SOLICIATION NO. W91238-19-B-0012
1 of 1 AM0001
FEATHER RIVER RIGHT BANK
SUTTER COUNTY, CALIFORNIA
PL 84-99 EMERGENCY LEVEE REPAIRS
SITE 0521-41
AMENDMENT 0001 - SUMMARY:
A) SPECIFICATION 2213
1) Replaced entire Section 01 22 00
2) Replaced entire Section 01 35 26
3) Replaced entire Section 31 00 00
4) Replaced entire Section 31 11 00
5) Replaced entire Section 31 56 14
B) DRAWINGS
1) Replaced entire Sheet C-117
23 August 2019
PL 84- 99 Emer gency Levee Repai r Spec No. 2213 Si t e 0521- 41 - Feat her Ri ver Final
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00
PRI CE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 SI NGLE JOB PAYMENT I TEMS
1. 2. 1 Mobi l i zat i on and Demobi l i zat i on
1. 2. 1. 1 Payment
1. 2. 1. 2 Uni t of Measur e
1. 2. 2 SWPPP Desi gn and I mpl ement at i on
1. 2. 2. 1 Payment
1. 2. 2. 2 Uni t of Measur e
1. 2. 3 Tempor ar y Fenci ng, Si gnage, and Tr af f i c Cont r ol
1. 2. 3. 1 Payment
1. 2. 3. 2 Uni t of Measur e
1. 2. 4 Demol i t i on
1. 2. 4. 1 Payment
1. 2. 5 Concr et e Headwal l
1. 2. 5. 1 Payment
1. 2. 5. 2 Uni t of Measur e
1. 2. 6 Vaul t
1. 2. 6. 1 Payment
1. 2. 6. 2 Uni t of Measur e
1. 3 UNI T PRI CE PAYMENT I TEMS
1. 3. 1 Cl ear i ng and Gr ubbi ng
1. 3. 1. 1 Payment
1. 3. 1. 2 Measur ement
1. 3. 1. 3 Uni t of Measur e
1. 3. 2 St r i ppi ng
1. 3. 2. 1 Payment
1. 3. 2. 2 Measur ement
1. 3. 2. 3 Uni t of Measur e
1. 3. 3 Tr ee Removal
1. 3. 3. 1 Payment
1. 3. 3. 2 Measur ement
1. 3. 3. 3 Uni t of Measur e
1. 3. 4 Excavat i on
1. 3. 4. 1 Payment
1. 3. 4. 2 Measur ement
1. 3. 4. 3 Uni t of Measur e
1. 3. 5 SB Cut of f Wal l
1. 3. 5. 1 Payment
1. 3. 5. 2 Measur ement
1. 3. 5. 2. 1 Uni t of Measur e
1. 3. 6 Levee Fi l l
1. 3. 6. 1 Payment
1. 3. 6. 2 Measur ement
1. 3. 6. 3 Uni t of Measur e
SECTI ON 01 22 00 Page 1
AM0001
1. 3. 7 Random Fi l l
1. 3. 7. 1 Payment
1. 3. 7. 2 Measur ement
1. 3. 7. 3 Uni t of Measur e
1. 3. 8 18" Wel ded St eel Pi pe
1. 3. 8. 1 Payment
1. 3. 8. 2 Measur ement
1. 3. 8. 3 Uni t of Measur e
1. 3. 9 24" Wel ded St eel Pi pe
1. 3. 9. 1 Payment
1. 3. 9. 2 Measur ement
1. 3. 9. 3 Uni t of Measur e
1. 3. 10 18" Gat e Val ve
1. 3. 10. 1 Payment
1. 3. 10. 2 Measur ement
1. 3. 10. 3 Uni t of Measur e
1. 3. 11 18" Ai r Rel ease Val ve
1. 3. 11. 1 Payment
1. 3. 11. 2 Measur ement
1. 3. 11. 3 Uni t of Measur e
1. 3. 12 24" Gat e Val ve
1. 3. 12. 1 Payment
1. 3. 12. 2 Measur ement
1. 3. 12. 3 Uni t of Measur e
1. 3. 13 24" Ai r Rel ease Val ve
1. 3. 13. 1 Payment
1. 3. 13. 2 Measur ement
1. 3. 13. 3 Uni t of Measur e
1. 3. 14 Hydr oseedi ng
1. 3. 14. 1 Payment
1. 3. 14. 2 Measur ement
1. 3. 14. 3 Uni t of Measur e
1. 3. 15 Aggr egat e Sur f aci ng
1. 3. 15. 1 Payment
1. 3. 15. 2 Measur ement
1. 3. 15. 3 Uni t of Measur e
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 CONTRACT COST BREAKDOWN
3. 2 I NVOI CE SUBMI SSI ON PROCEDURES
3. 2. 1 Requi r ed Pr ocedur e
3. 2. 2 Requi r ed Document s
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00 Page 2
SECTI ON 01 22 00
PRI CE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1. 1 SUBMITTALS
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Cont r act Cost Br eakdown
1. 2 SI NGLE JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 2. 1 Mobi l i zat i on and Demobi l i zat i on
1. 2. 1. 1 Payment
Measur ement and payment f or mobi l i zat i on, demobi l i zat i on, st agi ng ar eas, t empor ar y const r uct i on f aci l i t i es, and f or al l ot her wor k cover ed by t he Pr oj ect Speci f i cat i ons, as def i ned i n Sect i on 01 71 10 MOBI LI ZATI ON AND DEMOBI LI ZATI ON, shal l be made at t he Cont r act j ob pr i ce f or i t em " MOBI LI ZATI ON AND DEMOBI LI ZATI ON" ; whi ch payment shal l const i t ut e f ul l compensat i on f or al l t he Wor k i nvol ved i n mobi l i zat i on and demobi l i zat i on as shown or speci f i ed i n t he Cont r act document s, and di r ect ed by t he Cont r act i ng Of f i cer . Mobi l i zat i on and Demobi l i zat i on shal l be cost l oaded 40 per cent mobi l i zat i on and 60 per cent demobi l i zat i on. Fi nal As- Bui l t Dr awi ngs shal l be cost l oaded one hal f of one per cent of t he awar ded cont r act as a por t i on of t he demobi l i zat i on amount .
1. 2. 1. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 2. 2 SWPPP Desi gn and I mpl ement at i on
1. 2. 2. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h SWPPP desi gn and i mpl ement at i on as def i ned i n Sect i on 01 57 23 TEMPORARY STORMWATER POLLUTI ON CONTROL as shown on t he Pl ans, and as di r ect ed by t he Cont r act i ng
SECTI ON 01 22 00 Page 3
Of f i cer at t he cont r act l ump sum pr i ce f or i t em " SWPPP DESI GN AND I MPLEMENTATI ON" . Payment shal l const i t ut e f ul l compensat i on f or al l wor k i nvol ved i n st or m wat er pol l ut i on cont r ol i ncl udi ng i nst al l at i on and r emoval of best management pr act i ces f or er osi on cont r ol , spi l l cont r ol , moni t or i ng, pr ovi di ng updat es t o t he SWPPP, r ai n event act i on pl an, and r ecor d keepi ng as r equi r ed by l aw, as shown i n t he Cont r act document s.
