DISTRIBUTION STATEMENT A

Approved for public release; distribution is unlimited

REQUEST FOR PROPOSAL (RFP)

FEATHER RIVER RIGHT BANK

PL 84-99 EMERGENCY LEVEE REPAIRS

SITE 0521-41

SUTTER COUNTY, CALIFORNIA

SOLICITATION NO. W91238-19-B-0012

SPECIFICATION NO. 2213

DESIGN FILE NO. 4-04-0645

ISSUE DATE: JULY 2019

CLIN

No. Description Quantity Unit Unit Price Amount

0001 Mobilization and Demobilization 1 JA

0002 SWPPP Design and Implementation 1 JA

0003 Temporary Fencing, Signage, and Traffic Control 1 JA

0004 Demolition 1 JA

0005 Clearing and Grubbing 21.4 AC

0006 Stripping 16,630 CY

0007 Tree Removal 4 EA

0008 Excavation 129,360 CY

0009 SB Cutoff Wall 513,009 SF

0010 Levee Fill 26,740 CY

0011 Random Fill 90,500 CY

0012 18" Welded Steel Pipe 135 LF

0013 24" Welded Steel Pipe 135 LF

0014 18" Gate Valve 1 EA

0015 18" Air Release Valve 1 EA

0016 24" Gate Valve 1 EA

0017 24" Air Release Valve 1 EA

0018 Concrete Headwall 1 JA

0019 Vault 1 JA

0020 Aggregate Surfacing 5,730 TN

0021 Hydroseeding 17.5 AC

TOTAL BASE BID (CLINS 0001-0020)

Contract Duration

FEATHER RIVER RIGHT BANK

SUTTER COUNTY, CALIFORNIA

PL 84-99 EMERGENCY LEVEE REPAIRS

SITE 0521-41

BIDDING SCHEDULE

BASE BID

PL 84- 99 Emer gency Levee Repai r Spec No. 2213 Si t e 0521- 41 - Feat her Ri ver

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00 GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 22 00 PRI CE AND PAYMENT PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00 QUALI TY CONTROL

01 45 00. 15 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 57 23 TEMPORARY STORMWATER POLLUTI ON CONTROL

01 71 10 MOBI LI ZATI ON AND DEMOBI LI ZATI ON

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMI TTALS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 32 00 SUBSURFACE DRI LLI NG, SAMPLI NG, AND TESTI NG

DI VI SI ON 03 - CONCRETE

03 20 00 CONCRETE REI NFORCI NG

03 30 00 CAST- I N- PLACE CONCRETE

03 52 01 CONTROLLED LOW STRENGTH MATERI AL ( CLSM)

DI VI SI ON 05 - METALS

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARI NG, GRUBBI NG, AND STRI PPI NG

31 56 14 SOI L- BENTONI TE ( SB) CUTOFF WALL - OPEN TRENCH

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 15 00 AGGREGATE SURFACI NG

32 92 19 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER DI STRI BUTI ON; PRESSURE

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/11

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 3 SUPPLEMENTARY DRAWI NGS

1. 3. 1 Subsur f ace Dat a

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15 Page 1

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/11

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o Cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

DRAWI NG NO. REVI SI ON NO. TITLE

G-001 N/A Cover Sheet

G-002 N/A Gener al Not es, Legend, Abbr evi at i ons, and Sheet I ndex

G-003 N/A Pr oj ect Locat i on and Vi ci ni t y Map

G-004 N/A St agi ng Ar ea and Haul Rout es

G-005 N/A Key Map and Pr oj ect Cont r ol Li ne

G-006 N/A Cont r ol Li ne, Li ne and Cur ve Tabl es

G-007 N/A Const r uct i on Li mi t s

G-008 N/A Const r uct i on Li mi t s Li ne Tabl es

V-001 N/A Pr oj ect Sur vey Cont r ol

C-101 N/A Excavat i on Pl an, St a 2340+00 t o 2322+00

C-102 N/A Excavat i on Pl an, St a 2322+00 t o 2304+00

C-103 N/A Excavat i on Pl an, St a 2304+00 t o 2286+00

C-104 N/A Excavat i on Pl an, St a 2286+00 t o 2268+00

C-105 N/A Excavat i on Pl an, St a 2268+00 t o 2255+00

C-111 N/A Gr adi ng Pl an, St a 2340+00 t o 2331+00

C-112 N/A Gr adi ng Pl an, St a 2331+00 t o 2322+00

DOCUMENT 00 01 15 Page 2

DRAWI NG NO. REVI SI ON NO. TITLE

C-113 N/A Gr adi ng Pl an, St a 2322+00 t o 2313+00

C-114 N/A Gr adi ng Pl an, St a 2313+00 t o 2304+00

C-115 N/A Gr adi ng Pl an, St a 2304+00 t o 2295+00

C-116 N/A Gr adi ng Pl an, St a 2295+00 t o 2286+00

C-117 N/A Gr adi ng Pl an, St a 2286+00 t o 2277+00

C-118 N/A Gr adi ng Pl an, St a 2277+00 t o 2268+00

C-119 N/A Gr adi ng Pl an, St a 2268+00 t o 2259+00

C-120 N/A Gr adi ng Pl an, St a 2259+00 t o 2255+00

C-121 N/A Sacr ament o Avenue Pl an and Pr of i l e

C-201 N/A Geot echni cal Legend

C-202 N/A Cut of f Wal l Pr of i l e, St a 2340+00 t o 2331+00

C-203 N/A Cut of f Wal l Pr of i l e, St a 2331+00 t o 2322+00

C-204 N/A Cut of f Wal l Pr of i l e, St a 2322+00 t o 2313+00

C-205 N/A Cut of f Wal l Pr of i l e, St a 2313+00 t o 2304+00

C-206 N/A Cut of f Wal l Pr of i l e, St a 2304+00 TO 2295+00

C-207 N/A Cut of f Wal l Pr of i l e, St a 2295+00 t o 2286+00

C-208 N/A Cut of f Wal l Pr of i l e, St a 2286+00 t o 2277+00

C-209 N/A Cut of f Wal l Pr of i l e, St a 2277+00 t o 2268+00

C-210 N/A Cut of f Wal l Pr of i l e, St a 2268+00 t o 2259+00

C-211 N/A Cut of f Wal l Pr of i l e, St a 2259+00 t o 2255+00

C-301 N/A Typi cal Cr oss Sect i on

C-310 N/A Cr oss Sect i ons, St a 2256+00 t o 2279+00

C-311 N/A Cr oss Sect i ons, St a 2280+00 t o 2303+00

C-312 N/A Cr oss Sect i ons, St a 2304+00 t o 2327+00

C-313 N/A Cr oss Sect i ons, St a 2328+00 t o 2339+00

C-501 N/A Typi cal Det ai l s

DOCUMENT 00 01 15 Page 3

DRAWI NG NO. REVI SI ON NO. TITLE

C-502 N/A Typi cal Cut of f Wal l Det ai l s

C-601 N/A Wel ded St eel Pi pe Pl an and Pr of i l e

C-602 N/A Typi cal Vaul t Det ai l s

C-603 N/A Gener al St r uct ur al Not es and Det ai l s

C-604 N/A Typi cal Rei nf or cement Det ai l s

C-605 N/A Out l et Headwal l Det ai l s

C-606 N/A Out l et Headwal l Rei nf or cement Schedul e and Det ai l s

1. 3 SUPPLEMENTARY DRAWI NGS

These suppl ement ar y dr awi ngs may not be a par t of t he cont r act but ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on.

