SOW_Attachment_B_-_NCANG_Leak_Investigation_Report_-_Bldg._3.pdf

PDF 413 KB Posted

Attached to
Repair Multiple Facilities
Solicitation number
W91242-17-B-0994
Issued by

About this file

SOW Attachment B - NCANG Leak Investigation Report - Bldg. 3

View the file

Other files

File Type Posted
Visitor_Request_Worksheet.pdf PDF
SOW_Attachment_A_-_NCANG_Leak_Investigation_Report_-_Bldg._12.pdf PDF
Bid_Schedule_Mulitple_Facilities_RTS_-_Blank.docx DOCX document
W91242-17-B-0994_0001.pdf PDF
Statement_of_Work.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair roof at Building#3 (4900 sq ft)

Work scope for Building# 3

1. Clean and prepare areas that are in need of repairs

2. Prime and install 5” cover strip over all field seams that loose or have shown signs of pulling loose.

3. Install patches to 7 corners of curbs wall corners that have holes or voids that are leaking

4. Repair or replace and seal 6 pipe boots that appear to have failed over the years

5. Check 7 roof drains for loose bolts and install new target patch around each drain

6. Provide owner with a 1 year workmanship warranty

Attachment B - NCANG Leak Investigation - Bldg. 3

31 May 2017

Photograph 1 – Seams Pulling Loose

Attachment B - NCANG Leak Investigation - Bldg. 3

Photograph 2 – Patches loose

Photograph 3 – Patches loose

Photograph 4 – Seams pulling loose

File details come from the government source that posted it. Updated .