Payment wi l l not i ncl ude per manent er osi on cont r ol and seedi ng as speci f i ed under sect i on 32 92 33 GRASS SEEDI NG AND EROI SI ON CONTROL, whi ch i s cover ed by bi d i t em " Hydr oseedi ng. ”
1. 2. 2. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 2. 3 Tempor ar y Fenci ng, Si gnage, and Tr af f i c Cont r ol
1. 2. 3. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he pr epar at i on and i mpl ement at i on of t he t r af f i c cont r ol pl an as def i ned i n Sect i on 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS at t he cont r act l ump sum pr i ce f or i t em " TEMPORARY FENCI NG, SI GNAGE, AND TRAFFI C CONTROL" . Payment shal l const i t ut e f ul l compensat i on f or al l wor k i nvol ved i n t he pr ot ect i on of t r af f i c al ong haul r out es and at access poi nt s as r equi r ed by l ocal , st at e and f eder al r egul at i ons, i ncl udi ng al l bar r i er s, l i ght s, s i gnal s, det our s, and ot her anci l l ar y r equi r ement s.
1. 2. 3. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 2. 4 Demolition
1. 2. 4. 1 Payment
Payment wi l l be made f or t he cost s associ at ed wi t h demol i t i on of ex i st i ng f eat ur es, i ncl udi ng t he 24- i nch r ei nf or ced box cul ver t , headwal l and ot her i t ems i dent i f i ed f or r emoval . Al l cost s associ at ed t her ewi t h must be i ncl uded i n t he bi d i t em “ Demol i t i on” ; whi ch payment must const i t ut e f ul l payment f or al l t he Wor k i nvol ved i n demol i t i on, haul i ng, and di sposal as shown or speci f i ed i n t he Cont r act document s.
Uni t of Measur e
Uni t of Measur e: j ob
1. 2. 5 Concr et e Headwal l
1. 2. 5. 1 Payment
Payment wi l l be made f or t he cost s associ at ed wi t h oper at i ons necessar y t o i nst al l t he concr et e headwal l as shown on t he pl ans. The wor k must i ncl ude, but i s not l i mi t ed t o, f or mi ng, r ei nf or cement , and concr et e pl acement . Al l cost s associ at ed t her ewi t h must be i ncl uded i n t he bi d i t em “ Concr et e Headwal l ” ; whi ch payment must const i t ut e f ul l payment f or al l t he Wor k i nvol ved i n i nst al l at i on as shown or speci f i ed i n t he Cont r act documents.
SECTI ON 01 22 00 Page 4
1. 2. 5. 2 Uni t of Measur e
Uni t of Measur e: j ob
1. 2. 6 Vault
1. 2. 6. 1 Payment
Payment wi l l be made f or t he cost s associ at ed wi t h oper at i ons necessar y t o i nst al l t he vaul t as shown on t he pl ans. The wor k must i ncl ude, but i s not l i mi t ed t o, f or mi ng, r ei nf or cement , and concr et e pl acement . Al l cost s associ at ed t her ewi t h must be i ncl uded i n t he bi d i t em “ Vaul t ” ; whi ch payment must const i t ut e f ul l payment f or al l t he Wor k i nvol ved i n i nst al l at i on as shown or speci f i ed i n t he Cont r act document s.
1. 2. 6. 2 Uni t of Measur e
Uni t of Measur e: j ob
1. 3 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
1. 3. 1 Cl ear i ng and Gr ubbi ng
1. 3. 1. 1 Payment
Cl ear i ng and gr ubbi ng, and t he di sposal of t he mat er i al s f r om t hi s oper at i on and f or al l ot her r el at ed wor k as def i ned i n Sect i on 31 11 00 CLEARI NG, GRUBBI NG, AND STRI PPI NG, shal l be pai d at t he cont r act uni t pr i ce f or " CLEARI NG AND GRUBBI NG" . Thi s pr i ce shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l l abor , mat er i al s, equi pment and i nci dent al s, and doi ng al l wor k necessar y t o compl et e t he c l ear i ng and gr ubbi ng i ncl udi ng r emoval of r ocks, debr i s , exi st i ng aggr egat e sur f aci ng, and al l ot her del et er i ous i t ems as not ed on or speci f i ed i n t he Cont r act document s and as di r ect ed by t he Cont r act i ng Of f i cer , i ncl udi ng di sposal or sal vage of mat er i al s , and r est or i ng al l gr ound sur f aces i nc l udi ng f i l l i ng of hol es t hat r esul t f r om gr ubbi ng oper at i ons. Removal and resetting of rock slope protection shall be as noted on the Plans.
1. 3. 1. 2 Measurement
Cl ear i ng and gr ubbi ng shal l be measur ed f or payment t o t he near est 0. 1 acr e based upon hor i zont al ar ea sur veys.
1. 3. 1. 3 Uni t of Measur e
Uni t of measur e: acr e.
SECTI ON 01 22 00 Page 5
1. 3. 2 Stripping
1. 3. 2. 1 Payment
Payment f or st r i ppi ng of t he exi st i ng l evee sl ope as def i ned i n Sect i on 31 11 00 CLEARI NG, GRUBBI NG, AND STRI PPI NG wi l l be made at t he Cont r act bi d pr i ce f or " STRI PPI NG" . Thi s pr i ce shal l const i t ut e f ul l compensat i on f or al l equi pment , l abor , mat er i al s and i nci dent al s necessar y t o compl et e t he wor k as shown or speci f i ed i n t he Cont r act document s, or as di r ect ed by t he Cont r act i ng Of f i cer . Payment shal l const i t ut e f ul l compensat i on f or st r i ppi ng, st ockpi l i ng, t r anspor t at i on, l oadi ng, unl oadi ng, and pl acement as descr i bed i n t he Cont r act Document s.
1. 3. 2. 2 Measurement
St r i ppi ng shal l be measur ed f or payment t o t he near est cubi c yar d. The basi s f or measur ement wi l l be sur veys t aken af t er c l ear i ng and gr ubbi ng oper at i ons and af t er st r i ppi ng oper at i ons t o t he dept hs shown on t he Pl ans or di r ect ed by t he Cont r act i ng Of f i cer . Sur vey cr oss sect i ons shal l be per f or med at s i gni f i cant br eaks i n gr ade except t hat t he maxi mum di st ance bet ween cr oss sect i ons shal l not exceed 100 f eet .
1. 3. 2. 3 Uni t of Measur e
Uni t of measur e: cubi c yar d.
1. 3. 3 Tr ee Removal
1. 3. 3. 1 Payment
Payment f or t he r emoval of t r ees as def i ned i n Sect i on 31 11 00 CLEARI NG, GRUBBI NG, AND STRI PPI NG wi l l be made at t he Cont r act bi d pr i ce f or " TREE REMOVAL" . Thi s pr i ce shal l const i t ut e f ul l compensat i on f or al l equi pment , l abor , mat er i al s and i nci dent al s necessar y t o compl et e t he wor k as shown or speci f i ed i n t he Cont r act document s, or as di r ect ed by t he Cont r act i ng Of f i cer . Payment shal l const i t ut e f ul l compensat i on f or f el l i ng, excavat i on, st ump r emoval , and di sposal of mat er i al s.
1. 3. 3. 2 Measurement
Tr ee r emoval shal l be measur ed f or payment per each.
1. 3. 3. 3 Uni t of Measur e
Uni t of measur e: each.
1. 3. 4 Excavation
1. 3. 4. 1 Payment
Payment f or excavat i on as def i ned on t he Pl ans and i n Sect i on 31 00 00 EARTHWORK wi l l be pai d at t he at t he Cont r act bi d pr i ce f or " EXCAVATI ON" .