1. 3. 1 Subsur f ace Dat a

Subsur f ace dat a, not speci f i ed or i ndi cat ed, have been obt ai ned by t he Gover nment at t he Pr oj ect s i t e. The dat a ar e avai l abl e f or exami nat i on by pr ospect i ve bi dder s i n t he of f i ce of t he Cont r act i ng Of f i cer .

- - End of Document - -

DOCUMENT 00 01 15 Page 4

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00

GENERAL REQUI REMENTS

05/17

PART 1 GENERAL

1. 1 PAYMENT

1. 2 REFERENCES

1. 3 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

1. 4 SUBMI TTALS

1. 5 PARTNERI NG

1. 5. 1 I nf or mal Par t ner i ng

1. 6 UTI LI TI ES

1. 7 PLANNED UTI LI TY OUTAGES AND STREET CLOSURES

1. 8 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER

1. 9 BI D I TEM OVERRUN

1. 10 WARRANTY OF CONSTRUCTI ON

1. 11 NON CONTRACT WORK

1. 12 DAMAGE TO ROADS

1. 12. 1 Document at i on Regar di ng Pot ent i al Damage t o Access Rout es

1. 12. 1. 1 Pr econst r uct i on Quant i t y Sur vey Pl an

1. 12. 1. 2 Pr econst r uct i on Access Road Sur vey

1. 12. 1. 3 Post - Const r uct i on Access Road Sur vey

1. 13 LEVEE QUANTI TY SURVEY

1. 13. 1 Pr econst r uct i on Levee Sur vey

1. 13. 2 Post - Const r uct i on Levee Sur vey

1. 13. 3 Bor r ow Si t e and Di sposal Si t e

1. 14 ENVI RONMENTAL LI TI GATI ON

1. 15 ADDI TI ONAL STAGI NG AREAS

PART 2 PRODUCTS

2. 1 GOVERNMENT FURNI SHED MATERI ALS

PART 3 EXECUTI ON

3. 1 AFTER AWARD DOCUMENTS

SECTI ON 01 00 00 Page 1

SECTI ON 01 00 00

GENERAL REQUI REMENTS

05/17

PART 1 GENERAL

1. 1 PAYMENT

No separ at e payment wi l l be made f or t he wor k cover ed under t hi s Sect i on and al l cost s i n connect i on t her ewi t h wi l l be consi der ed a subsi di ar y obligation.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s Sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

ER 415- 1- 15 ( 1989) Const r uct i on Ti me Ext ensi ons f or Weather

1. 3 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS

222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) Cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE Cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant Cont r act , USACE Cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s Cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE Cont r act or s i n t hei r out r each ef f or t s:

Feder al Vet er an empl oyment i nf or mat i on at http://www.fedshirevets.gov/index.aspx

Depar t ment of Labor Vet er ans Empl oyment Assi st ance http://www.dol.gov/vets/

Depar t ment of Vet er ans Af f ai r s- VOW t o Hi r e Her oes Act http://benefits.va.gov/vow/

Ar my Wounded War r i or Pr ogr am -http://wtc.army.mil/modules/employers/index.html

U. S. Chamber of Commer ce Foundat i on- Hi r i ng Our Her oes http://www.hiringourheroes.org/

Gui de t o Hi r i ng Vet er ans - Ref er ence Mat er i al http://www.whitehouse.gov/sites/default/files/docs/white_house _business_council_-_guide_to_hiring_veterans_0.pdf

SECTI ON 01 00 00 Page 2

1. 4 SUBMITTALS

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr econst r uct i on Quant i t y Sur vey Pl an; G

Pr econst r uct i on Access Road Sur vey

Pr econst r uct i on Levee Sur vey; G

Af t er Awar d Document s

SD- 11 Cl oseout Submi t t al s

Post - const r uct i on Access Road Sur vey

Post - Const r uct i on Levee Sur vey; G

1. 5 PARTNERING

To most ef f ect i vel y accompl i sh t hi s Cont r act , t he Gover nment r equi r es t he f or mat i on of a cohesi ve par t ner shi p wi t hi n t he Pr oj ect Team whose member s ar e f r om t he Gover nment Const r uct i on Team, t he Cont r act or and t hei r Subcont r act or s. Key per sonnel f r om t he Gover nment Const r uct i on t eam, Const r uct i on Subj ect Mat t er Exper t s, t he Cont r act or and Subcont r act or s, wi l l be i nvi t ed t o par t i c i pat e i n t he Par t ner i ng pr ocess. The Par t ner shi p wi l l dr aw on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a pr oj ect t hat i s wi t hout any saf et y mi shaps, conf or ms t o t he Cont r act , and st ays wi t hi n budget and on schedul e. Smal l pr oj ect s shoul d have an I ssue Resol ut i on Mat r i x at a mi ni mum. As pr oj ect i ncr ease i n s i ze/ compl exi t y, t he par t ner i ng pr ocesses wi l l expand accor di ngl y.

1. 5. 1 I nf or mal Par t ner i ng

The Cont r act i ng Of f i cer wi l l or gani ze t he Par t ner i ng Sessi ons wi t h key per sonnel of t he pr oj ect t eam, i ncl udi ng Cont r act or per sonnel and Gover nment per sonnel . The I ni t i al Par t ner i ng sessi on wi l l be a par t of t he Pr e- Const r uct i on Meet i ng. Par t ner i ng sessi ons wi l l be hel d at a l ocat i on agr eed t o by t he Cont r act i ng Of f i cer and t he Cont r act or . The I ni t i al I nf or mal Par t ner i ng Sessi on wi l l be conduct ed and f aci l i t at ed usi ng el ect r oni c medi a ( a v i deo and accompanyi ng f or ms) pr ovi ded by t he Cont r act i ng Of f i cer . The Par t ner s wi l l det er mi ne t he f r equency of t he f ol l ow- on sessi ons, at no mor e t han t hr ee t o s i x mont h i nt er val s. I nf or mal Par t ner i ng i s l ed by Resi dent Engi neer per sonnel at t he Pr e- Const r uct i on Conf er ence ( Pr eCon. )

1. 6 UTILITIES

I t i s ant i c i pat ed t hat pol e l i nes, s i gns, pi pel i nes and pr i vat e i mpr ovement s t hat woul d i nt er f er e wi t h or ar e t o be r epl aced by new const r uct i on wi l l be r emoved t o new l ocat i ons by t he owner s ( or by t he St at e of Cal i f or ni a or i t s agent s) i n advance of const r uct i on oper at i ons.

Not i f y t he Cont r act i ng Of f i cer at l east 30 cal endar days i n advance of t he dat e on whi ch wor k wi l l be st ar t ed r equi r i ng t he r emoval of such ut i l i t i es or pr i vat e i mpr ovement s. Car e must be t aken t o pr eser ve and pr ot ect any such i mpr ovement s f r om i nj ur y or damage dur i ng const r uct i on oper at i ons.

