards. (Quality)
97.5% Random sample supported by validated customer complaints and incidental inspections.
CDR
# 2 Preventive Maintenance
(paragraph 5.2.1.4.1)
Perform maintenance and inspection in accordance with specified PM schedules.
(Timeliness)
96% Random sample supported by validated customer complaints
# 3 Preventive Maintenance (paragraph 5.2.1.4.1)
Maintain documentation as required. (Reporting)
96% Random Sampling CDR
#4 Service Orders (paragraph 5.2.1.4.2)
Perform work in accordance with all applicable professional and quality standards. (Quality)
97.5% Random sample supported by validated customer complaints and incidental inspections.
CDR
#5
Respond to and complete SOs in accordance with contract requirements and timeframes.
(Timeliness)
97.5% Random sample supported by validated customer complaints and incidental inspections.
CDR
#6
Maintain complete and accurate records of work. (Reporting)
96% Random Sampling CDR
#7 Schedules and Reports (paragraph 5.2.1.4.1)
Submit reports and schedules as required. (Quality and Timeliness)
97.5% 100% Inspection CDR
#8 BUD Locates (paragraph 5.2.1.4)
Contractor shall accurately locate and mark underground HVAC equipment (geothermal lines, ect.) for BUD requests
Within 5 days of request
Random sample supported by validated customer complaints
File details come from the government source that posted it. Updated .