Thi s pr i ce shal l const i t ut e f ul l compensat i on f or al l equi pment , l abor , mat er i al s, and al l i nci dent al s necessar y t o compl et e t he wor k as shown or speci f i ed i n t he Cont r act document s, or as di r ect ed by t he Cont r act i ng Of f i cer , i ncl udi ng excavat i on of t he exi st i ng l evee t o const r uct a wor ki ng sur f ace, excavat i on of t he cut of f wal l s t ar t er t r ench, and haul i ng excavat ed mat er i al t o st agi ng or st ockpi l e ar eas f or r euse or haul i ng t o an appr oved wast e l ocat i on.
SECTI ON 01 22 00 Page 6
1. 3. 4. 2 Measurement
Excavat i on wi l l be measur ed f or payment by t he cubi c yar d and quant i t i es wi l l be det er mi ned by t he aver age end ar ea met hod. The basi s f or measur ement wi l l be sur veys t aken af t er st r i ppi ng, c l ear i ng and gr ubbi ng oper at i ons and af t er l evee excavat i on t o wi t hi n t he speci f i ed t ol er ance.
Sur vey cr oss sect i ons shal l be per f or med at s i gni f i cant br eaks i n gr ade except t hat t he maxi mum di st ance bet ween cr oss sect i ons shal l not exceed 100 f eet . Excavat i on i n excess of t he desi gn gr ades as i ndi cat ed on t he Pl ans, i ncl udi ng al l owabl e t ol er ance, wi l l not be accept ed.
1. 3. 4. 3 Uni t of Measur e
Uni t of measur e: cubi c yar d.
1. 3. 5 SB Cut of f Wal l
1. 3. 5. 1 Payment
Payment f or t he SB cut of f wal l as def i ned i n Sect i on 31 56 13. 14 CUTOFF WALL - OPEN TRENCH SOI L BENTONI TE ( SB) shal l be made at t he cont r act pr i ce f or " SB CUTOFF WALL" . Such pr i ce shal l i ncl ude al l cost s of bent oni t e, addi t i ves, mi x i ng of t he cut of f wal l backf i l l , spoi l s gener at ed dur i ng cut of f wal l i nst al l at i on i ncl udi ng of f s i t e di sposal , t empor ar y cut of f wal l cap i nst al l at i on and r emoval , and al l ot her i t ems i nci dent al t o t he const r uct i on and compl et i on of t he cut of f wal l . No separ at e payment wi l l be made f or equi pment , mi x i ng, over t i me dur i ng cont i nuous oper at i ons, c l eanup, and assi st ance i n t he col l ect i on and mai nt enance of r ecor ds and qual i t y cont r ol t est i ng; such i t ems bei ng i ncl uded i n t he pr i ce of t he cut of f wal l .
Fi nal accept ance of t he cut of f wal l wi l l be based on meet i ng al l accept ance requirements.
1. 3. 5. 2 Measurement
Measur ement f or SB cut of f wal l shal l be based on t he ar ea i n squar e f eet of cut of f wal l measur ed i n a ver t i cal pl ane t hr ough t he cent er l i ne of t he cut of f wal l as est abl i shed by t he wor ki ng sur f ace, t he bot t om of t he cut of f wal l shown on t he Pl ans or as modi f i ed i n t he f i el d by t he Cont r act i ng Of f i cer , and ver t i cal l i nes at each speci f i ed end of t he cut of f wal l .
Measur ement shal l be based on sur veys i n accor dance wi t h t he Speci f i cat i ons and as di r ect ed and appr oved by t he Gover nment .
1. 3. 5. 2. 1 Uni t of Measur e
Uni t of measur e: squar e f oot .
1. 3. 6 Levee Fi l l
1. 3. 6. 1 Payment
Payment wi l l be made f or Levee Fi l l as def i ned i n Sect i on 31 00 00 EARTHWORK at t he Cont r act bi d pr i ce f or " LEVEE FI LL" . Payment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , mat er i al s, and per f or mi ng al l oper at i ons necessar y f or f oundat i on pr epar at i on, haul i ng mat er i al f r om st agi ng ar eas, bor r ow ar eas or st ockpi l es, bl endi ng, pl aci ng and compact i ng t he mat er i al , mat er i al s t est i ng, sur veyi ng, and moi st ur e cont r ol .
SECTI ON 01 22 00 Page 7
1. 3. 6. 2 Measurement
Mat er i al speci f i ed f or Levee Fi l l shal l be measur ed f or payment by t he cubi c yar d, i n pl ace, and quant i t i es wi l l be det er mi ned by t he aver age end ar ea met hod t o t he near est cubi c yar d. The basi s f or measur ement wi l l be sur veys of t he ar eas t o be f i l l ed t aken af t er cut of f wal l const r uct i on and af t er f i l l pl acement . Cr oss sect i ons shal l be per f or med at s i gni f i cant br eaks i n gr ade except t hat t he maxi mum di st ance bet ween cr oss sect i ons shal l not exceed 100 f eet .
1. 3. 6. 3 Uni t of Measur e
Uni t of measur e: cubi c yar d.
1. 3. 7 Random Fi l l
1. 3. 7. 1 Payment
Payment wi l l be made f or Random Fi l l as def i ned i n Sect i on 31 00 00 EARTHWORK at t he Cont r act bi d pr i ce f or " RANDOM FI LL" . Payment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , mat er i al s, and per f or mi ng al l oper at i ons necessar y f or f oundat i on pr epar at i on, haul i ng mat er i al f r om st agi ng ar eas, bor r ow ar eas or st ockpi l es, bl endi ng, pl aci ng and compact i ng t he mat er i al , mat er i al s t est i ng, sur veyi ng, and moi st ur e cont r ol .
1. 3. 7. 2 Measurement
Mat er i al speci f i ed f or Random Fi l l shal l be measur ed f or payment by t he cubi c yar d, i n pl ace, and quant i t i es wi l l be det er mi ned by t he aver age end ar ea met hod t o t he near est cubi c yar d. The basi s f or measur ement wi l l be sur veys of t he ar eas t o be f i l l ed t aken af t er cut of f wal l const r uct i on and af t er pl acement of r andom f i l l t o t he t ol er ances speci f i ed and bef or e pl acement of t opsoi l . Cr oss sect i ons shal l be per f or med at s i gni f i cant br eaks i n gr ade except t hat t he maxi mum di st ance bet ween cr oss sect i ons shal l not exceed 100 f eet .
1. 3. 7. 3 Uni t of Measur e
Uni t of measur e: cubi c yar d.
1. 3. 8 18" Wel ded St eel Pi pe
1. 3. 8. 1 Payment
Payment wi l l be made f or 18" Wel ded St eel Pi pe as def i ned i n Sect i on 33 11 00 WATER DI STRI BUTI ON; PRESSURE at t he Cont r act bi d pr i ce f or " 18" WELDED STEEL PI PE" . Payment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , mat er i al s, and per f or mi ng al l oper at i ons necessar y f or excavat i on, f oundat i on pr epar at i on, pl acement of pi pe, pl aci ng cont r ol l ed l ow st r engt h mat er i al , and mat er i al s t est i ng.
1. 3. 8. 2 Measurement
18" wel ded st eel pi pe shal l be measur ed f or payment by t he l engt h of pi pe pl aced at t he l ocat i ons shown on t he Pl ans.
SECTI ON 01 22 00 Page 8
1. 3. 8. 3 Uni t of Measur e
Uni t of measur e: l i near f eet .