SECTI ON 01 00 00 Page 3

Assume f ul l r esponsi bi l i t y f or r ei mbur si ng t he owner s f or any damage t o t hei r pr oper t i es, ut i l i t i es, or i mpr ovement s, or i nt er f er ence wi t h t hei r ser vi ces caused t hr ough const r uct i on oper at i ons. Shoul d such damage be f ound t o have been caused wi t hout t he Cont r act or ' s f aul t or negl i gence an equi t abl e adj ust ment i n t he amount due under t he Cont r act wi l l be made under t he appl i cabl e CONTRACT CLAUSES. I f unpl anned ut i l i t i es ar e di scover ed dur i ng const r uct i on t he Cont r act or must not i f y t he Cont r act i ng Officer.

The Cont r act or shal l coor di nat e wi t h ut i l i t y owner s and t he Cont r act i ng Of f i cer f or ut i l i t i es i dent i f i ed t o be pr ot ect ed i n pl ace on t he Pl ans.

Cont act i nf or mat i on f or ut i l i t y owner s ar e shown on t he Pl ans.

1. 7 PLANNED UTI LI TY OUTAGES AND STREET CLOSURES

Power out ages must be r est r i c t ed t o of f - dut y hour s and weekends. Ot her ut i l i t i es may be connect ed and st r eet s c l osed dur i ng nor mal wor ki ng hour s wi t h t he out age dur at i on and st r eet c l osur e as shor t as possi bl e. Al l out ages and st r eet c l osur es must be schedul ed as f ar i n advance as possi bl e wi t h t he Cont r act i ng Of f i cer and i n no case l ess t han 7 days bef or e t he out age or c l osur e.

1. 8 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER

Thi s pr ovi s i on speci f i es t he pr ocedur e f or t he det er mi nat i on of t i me ext ensi ons f or unusual l y sever e weat her . I n or der f or t he Cont r act i ng Of f i cer t o awar d a t i me ext ensi on under t hi s c l ause, t he f ol l owi ng condi t i ons must be sat i sf i ed:

a. The weat her exper i enced at t he pr oj ect s i t e dur i ng t he Cont r act per i od must be f ound t o be unusual l y sever e, t hat i s , mor e sever e t han t he adver se weat her ant i c i pat ed f or t he pr oj ect l ocat i on dur i ng any gi ven month.

b. The unusual l y sever e weat her must act ual l y cause a del ay t o t he compl et i on of t he pr oj ect . The del ay must be beyond t he cont r ol and wi t hout t he f aul t or negl i gence of t he Cont r act or .

The f ol l owi ng schedul e of mont hl y ant i c i pat ed adver se weat her del ays i s based on Nat i onal Oceani c and At mospher i c Admi ni st r at i on ( NOAA) or s i mi l ar dat a f or t he pr oj ect l ocat i on and wi l l const i t ut e t he base l i ne f or mont hl y weat her t i me eval uat i ons. The Cont r act or ' s pr ogr ess schedul e must r ef l ect t hese ant i c i pat ed adver se weat her del ays i n al l weat her dependent activities.

MONTHLY ANTI CI PATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON ( 5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

8 7 7 3 2 0 0 0 1 2 5 8

Upon execut i on of t he Not i ce t o Pr oceed ( NTP) and cont i nui ng t hr oughout t he Cont r act , t he Cont r act or wi l l r ecor d on t he dai l y CQC r epor t , t he occur r ence of adver se weat her and r esul t ant i mpact t o nor mal l y schedul ed wor k. Act ual adver se weat her del ay days must pr event wor k on cr i t i cal act i v i t i es f or 50 per cent or mor e of t he Cont r act or ' s schedul ed wor k day.

SECTI ON 01 00 00 Page 4

Ref er t o ER 415- 1- 15.

1. 9 BI D I TEM OVERRUN

Thr oughout t he Cont r act ( at a mi ni mum, ever y t wo weeks) , moni t or pl acement or i nst al l at i on of uni t pr i ce i t ems ( i f any) wi t h r espect t o t he or i gi nal est i mat ed quant i t i es shown i n t he Cont r act . I f pl acement or i nst al l at i on i ndi cat es a possi bl e over r un wi t h r espect t o t he or i gi nal est i mat ed quant i t i es shown i n t he Cont r act , i mmedi at el y pr ovi de wr i t t en not i f i cat i on t o t he Cont r act i ng Of f i cer wi t h r evi sed t ot al est i mat ed quant i t i es.

1. 10 WARRANTY OF CONSTRUCTI ON

a. Per f or mance Bond.

( 1) I t i s under st ood t hat t he Cont r act or ' s Per f or mance Bond wi l l r emai n ef f ect i ve t hr oughout t he l i f e of al l war r ant i es and war r ant y ext ensi ons.

( 2) I n t he event t he Cont r act or or hi s desi gnat ed r epr esent at i ve f ai l s t o commence and di l i gent l y pur sue any wor k r equi r ed under t he War r ant y of Const r uct i on Sect i on of t he Techni cal Pr ovi s i ons wi t hi n a r easonabl e t i me af t er r ecei pt of wr i t t en not i f i cat i on pur suant t o t he r equi r ement s t her eof , t he Cont r act i ng Of f i cer must have a r i ght t o demand t hat sai d wor k be per f or med under t he Per f or mance Bond by maki ng wr i t t en not i ce on t he sur et y. I f t he sur et y f ai l s or r ef uses t o per f or m t he obl i gat i on i t assumed under t he Per f or mance Bond, t he Cont r act i ng Of f i cer must have t he wor k per f or med by ot her s, and af t er compl et i on of t he wor k, must make demand f or r ei mbur sement of any or al l expenses i ncur r ed by t he Gover nment whi l e per f or mi ng t he wor k, i ncl udi ng, but not l i mi t ed t o admi ni st r at i ve expenses.

( 3) War r ant y r epai r wor k whi ch ar i ses t o t hr eat en t he heal t h or saf et y of per sonnel , t he physi cal saf et y of pr oper t y or equi pment , or whi ch i mpai r s oper at i ons, habi t abi l i t y of l i v i ng spaces, et c. , wi l l be handl ed by t he Cont r act or on an i mmedi at e basi s as di r ect ed ver bal l y by t he Cont r act i ng Of f i cer or hi s aut hor i zed r epr esent at i ve. Wr i t t en ver i f i cat i on wi l l f ol l ow ver bal i nst r uct i ons. Fai l ur e of t he Cont r act or t o r espond as ver bal l y di r ect ed wi l l be cause f or t he Cont r act i ng Of f i cer or hi s aut hor i zed r epr esent at i ve t o have t he war r ant y r epai r wor k per f or med by ot her s and t o pr oceed agai nst t he Cont r act or as out l i ned i n t he par agr aph 1. 10( a) ( 2) above.

1. 11 NON CONTRACT WORK

Do not per f or m any wor k or er ect any st r uct ur e f or t hi r d par t i es, l andowner s or ot her wi se, wi t hi n t he l i mi t s of const r uct i on wi t hout pr i or appr oval of t he Cont r act i ng Of f i cer .

