This sources sought synopsis requests capability statements for a planned maintenance contract for central energy plants at Fort Jackson, South Carolina. The contract will provide personnel, equipment, supplies and non-personal services to perform preventative maintenance, demand maintenance, emergency repairs and water treatment services for boilers, chillers, pumps, pipes and associated systems. Capability statements are due by December 22, 2021 and must demonstrate experience with similar requirements, project management capabilities, and technical skills to perform required tasks. Respondents must indicate if they qualify as a small, small disadvantaged, women-owned, HUBZone or veteran-owned small business. The contract type is anticipated to be firm fixed price for one base year plus four option years commencing around September 1, 2022.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Central Energy Plant Planned Maintenance Contract

Technical Exhibit 4: Chemicals

CEP 3

Common Name

1st Month

2nd Month

3rd Month

4th Month

5th Month

6th Month

7th Month

8th Month

9th Month

10th Month

11th Month

12th Month tolyltriazole 1 1 Silicate 1 1 Sulfite 2 1 1 1 1 Caustic + Tannin

Non-oxidizing biocide (Isothiazolin)

1 1 1 1 1 1 1 1

Oxidizing biocide (Bromine)

1 1 1 1 1 1 1 1 1 1 1 1

Corrosion inhibitor (Sodium tolyltriazole with fluorescent tracer)

1 1 1 1 1 1 1 1

CEP 1

Common Name

1st Month

2nd Month

3rd Month

4th Month

5th Month

6th Month

7th Month

8th Month

9th Month

10th Month

11th Month

12th Month tolyltriazole 1 1 Silicate 1 1 Sulfite 2 1 1 1 1 1 1 Caustic + Tannin

Non-oxidizing biocide (Isothiazolin)

1 1 1 1 1 1 1 1

Oxidizing biocide (Bromine)

1 1 1 1 1 1 1 1 1 1 1 1

Corrosion inhibitor (Sodium tolyltriazole with fluorescent

CEP 2

Common Name

1st Month

2nd Month

3rd Month

4th Month

5th Month

6th Month

7th Month

8th Month

9th Month

10th Month

11th Month

12th Month tolyltriazole 2 1 1 Silicate 2 1 1 Sulfite 2 1 1 1 1 1 1 1 Caustic + Tannin

Non-oxidizing biocide (Isothiazolin)

2 2 2 2 2 2 2 2

Oxidizing biocide (Bromine)

2 2 2 2 2 2 2 2 2 2 2 2

Corrosion inhibitor (Sodium tolyltriazole with fluorescent

2 2 2 2 2 2 2 2

CEP 4

Common Name

1st Month

2nd Month

3rd Month

4th Month

5th Month

6th Month

7th Month

8th Month

9th Month

10th Month

11th Month

12th Month tolyltriazole 2 1 1 Silicate 2 1 1 Sulfite 2 1 1 1 1 Caustic + Tannin

Non-oxidizing biocide (Isothiazolin)

1 1 1 1 1 1 1 1

Oxidizing biocide (Bromine)

1 1 1 1 1 1 1 1 1 1 1 1

Corrosion inhibitor (Sodium tolyltriazole with fluorescent

1. Provider will maintain, adjust and calibrate all chemical feed pumps and be responsible for all chemical feed hook-ups, using only flexible tubing. Electrical outlets will be provided by the Governmental Agency. All chemical feed pumps to be replaced will be approved and provided by the Governmental Agency.

2. Any spillage will be the responsibility of provider for clean-up. In the event of a spillage of chemicals, Governmental personnel will be notified as soon as condition is found/occurs.

3. Provider will provide a water treatment control chart for each system showing quantity of treatment to be applied, control ranges, and bleed/blowdown control setting or rate. This information will be posted near each piece of equipment.

4. Provider will maintain inventory levels of chemical treatments, laboratory reagents and cleaning compounds at central storage Governmental Agency provided location

5. Provider will deliver the chemical treatments to the appropriate storage area provided by the Governmental Agency (if needed). The chemical treatment products will be transported to appropriate point of use location as needed, to provide uninterrupted chemical treatment application at the level required to maintain corrosion rates and scale deposition within industry standards.

6. Provider will provide all test kits and reagents to maintain an on-site laboratory in Governmental Agency provided space for Governmental Agency Personnel testing purposes.

7. Provider will provide Technical support for all water treatment related problems that may occur and non-water related problems where applicable.

8. Provide a quarterly report showing the monthly chemical usage report per tower system and for each boiler and chiller plant

9. Provider will provide a complete analysis once each week during the cooling season on the Cooling Tower water system for all Cooling Towers of 50 Tons or more. The Closed Loops will be tested on an annual basis. The water analysis will include, but not be limited to the following: Conductivity, pH, Inhibitor Level, Hardness, Chlorides, Alkalinity and Concentration Cycles. A report will be provided with the analysis, to provide details on the condition of the treated system water, any adjustments made, treatment inventory level, and advise when additional chemical treatment is needed and added to the chemical feed tank.

10. Provider will run bacterial levels (by dip slide method) in all open loop cooling systems weekly with annual dip slide bacterial level testing in all closed loops.

11. Provider to perform analysis of coupon racks for recommendation of dosage and treatment.

12. Provider will be responsible for determining the appropriate chemical feed, and blowdown for all designated systems to insure proper operation.

13. Provide recommendations, consulting, and trouble-shooting assistance as necessary in order to improve results, reduce energy and water cost, and system reliability.

14. Provide Operator Training as mutually agreed upon with Governmental Agency Supervisors.

15. Provide information and treatment recommendations for preparation of steam boilers for wet or dry stand-by or for long term storage.

16. Provider will provide analysis and written reports for the makeup water, softener effluent, dealkalizer (where applicable), boiler feedwater, boiler water and condensate for each boiler system. The analysis will include, but not be limited to Conductivity, pH, P Alkalinity, M Alkalinity, Chlorides, Phosphate, Total Hardness, and Phosphate as applicable:

Common Name

Desired product

Pounds per container

Price per container

Make-up Year supply

Total cost tolyltriazole CHEM-

AQUA

34120

550# $1,150.00 1 lb/ 4802 gal

12 13800.00

Silicate CHEM-

AQUA

117c

630# $1,776.60 1 lb/ 4284 gal

12 21319.20

Sulfite CHEM-

AQUA

10270

590# $477.90 1 lb/ 385 gal

29 13859.10

Caustic + Tannin

CHEM-

AQUA

11900

600# $504.54 1 lb/ 11250 gal

8 4036.32

Non-oxidizing biocide (Isothiazolin)

CHEM-

AQUA

40215

460LB 1140.80 Evaporation Weather

40 45632.00

Oxidizing biocide (Bromine)

CHEM-

AQUA

42171

570LB 2023.50 Evaporation

60 121410.00

Corrosion inhibitor (Sodium tolyltriazole with fluorescent tracer)

CHEM-

AQUA

31155

520LB 1159.60 Evaporation

40 46384.00

This is based on an average weather temp of 78 degrees for towers and 1 million gallon leak in each plant for the year on the CHW and MTW closed-loops, and after initial dose set on the 3 month values.

Prices are for Chem-Aqua GSA contract product list.

Delivery to each of plants holding tanks preferably.

Monthly test and concentration by chemical provider, as well as test means for local use and verification (provide us with required test kits for the chemicals provided).

Provide training for chemical use provided.