1. 3. 9 24" Wel ded St eel Pi pe
1. 3. 9. 1 Payment
Payment wi l l be made f or 24" Wel ded St eel Pi pe as def i ned i n Sect i on 33 11 00 WATER DI STRI BUTI ON; PRESSURE at t he Cont r act bi d pr i ce f or " 24" WELDED STEEL PI PE" . Payment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , mat er i al s, and per f or mi ng al l oper at i ons necessar y f or excavat i on, f oundat i on pr epar at i on, pl acement of pi pe, pi pe suppor t s, pl aci ng cont r ol l ed l ow st r engt h mat er i al , and mat er i al s t est i ng.
1. 3. 9. 2 Measurement
24" wel ded st eel pi pe shal l be measur ed f or payment by t he l engt h of pi pe pl aced at t he l ocat i ons shown on t he Pl ans.
1. 3. 9. 3 Uni t of Measur e
Uni t of measur e: l i near f eet .
1. 3. 10 18" Gat e Val ve
1. 3. 10. 1 Payment
Payment wi l l be made f or 18" gat e val ve as def i ned i n Sect i on 33 11 00 WATER DI STRI BUTI ON; PRESSURE at t he Cont r act bi d pr i ce f or " 18" GATE VALVE" . Payment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , mat er i al s, and per f or mi ng al l oper at i ons necessar y f or del i ver , pl acement , and connect i on r equi r ed t o i nst al l t he gat e val ve.
1. 3. 10. 2 Measurement
18" gat e val ve shal l be measur ed f or payment per each.
1. 3. 10. 3 Uni t of Measur e
Uni t of measur e: each.
1. 3. 11 18" Ai r Rel ease Val ve
1. 3. 11. 1 Payment
Payment wi l l be made f or 18" ai r r el ease val ve as def i ned i n Sect i on 33 11 00 WATER DI STRI BUTI ON; PRESSURE at t he Cont r act bi d pr i ce f or " 18" AI R RELEASE VALVE" . Payment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , mat er i al s, and per f or mi ng al l oper at i ons necessar y f or del i ver , pl acement , and connect i on r equi r ed t o i nst al l t he val ve.
1. 3. 11. 2 Measurement
18" ai r r el ease val ve shal l be measur ed f or payment per each.
SECTI ON 01 22 00 Page 9
1. 3. 11. 3 Uni t of Measur e
Uni t of measur e: each.
1. 3. 12 24" Gat e Val ve
1. 3. 12. 1 Payment
Payment wi l l be made f or 24" gat e val ve as def i ned i n Sect i on 33 11 00 WATER DI STRI BUTI ON; PRESSURE at t he Cont r act bi d pr i ce f or " 24" GATE VALVE" . Payment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , mat er i al s, and per f or mi ng al l oper at i ons necessar y f or del i ver , pl acement , and connect i on r equi r ed t o i nst al l t he gat e val ve.
1. 3. 12. 2 Measurement
24" gat e val ve shal l be measur ed f or payment per each.
1. 3. 12. 3 Uni t of Measur e
Uni t of measur e: each.
1. 3. 13 24" Ai r Rel ease Val ve
1. 3. 13. 1 Payment
Payment wi l l be made f or 24" ai r r el ease val ve as def i ned i n Sect i on 33 11 00 WATER DI STRI BUTI ON; PRESSURE at t he Cont r act bi d pr i ce f or " 24" AI R RELEASE VALVE" . Payment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , mat er i al s, and per f or mi ng al l oper at i ons necessar y f or del i ver , pl acement , and connect i on r equi r ed t o i nst al l t he val ve.
1. 3. 13. 2 Measurement
24" ai r r el ease val ve shal l be measur ed f or payment per each.
1. 3. 13. 3 Uni t of Measur e
Uni t of measur e: each.
1. 3. 14 Hydroseeding
1. 3. 14. 1 Payment
Hydr oseedi ng as def i ned i n Sect i on 32 92 19 SEEDI NG wi l l be pai d f or at t he cont r act uni t pr i ce under Bi d I t em " HYDROSEEDI NG" . Payment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , mat er i al s, and per f or mi ng al l oper at i ons necessar y f or hydr oseedi ng t he compl et ed l evee sl opes as shown on t he Cont r act Document s.
1. 3. 14. 2 Measurement
Hydr oseedi ng wi l l be measur ed f or payment t o t he near est 0. 1 acr e by hor i zont al ar ea sur vey.
1. 3. 14. 3 Uni t of Measur e
Uni t of measur e: acr e.
SECTI ON 01 22 00 Page 10
1. 3. 15 Aggr egat e Sur f aci ng
1. 3. 15. 1 Payment
Aggr egat e sur f aci ng as def i ned i n Sect i on 32 15 00 AGGREGATE SURFACI NG wi l l be pai d f or at t he cont r act uni t pr i ce under Bi d I t em " AGGREGATE SURFACI NG" . Payment wi l l const i t ut e f ul l compensat i on f or t he const r uct i on and compl et i on of t he wor k, i ncl udi ng mat er i al , subgr ade pr epar at i on, and f ur ni shi ng al l l abor and i nci dent al s necessar y t o compl et e t he wor k as def i ned i n t he Cont r act Document s.
1. 3. 15. 2 Measurement
Aggr egat e sur f aci ng wi l l be measur ed f or payment t o t he near est 0. 1 t on.
Quant i t i es f or payment wi l l be cer t i f i ed by i ndi v i dual t r uck wei ght t i cket s del i ver ed t o t he Pr oj ect Si t e at t he t i me of del i ver y of each t r uckl oad of mat er i al . Moi st ur e cont ent not exceedi ng s i x per cent by wei ght wi l l be accept abl e i n det er mi ni ng payment quant i t i es. Deduct i ons wi l l be made f r om t he cer t i f i ed wei ght f or moi st ur e i n excess of t hi s amount and f or mat er i al s i n excess of t he al l owabl e t hi ckness.
1. 3. 15. 3 Uni t of Measur e
Uni t of measur e: t on.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
3. 1 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 15 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act .
3. 2 I NVOI CE SUBMI SSI ON PROCEDURES
Ref er ences i ncl ude USACE QMS, FAR 52. 232- 5, Payment s under Fi xed- Pr i ce Const r uct i on Cont r act s, and FAR 52. 232- 27, Pr ompt Payment f or Const r uct i on Contracts.
3. 2. 1 Requi r ed Pr ocedur e
a. The payment r equest pr ocess must begi n wi t h t he schedul i ng meet i ng.
Sect i on 01 32 01 PROJECT SCHEDULE st at es: " Use t he schedul e as t he basi s f or det er mi ni ng cont r act ear ni ngs dur i ng each updat e per i od and t her ef or e t he amount of each pr ogr ess payment . " The QA Repr esent at i ve or Pr oj ect Engi neer wi l l meet wi t h t he Cont r act or each mont h and mut ual l y agr ee t o t he quant i t i es and l ump sum per cent ages t o be i nvoi ced pr i or t o t he Cont r act or ' s of f i c i al i nvoi ce bei ng submi t t ed t o
SECTI ON 01 22 00 Page 11 t he Admi ni st r at i ng Of f i ce.
b. The Cont r act or shal l pr i nt a copy of t he Cont r act or ' s Pay Request For m f r om RMS t o r ecor d t he mut ual l y agr eed upon quant i t i es and per cent ages. NOTE: Cont r act or ear ni ngs shal l not be pr oj ect ed. Thi s f or m shal l be s i gned and dat ed by t he QA Repr esent at i ve and t he Cont r act or . Consi der at i on wi l l be gi ven t o saf et y, submi t t al s, Cont r act or Qual i t y Cont r ol ( CQC) , accept abl e wor k, as wel l as over al l pr ogr ess. I n t he case of def i c i ent wor k, wi t hhol di ng t he cost of r emoval and r econst r uct i on shal l be consi der ed.