1. 12 DAMAGE TO ROADS

Pr eser ve and pr ot ect al l exi st i ng pr i vat e or pr i vat e pr oj ect access or r i ght - of - way r oads. At t he compl et i on of wor k and pr i or t o t he Cont r act or l eavi ng t he pr oj ect , he must r est or e t o pr e- pr oj ect condi t i ons al l such r oads. Repai r s must i ncl ude r epl acement of base r ock and/ or sur f ace t r eat ment as r equi r ed. Ref er al so t o par agr aph PROTECTI ON OF TRAFFI C i n Sect i on 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS.

SECTI ON 01 00 00 Page 5

1. 12. 1 Document at i on Regar di ng Pot ent i al Damage t o Access Rout es

1. 12. 1. 1 Pr econst r uct i on Quant i t y Sur vey Pl an

Compl et e and submi t a Pr econst r uct i on Quant i t y Sur vey Pl an st at i ng t he names of per sonnel and l i cense number who wi l l be per f or mi ng t he Bef or e Const r uct i on ( BC) sur vey, pl us t he pr ocedur es t o be f ol l owed i n conduct i ng t he BC Sur vey. Sur veys must be per f or med by a l i censed sur veyor i n t he St at e of Cal i f or ni a. The pl an must al so i ncl ude t he Pr econst r uct i on Access Road Sur vey and t he Post - Const r uct i on Access Road Sur vey.

1. 12. 1. 2 Pr econst r uct i on Access Road Sur vey

Compl et e and submi t a Pr econst r uct i on Access Road Sur vey i ncl udi ng di gi t al v i deo and di gi t al phot ogr aphs of t he por t i ons of Laur el Avenue and Sacr ament o Avenue t o be used f or haul i ng and access ( f r om St at e Rout e 99 t o t he l evee access poi nt s shown on t he Pl ans) bef or e const r uct i on begi ns.

Submi t t wo copi es of t he sur vey, t he di gi t al v i deo, and t he di gi t al phot ogr aphs bef or e t he st ar t of const r uct i on oper at i ons.

1. 12. 1. 3 Post - Const r uct i on Access Road Sur vey

Af t er compl et i on of const r uct i on of t he pr oj ect , submi t a Post - Const r uct i on Access Road Sur vey i ncl udi ng di gi t al v i deo and di gi t al phot ogr aphs of t he same ar ea wher e pr econst r uct i on di gi t al v i deo and di gi t al phot ogr aphs wer e taken.

1. 13 LEVEE QUANTI TY SURVEY

1. 13. 1 Pr econst r uct i on Levee Sur vey

Sur vey cr oss sect i ons bef or e const r uct i on begi ns ( see submi t t al " Pr econst r uct i on Levee Sur vey" ) , al ong t he ent i r e l engt h of t he const r uct i on s i t e. These pr econst r uct i on sur vey cr oss sect i ons wi l l be used t o r ef l ect exi st i ng gr ound bef or e any const r uct i on act i v i t i es begi n and wi l l al so be used as t he or i gi nal gr ound sur veys when checki ng measur ement f or pay quant i t i es as descr i bed i n Sect i on 01 22 00 PRI CE AND PAYMENT PROCEDURES. Speci f i cat i on Sect i on wher e t he pr econst r uct i on sur vey i s used f or measur ement or t he ver i f i cat i on of measur ement i ncl ude Sect i on 31 00 00 EARTHWORK. Cr oss sect i ons must be sur veyed per pendi cul ar t o t he cont r ol l i ne shown on t he Pl ans. Poi nt s al ong t he cr oss sect i ons must be sur veyed wi t hi n 10 f eet of each ot her . Wher e appl i cabl e, per f or m a pr of i l e sur vey of t he t op of t he l evee al ong t he ent i r e l engt h wher e t he r oad i s used f or access and r epai r .

Cr oss sect i ons al ong t he cont r ol l i ne shown on t he Pl ans shal l i ncl ude t he ent i r e exi st i ng l evee embankment wher e t he exi st i ng l evee wi l l be excavat ed and r econst r uct ed and cont i nue out t o a poi nt at l east 10 hor i zont al f eet past t he compl et ed wor k on bot h t he wat er si de and l andsi de. El evat i ons must be t aken at i nf l ect i on poi nt s but at not mor e t han 10 f eet i nt er val s t o t he near est 0. 1 f eet . Hor i zont al l ocat i ons must not devi at e f r om t he al i gnment of t he cr oss sect i on l i ne by mor e t han 1 f oot . Al l cr oss sect i ons must be pl ot t ed as v i ewed i n t he downst r eam di r ect i on. The sur vey dat a must be pr ovi ded t o t he Cont r act i ng Of f i cer on Compact Di sk cont ai ni ng sur vey cont r ol and cr oss sect i on poi nt s def i ned i n t he f or m of Nor t hi ng and East i ng coor di nat es and t hei r el evat i ons ( i . e. , X, Y and Z) . Hor i zont al cont r ol must be r ef er enced t o t he Nor t h Amer i can Dat um ( NAD) of 1983.

Ver t i cal cont r ol must be t he Nor t h Amer i can Ver t i cal Dat um ( NAVD) of 1988.

SECTI ON 01 00 00 Page 6

Sur vey dat a must be pr ovi ded i n Engl i sh uni t s i n Aut oCAD 2016 f or mat (Name.DWG).

Pr ovi de t he Cont r act i ng Of f i cer t he sur vey dat a f i l es, one set of t he cr oss sect i on dat a, pl ot t ed as v i ewed i n t he downst r eam di r ect i on, wi t h a 5 hor i zont al X 2 ver t i cal gr i d, on a st andar d D si ze dr awi ng sheet , at a scal e of 1: 10, hor i zont al and ver t i cal . The Cont r act or i s r esponsi bl e f or pr epar i ng any needed l ayout dr awi ngs. St andar d cr oss sect i on pl ot t i ng paper wi t h pr e- pr i nt ed r ed gr i d i s not accept abl e.

1. 13. 2 Post - Const r uct i on Levee Sur vey

Pr ovi de t o t he Cont r act i ng Of f i cer sur veyed cr oss sect i ons t aken af t er t he pl acement of compact ed f i l l . Take cr oss sect i ons at t he same l ocat i ons as t he Pr econst r uct i on Levee Sur vey cr oss sect i on . Al l sur veys must be per f or med by a l i censed sur veyor i n t he St at e of Cal i f or ni a.

1. 13. 3 Bor r ow Si t e and Di sposal Si t e

Fi l l mat er i al shal l be acqui r ed f r om a combi nat i on of onsi t e excavat i ons and commer ci al bor r ow si t es. Requi r ement s f or f i l l mat er i al s ar e descr i bed i n Sect i on 31 00 00 EARTHWORK. The Cont r act or shal l be r esponsi bl e f or l ocat i ng a sui t abl e bor r ow si t e and shal l det er mi ne t hat t he bor r ow si t e i s Feder al l y appr oved and St at e of Cal i f or ni a appr oved. Excess mat er i al shal l be sent t o an appr oved di sposal s i t e at Cont r act or ' s expense.

