W9124724R0021_Special Notice_Fort Liberty ALMCS Requirement_01232024.pdf

PDF 109 KB Posted

Attached to
Airfield Lighting & Control System Services
Solicitation number
W9124724R0021
Issued by

About this file

This special notice announces the Department of the Army Materiel Command Mission and Installation Contracting Command's intent to award a sole-source contract to ADB Safegate Americas LLC for airfield lighting control and monitoring system repair and maintenance services at Fort Liberty, North Carolina. The contractor will be responsible for semi-annual routine maintenance, repairs, updates, and technical assistance to ensure operational readiness of the airfield lighting control computer systems and software installed by ADB Safegate. Market research found the ALMCS software to be proprietary, and no other companies capable of providing the required services. The period of performance will be one year with four optional one-year renewal periods. The notice initiates a 15-day waiting period before contract award to determine if a competitive procurement is in the government's best interest.

View the file

Other files

File Type Posted
PWS-Airfield Lighting_PAAF Update _ 01242024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This notice announces the intent by Mission Installation Contracting Command (MICC) Fort Liberty in support of the Department of Public Works (DPW) to procure Airfield Lighting Control and Monitoring Systems (ALCMS) repairs and maintenance services without competition as prescribed in FAR 13.501(a)(1)(ii).

The proposed contract will facilitate the computer Airfield Lighting Control and Monitoring Systems (ALCMS) repairs and maintenance services. The computer for the ALCMS is the interface between the air traffic control tower and the airport lighting systems located at Pope Army Airfield, NC.

It is essential that the system be reliable, and that the system be simple to maintain by airport personnel.

The contractor shall maintain and keep the new Airfield Lighting Control and Monitoring System current and in good working order. It is important that the contractor shall use only like equipment that the contractor has installed since the equipment upgrade. The Contractor shall be responsible for servicing, updating, repairing, and providing technical assistance as necessary to ensure operational readiness and compliance with applicable airfield regulations. Contractor shall provide semi-annual routine maintenance services that permit the early detection and correction of items that, if deficient or defective, would interfere with normal operations for the Airfield Lighting Control Systems equipment listed.

Maintenance work shall include comprehensive operational inspection, updates, and adjustments to ensure the satisfactory functioning of computer software programs, communication systems, switch panels, power systems and computer hardware components.

Through market research and historical information, it was discovered that it would be necessary to utilize ADB Safegate Americas LLC, for maintenance and repair of the existing ALCMS equipment and software. An ADB Safegate regional sales manager, stated in a March 1, 2022 email that the software in its ALCMS systems is proprietary. Additionally, previous market research has been found that there are no small or large companies can provide this service.

DPW’s current plan is to procure a maintenance and service repairs contract that will ensure continuous operation of the computer systems. The ALCMS is designed to revert to a fail-safe mode upon computer failure, communications failure, or loss of power. Under fail-safe conditions, airport lighting equipment that is operating at the time of failure shall continue to work at the same intensity level. This action shall allow DPW to improve airfields maintenance. The Contractor shall provide all labor, service and repair parts, components, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the required maintenance and repair of the airfield lighting control systems, as defined in this Performance Work Statement (PWS), except for those items specified as Government furnished property and services or acts of God, which will be procured through an alternate method.

This announcement fulfills the synopsis requirements under FA 5.203(a). MICC-Fort Liberty intends to publish a solicitation no sooner than 15 days after publishing this synopsis. This Special Notice of Intent is not a request for competitive quotes. Information received in response to this notice will be considered solely for the purpose of determining whether a competitive procurement is in the best interest of the Government. If no written responses are received by the date listed below, which reflects at least fifteen

(15) days after the publication of this notice, the solicitation will be issued as sole source requirement.

File details come from the government source that posted it. Updated .