c. Cont r act or must submi t a pr el i mi nar y payment r equest wor ksheet t o t he Qual i t y Assur ance ( QA) Repr esent at i ve. Thi s document i s pr i nt ed f r om RMS, whi ch l i s t s not onl y t he pay act i v i t i es f or whi ch payment i s r equest ed, but al so l i s t s any Cont r act or act i on i t ems e. g. out st andi ng submi t t al s, payr ol l s , qual i t y cont r ol i t ems, et c. Cont r act or must submi t document at i on, sur veys, concr et e cal cul at i ons, and wei ght t i cket s f or t onnage i t ems.
d. QA Repr esent at i ve wi l l meet wi t h t he Cont r act or t o det er mi ne i f t he pr el i mi nar y pay r equest and cor r espondi ng back- up i s accept abl e. The QA Repr esent at i ve shal l ent er t he appr oved per cent ages or quant i t i es on t he pr el i mi nar y pay r equest wor ksheet , ensur i ng t hat consi der at i on has been made t o al l Cont r act or act i on i t ems t hat have not been compl et ed or cor r ect ed. Bot h par t i es wi l l s i gn and dat e t he l ast page.
e. Cont r act or must submi t t he f or mal pay r equest package t o t he Admi ni st r at i ng Of f i ce ( or i gi nal ) and t he QA Repr esent at i ve ( copy) , i ncor por at i ng any changes made on t he pr el i mi nar y pay r equest on or bef or e t he 10t h of t he mont h. Cont r act or must al so ent er t he pay r equest i nt o RMS.
3. 2. 2 Requi r ed Document s
Pay r equest packages f r om Cont r act or s must i ncl ude t he f ol l owi ng document s:
a. Pr ompt Payment Cer t i f i cat i on and Request ed Ear ni ngs pr i nt ed f r om RMS and wet s i gned.
b. Pr el i mi nar y payment r equest wor ksheet , s i gned and dat ed by bot h par t i es.
c. Requi r ed document at i on i ncl udes sur veys ( PDF and CAD) , cr oss- sect i ons, QC t est r esul t s, and wei ght t i cket s.
d. Updat ed appr oved schedul e ( pr ogr ess char t or NAS wi t h nar r at i ve r epor t as speci f i ed) .
e. Saf et y Exposur e Repor t ( har d copy not r equi r ed, wi l l be ver i f i ed i n
RMS).
f . Cur r ent Submi t t al Regi st er ( har d copy not r equi r ed, wi l l be ver i f i ed i n
RMS).
g. Cur r ent QC Test Log ( har d copy pr ovi ded and al l t est s ent er ed i n RMS) .
h. Cer t i f i ed Payr ol l s ( pr i me and subs at al l t i er s) ent er ed i n RMS and submi t t ed t o t he Admi ni st r at i ng Of f i ce.
I f t he pr ogr ess payment r equest i s mi ssi ng any of t he above i t ems or
SECTI ON 01 22 00 Page 12 i mpor t s i nt o RMS, t he Admi ni st r at i ng Of f i ce wi l l not i f y t he Cont r act or wi t hi n 7 days and suspend t he pr ocessi ng of t he pr ogr ess payment unt i l t he mi ssi ng i nf or mat i on has been r ecei ved. The i nvoi ce wi l l not be consi der ed accept abl e unt i l a compl et e pay r equest package has been submi t t ed and i mpor t s per f or med. Upon r ecei pt of an accept abl e i nvoi ce, t he i nvoi ce i s st amped ' RECEI VED' . I n accor dance wi t h FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s, t he due dat e f or maki ng payment i s 14 days af t er t he desi gnat ed bi l l i ng of f i ce r ecei ves a pr oper compl et e payment r equest .
- - End of Sect i on - -
SECTI ON 01 22 00 Page 13
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 35 26
GOVERNMENTAL SAFETY REQUI REMENTS
11/15
PART 1 GENERAL
1. 1 REFERENCES
1. 2 DEFI NI TI ONS
1. 2. 1 Compet ent Per son ( CP)
1. 2. 2 Compet ent Per son, Conf i ned Space
1. 2. 3 Compet ent Per son, Cr anes and Ri ggi ng
1. 2. 4 Compet ent Per son, Excavat i on/ Tr enchi ng
1. 2. 5 Compet ent Per son, Fal l Pr ot ect i on
1. 2. 6 Hi gh Ri sk Act i v i t i es
1. 2. 7 Hi gh Vi s i bi l i t y Acci dent
1. 2. 8 Load Handl i ng Equi pment ( LHE)
1. 2. 9 Medi cal Tr eat ment
1. 2. 10 Near Mi ss
1. 2. 11 Oper at i ng Envel ope
1. 2. 12 Qual i f i ed Per son ( QP)
1. 2. 13 Qual i f i ed Per son, Fal l Pr ot ect i on ( QP f or FP)
1. 2. 14 USACE Pr oper t y and Equi pment
1. 2. 15 Load Handl i ng Equi pment ( LHE) Acci dent or Load Handl i ng
Equi pment Mi shap
1. 3 SUBMI TTALS
1. 4 MONTHLY EXPOSURE REPORTS
1. 5 REGULATORY REQUI REMENTS
1. 6 SI TE QUALI FI CATI ONS, DUTI ES, AND MEETI NGS
1. 6. 1 Per sonnel Qual i f i cat i ons
1. 6. 1. 1 Si t e Saf et y and Heal t h Of f i cer ( SSHO)
1. 6. 1. 1. 1 Addi t i onal Si t e Saf et y and Heal t h Of f i cer ( SSHO)
Requi r ement s and Dut i es
1. 6. 1. 2 Compet ent Per son Qual i f i cat i ons
1. 6. 1. 2. 1 Compet ent Per son f or Conf i ned Space Ent r y
1. 6. 1. 2. 2 Compet ent Per son f or Fal l Pr ot ect i on
1. 6. 1. 3 Cr ane Oper at or s/ Ri gger s
1. 6. 2 Per sonnel Dut i es
1. 6. 2. 1 Dut i es of t he Si t e Saf et y and Heal t h Of f i cer ( SSHO)
1. 6. 3 Meet i ngs
1. 6. 3. 1 Pr econst r uct i on Conf er ence
1. 6. 3. 2 Saf et y Meet i ngs
1. 7 ACCI DENT PREVENTI ON PLAN ( APP)
1. 7. 1 Names and Qual i f i cat i ons
1. 7. 2 Pl ans
1. 7. 2. 1 Conf i ned Space Ent r y Pl an
1. 7. 2. 2 St andar d Li f t Pl an ( SLP)
1. 7. 2. 3 Cr i t i cal Li f t Pl an - Cr ane or Load Handl i ng Equi pment
1. 7. 2. 3. 1 Cr i t i cal Li f t Pl an Pl anni ng and Schedul e
1. 7. 2. 3. 2 Li f t s of Per sonnel
1. 7. 2. 4 Bar ge Mount ed Mobi l e Cr ane Li f t Pl an
SECTI ON 01 35 26 Page 1
1. 7. 2. 5 Mul t i - Pur pose Machi nes, Mat er i al Handl i ng Equi pment , and Const r uct i on Equi pment Li f t Pl an
1. 7. 2. 6 Fal l Pr ot ect i on and Pr event i on ( FP&P) Pl an
1. 7. 2. 7 Excavat i on Pl an
1. 8 ACTI VI TY HAZARD ANALYSI S ( AHA)
1. 8. 1 AHA Management
1. 8. 2 AHA Si gnat ur e Log
1. 9 DI SPLAY OF SAFETY I NFORMATI ON
1. 9. 1 Saf et y Bul l et i n Boar d
1. 9. 2 Saf et y and Occupat i onal Heal t h ( SOH) Def i c i ency Tr acki ng Syst em
1. 10 SI TE SAFETY REFERENCE MATERI ALS
1. 11 EMERGENCY MEDI CAL TREATMENT
1. 12 NOTI FI CATI ONS and REPORTS
1. 12. 1 Mi shap Not i f i cat i on
1. 12. 2 Acci dent Repor t s
1. 12. 3 LHE I nspect i on Repor t s