1. 14 ENVI RONMENTAL LI TI GATI ON

a. I f t he per f or mance of al l or any par t of t he wor k i s suspended, del ayed, or i nt er r upt ed due t o an or der of a cour t of compet ent j ur i sdi ct i on as a r esul t of envi r onment al l i t i gat i on, as def i ned bel ow, t he Cont r act i ng Of f i cer , at t he r equest of t he Cont r act or , must det er mi ne whet her t he or der i s due i n any par t t o t he act s or omi ssi ons of t he Cont r act or or a subcont r act or at any t i er not r equi r ed by t he t er ms of t hi s Cont r act . I f i t i s det er mi ned t hat t he or der i s not due i n any par t t o act s or omi ssi ons of t he Cont r act or or a subcont r act or at any t i er ot her t han as r equi r ed by t he t er ms of t hi s Cont r act , such suspensi on, del ay, or i nt er r upt i on must be consi der ed as i f or der ed by t he Cont r act i ng Of f i cer i n t he admi ni st r at i on of t hi s Cont r act under t he t er ms of t he SUSPENSI ON OF WORK cl ause of t hi s Cont r act . The per i od of such suspensi on, del ay or i nt er r upt i on must be consi der ed unr easonabl e, and an adj ust ment must be made f or any i ncr ease i n t he cost of per f or mance of t hi s Cont r act ( excl udi ng pr of i t ) as pr ovi ded i n t hat c l ause, subj ect t o al l t he pr ovi s i ons t her eof .

b. The t er m " envi r onment al l i t i gat i ons" as used her ei n, means a l awsui t al l egi ng t hat t he wor k wi l l have an adver se ef f ect on t he envi r onment or t hat t he Gover nment has not dul y consi der ed, ei t her subst ant i vel y or pr ocedur al l y, t he ef f ect of t he wor k on t he envi r onment .

1. 15 ADDI TI ONAL STAGI NG AREAS

No addi t i onal st agi ng ar eas out s i de of t hose desi gnat ed i n t he Cont r act wi l l be per mi t t ed.

SECTI ON 01 00 00 Page 7

PART 2 PRODUCTS

2. 1 GOVERNMENT FURNI SHED MATERI ALS

The Gover nment wi l l pr ovi de an opt i cal di sc at t he pr econst r uct i on conf er ence t hat cont ai ns t he mat er i al s speci f i ed i n Sect i on 01 78 00

CLOSEOUT SUBMI TTALS.

PART 3 EXECUTI ON

3. 1 AFTER AWARD DOCUMENTS

Provide five conf or med har d copy set s r epr oduced f r om t he PDF Cont r act pl ans and speci f i cat i on pr ovi ded by t he Cont r act i ng Of f i cer at t he t i me of awar d. The har d copy dr awi ngs must be two set s of ANSI D ( 22" x 34" ) and three set s of hal f s i ze ( 11" x 17" ) 3- hol e punched and bound wi t h met al post s. The five set s of speci f i cat i ons must be st andar d l et t er ( 8- 1/ 2" x 11" ) 3- hol e punched and bound wi t h met al post s. Submi t t hese document s wi t hi n 5 wor k days of t he r ecei pt of t he AWARD document s f r om t he Gover nment .

- - End of Sect i on - -

SECTI ON 01 00 00 Page 8

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 WORK COVERED BY CONTRACT DOCUMENTS

1. 2 TYPE OF CONTRACT

1. 3 PROJECT LOCATI ON

1. 4 PROJECT DESCRI PTI ON

1. 4. 1 Pr oj ect Descr i pt i on

1. 4. 2 Bor r ow Ar ea

1. 4. 3 Wat er Suppl y f or Const r uct i on

1. 4. 4 Of f i ces, St ockpi l e and St agi ng Ar eas

1. 4. 5 Si t e Access

1. 5 EXI STI NG FACI LI TI ES

1. 6 LOCATI ON OF UNDERGROUND UTI LI TI ES

1. 7 CONTRACTOR' S USE OF THE PREMI SES

1. 8 WORK TO BE PERFORMED BY THE CONTRACTOR

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 11 00 Page 1

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 WORK COVERED BY CONTRACT DOCUMENTS

Thi s Speci f i cat i on Sect i on descr i bes t he Feat her Ri ver Ri ght Bank, PL 84- 99 Emer gency Levee Repai r s, Si t e 0521- 41 Pr oj ect , i nc l udi ng l ocat i on and access, exi st i ng f aci l i t i es, t he Cont r act or ' s use of t he pr emi ses, pr oj ect occupancy, and t he wor k t o be per f or med by t he Cont r act or . The descr i pt i on of t he wor k t o be per f or med t hat i s pr ovi ded her ei n i s i nt ended t o be a gener al over vi ew and does not i nc l ude al l t he wor k act ual l y r equi r ed under t he Cont r act .

1. 2 TYPE OF CONTRACT

Thi s cont r act consi st s of Lump Sum and Uni t Pr i ce Bi d Schedul e I t ems. Ref er t o Sect i on 01 22 00 PRI CE AND PAYMENT PROCEDURES f or addi t i onal det ai l s .

1. 3 PROJECT LOCATI ON

The pr oj ect i s l ocat ed on t he r i ght bank of t he Feat her Ri ver appr oxi mat el y 15 mi l es sout h of Yuba Ci t y i n Sut t er Count y, Cal i f or ni a. The exact wor k i s shown on t he Pl ans.

1. 4 PROJECT DESCRI PTI ON

1. 4. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes t he const r uct i on of an appr oxi mat el y 1. 6- mi l e- l ong soi l bent oni t e cut of f wal l al ong t he r i ght bank of t he Feat her Ri ver . The exi st i ng l evee wi l l be degr aded by appr oxi mat el y one t hi r d of t he l evee hei ght and t he mat er i al st ockpi l ed f or r euse f or const r uct i on of t he l evee embankment . The cut of f wal l wi l l be appr oxi mat el y 65 f eet i n dept h f r om t he degr aded wor ki ng sur f ace. The l evee wi l l be r econst r uct ed wi t h a sel ect l evee f i l l cor e and r eused excavat i on as shel l mat er i al .

The cut of f wal l wi l l i nc l ude a gap i n t he v i c i ni t y of an exi st i ng concr et e cul ver t cr ossi ng t he l evee and a ut i l i t y t ower wi t h f our concr et e anchor s.

The cul ver t wi l l be r emoved and r epl aced wi t h t wo wel ded st eel pi pes over t he compl et ed cut of f wal l . The ut i l i t y t ower wi l l r emai n i n pl ace.

Modi f i cat i ons t o t he t ower f or const r uct i on wi l l be per f or med by ot her s.

1. 4. 2 Bor r ow Ar ea

The Cont r act or shal l i dent i f y a l ocal bor r ow sour ce wi t h suf f i c i ent mat er i al t o const r uct t he pr oposed wor k. On si t e excavat i on may be used as f i l l mat er i al s pr ovi ded t hey meet , or can be bl ended t o meet , t he r equi r ement s of t hese Speci f i cat i ons. Ref er t o Sect i on 31 00 00 EARTHWORK f or mat er i al r equi r ement s. The Cont r act or shal l ensur e t hat t he pr oposed bor r ow si t e meet s al l l ocal , St at e, and Feder al r equi r ement s.

