SOW_Attachment_B_-_NCANG_Leak_Investigation_Report_-_Bldg._3.pdf
PDF 413 KB Posted
- Attached to
- Repair Multiple Facilities
- Solicitation number
- W91242-17-B-0994
About this file
SOW Attachment B - NCANG Leak Investigation Report - Bldg. 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Visitor_Request_Worksheet.pdf | ||
| SOW_Attachment_A_-_NCANG_Leak_Investigation_Report_-_Bldg._12.pdf | ||
| Bid_Schedule_Mulitple_Facilities_RTS_-_Blank.docx | DOCX document | |
| W91242-17-B-0994_0001.pdf | ||
| Statement_of_Work.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair roof at Building#3 (4900 sq ft)
Work scope for Building# 3
1. Clean and prepare areas that are in need of repairs
2. Prime and install 5” cover strip over all field seams that loose or have shown signs of pulling loose.
3. Install patches to 7 corners of curbs wall corners that have holes or voids that are leaking
4. Repair or replace and seal 6 pipe boots that appear to have failed over the years
5. Check 7 roof drains for loose bolts and install new target patch around each drain
6. Provide owner with a 1 year workmanship warranty
Attachment B - NCANG Leak Investigation - Bldg. 3
31 May 2017
Photograph 1 – Seams Pulling Loose
Attachment B - NCANG Leak Investigation - Bldg. 3
Photograph 2 – Patches loose
Photograph 3 – Patches loose
Photograph 4 – Seams pulling loose
File details come from the government source that posted it. Updated .