1. 12. 4 Cer t i f i cat e of Compl i ance and Pr e- l i f t Pl an/ Checkl i st f or LHE and Ri ggi ng
1. 13 HOT WORK
1. 14 CONFI NED SPACE ENTRY REQUI REMENTS
1. 14. 1 Ent r y Pr ocedur es
1. 14. 2 For ced Ai r Vent i l at i on
1. 14. 3 Rescue Pr ocedur es and Coor di nat i on wi t h Local Emer gency
Responders
1. 15 SEVERE STORM PLAN
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 CONSTRUCTI ON AND OTHER WORK
3. 1. 1 Wor ksi t e Communi cat i on
3. 1. 2 Hazar dous Mat er i al Excl usi ons
3. 1. 3 Unf or eseen Hazar dous Mat er i al
3. 2 FALL PROTECTI ON PROGRAM
3. 2. 1 Tr ai ni ng
3. 2. 2 Fal l Pr ot ect i on Equi pment and Syst ems
3. 2. 2. 1 Addi t i onal Per sonal Fal l Pr ot ect i on
3. 2. 2. 2 Per sonal Fal l Pr ot ect i on Har nesses
3. 2. 3 Rescue and Evacuat i on Pl an and Pr ocedur es
3. 3 EQUI PMENT
3. 3. 1 Mat er i al Handl i ng Equi pment ( MHE)
3. 3. 2 Load Handl i ng Equi pment ( LHE)
3. 3. 3 Machi ner y and Mechani zed Equi pment
3. 3. 4 Base Mount ed Dr um Hoi st s
3. 3. 5 Use of Expl osi ves
3. 4 EXCAVATI ONS
3. 4. 1 Ut i l i t y Locat i ons
3. 4. 2 Ut i l i t y Locat i on Ver i f i cat i on
3. 4. 3 Ut i l i t i es Wi t hi n and Under Concr et e, Bi t umi nous Asphal t , and
Ot her I mper vi ous Sur f aces
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 35 26 Page 2
SECTI ON 01 35 26
GOVERNMENTAL SAFETY REQUI REMENTS
11/15
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN SOCI ETY OF SAFETY PROFESSI ONALS ( ASSP)
ASSP A10. 22 ( 2007; R 2017) Saf et y Requi r ement s f or Rope- Gui ded and Non- Gui ded Wor ker s’ Hoi st s
ASSP A10. 34 ( 2001; R 2012) Pr ot ect i on of t he Publ i c on or Adj acent t o Const r uct i on Si t es
ASSP Z359. 0 ( 2012) Def i ni t i ons and Nomencl at ur e Used f or Fal l Pr ot ect i on and Fal l Ar r est
ASSP Z359. 1 ( 2016) The Fal l Pr ot ect i on Code
ASSP Z359. 11 ( 2014) Saf et y Requi r ement s f or Ful l Body Harnesses
ASSP Z359. 12 ( 2009) Connect i ng Component s f or Per sonal Fal l Ar r est Syst ems
ASSP Z359. 13 ( 2013) Per sonal Ener gy Absor ber s and Ener gy Absor bi ng Lanyar ds
ASSP Z359. 14 ( 2014) Saf et y Requi r ement s f or Sel f - Ret r act i ng Devi ces f or Per sonal Fal l Ar r est and Rescue Syst ems
ASSP Z359. 15 ( 2014) Saf et y Requi r ement s f or Si ngl e Anchor Li f el i nes and Fal l Ar r est er s f or Per sonal Fal l Ar r est Syst ems
ASSP Z359. 2 ( 2017) Mi ni mum Requi r ement s f or a Compr ehensi ve Managed Fal l Pr ot ect i on Program
ASSP Z359. 3 ( 2017) Saf et y Requi r ement s f or Lanyar ds and Posi t i oni ng Lanyar ds
ASSP Z359. 4 ( 2013) Saf et y Requi r ement s f or Assi st ed- Rescue and Sel f - Rescue Syst ems, Subsyst ems and Component s
ASSP Z359. 6 ( 2016) Speci f i cat i ons and Desi gn Requi r ement s f or Act i ve Fal l Pr ot ect i on Systems
SECTI ON 01 35 26 Page 3
ASSP Z359. 7 ( 2011) Qual i f i cat i on and Ver i f i cat i on Test i ng of Fal l Pr ot ect i on Pr oduct s
ASME I NTERNATI ONAL ( ASME)
ASME B30. 20 ( 2013; I NT Oct 2010 - May 2012) Bel ow- t he- Hook Li f t i ng Devi ces
ASME B30. 22 ( 2016) Ar t i cul at i ng Boom Cr anes
ASME B30. 23 ( 2011) Per sonnel Li f t i ng Syst ems Saf et y St andar d f or Cabl eways, Cr anes, Der r i cks, Hoi st s, Hooks, Jacks, and Sl i ngs
ASME B30. 26 ( 2015; I NT Jun 2010 - Jun 2014) Ri ggi ng Hardware
ASME B30. 3 ( 2016) Tower Cr anes
ASME B30. 5 ( 2014) Mobi l e and Locomot i ve Cr anes
ASME B30. 7 ( 2011) Wi nches
ASME B30. 8 ( 2015) Fl oat i ng Cr anes and Fl oat i ng Derricks
ASME B30. 9 ( 2014; I NT Feb 2011 - Nov 2013) Sl i ngs
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 10 ( 2018; TI A 18- 1) St andar d f or Por t abl e Fi r e Ext i ngui sher s
NFPA 241 ( 2013; Er r at a 2015) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons
NFPA 51B ( 2014) St andar d f or Fi r e Pr event i on Dur i ng Wel di ng, Cut t i ng, and Ot her Hot Wor k
NFPA 70 ( 2017; ERTA 1- 2 2017; TI A 17- 1; TI A 17- 2;
TI A 17- 3; TI A 17- 4; TI A 17- 5; TI A 17- 6;
TI A 17- 7; TI A 17- 8; TI A 17- 9; TI A 17- 10;
TI A 17- 11; TI A 17- 12; TI A 17- 13; TI A
17- 14; TI A 17- 15; TI A 17- 16; TI A 17- 17 )
Nat i onal El ect r i cal Code
NFPA 70E ( 2018; TI A 18- 1; TI A 81- 2) St andar d f or El ect r i cal Saf et y i n t he Wor kpl ace
TELECOMMUNI CATI ONS I NDUSTRY ASSOCI ATI ON ( TI A)
TIA-1019 ( 2012; R 2016) St andar d f or I nst al l at i on, Al t er at i on and Mai nt enance of Ant enna Suppor t i ng St r uct ur es and Ant ennas
TIA-222 ( 2005G; Add 1 2007; Add 2 2009; Add 3 2014; Add 4 2014; R 2014; R 2016)
SECTI ON 01 35 26 Page 4
St r uct ur al St andar ds f or St eel Ant enna Tower s and Ant enna Suppor t i ng St r uct ur es
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
29 CFR 1910 Occupat i onal Saf et y and Heal t h St andar ds
29 CFR 1910. 146 Per mi t - r equi r ed Conf i ned Spaces
29 CFR 1915 Conf i ned and Encl osed Spaces and Ot her Danger ous At mospher es i n Shi pyar d Employment
29 CFR 1926 Saf et y and Heal t h Regul at i ons f or Construction
29 CFR 1926. 1400 Cr anes and Der r i cks i n Const r uct i on
29 CFR 1926. 16 Rul es of Const r uct i on
29 CFR 1926. 500 Fal l Pr ot ect i on
29 CFR 1926. 552 Mat er i al Hoi st s, Per sonal Hoi st s, and Elevators
29 CFR 1926. 553 Base- Mount ed Dr um Hoi st s
CPL 02- 01- 056 ( 2014) I nspect i on Pr ocedur es f or Accessi ng Communi cat i on Tower s by Hoi st
CPL 2. 100 ( 1995) Appl i cat i on of t he Per mi t - Requi r ed Conf i ned Spaces ( PRCS) St andar ds, 29 CFR 1910.146
1. 2 DEFINITIONS
1. 2. 1 Compet ent Per son ( CP)
The CP i s a per son desi gnat ed i n wr i t i ng, who, t hr ough t r ai ni ng, knowl edge and exper i ence, i s capabl e of i dent i f y i ng, eval uat i ng, and addr essi ng exi st i ng and pr edi ct abl e hazar ds i n t he wor ki ng envi r onment or wor k i ng condi t i ons t hat ar e danger ous t o per sonnel , and who has aut hor i zat i on t o t ake pr ompt cor r ect i ve measur es wi t h r egar ds t o such hazar ds.