SECTI ON 01 11 00 Page 2

1. 4. 3 Wat er Suppl y f or Const r uct i on

Ref er t o Sect i on 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS f or i nf or mat i on r egar di ng t he wat er suppl y f or const r uct i on and t he r esponsi bi l i t i es of t he Cont r act or .

1. 4. 4 Of f i ces, St ockpi l e and St agi ng Ar eas

Ref er t o Sect i on 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS f or i nf or mat i on r egar di ng ar eas avai l abl e f or f i el d of f i ces and st ockpi l e and st agi ng ar eas.

1. 4. 5 Si t e Access

Ref er t o Sect i on 01 50 00, TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS f or i nf or mat i on r egar di ng s i t e access f or const r uct i on.

1. 5 EXI STI NG FACI LI TI ES

Exi st i ng f aci l i t i es ar e shown on t he Pl ans t o t he ext ent known.

1. 6 LOCATI ON OF UNDERGROUND UTI LI TI ES

Over head and under gr ound ut i l i t i es exi st wi t hi n t he pr oj ect ar ea and al ong access/ haul r out es t hat wi l l be pr ot ect ed i n pl ace. The Cont r act or shal l be r esponsi bl e f or t he l ocat i ng of al l under gr ound ut i l i t i es and f or coor di nat i ng i t s wor k wi t h t he appr opr i at e Ut i l i t y Owner as needed. Not i f y t he Cont r act i ng Of f i cer and Under gr ound Ser vi ce Al er t ( USA) at l east 48 hour s pr i or t o st ar t i ng excavat i on wor k t o l ocat e and mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Holiday.

Any damage t o exi st i ng ut i l i t i es by t he Cont r act or dur i ng const r uct i on shal l be r epai r ed at no cost t o t he Gover nment . The Cont r act or shal l be r esponsi bl e f or pr ot ect i ng any ut i l i t i es near wor k or haul / access r oads.

1. 7 CONTRACTOR' S USE OF THE PREMI SES

I n addi t i on t o r equi r ement s pr esent ed el sewher e on t he Pl ans and i n t he Speci f i cat i ons, t he Cont r act or shal l adher e t o t he f ol l owi ng r equi r ement s:

a. The Cont r act or shal l have char ge and car e of , and bear t he r i sk of damage t o, t he Pr oj ect unt i l i t s compl et i on and f i nal accept ance.

b. The Cont r act or shal l not cr eat e or per mi t t he cont i nued exi st ence of any nui sance i n or about t he wor k s i t e.

c. The Cont r act or shal l pr ot ect and not di st ur b exi st i ng f aci l i t i es, or access t her et o, whi ch ar e not i n t he wor k ar ea or ar e i n t he wor k ar ea and can be avoi ded.

d. Mat er i al s and equi pment shal l be st or ed and pr ot ect ed as r ecommended by t he manuf act ur er or r equi r ed by appl i cabl e codes and st andar ds, t o guar ant ee pr eser vat i on of qual i t y , appear ance, and sui t abi l i t y f or t he Pr oj ect . They shal l be st or ed t o f aci l i t at e i nspect i on by t he Government.

e. The Gover nment wi l l pr ovi de t he l ands, easement s, and r i ght s- of - way, or ot her r i ght - t o- ent er and wor k on l ands shown on t he Pl ans. Not hi ng

SECTI ON 01 11 00 Page 3 her ei n cont ai ned and not hi ng mar ked on t he Pl ans, shal l be i nt er pr et ed as gi v i ng t he Cont r act or excl usi ve occupancy of t he l ands, easement s, or r i ght s- of - way pr ovi ded by t he Gover nment .

f . The wor k ar eas and t he ar eas f or t he Cont r act or ' s use ar e shown on t he Pl ans.

g. The Cont r act or shal l be r esponsi bl e f or r est or i ng, at i t s own expense, al l di s t ur bed st or age and wor k ar eas t o a condi t i on s i mi l ar t o t hose exi st i ng pr i or t o const r uct i on, except wher e ot her sur f aci ng or t r eat ment i s r equi r ed by t he Pl ans or Speci f i cat i ons.

1. 8 WORK TO BE PERFORMED BY THE CONTRACTOR

Const r uct i on of t he Pr oj ect consi st s, i n gener al , of t he f ol l owi ng activities:

a. Per f or mi ng mobi l i zat i on, demobi l i zat i on, and Cont r act administration.

b. Per f or mi ng er osi on and sedi ment cont r ol and st or m wat er pol l ut i on pr event i on, and compl yi ng wi t h al l envi r onment al cont r ol s and r equi r ement s r el at ed t o t he Cont r act or ' s oper at i ons as speci f i ed i n t he Cont r act Document s, i n Pr oj ect l i censes and per mi t s obt ai ned by t he Gover nment , and as speci f i ed el sewher e i n t he Speci f i cat i ons.

c. Per f or mi ng const r uct i on sur veyi ng and const r uct i on qual i t y cont r ol .

d. Pr ovi di ng al l r equi r ed equi pment , per sonnel , and mat er i al s t o const r uct t he Pr oj ect as r equi r ed by t he Pl ans and Speci f i cat i ons, and t o compl et e t he Pr oj ect i n accor dance wi t h t he Cont r act schedul e.

e. Pr ovi di ng al l r equi r ed t empor ar y f aci l i t i es, ut i l i t i es, and of f i ces r equi r ed t o compl et e t he wor k.

f . Pr ovi di ng wat er f or const r uct i on f r om avai l abl e sour ces, i ncl udi ng pumpi ng, pi pi ng, haul i ng, and st or age t hat may be r equi r ed, and payi ng al l f ees and cost s associ at ed wi t h devel opi ng t he wat er suppl y, i ncl udi ng pumpi ng ener gy cost s.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

SECTI ON 01 11 00 Page 4

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00

PRI CE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 SI NGLE JOB PAYMENT I TEMS

