Technical_Exhibit_1_-_SRT2P_PRS_v2,_19_Jun_18.pdf

PDF 25 KB Posted

Attached to
Strength and Conditioning Coach (SCC) Support Services Request for Proposals (RFP)
Solicitation number
W9124718R0012
Issued by

About this file

TE 1 - PRS

View the file

Other files

File Type Posted
W91247-18-R-0012-0003_Amendment_FORSCOM_SCC_17AUG18.pdf PDF
W91247-18-R-0012-0003_Amendment_FORSCOM_SCC_17AUG18.pdf PDF
W91247-18-R-0012-0003_Amendment_Conformed_Copy_FORSCOM_SCC_17AUG18.pdf PDF
W91247-18-R-0012-0002_Amendment_Conformed_Copy_FORSCOM_SCC_15AUG18.pdf PDF
W91247-18-R-0012-0002_Amendment_FORSCOM_SCC_15AUG18.pdf PDF
W91247-18-R-0012-0001_Amendment_Conformed_Copy_FORSCOM_SCC_15AUG18.pdf PDF
Technical_Exhibit_7_Amend_0001_QAs_W9124718R0012_15AUG2018_v3.pdf PDF
W91247-18-R-0012-0001_Amendment_FORSCOM_SCC_15AUG18.pdf PDF
Q&As_from_DRAFT_Solicitation_10AUG2018.pdf PDF
Technical_Exhibit_6__Schedule_Security_Requirements,_DD_Form_254.pdf PDF
Technical_Exhibit_1__Performance_Requirements_Summary,_SCC_9_Aug_2018.pdf PDF
Technical_Exhibit_2__Deliverables,_SCC_9_Aug_2018.pdf PDF
W91247-18-R-0012_FORSCOM_SRT2P_FINAL_RFP_9AUG2018.pdf PDF
Technical_Exhibit_5__Wage_Determination,_SCC_9_Aug_2018.pdf PDF
Technical_Exhibit_4__Government_Furnished_Property.pdf PDF
Technical_Exhibit_3_-_Site_Locations,_SCC_9_Aug_2018.pdf PDF
Technical_Exhibit_2_-_Deliverables_v2_27JULY2018.pdf PDF
Technical_Exhibit_3_-_Site_Location_v3,_27JULY2018.pdf PDF
W91247-18-R-0012_DRAFT_RFP_FORSCOM_SCC_30JULY_2018.pdf PDF
Technical_Exhibit_4_-_Government_Furnished_Property_Listing.pdf PDF
Technical_Exhibit_5_-_Wage_Determinations,_30JULY18.pdf PDF
Technical_Exhibit_6_-_Schedule_Security_Requirements,_DD_Form_254.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHICAL EXHIBIT 1

Performance Requirements Summary (PRS)

The PRS table below reflects tasks/deliverables considered by the Government to be most important for the successful performance of this PWS. This includes the expected standards of performance and planned reductions for not meeting those standards. The Government will establish a Quality Assurance Surveillance Plan (QASP) that is not part of this PWS in order to monitor performance requirements summary items described in the table below.

PWS

Reference Performance Objective Performance / Standard (s)

Acceptable Quality Level

(AQL)

Incentives/ Disincentives for

Not Meeting Performance

Standards PWS Para 1.6.1

Submit Quality Control Plan

Submit to the KO final plan NLT 30 days after contract award or 5 days after changes made to accepted plan.

On-time delivery at 95% level

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System.

PWS Para 1.21.1.1.

Complete Anti-Terrorism (AT) Level 1 Training and provide Certificates

Successfully conduct AT Level 1 Training 100% of the time, within 30 calendar days of the completion of the contract Phase-in/Option Year award

On-time delivery at 95% level

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para 1.22.4.

Complete OPSEC Level 1 Training and provide Certificates

Successfully conduct OPSEC Training 100% of the time, within 30 calendar days of days of the completion of the contract Phase-in/Option Year award

On-time delivery at 95% level

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS

Para1.22.5.

Complete Sexual Harassment/Assault Response Prevention (SHARP) Training

Successfully conduct iWATCH Training 100% of the time, within 30 calendar days of days of the completion of the contract Phase-in /Option Year award, documenting completion in the appropriate Monthly Status Report

On-time delivery at 95% level

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para 1.22.1.2.

Complete iWATCH Training

Successfully conduct IA Training 100% of the time, within 30 calendar days of days of the completion of the contract Phase-in /Option Year award, documenting completion in the appropriate Monthly Status Report

On-time delivery at 95% level

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para 5.2.1.

Submit the Monthly Status report to the COR

The Contractor shall provide timely, accurate Monthly Status Report within 5 working days

91% minimum acceptable level of service

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para 1.24.1.2.

Submit Long Distance Trip Reports

Complete written trip reports of meetings/conferences within five working days of travel completion

Meet delivery schedule milestone at 90% level, as required

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para 5.1.2.

Participate in unit leadership meetings involving discussions on Physical Training Program

Active participate in unit staff meetings or other meetings involving the SRT2P Physical Training Program

Participate in 90% of scheduled meetings

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para

5.1.7.4 and 5.1.8.3

Develop and submit unit physical training programs

Successfully submit the Company Level Training Program using the approved SRT2P Training template

On-time delivery at 95% level

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para

5.1.7.1 and 5.1.8.3

Review Unit Physical Training Program

Review and make appropriate changes to the Unit Physical Training Program Quarterly

On-time delivery at 95% level

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para

5.1.7.7 and 5.1.8.6

Oversee Unit Physical Training Program

Attend, observe and participate in scheduled Physical training events

Participate in scheduled PT with each individual Company at least 3 time per month

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para

5.1.7.7 and 5.1.8.6

Coordinate Profile Physical Training Program

Attend, observe and participate in scheduled Physical training events

Participate in scheduled Profile PT at least 3 time per month

Contractor compliance rate shall be utilized as objective evidence of contract compliance

PWS Para

5.1.7.6 and 5.1.8.6

Coordinate Pregnancy Physical Training Program

Attend, observe and participate in scheduled Physical training events

Participate in scheduled Profile PT at least 3 time per month

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para 5.1.7.10

Provide Training to Unit Fitness Trainers

Proved weekly training sessions with unit Fitness leaders (including the MFTs and TSAC-F)

On-time delivery at 95% level

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System

PWS Para 5.3. Contractor Manpower Reporting

Complete contractor manpower reporting within the CMR website by 31 Oct of each year for last Fiscal Year.

Meet delivery schedule milestone

Contractor compliance rate shall be utilized as objective evidence of contract compliance

Note: Government surveillance of Contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.