1. 2. 2 Compet ent Per son, Conf i ned Space
The CP, Conf i ned Space, i s a per son meet i ng t he compet ent per son r equi r ement s as def i ned EM 385- 1- 1 Appendi x Q, wi t h t hor ough knowl edge of OSHA’ s Conf i ned Space St andar d, 29 CFR 1910. 146, and desi gnat ed i n wr i t i ng t o be r esponsi bl e f or t he i mmedi at e super vi s i on, i mpl ement at i on and moni t or i ng of t he conf i ned space pr ogr am, who t hr ough t r ai ni ng, knowl edge and exper i ence i n conf i ned space ent r y i s capabl e of i dent i f y i ng, eval uat i ng and addr essi ng exi st i ng and pot ent i al conf i ned space hazar ds and, who has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es wi t h r egar d
SECTI ON 01 35 26 Page 5 t o such hazar ds.
1. 2. 3 Compet ent Per son, Cr anes and Ri ggi ng
The CP, Cr anes and Ri ggi ng, as def i ned i n EM 385- 1- 1 Appendi x Q, i s a per son meet i ng t he compet ent per son, who has been desi gnat ed i n wr i t i ng t o be r esponsi bl e f or t he i mmedi at e super vi s i on, i mpl ement at i on and moni t or i ng of t he Cr ane and Ri ggi ng Pr ogr am, who t hr ough t r ai ni ng, knowl edge and exper i ence i n cr ane and r i ggi ng i s capabl e of i dent i f y i ng, eval uat i ng and addr essi ng exi st i ng and pot ent i al hazar ds and, who has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es wi t h r egar d t o such hazar ds.
1. 2. 4 Compet ent Per son, Excavat i on/ Tr enchi ng
A CP, Excavat i on/ Tr enchi ng, i s a per son meet i ng t he compet ent per son r equi r ement s as def i ned i n EM 385- 1- 1 Appendi x Q and 29 CFR 1926, who has been desi gnat ed i n wr i t i ng t o be r esponsi bl e f or t he i mmedi at e super vi s i on, i mpl ement at i on and moni t or i ng of t he excavat i on/ t r enchi ng pr ogr am, who t hr ough t r ai ni ng, knowl edge and exper i ence i n excavat i on/ t r enchi ng i s capabl e of i dent i f y i ng, eval uat i ng and addr essi ng exi st i ng and pot ent i al hazar ds and, who has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es wi t h r egar d t o such hazar ds.
1. 2. 5 Compet ent Per son, Fal l Pr ot ect i on
The CP, Fal l Pr ot ect i on, i s a per son meet i ng t he compet ent per son r equi r ement s as def i ned i n EM 385- 1- 1 Appendi x Q and i n accor dance wi t h ASSP Z359. 0, who has been desi gnat ed i n wr i t i ng by t he empl oyer t o be r esponsi bl e f or i mmedi at e super vi s i ng, i mpl ement i ng and moni t or i ng of t he f al l pr ot ect i on pr ogr am, who t hr ough t r ai ni ng, knowl edge and exper i ence i n f al l pr ot ect i on and r escue syst ems and equi pment , i s capabl e of i dent i f y i ng, eval uat i ng and addr essi ng exi st i ng and pot ent i al f al l hazar ds and, who has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es wi t h r egar d t o such hazar ds.
1. 2. 6 Hi gh Ri sk Act i v i t i es
Hi gh Ri sk Act i v i t i es ar e act i v i t i es t hat i nvol ve wor k at hei ght s, cr ane and r i ggi ng, excavat i ons and t r enchi ng, and conf i ned space ent r y.
1. 2. 7 Hi gh Vi s i bi l i t y Acci dent
A Hi gh Vi s i bi l i t y Acci dent i s any mi shap whi ch may gener at e publ i c i t y or hi gh v i s i bi l i t y .
1. 2. 8 Load Handl i ng Equi pment ( LHE)
LHE i s a t er m used t o descr i be cr anes, hoi st s and al l ot her hoi st i ng equi pment ( hoi st i ng equi pment means equi pment , i nc l udi ng cr ane, der r i cks, hoi st s and power oper at ed equi pment used wi t h r i ggi ng t o r ai se, l ower or hor i zont al l y move a l oad) .
1. 2. 9 Medi cal Tr eat ment
Medi cal Tr eat ment i s t r eat ment admi ni st er ed by a physi c i an or by r egi st er ed pr of essi onal per sonnel under t he st andi ng or der s of a physi c i an. Medi cal t r eat ment does not i ncl ude f i r st ai d t r eat ment even when pr ovi ded by a physi c i an or r egi st er ed per sonnel .
SECTI ON 01 35 26 Page 6
1. 2. 10 Near Mi ss
A Near Mi ss i s a mi shap r esul t i ng i n no per sonal i nj ur y and zer o pr oper t y damage, but gi ven a shi f t i n t i me or posi t i on, damage or i nj ur y may have occur r ed ( e. g. , a wor ker f al l s of f a scaf f ol d and i s not i nj ur ed; a cr ane swi ngs ar ound t o move t he l oad and nar r owl y mi sses a par ked vehi c l e) .
1. 2. 11 Oper at i ng Envel ope
The Oper at i ng Envel ope i s t he ar ea sur r oundi ng any cr ane or l oad handl i ng equi pment . I nsi de t hi s " envel ope" i s t he cr ane, t he oper at or , r i gger s and cr ane wal ker s, ot her per sonnel i nvol ved i n t he oper at i on, r i ggi ng gear bet ween t he hook, t he l oad, t he cr ane' s suppor t i ng st r uct ur e ( i . e. gr ound or r ai l ) , t he l oad' s r i ggi ng pat h, t he l i f t and r i ggi ng pr ocedur e.