1. 2. 1 Mobi l i zat i on and Demobi l i zat i on

1. 2. 1. 1 Payment

1. 2. 1. 2 Uni t of Measur e

1. 2. 2 SWPPP Desi gn and I mpl ement at i on

1. 2. 2. 1 Payment

1. 2. 2. 2 Uni t of Measur e

1. 2. 3 Tempor ar y Fenci ng, Si gnage, and Tr af f i c Cont r ol

1. 2. 3. 1 Payment

1. 2. 3. 2 Uni t of Measur e

1. 2. 4 Demol i t i on

1. 2. 4. 1 Payment

1. 2. 5 Concr et e Headwal l

1. 2. 5. 1 Payment

1. 2. 5. 2 Uni t of Measur e

1. 2. 6 Vaul t

1. 2. 6. 1 Payment

1. 2. 6. 2 Uni t of Measur e

1. 3 UNI T PRI CE PAYMENT I TEMS

1. 3. 1 Cl ear i ng and Gr ubbi ng

1. 3. 1. 1 Payment

1. 3. 1. 2 Measur ement

1. 3. 1. 3 Uni t of Measur e

1. 3. 2 St r i ppi ng

1. 3. 2. 1 Payment

1. 3. 2. 2 Measur ement

1. 3. 2. 3 Uni t of Measur e

1. 3. 3 Tr ee Removal

1. 3. 3. 1 Payment

1. 3. 3. 2 Measur ement

1. 3. 3. 3 Uni t of Measur e

1. 3. 4 Excavat i on

1. 3. 4. 1 Payment

1. 3. 4. 2 Measur ement

1. 3. 4. 3 Uni t of Measur e

1. 3. 5 SB Cut of f Wal l

1. 3. 5. 1 Payment

1. 3. 5. 2 Measur ement

1. 3. 5. 2. 1 Uni t of Measur e

1. 3. 6 Levee Fi l l

1. 3. 6. 1 Payment

1. 3. 6. 2 Measur ement

1. 3. 6. 3 Uni t of Measur e

SECTI ON 01 22 00 Page 1

1. 3. 7 Random Fi l l

1. 3. 7. 1 Payment

1. 3. 7. 2 Measur ement

1. 3. 7. 3 Uni t of Measur e

1. 3. 8 18" Wel ded St eel Pi pe

1. 3. 8. 1 Payment

1. 3. 8. 2 Measur ement

1. 3. 8. 3 Uni t of Measur e

1. 3. 9 24" Wel ded St eel Pi pe

1. 3. 9. 1 Payment

1. 3. 9. 2 Measur ement

1. 3. 9. 3 Uni t of Measur e

1. 3. 10 18" Gat e Val ve

1. 3. 10. 1 Payment

1. 3. 10. 2 Measur ement

1. 3. 10. 3 Uni t of Measur e

1. 3. 11 18" Ai r Rel ease Val ve

1. 3. 11. 1 Payment

1. 3. 11. 2 Measur ement

1. 3. 11. 3 Uni t of Measur e

1. 3. 12 24" Gat e Val ve

1. 3. 12. 1 Payment

1. 3. 12. 2 Measur ement

1. 3. 12. 3 Uni t of Measur e

1. 3. 13 24" Ai r Rel ease Val ve

1. 3. 13. 1 Payment

1. 3. 13. 2 Measur ement

1. 3. 13. 3 Uni t of Measur e

1. 3. 14 Hydr oseedi ng

1. 3. 14. 1 Payment

1. 3. 14. 2 Measur ement

1. 3. 14. 3 Uni t of Measur e

1. 3. 15 Aggr egat e Sur f aci ng

1. 3. 15. 1 Payment

1. 3. 15. 2 Measur ement

1. 3. 15. 3 Uni t of Measur e

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

3. 2 I NVOI CE SUBMI SSI ON PROCEDURES

3. 2. 1 Requi r ed Pr ocedur e

3. 2. 2 Requi r ed Document s

SECTI ON 01 22 00 Page 2

SECTI ON 01 22 00

PRI CE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1. 1 SUBMITTALS

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Cont r act Cost Br eakdown

1. 2 SI NGLE JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 2. 1 Mobi l i zat i on and Demobi l i zat i on

1. 2. 1. 1 Payment

Measur ement and payment f or mobi l i zat i on, demobi l i zat i on, st agi ng ar eas, t empor ar y const r uct i on f aci l i t i es, and f or al l ot her wor k cover ed by t he Pr oj ect Speci f i cat i ons, as def i ned i n Sect i on 01 71 10 MOBI LI ZATI ON AND DEMOBI LI ZATI ON, shal l be made at t he Cont r act j ob pr i ce f or i t em " MOBI LI ZATI ON AND DEMOBI LI ZATI ON" ; whi ch payment shal l const i t ut e f ul l compensat i on f or al l t he Wor k i nvol ved i n mobi l i zat i on and demobi l i zat i on as shown or speci f i ed i n t he Cont r act document s, and di r ect ed by t he Cont r act i ng Of f i cer . Mobi l i zat i on and Demobi l i zat i on shal l be cost l oaded 40 per cent mobi l i zat i on and 60 per cent demobi l i zat i on. Fi nal As- Bui l t Dr awi ngs shal l be cost l oaded one hal f of one per cent of t he awar ded cont r act as a por t i on of t he demobi l i zat i on amount .

1. 2. 1. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 2. 2 SWPPP Desi gn and I mpl ement at i on

1. 2. 2. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h SWPPP desi gn and i mpl ement at i on as def i ned i n Sect i on 01 57 23 TEMPORARY STORMWATER POLLUTI ON CONTROL as shown on t he Pl ans, and as di r ect ed by t he Cont r act i ng

SECTI ON 01 22 00 Page 3

Of f i cer at t he cont r act l ump sum pr i ce f or i t em " SWPPP DESI GN AND I MPLEMENTATI ON" . Payment shal l const i t ut e f ul l compensat i on f or al l wor k i nvol ved i n st or m wat er pol l ut i on cont r ol i ncl udi ng i nst al l at i on and r emoval of best management pr act i ces f or er osi on cont r ol , spi l l cont r ol , moni t or i ng, pr ovi di ng updat es t o t he SWPPP, r ai n event act i on pl an, and r ecor d keepi ng as r equi r ed by l aw, as shown i n t he Cont r act document s.

Payment wi l l not i ncl ude per manent er osi on cont r ol and seedi ng as speci f i ed under sect i on 32 92 33 GRASS SEEDI NG AND EROI SI ON CONTROL, whi ch i s cover ed by bi d i t em " Hydr oseedi ng. ”

1. 2. 2. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 2. 3 Tempor ar y Fenci ng, Si gnage, and Tr af f i c Cont r ol

1. 2. 3. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h t he pr epar at i on and i mpl ement at i on of t he t r af f i c cont r ol pl an as def i ned i n Sect i on 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS at t he cont r act l ump sum pr i ce f or i t em " TEMPORARY FENCI NG, SI GNAGE, AND TRAFFI C CONTROL" . Payment shal l const i t ut e f ul l compensat i on f or al l wor k i nvol ved i n t he pr ot ect i on of t r af f i c al ong haul r out es and at access poi nt s as r equi r ed by l ocal , st at e and f eder al r egul at i ons, i ncl udi ng al l bar r i er s, l i ght s, s i gnal s, det our s, and ot her anci l l ar y r equi r ement s.

1. 2. 3. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 2. 4 Demolition

1. 2. 4. 1 Payment

Payment wi l l be made f or t he cost s associ at ed wi t h demol i t i on of ex i st i ng f eat ur es, i ncl udi ng t he 24- i nch r ei nf or ced box cul ver t , headwal l and ot her i t ems i dent i f i ed f or r emoval . Al l cost s associ at ed t her ewi t h must be i ncl uded i n t he bi d i t em “ Demol i t i on” ; whi ch payment must const i t ut e f ul l payment f or al l t he Wor k i nvol ved i n demol i t i on, haul i ng, and di sposal as shown or speci f i ed i n t he Cont r act document s.

Uni t of Measur e

Uni t of Measur e: j ob

1. 2. 5 Concr et e Headwal l

1. 2. 5. 1 Payment

Payment wi l l be made f or t he cost s associ at ed wi t h oper at i ons necessar y t o i nst al l t he concr et e headwal l as shown on t he pl ans. The wor k must i ncl ude, but i s not l i mi t ed t o, f or mi ng, r ei nf or cement , and concr et e pl acement . Al l cost s associ at ed t her ewi t h must be i ncl uded i n t he bi d i t em “ Concr et e Headwal l ” ; whi ch payment must const i t ut e f ul l payment f or al l t he Wor k i nvol ved i n i nst al l at i on as shown or speci f i ed i n t he Cont r act documents.

SECTI ON 01 22 00 Page 4

1. 2. 5. 2 Uni t of Measur e

Uni t of Measur e: j ob

1. 2. 6 Vault

1. 2. 6. 1 Payment

Payment wi l l be made f or t he cost s associ at ed wi t h oper at i ons necessar y t o i nst al l t he vaul t as shown on t he pl ans. The wor k must i ncl ude, but i s not l i mi t ed t o, f or mi ng, r ei nf or cement , and concr et e pl acement . Al l cost s associ at ed t her ewi t h must be i ncl uded i n t he bi d i t em “ Vaul t ” ; whi ch payment must const i t ut e f ul l payment f or al l t he Wor k i nvol ved i n i nst al l at i on as shown or speci f i ed i n t he Cont r act document s.

1. 2. 6. 2 Uni t of Measur e

Uni t of Measur e: j ob

1. 3 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

1. 3. 1 Cl ear i ng and Gr ubbi ng

1. 3. 1. 1 Payment

Cl ear i ng and gr ubbi ng, and t he di sposal of t he mat er i al s f r om t hi s oper at i on and f or al l ot her r el at ed wor k as def i ned i n Sect i on 31 11 00 CLEARI NG, GRUBBI NG, AND STRI PPI NG, shal l be pai d at t he cont r act uni t pr i ce f or " CLEARI NG AND GRUBBI NG" . Thi s pr i ce shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l l abor , mat er i al s, equi pment and i nci dent al s, and doi ng al l wor k necessar y t o compl et e t he c l ear i ng and gr ubbi ng i ncl udi ng r emoval of r ocks, debr i s , exi st i ng aggr egat e sur f aci ng, and al l ot her del et er i ous i t ems as not ed on or speci f i ed i n t he Cont r act document s and as di r ect ed by t he Cont r act i ng Of f i cer , i ncl udi ng di sposal or sal vage of mat er i al s , and r est or i ng al l gr ound sur f aces i nc l udi ng f i l l i ng of hol es t hat r esul t f r om gr ubbi ng oper at i ons.

1. 3. 1. 2 Measurement

Cl ear i ng and gr ubbi ng shal l be measur ed f or payment t o t he near est 0. 1 acr e based upon hor i zont al ar ea sur veys.

1. 3. 1. 3 Uni t of Measur e

Uni t of measur e: acr e.

1. 3. 2 Stripping

1. 3. 2. 1 Payment

Payment f or st r i ppi ng of t he exi st i ng l evee sl ope as def i ned i n Sect i on

SECTI ON 01 22 00 Page 5

31 11 00 CLEARI NG, GRUBBI NG, AND STRI PPI NG wi l l be made at t he Cont r act bi d pr i ce f or " STRI PPI NG" . Thi s pr i ce shal l const i t ut e f ul l compensat i on f or al l equi pment , l abor , mat er i al s and i nci dent al s necessar y t o compl et e t he wor k as shown or speci f i ed i n t he Cont r act document s, or as di r ect ed by t he Cont r act i ng Of f i cer . Payment shal l const i t ut e f ul l compensat i on f or st r i ppi ng, st ockpi l i ng, t r anspor t at i on, l oadi ng, unl oadi ng, and pl acement as descr i bed i n t he Cont r act Document s.

1. 3. 2. 2 Measurement

St r i ppi ng shal l be measur ed f or payment t o t he near est cubi c yar d. The basi s f or measur ement wi l l be sur veys t aken af t er c l ear i ng and gr ubbi ng oper at i ons and af t er st r i ppi ng oper at i ons t o t he dept hs shown on t he Pl ans or di r ect ed by t he Cont r act i ng Of f i cer . Sur vey cr oss sect i ons shal l be per f or med at s i gni f i cant br eaks i n gr ade except t hat t he maxi mum di st ance bet ween cr oss sect i ons shal l not exceed 100 f eet .

1. 3. 2. 3 Uni t of Measur e

Uni t of measur e: cubi c yar d.

1. 3. 3 Tr ee Removal

1. 3. 3. 1 Payment

Payment f or t he r emoval of t r ees as def i ned i n Sect i on 31 11 00 CLEARI NG, GRUBBI NG, AND STRI PPI NG wi l l be made at t he Cont r act bi d pr i ce f or " TREE REMOVAL" . Thi s pr i ce shal l const i t ut e f ul l compensat i on f or al l equi pment , l abor , mat er i al s and i nci dent al s necessar y t o compl et e t he wor k as shown or speci f i ed i n t he Cont r act document s, or as di r ect ed by t he Cont r act i ng Of f i cer . Payment shal l const i t ut e f ul l compensat i on f or f el l i ng, excavat i on, st ump r emoval , and di sposal of mat er i al s.

1. 3. 3. 2 Measurement

Tr ee r emoval shal l be measur ed f or payment per each.

1. 3. 3. 3 Uni t of Measur e

Uni t of measur e: each.

1. 3. 4 Excavation

1. 3. 4. 1 Payment

Payment f or excavat i on as def i ned on t he Pl ans and i n Sect i on 31 00 00 EARTHWORK wi l l be pai d at t he at t he Cont r act bi d pr i ce f or " EXCAVATI ON" .

Thi s pr i ce shal l const i t ut e f ul l compensat i on f or al l equi pment , l abor , mat er i al s, and al l i nci dent al s necessar y t o compl et e t he wor k as shown or speci f i ed i n t he Cont r act document s, or as di r ect ed by t he Cont r act i ng Of f i cer , i ncl udi ng excavat i on of t he exi st i ng l evee t o const r uct a wor ki ng sur f ace, excavat i on of t he cut of f wal l s t ar t er t r ench, and haul i ng excavat ed mat er i al t o st agi ng or st ockpi l e ar eas f or r euse or haul i ng t o an appr oved wast e l ocat i on.

1. 3. 4. 2 Measurement

Excavat i on wi l l be measur ed f or payment by t he cubi c yar d and quant i t i es wi l l be det er mi ned by t he aver age end ar ea met hod. The basi s f or

SECTI ON 01 22 00 Page 6 measur ement wi l l be sur veys t aken af t er st r i ppi ng, c l ear i ng and gr ubbi ng oper at i ons and af t er l evee excavat i on t o wi t hi n t he speci f i ed t ol er ance.

Sur vey cr oss sect i ons shal l be per f or med at s i gni f i cant br eaks i n gr ade except t hat t he maxi mum di st ance bet ween cr oss sect i ons shal l not exceed 100 f eet . Excavat i on i n excess of t he desi gn gr ades as i ndi cat ed on t he Pl ans, i ncl udi ng al l owabl e t ol er ance, wi l l not be accept ed.

1. 3. 4. 3 Uni t of Measur e

Uni t of measur e: cubi c yar d.

1. 3. 5 SB Cut of f Wal l

1. 3. 5. 1 Payment

Payment f or t he SB cut of f wal l as def i ned i n Sect i on 31 56 13. 14 CUTOFF WALL - OPEN TRENCH SOI L BENTONI TE ( SB) shal l be made at t he cont r act pr i ce f or " SB CUTOFF WALL" .