1. 2. 12 Qual i f i ed Per son ( QP)
The QP i s a per son desi gnat ed i n wr i t i ng, who, by possessi on of a r ecogni zed degr ee, cer t i f i cat e, or pr of essi onal st andi ng, or ext ensi ve knowl edge, t r ai ni ng, and exper i ence, has successf ul l y demonst r at ed t hei r abi l i t y t o sol ve or r esol ve pr obl ems r el at ed t o t he subj ect mat t er , t he wor k, or t he pr oj ect .
1. 2. 13 Qual i f i ed Per son, Fal l Pr ot ect i on ( QP f or FP)
A QP f or FP i s a per son meet i ng t he r equi r ement s of EM 385- 1- 1 Appendi x Q, and ASSP Z359. 0, wi t h a r ecogni zed degr ee or pr of essi onal cer t i f i cat e and wi t h ext ensi ve knowl edge, t r ai ni ng and exper i ence i n t he f al l pr ot ect i on and r escue f i el d who i s capabl e of desi gni ng, anal yzi ng, and eval uat i ng and speci f y i ng f al l pr ot ect i on and r escue syst ems.
1. 2. 14 USACE Pr oper t y and Equi pment
I nt er pr et " USACE" pr oper t y and equi pment speci f i ed i n USACE EM 385- 1- 1 as Gover nment pr oper t y and equi pment .
1. 2. 15 Load Handl i ng Equi pment ( LHE) Acci dent or Load Handl i ng Equi pment Mishap
A LHE acci dent occur s when any one or mor e of t he ei ght el ement s i n t he oper at i ng envel ope f ai l s t o per f or m cor r ect l y dur i ng oper at i on, i nc l udi ng oper at i on dur i ng mai nt enance or t est i ng r esul t i ng i n per sonnel i nj ur y or deat h; mat er i al or equi pment damage; dr opped l oad; der ai l ment ;
t wo- bl ocki ng; over l oad; or col l i s i on, i ncl udi ng unpl anned cont act bet ween t he l oad, cr ane, or ot her obj ect s. A dr opped l oad, der ai l ment , t wo- bl ocki ng, over l oad and col l i s i on ar e consi der ed acci dent s, even t hough no mat er i al damage or i nj ur y occur s. A component f ai l ur e ( e. g. , mot or bur nout , gear t oot h f ai l ur e, bear i ng f ai l ur e) i s not consi der ed an acci dent sol el y due t o mat er i al or equi pment damage unl ess t he component f ai l ur e r esul t s i n damage t o ot her component s ( e. g. , dr opped boom, dr opped l oad, or r ol l over ) . Document an LHE mi shap usi ng t he Cr ane Hi gh Hazar d wor ki ng gr oup mi shap r epor t i ng f or m.
1. 3 SUBMITTALS
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
SECTI ON 01 35 26 Page 7
Acci dent Pr event i on Pl an ( APP) ; G
Naval Ar chi t ect ur e Anal ysi s
SD- 06 Test Repor t s
Mont hl y Exposur e Repor t s
Not i f i cat i ons and Repor t s
Acci dent Repor t s; G
LHE I nspect i on Repor t s
SD- 07 Cer t i f i cat es
Cr ane Oper at or s/ Ri gger s
St andar d Li f t Pl an; G
Cr i t i cal Li f t Pl an; G
Act i v i t y Hazar d Anal ysi s ( AHA)
Conf i ned Space Ent r y Per mi t
Hot Wor k Per mi t
Cer t i f i cat e of Compl i ance
1. 4 MONTHLY EXPOSURE REPORTS
Pr ovi de a Mont hl y Exposur e Repor t and at t ach t o t he mont hl y bi l l i ng r equest . Thi s r epor t i s a compi l at i on of empl oyee- hour s wor ked each mont h f or al l s i t e wor ker s, bot h Pr i me and subcont r act or . Fai l ur e t o submi t t he r epor t may r esul t i n r et ent i on of up t o 10 per cent of t he voucher .
1. 5 REGULATORY REQUI REMENTS
I n addi t i on t o t he det ai l ed r equi r ement s i ncl uded i n t he pr ovi s i ons of t hi s cont r act , compl y wi t h t he most r ecent edi t i on of USACE EM 385- 1- 1, and al l f eder al , st at e, and l ocal r egul at i ons. Submi t mat t er s of i nt er pr et at i on of st andar ds t o t he appr opr i at e admi ni st r at i ve agency f or r esol ut i on bef or e st ar t i ng wor k. Wher e t he r equi r ement s of t hi s speci f i cat i on, appl i cabl e l aws, cr i t er i a, or di nances, r egul at i ons, and r ef er enced document s var y, t he most st r i ngent r equi r ement s gover n.
1. 6 SI TE QUALI FI CATI ONS, DUTI ES, AND MEETI NGS
1. 6. 1 Per sonnel Qual i f i cat i ons
1. 6. 1. 1 Si t e Saf et y and Heal t h Of f i cer ( SSHO)
Pr ovi de an SSHO t hat meet s t he r equi r ement s of EM 385- 1- 1 Sect i on 1. The SSHO must ensur e t hat t he r equi r ement s of 29 CFR 1926. 16 ar e met f or t he pr oj ect . Pr ovi de a Saf et y over si ght t eam t hat i nc l udes a mi ni mum of one ( 1) per son at each pr oj ect s i t e t o f unct i on as t he Si t e Saf et y and Heal t h Of f i cer ( SSHO) . The SSHO or an equal l y- qual i f i ed Al t er nat e SSHO must be at
SECTI ON 01 35 26 Page 8 t he wor k s i t e at al l t i mes t o i mpl ement and admi ni st er t he Cont r act or ' s saf et y pr ogr am and gover nment - accept ed Acci dent Pr event i on Pl an. The SSHO and Al t er nat e SSHO must have t he r equi r ed t r ai ni ng, exper i ence, and qual i f i cat i ons i n accor dance wi t h EM 385- 1- 1 Sect i on 01. A. 17, and al l associ at ed sub- par agr aphs.
I f t he SSHO i s of f - s i t e f or a per i od l onger t han 24 hour s, an equal l y- qual i f i ed al t er nat e SSHO must be pr ovi ded and must f ul f i l l t he same r ol es and r esponsi bi l i t i es as t he pr i mar y SSHO. When t he SSHO i s t empor ar i l y ( up t o 24 hour s) of f - s i t e, a Desi gnat ed Repr esent at i ve ( DR) , as i dent i f i ed i n t he AHA may be used i n l i eu of an Al t er nat e SSHO, and must be on t he pr oj ect s i t e at al l t i mes when wor k i s bei ng per f or med. Not e t hat t he DR i s a col l at er al dut y saf et y posi t i on, wi t h saf et y dut i es i n addi t i on t o t hei r f ul l t i me occupat i on.
1. 6. 1. 1. 1 Addi t i onal Si t e Saf et y and Heal t h Of f i cer ( SSHO) Requi r ement s and Duties
The SSHO may al so ser ve as t he Qual i t y Cont r ol Manager . The SSHO may not ser ve as t he Super i nt endent .
1. 6. 1. 2 Compet ent Per son Qual i f i cat i ons
Pr ovi de Compet ent Per sons i n accor dance wi t h EM 385- 1- 1, Appendi x Q and her ei n. Compet ent Per sons f or hi gh r i sk act i v i t i es i ncl ude conf i ned space, cr anes and r i ggi ng, excavat i on/ t r enchi ng, and f al l pr ot ect i on. The CP f or t hese act i v i t i es must be desi gnat ed i n wr i t i ng, and meet t he r equi r ement s f or t he speci f i c act i v i t y ( i . e.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.